CN104988928B - Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images - Google Patents

Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images Download PDF

Info

Publication number
CN104988928B
CN104988928B CN201510269598.9A CN201510269598A CN104988928B CN 104988928 B CN104988928 B CN 104988928B CN 201510269598 A CN201510269598 A CN 201510269598A CN 104988928 B CN104988928 B CN 104988928B
Authority
CN
China
Prior art keywords
black
point
mark
white
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510269598.9A
Other languages
Chinese (zh)
Other versions
CN104988928A (en
Inventor
郑敬云
蒋国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG RECLAM CONSTRUCTION GROUP CO Ltd
Fujian Jiangxia University
Original Assignee
ZHEJIANG RECLAM CONSTRUCTION GROUP CO Ltd
Fujian Jiangxia University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG RECLAM CONSTRUCTION GROUP CO Ltd, Fujian Jiangxia University filed Critical ZHEJIANG RECLAM CONSTRUCTION GROUP CO Ltd
Priority to CN201510269598.9A priority Critical patent/CN104988928B/en
Publication of CN104988928A publication Critical patent/CN104988928A/en
Application granted granted Critical
Publication of CN104988928B publication Critical patent/CN104988928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method for monitoring the foundation pit excavation horizontal displacement in a real-time manner based on digital images. According to the method, a monitoring system provided with a single camera is established; multiple objects can be rapidly positioned through the single camera; the system is easy to install as information such as camera installation positions and lens parameters is not required to be taken into account; integral calibration is performed after the installation; and a system error is considered according to the integral calibration. The method improves the measuring accuracy, has a simple algorithm, is high in code execution efficiency, and is applicable to long-term field working environment. During a foundation pit excavation process, the system gives an alarm when the horizontal displacement exceeds a preset threshold, a laser lamp points to an alarm position, and the system instructs the field staff to reinforce and maintain the area so as to prevent foundation pit collapse or other severer accidents.

Description

Method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement
Technical field
The present invention relates to a kind of excavation of foundation pit method of real-time, more particularly to one kind are based on digital picture real-time monitoring The method of excavation of foundation pit horizontal displacement.
Background technology
The development built with Chinese Urbanization, the gushing in a large number of the engineering such as various skyscrapers, subterranean tunnel, overpass Existing, in order to more stablize and meet the load actions such as wind resistance, antidetonation, generally it is required for excavation pit in engineering, excavation of foundation pit is The basis of engineering construction, because excavation of foundation pit can affect to the stability of Adjacent Buildings, usually can cause base Support system around hole and surrounding building, environment etc. change.Simultaneously because the extruding of surrounding high-lager building, The harmful effect such as may cause to the new foundation ditch excavating to cave in, and causes claim for eot, economic loss, therefore, for comprehensive, system The impact to pattern foundation pit supporting structure, surrounding soil and surrounding contiguous structure, carrying out horizontal displacement monitoring to excavation of foundation pit is very It is necessary.
Existing pit retaining monitoring method is a lot, such as collimation line method, minor angle method, method of polar coordinates and forward intersection Deng.For traditional Foundation Pit monitoring, to be typically observed using theodolite or total powerstation.For foundation ditch level The method of displacement monitoring is a lot, and in Practical Project, the precision of measuring method, the simplification of measuring method, real time implementation are current people The problem of general concern, can reach the essential condition that high accuracy is to ensure that construction safety.
Digital picture measurement is the new disciplines developing rapidly in the last few years.It is mainly surveyed by traditional photography Subject crossing, the fusion such as the computer vision of amount, optical measurement and modern trend and digital image processing and analyzing, take each The advantage of section and strong point and formed.Its main process object is based on digital (video) sequence image.The method is to utilize Video camera, photographing unit etc. carry out shooting and obtain single frames or Serial digital image to dynamic, stationary body motion, recycle number The technology such as word image processing method are identified to target, position, follow the tracks of, and are solved and analyzed calculation method, realize to mesh Mark real-time automatic measurement and the theory and technology estimated.The method is widely used in a lot of fields, and with Reaching its maturity of modern digital cameras, its application prospect will be more extensive.
Patent of the present invention is mainly based upon digital picture measurement to realize excavation of foundation pit horizontal displacement real-time monitoring.This system Simple to operate, high precision, real-time are good, suitable field site operation, disclosure satisfy that existing base pit engineering excavates horizontal displacement The needs of monitoring.
Content of the invention
It is an object of the invention to provide a kind of method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement, should Method improves certainty of measurement, and algorithm is simple.
For achieving the above object, the technical scheme is that one kind is based on digital picture real-time monitoring excavation of foundation pit water The method that prosposition moves, comprises the steps,
S1: provide an excavation of foundation pit real-time horizontal displacement monitoring system, including central control computer and with this central control computer The video camera being arranged near foundation ditch of connection, head, the laser lamp being installed on described head;
S2: set global coordinate system, that is, camera coordinates system is xyz, and, as xyz, head is around x-axis for the coordinate system centered on head The angle rotating is designated as, it is designated as around the angle that z-axis rotates
S3: open laser lamp, make laser lamp point to each monitoring point, i.e. fixed point by rotary platform, record now cloud Platform corner (), record simultaneously coordinate under global coordinate system for each fixed point (), you can obtain overall coordinate Under system each fixed point coordinate () and head corner () between one-to-one relationship, and be stored in middle control calculate In machine, whereiniRepresent row coordinate,jRepresent row coordinate;
S4: after integral calibrating, when monitoring that target monitoring point shifts, you can existed by this target monitoring point Coordinate under global coordinate system (), acquisition head corner (), and then cloud platform rotation is controlled by central control computer This corner (), open laser lamp and can expose at the target monitoring point shifting, reported to the police.
In an embodiment of the present invention, in described step s4, if the target detection point shifting monitoring is not mark During fixed point, the rotation of head and laser lamp need to be controlled in the following manner to report to the police,
S21: shoot the image of the target monitoring point p shifting by camera, determine its seat under global coordinate system Mark (), and obtain the fixed point positioned at its surrounding coordinate (), (), (), () and its corresponding head corner (), (), (), ();
S22: because target monitoring point p is not fixed point, calculate according to four click-through row interpolations about, concrete calculating Formula is as follows:
(1)
(2)
Wherein:,,,,,
By p point coordinates () can solve ginseng with four demarcation point coordinates substitution formula (1) and (2) about Number,
S23: by step s22, the head corner according to corresponding to known four fixed points, you can by following formula meters Head corner corresponding to target monitoring point p at calculation:
(3)
(4)
Wherein:,.
In an embodiment of the present invention, in described step s4, the skew of monitoring objective monitoring point is real in the following manner It is existing,
S31: be respectively provided with a mark plate in each monitoring point of foundation ditch, described mark plate includes the bar of mark plate information that is stored with Shape code and 5 black and white marks, this 5 black and white marks are in that other four is arranged in this center black and white mark centered on one of Upper and lower, left and right;The bar code information of each mark plate is all deposited to described central control computer;
S32: mark plate image is shot by video camera, and this mark is obtained by the bar code that central control computer reads mark plate The information of will plate, draws the distance between the left and right two black and white marks of this mark plate, distance between upper and lower two black and white marks;Identify the image pixel coordinates calculating this 4 black and white marks and center black and white mark by image recognition principle respectively, that is, Left, right, on, under, center
S33: when target monitoring point shifts, skew in mark plate, shoots mark plate figure now by video camera Picture, and now center black and white marker coordinates are calculated by image recognition principle, there are following formula:
(7)
(8)
By above-mentioned formula, you can obtain horizontally and vertically displacement in mark plate for the center black and white mark;
S34: step s33 obtain after horizontally and vertically displacement exceedes threshold value, that is, judge that this target monitoring point shifts.
In an embodiment of the present invention, the square black and white mark of described center black and white flag bit, is arranged in this center black and white mark The black and white mark of the upper and lower, left and right of will is circular black and white mark.
Compared to prior art, the method have the advantages that the inventive method certainty of measurement is high, real-time is good, Suitable field site operation, disclosure satisfy that existing base pit engineering excavates the needs of horizontal displacement monitoring.
Brief description
Fig. 1 is head coordinate system schematic diagram of the present invention.
Fig. 2 is the corresponding relation figure between position and head angle in digital picture of the present invention.
Fig. 3 is isoparametric element interpolation calculation figure.
Fig. 4 is mark plate schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings, technical scheme is specifically described.
A kind of method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement of the present invention, comprises the steps,
S1: provide an excavation of foundation pit real-time horizontal displacement monitoring system, including central control computer and with this central control computer The video camera being arranged near foundation ditch of connection, head, the laser lamp being installed on described head;
S2: set global coordinate system, that is, camera coordinates system is xyz, and, as xyz, head is around x-axis for the coordinate system centered on head The angle rotating is designated as, it is designated as around the angle that z-axis rotates
S3: open laser lamp, make laser lamp point to each monitoring point, i.e. fixed point by rotary platform, record now cloud Platform corner (), record simultaneously coordinate under global coordinate system for each fixed point (), you can obtain overall coordinate Under system each fixed point coordinate () and head corner () between one-to-one relationship, and be stored in middle control calculate In machine, whereiniRepresent row coordinate,jRepresent row coordinate;
S4: after integral calibrating, when monitoring that target monitoring point shifts, you can existed by this target monitoring point Coordinate under global coordinate system (), acquisition head corner (), and then cloud platform rotation is controlled by central control computer This corner (), open laser lamp and can expose at the target monitoring point shifting, reported to the police.
Further, in described step s4, if the target detection point shifting monitoring not is fixed point, need to lead to Cross in the following manner to report to the police come the rotation and laser lamp to control head,
S21: shoot the image of the target monitoring point p shifting by camera, determine its seat under global coordinate system Mark (), and obtain the fixed point positioned at its surrounding coordinate (), (), (), () and its corresponding head corner (), (), (), ();
S22: because target monitoring point p is not fixed point, calculate according to four click-through row interpolations about, concrete calculating Formula is as follows:
(1)
(2)
Wherein:,,,,,
By p point coordinates () can solve ginseng with four demarcation point coordinates substitution formula (1) and (2) about Number,
S23: by step s22, the head corner according to corresponding to known four fixed points, you can by following formula meters Head corner corresponding to target monitoring point p at calculation:
(3)
(4)
Wherein:,.
Further, in described step s4, the skew of monitoring objective monitoring point is to be accomplished by,
S31: be respectively provided with a mark plate in each monitoring point of foundation ditch, described mark plate includes the bar of mark plate information that is stored with Shape code and 5 black and white marks, this 5 black and white marks are in that other four is arranged in this center black and white mark centered on one of Upper and lower, left and right (the square black and white mark of described center black and white flag bit, be arranged in this center black and white mark upper and lower, left, Right black and white mark is circular black and white mark);The bar code information of each mark plate is all deposited to described central control computer;
S32: mark plate image is shot by video camera, and this mark is obtained by the bar code that central control computer reads mark plate The information of will plate, draws the distance between the left and right two black and white marks of this mark plate, distance between upper and lower two black and white marks;Identify the image pixel coordinates calculating this 4 black and white marks and center black and white mark by image recognition principle respectively, that is, Left, right, on, under, center
S33: when target monitoring point shifts, skew in mark plate, shoots mark plate figure now by video camera Picture, and now center black and white marker coordinates are calculated by image recognition principle, there are following formula:
(7)
(8)
By above-mentioned formula, you can obtain horizontally and vertically displacement in mark plate for the center black and white mark;
S34: step s33 obtain after horizontally and vertically displacement exceedes threshold value, that is, judge that this target monitoring point shifts.
It is below the specific embodiment of the present invention.
The inventive method is mainly realized by following technological means: provides an excavation of foundation pit real-time horizontal displacement monitoring system System, including in control computer, be arranged on video camera near foundation ditch (multiple targets monitored by a video camera), head 2(1), peace It is loaded on laser lamp 1(1 of head 2 top);1 multiple measuring point of measurement of described video camera, to the water in Excavation Process Prosposition be moved into row real-time monitoring, and with middle control computer is connected, by middle control computer control video camera shoot, when situation occurs in control Computer retransmits instruction and arrives head, opens laser lamp so that head (head can be around x-axis and 360 ° of rotations of y-axis) turns to laser Lamp points to alarm target.
Each instrument and equipment is fixed it is desirable to the installation of each equipment is stable firm, laser lamp is installed on head in engineering, Do not need to measure the position relationship between head and video camera.All of equipment is connected on middle control computer, and carries out initial Integral calibrating, demarcates the corresponding relation between each video camera and head, is stored in middle control computer.
Concrete method of demarcating:
It is assumed that the coordinate system that head is located is xyz, laser lamp is arranged on head, as shown in Figure 1.Rotate permissible around x-axis Change laser lamp far and near, laser lamp sensing can be changed around z-axis rotation left or right.The angle rotating around x-axis is designated as, around z-axis The angle of rotation is designated as.It is assumed that global coordinate system is xyz, then, when there being multiple monitoring objective, it is first turned on laser lamp and rotates Head to specified location record head (), record simultaneously coordinate under global coordinate system for the target monitoring point ();Rotary platform points to each target monitoring point successively, and record respectively head position coordinateses () (i table Show row coordinate, j represents row coordinate), also obtained in camera coordinate under camera coordinates system for the respective point ().Then pass through Obtained after above-mentioned demarcation coordinate under global coordinate system () and head corner () between one-to-one relationship. After integral calibrating, when under given global coordinate system coordinate (), you can with find its head corner (), Being completed and being stored in memorizer by middle control computer for after relation integral calibrating with regard to both, different requirement of engineering is marked again Fixed.Integral calibrating need not consider the relation between camera coordinates system and head coordinate system, and construction and installation are simple, and due to entirety Contain situations such as relation between coordinate system, lens distortion, systematic error, in demarcation in therefore obtained corresponding relation not Rethink again, effectively reduce complexity, improve the precision of calculating, improve the execution efficiency of code.
Data points more at most computational accuracy used is demarcated higher, when impact point is not on fixed point during integral calibrating When, p point as shown in Figure 2, this point is located between four fixed points, now also needs here to process again.According to above-mentioned foundation Camera coordinates () and head angle () corresponding relation, obtained global coordinate system after identifying target Lower p point coordinate (), because this point is not on fixed point, positioned at this surrounding point be respectively (), (), (), (), in the head according to corresponding to this four points of corresponding corresponding relation Position be respectively (), (), (), ().Impact point p due to identification does not exist When on identification point, then just calculate according to four click-through row interpolations about, specific computational methods are as follows (as Fig. 3 institute Show):
(1)
(2)
Wherein:, (),,, ,.
By p point coordinates () can solve ginseng with four demarcation point coordinates substitution formula (1) and (2) about Number,.
As shown in figure 3, work as solving,Afterwards, the head angle according to corresponding to known four fixed points, then according under Head angle corresponding to the method calculating point p of face:
(3)
(4)
Wherein:, ().
When target is located on fixed point, then the precision of the quick positioning of target is consistent with image recognition precision;When target position When outside fixed point, then the quick positioning of target needs to be calculated, therefore, its precision and demarcation by four fixed points of surrounding Dot spacing (demarcating point resolution) is relevant.When the resolution of fixed point isWhen, the resolution of picture captured by camera For, then the pixel between fixed point be, any point between fixed point calculates Precision is:
(5)
(6)
Wherein:WithRepresent the error of image recognition respectively.From formula (5), (6) can Less to find out demarcation dot spacing, that is, nominal data point is more, then the precision calculating between two fixed points is also higher.For example away from Away from 100m position, camera resolution is, under different demarcation point resolutions, computational accuracy is as shown in table 1, whereinFor image accuracy of identification in the x and y direction.
Horizontal position shift measurement in real time:
Computational accuracy can effectively be improved using mark plate, the mark plate that patent of the present invention adopts is as shown in figure 4, this mark Will plate includes bar code (storing data and the type of mark plate), black and white mark 5 (wherein 4 circles, square), black It is graduation mark between white mark.
Arrange multiple mark plates around foundation ditch, obtained between laser lamp and mark plate according to above-mentioned scaling method Corresponding relation, for each mark plate, its measuring method is identical, specific as follows:
Read bar code recognition mark plate type first, middle control computer recalls the data of this mark plate, such as level two Circular black and white tag distance, vertical two circular black and white tag distance.Then identified respectively simultaneously according to image recognition principle Calculate the image pixel coordinates of 4 circular black and white marks and central square black and white mark, respectively left mark, right Mark, upper mark, lower markAnd intermediate marker.
According to four points of circular black and white can obtain image pixel and coordinate in the region that this four points are located it Between relation.When middle square black and white identification point changes, image pixel coordinates are changed intoIt is possible to by calculating To its horizontally and vertically displacement in this cooperation Surface of sign board.
(7)
(8)
If being m pixel between indicating about the mark plate image collecting and up and down,Actual size is h millimeter, real The deviation of border size is δ millimeter, then the error estimate of measurement result is:
(millimeter) (9)
Due to m > > δ, h > > δ, therefore if instrument is sufficiently stable and environmental condition is good (adopts that plot quality is good, power supply is steady Fixed, flow perturbation is little etc.), then certainty of measurement is mainly by amplification (h/m) and index point extraction accuracy δ decision.Using sub- picture Plain location technology, to carrying out the target plate face index point extraction accuracy of special marking up to 0.2 pixel, current instrument can gather The image of resolution 1280*1024, the instrument angle of visual field is ± 15 points.If taking m=1000, h=500mm, δ=1mm, δ= 0.2, then the error estimate pressing the calculated measurement result of formula (1) is 0.1 millimeter.
Flow perturbation and various interference can be used as noise, the pixel precision of main impact imaging, are that precision analysis is convenient, will It is attributed to picture point extraction accuracy.For improving precision, using multiple averaging method.To pure random noise, n average precision It is single shot occuracy.
Identical for its measuring method of other mark plates, therefore, target and head are obtained by fast locating algorithm Between corresponding relation, and obtain the horizontally and vertically displacement of each target by image measuring method in real time measurement, when certain After target measurement displacement exceedes threshold value, middle control computer will be made warning and laser lamp will be pointed to this target, and all processes are in real time, right It is very important in engineering safety.
It is more than presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, produced function is made With without departing from technical solution of the present invention scope when, belong to protection scope of the present invention.

Claims (3)

1. a kind of method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement it is characterised in that: comprise the steps,
S1 a: excavation of foundation pit real-time horizontal displacement monitoring system is provided, is connected including central control computer and with this central control computer The video camera being arranged near foundation ditch, head, the laser lamp being installed on described head;
S2: set global coordinate system, that is, camera coordinates system is xyz, as xyz, head rotates the coordinate system centered on head around x-axis Angle be designated as, it is designated as around the angle that z-axis rotates
S3: open laser lamp, make laser lamp point to each monitoring point, i.e. fixed point by rotary platform, record now head and turn Angle (), record simultaneously coordinate under global coordinate system for each fixed point (), you can obtain under global coordinate system Each fixed point coordinate () and head corner () between one-to-one relationship, and be stored in central control computer, WhereiniRepresent row coordinate,jRepresent row coordinate;
S4: after integral calibrating, when monitoring that target monitoring point shifts, you can by this target monitoring point in entirety Coordinate under coordinate system (), acquisition head corner (), and then this turn of cloud platform rotation is controlled by central control computer Angle (), open laser lamp and can expose at the target monitoring point shifting, reported to the police;
In described step s4, if the target monitoring point shifting monitoring not is fixed point, need to come in the following manner The rotation of head and laser lamp is controlled to report to the police,
S21: the image of target monitoring point p shifting is shot by camera, determine its coordinate under global coordinate system (), and obtain the fixed point positioned at its surrounding coordinate (), (), (), () and its corresponding head corner (), (), (), ();
S22: because target monitoring point p is not fixed point, calculate according to four click-through row interpolations about, specific formula for calculation As follows:
(1)
(2)
Wherein:,,,,,
By p point coordinates () can solve parameter with four demarcation point coordinates substitution formula (1) and (2) about,
S23: by step s22, the head corner according to corresponding to known four fixed points, you can calculated by following formula Head corner corresponding to target monitoring point p:
(3)
(4)
Wherein:,.
2. the method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement according to claim 1, its feature exists In: in described step s4, the judgement of the skew of target monitoring point is to be accomplished by,
S31: be respectively provided with a mark plate in each monitoring point of foundation ditch, described mark plate includes the bar code of mark plate information that is stored with And 5 black and white marks, this 5 black and white marks are in centered on one of, other four be arranged in this center black and white mark upper, Under, left and right;The bar code information of each mark plate is all deposited to described central control computer;
S32: mark plate image is shot by video camera, and this mark plate is obtained by the bar code that central control computer reads mark plate Information, draw the distance between the left and right two black and white marks of this mark plate, distance between upper and lower two black and white marks;Logical Cross image recognition principle and identify the image pixel coordinates calculating this 4 black and white marks and center black and white mark respectively, that is, left, right, on, under, center
S33: when target monitoring point shifts, skew in mark plate, shoots mark plate image now by video camera, and Now center black and white marker coordinates are calculated by image recognition principle, there are following formula:
(7)
(8)
By above-mentioned formula, you can obtain horizontally and vertically displacement in mark plate for the center black and white mark;
S34: step s33 obtain after horizontally and vertically displacement exceedes threshold value, that is, judge that this target monitoring point shifts.
3. the method based on digital picture real-time monitoring excavation of foundation pit horizontal displacement according to claim 2, its feature exists In: described center black and white is masked as square black and white mark, is arranged in the black and white mark of the upper and lower, left and right of this center black and white mark It is circular black and white mark.
CN201510269598.9A 2015-05-25 2015-05-25 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images Active CN104988928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510269598.9A CN104988928B (en) 2015-05-25 2015-05-25 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510269598.9A CN104988928B (en) 2015-05-25 2015-05-25 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images

Publications (2)

Publication Number Publication Date
CN104988928A CN104988928A (en) 2015-10-21
CN104988928B true CN104988928B (en) 2017-01-25

Family

ID=54300810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510269598.9A Active CN104988928B (en) 2015-05-25 2015-05-25 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images

Country Status (1)

Country Link
CN (1) CN104988928B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105547160B (en) * 2016-01-08 2018-11-30 中铁第四勘察设计院集团有限公司 Railway component system for monitoring displacement and method
CN105672377B (en) * 2016-04-01 2017-12-22 上海筑邦测控科技有限公司 Intelligent foundation ditch support meanss and intelligent foundation pit support system
CN106441108B (en) * 2016-09-14 2020-02-14 苏州市建筑科学研究院集团股份有限公司 Visual displacement measurement system and measurement method thereof
CN107478318B (en) * 2017-08-02 2019-11-15 深圳钰湖电力有限公司 A kind of vibration measuring control method of crusing robot system
CN108612075B (en) * 2018-05-21 2020-07-07 辽宁工程技术大学 Method for monitoring horizontal displacement of deep foundation pit
CN109579680A (en) * 2018-11-22 2019-04-05 中国十七冶集团有限公司 A kind of displacement monitoring method of interim door opening
CN110057302A (en) * 2019-05-15 2019-07-26 南京工业职业技术学院 Automatic Measuring Apparatus and measurement method towards subsurface safety
CN110241700B (en) * 2019-05-27 2020-12-04 内蒙古路桥工程技术检测有限责任公司 Pit slot detection post-repair process
CN111121731B (en) * 2019-12-11 2022-09-09 国网湖北省电力有限公司荆州供电公司 Foundation pit dividing instrument
CN112504134B (en) * 2020-11-27 2022-03-29 重庆康盛监理咨询有限公司 Dynamic displacement monitoring system, method and device for steel structure net rack and storage medium
CN113779668B (en) * 2021-08-23 2023-05-23 浙江工业大学 Foundation pit support structure displacement monitoring system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3769666B2 (en) * 2000-11-09 2006-04-26 日本電気株式会社 Aberration correction method and optical disc apparatus
CN202485632U (en) * 2011-12-20 2012-10-10 中建八局第一建设有限公司 Deep foundation pit displacement laser monitoring and alarming system
CN103363904B (en) * 2013-06-26 2015-12-16 同济大学 The measurement mechanism of foundation pit enclosure structure layering horizontal shift and measuring method
CN103557800B (en) * 2013-11-07 2016-03-30 大连市勘察测绘研究院有限公司 Multilayer floor slab layering horizontal displacement monitoring method
CN204313798U (en) * 2014-12-26 2015-05-06 华中科技大学 A kind of laser beam in-situ calibration device
CN204286365U (en) * 2014-12-30 2015-04-22 姜泓任 Foundation pit side-wall displacement monitor

Also Published As

Publication number Publication date
CN104988928A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104988928B (en) Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images
JP6779698B2 (en) Pavement crack analysis device, pavement crack analysis method and pavement crack analysis program
CN102034238B (en) Multi-camera system calibrating method based on optical imaging probe and visual graph structure
CN102564335B (en) Method for measuring deformation of large-scale tunnel
CN105699399B (en) A kind of detection device and method of SMT masterplates quality
CN106682664A (en) Water meter disc area detection method based on full convolution recurrent neural network
US20130113897A1 (en) Process and arrangement for determining the position of a measuring point in geometrical space
CN107833203A (en) A kind of horizontal plane identification and water level method for real-time measurement based on image procossing
CN106646509B (en) A kind of shaft tower slope protection Damage Assessment method based on outdoor scene point cloud data
CN110736446B (en) Pose identification system and method for cantilever type heading machine
CN104063863B (en) The lower facedown binocular vision system and image processing method monitored for river course
CN106908081A (en) Laser level detecting system and method based on ccd video camera
JP5079547B2 (en) Camera calibration apparatus and camera calibration method
CN113223087B (en) Target object geographic coordinate positioning method and device based on video monitoring
Chmelina et al. A 3-d laser scanning system and scan data processing method for the monitoring of tunnel deformations
CN107509055A (en) A kind of rotary panorama focus identification optronic tracker and its implementation
CN103487033A (en) River surface photographic surveying method based on height-change homography
CN107391631A (en) A kind of electric transmission line channel solid space monitoring and fast ranging method
CN110159199B (en) Coal mine water exploration drilling positioning method based on image recognition
CN112989099B (en) Intelligent construction management system and method based on image communication
CN104931021B (en) Crack multi-parameter observation device based on close-range photogrammetry
CN109977853A (en) A kind of mine group overall view monitoring method based on more identifiers
CN104063884B (en) The images steganalysis method being combined based on motion prediction with multi-template matching
US11544857B1 (en) Method and device for calculating river surface flow velocity based on variational principle
KR101379237B1 (en) Infrastructure safety management method by image analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant