CN104986581A - 直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 - Google Patents
直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 Download PDFInfo
- Publication number
- CN104986581A CN104986581A CN201510395744.2A CN201510395744A CN104986581A CN 104986581 A CN104986581 A CN 104986581A CN 201510395744 A CN201510395744 A CN 201510395744A CN 104986581 A CN104986581 A CN 104986581A
- Authority
- CN
- China
- Prior art keywords
- armg
- berth
- container
- freight container
- case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 40
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 42
- 230000017105 transposition Effects 0.000 claims description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 4
- 239000004567 concrete Substances 0.000 claims description 3
- 239000011178 precast concrete Substances 0.000 claims description 3
- 230000003247 decreasing effect Effects 0.000 abstract 1
- 238000012384 transportation and delivery Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000007599 discharging Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
本发明公开了直角岸线多泊位布置的自动化集装箱码头装卸系统包括岸桥、跨运车、ARMG、高架行车子系统组成,高架行车子系统由高架桥和高架行车组成;岸桥分别布置在正面泊位的前沿和侧面泊位的前沿,岸桥用于集装箱由集装箱船至岸边作业区的垂直及水平运输;集装箱堆场的ARMG轨道垂直于正面泊位岸线方向布置。集装箱堆场紧邻正面泊位端的区域为堆场正面泊位端,集装箱堆场紧邻后方集疏运通道的区域为堆场陆侧端,集装箱堆场紧邻堆场侧面泊位端的区域为堆场侧面泊位端;本发明可较大程度地减小正面泊位和侧面泊位共同作业时可能引起的交叉作业,并同时减小侧面泊位港内水平运输设备的运输距离,从而提升整个系统的装卸效率及节能水平。
Description
技术领域
本发明涉及港口集装箱码头的装卸技术,特别涉及一种适于直角岸线泊位布置的集装箱码头的装卸系统及装卸方法。
背景技术
目前国内外集装箱自动化码头的泊位岸线主要呈“一字型”布置(见图1)。整个自动化码头从平面布局上看主要由以下内容构成:集装箱岸边作业区、集装箱水平运输区、集装箱海侧交换区、自动化堆场区、集装箱陆侧交换区。自动化集装箱码头装卸系统的主要特点如下:1.装卸船作业采用岸桥。2.港内集装箱水平运输采用自动导向车(AGV)或跨运车;3.堆场内的装卸作业采用自动化轨道式ARMG(ARMG),ARMG轨道垂直码头岸线布置。整个自动化堆场封闭运行,所有水平运输设备均不进入堆场内部。4.港内水平运输设备装卸作业区(即集装箱海侧交换区)靠近海侧布置,港外集卡装卸作业区(即集装箱陆侧交换区)靠近后方集疏运口门布置, 2种水平运输设备的运输距离均较短,能耗较低。但现代集装箱码头规划设计中通常有多泊位,且泊位岸线呈90度折线布置的设计(见图2、图3)。如果此类集装箱码头仍采用上述装卸系统(自动化堆场垂直正面岸线泊位布置,港内水平运输设备装卸作业区靠近“正面泊位”布置),势必造成“侧面泊位”港内水平运输设备的水平运输距离大大增加,从而降低系统的装卸效率,增加系统的运行成本。
发明内容
本发明的目的,在于开发一种适于直角泊位岸线布置的自动化集装箱码头的装卸系
统,使得正面泊位和侧面泊位的装卸船作业能够相对独立,互不干扰,并减小侧面泊位港内水平运输设备的运输距离、从而提升整个系统的装卸效率及节能水平。
本发明的技术方案如下:
一种直角岸线多泊位布置的自动化集装箱码头装卸系统包括岸桥2、跨运车1、ARMG4、高架行车子系统组成,高架行车子系统由高架桥5和高架行车6组成;
岸桥2分别布置在正面泊位的前沿和侧面泊位的前沿,其轨道分别平行于正面泊位岸线方向和侧面泊位岸线方向。岸桥2用于集装箱由集装箱船3至岸边作业区的垂直及水平运输;
集装箱堆场的ARMG4轨道垂直于正面泊位岸线方向布置,ARMG4位于ARMG4轨道上。集装箱堆场紧邻正面泊位端的区域为堆场正面泊位端,集装箱堆场紧邻后方集疏运通道的区域为堆场陆侧端,集装箱堆场紧邻堆场侧面泊位端的区域为堆场侧面泊位端;
跨运车1用于集装箱由岸边作业区域至堆场正面泊位端或堆场侧面泊位端的水平运输;
集装箱堆场布置若干条ARMG4作业线,ARMG4作业线数量与正面泊位的岸桥2装卸船能力相匹配,每条ARMG4作业线配备的ARMG4数量不少于2台,ARMG4的运行轨迹垂直于正面泊位岸线方向;
ARMG4用于集装箱由堆场正面泊位端至堆场间的垂直或水平运输以及堆场陆侧端至堆场间的垂直或水平运输;ARMG4还能用于集装箱在集装箱堆场内的堆垛、转运、接力作业;
集装箱堆场内还布置若干条高架行车6作业线,高架行车6的作业线数量与侧面泊位的岸桥装卸船能力相匹配;高架行车子系统用于集装箱由堆场侧面泊位端至堆场间的垂直及水平运输;每条高架行车作业线配备的高架行车6数量不少于2台;高架行车6的运行轨道敷设在高架桥5的轨道梁上,其方向垂直于ARMG4运行轨道;
更进一步,高架行车6带箱的运行高度距离ARMG4的结构最高点至少留有1.5m的安全距离;
更进一步,高架桥5的立柱架设于相邻ARMG4的轨道间隙内,采用混凝土结构或钢结构;高架桥5的上部支承高架行车6轨道的结构可采用预制混凝土结构或钢结构。
本发明的另一种技术方案:一种直角岸线多泊位布置的自动化集装箱码头装卸方法,包括如下步骤:
1.卸船:
先从岸桥2将集装箱从集装箱船3上卸下,放置在岸桥2后伸距下方的码头面上;卸下的集装箱的长边方向与码头泊位岸线方向平行;
跨运车1将集装箱从码头面上吊起,搬运至堆场正面泊位端或堆场侧面泊位端的卸箱位,然后将集装箱卸在地面上;卸下集装箱的长边方向与侧面码头泊位岸线方向平行;
ARMG4或高架行车6从地面上将集装箱吊起,将集装箱搬运至集装箱堆场中,通过ARMG4或高架行车6的相互配合可以将集装箱搬运至集装箱堆场的任意位置;
2.疏港:
港外集卡7空车从后方集疏运通道倒车进入堆场陆侧端的装卸位置;
ARMG4起吊堆场内的目标集装箱并运行至装卸位,ARMG4卸箱至港外集卡上;
装好集装箱后,港外集卡7由后方集疏运通道驶离集装箱码头。
所述步骤一和步骤二之间还包括装船方法,装船方法为卸船方法的反过程。
所述步骤一和步骤二之间还包括集港方法,集港方法为疏港方法的反过程。
所述步骤一和步骤二之间还包括集装箱在同一箱区内的倒箱方法:海侧第一ARMG4或陆侧第一ARMG4将集装箱吊起,海侧第一ARMG4或陆侧第一ARMG4带箱运行至堆场中的集装箱中转位,海侧第一ARMG4将集装箱卸至集装箱中转位,陆侧第二ARMG4或海侧第二ARMG4将集装箱吊起,陆侧第二ARMG4或海侧第二ARMG4带箱运行至集装箱目标位,陆侧第二ARMG4或海侧第二ARMG4将集装箱卸至集装箱目标位。
所述步骤一和步骤二之间还包括集装箱在不同箱区内的倒箱方法为:例如A箱区至B箱区:A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4将目标集装箱吊起,A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4带箱运行至A箱区集装箱中转位,A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4卸箱至A箱区集装箱中转位,高架行车6将集装箱吊起,高架行车6带箱运行至B箱区集装箱中转位, 高架行车6卸箱至B箱区集装箱中转位,B箱区海侧第二ARMG4或B箱区陆侧第二ARMG4将集装箱吊起,B箱区海侧第二ARMG4或B箱区陆侧第二ARMG4带箱运行至B箱区集装箱目标位,B箱区海侧第二ARMG4或B箱区陆侧第二卸箱至B箱区集装箱目标位。
有益效果:在码头中央控制室的调度下,由ARMG4作业线与高架行车6作业线共同组成的立体装卸系统能够同时进行正面泊位与侧面泊位装卸船的自动化作业,并可较大程度地减小两侧泊位共同作业时可能引起的交叉作业,从而实现整个装卸系统的高效运行。巧妙设计的高架桥系统从横向将整个堆场系统联系起来,更便于整个堆场系统的联动。
附图说明
图1泊位岸线主要呈“一字型”布置的结构示意图;
图2为本发明直角岸线多泊位呈“L型”布置的示意图;
图3为本发明直角岸线多泊位呈“U型”布置的示意图;
图4为本发明直角岸线多泊位呈“L型”布置的平面结构示意图;
图5为本发明直角岸线多泊位呈“U型”布置的平面结构示意图;
图6为图4、5的A-A向纵断面示意图;
图7为图4、5的B-B向纵断面示意图。
具体实施方式
一种直角岸线多泊位布置的自动化集装箱码头装卸系统包括岸桥2、跨运车1、ARMG4、高架行车子系统组成,高架行车子系统由高架桥5和高架行车6组成。
岸桥2分别布置在正面泊位的前沿和侧面泊位的前沿,其轨道分别平行于正面泊位岸线方向和侧面泊位岸线方向。岸桥2用于集装箱由集装箱船3至岸边作业区的垂直及水平运输。
集装箱堆场的ARMG4轨道垂直于正面泊位岸线方向布置,ARMG4位于ARMG4轨道上。集装箱堆场紧邻正面泊位端的区域为堆场正面泊位端,集装箱堆场紧邻后方集疏运通道的区域为堆场陆侧端,集装箱堆场紧邻堆场侧面泊位端的区域为堆场侧面泊位端。
跨运车1用于集装箱由岸边作业区域至堆场正面泊位端或堆场侧面泊位端的水平运输。
集装箱堆场布置若干条ARMG4作业线,ARMG4作业线数量与正面泊位的岸桥2装卸船能力相匹配。每条ARMG4作业线配备的ARMG4数量不少于2台。ARMG4的运行轨迹垂直于正面泊位岸线方向。
ARMG4用于集装箱由堆场正面泊位端至堆场间的垂直或水平运输以及堆场陆侧端至堆场间的垂直或水平运输。ARMG4还能用于集装箱在集装箱堆场内的堆垛、转运、接力作业。
集装箱堆场内还布置若干条高架行车6作业线,高架行车6的作业线数量与侧面泊位的岸桥装卸船能力相匹配。高架行车子系统用于集装箱由堆场侧面泊位端至堆场间的垂直及水平运输。每条高架行车作业线配备的高架行车6数量不少于2台。高架行车6的运行轨道敷设在高架桥5的轨道梁上,其方向垂直于ARMG4运行轨道。高架行车6带箱的运行高度距离ARMG4的结构最高点至少留有1.5m的安全距离。高架桥5的立柱架设于相邻ARMG4的轨道间隙内,采用混凝土结构或钢结构。高架桥5的上部支承高架行车6轨道的结构可采用预制混凝土结构或钢结构。
一种直角岸线多泊位布置的自动化集装箱码头装卸系统包括如下步骤:
a.卸船:
先从岸桥2将集装箱从集装箱船3上卸下,放置在岸桥2后伸距下方的码头面上;卸下的集装箱的长边方向与码头泊位岸线方向平行;
跨运车1将集装箱从码头面上吊起,搬运至堆场正面泊位端或堆场侧面泊位端的卸箱位,然后将集装箱卸在地面上;卸下集装箱的长边方向与侧面码头泊位岸线方向平行;
ARMG4或高架行车6从地面上将集装箱吊起,将集装箱搬运至集装箱堆场中,通过ARMG4或高架行车6的相互配合可以将集装箱搬运至集装箱堆场的任意位置;
b.疏港:
港外集卡7空车从后方集疏运通道倒车进入堆场陆侧端的装卸位置;
ARMG4起吊堆场内的目标集装箱并运行至装卸位,ARMG4卸箱至港外集卡上;
装好集装箱后,港外集卡7由后方集疏运通道驶离集装箱码头。
所述步骤a和步骤b之间还包括装船方法,装船方法为卸船方法的反过程。
ARMG4或高架行车6将集装箱搬从集装箱堆场中的地面上吊起运至堆场正面泊位端或堆场侧面泊位端的卸箱位,并卸在地面上,卸下集装箱的长边方向与侧面码头泊位岸线方向平行;跨运车1将集装箱运至岸桥2后伸距下方的码头面上;最后将集装箱从岸桥2后伸距下方的码头面上装到集装箱船3上。
所述步骤a和步骤b之间还包括集港方法,集港方法为疏港方法的反过程。集装箱装上港外集卡7后,港外集卡7由后方集疏运通道倒入集装箱码头;ARMG4从港外集卡7上卸箱至装卸位,ARMG4起吊堆场内的目标集装箱;
所述步骤a和步骤b之间还包括集装箱在同一箱区内的倒箱方法:海侧第一ARMG4或陆侧第一ARMG4将集装箱吊起,海侧第一ARMG4或陆侧第一ARMG4带箱运行至堆场中的集装箱中转位,海侧第一ARMG4将集装箱卸至集装箱中转位,陆侧第二ARMG4或海侧第二ARMG4将集装箱吊起,陆侧第二ARMG4或海侧第二ARMG4带箱运行至集装箱目标位,陆侧第二ARMG4或海侧第二ARMG4将集装箱卸至集装箱目标位。
所述步骤a和步骤b之间还包括集装箱在不同箱区内的倒箱方法为:例如A箱区至B箱区:A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4将目标集装箱吊起,A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4带箱运行至A箱区集装箱中转位,A箱区海侧第一ARMG4或A箱区陆侧第一ARMG4卸箱至A箱区集装箱中转位,高架行车6将集装箱吊起,高架行车6带箱运行至B箱区集装箱中转位, 高架行车6卸箱至B箱区集装箱中转位,B箱区海侧第二ARMG4或B箱区陆侧第二ARMG4将集装箱吊起,B箱区海侧第二ARMG4或B箱区陆侧第二ARMG4带箱运行至B箱区集装箱目标位,B箱区海侧第二ARMG4或B箱区陆侧第二卸箱至B箱区集装箱目标位。
Claims (8)
1. 一种直角岸线多泊位布置的自动化集装箱码头装卸系统包括岸桥(2)、跨运车(1)、ARMG(4)、高架行车子系统组成,高架行车子系统由高架桥(5)和高架行车(6)组成;
岸桥(2)分别布置在正面泊位的前沿和侧面泊位的前沿,其轨道分别平行于正面泊位岸线方向和侧面泊位岸线方向;
岸桥(2)用于集装箱由集装箱船(3)至岸边作业区的垂直及水平运输;
集装箱堆场的ARMG(4)轨道垂直于正面泊位岸线方向布置,ARMG(4)位于ARMG(4)轨道上;
集装箱堆场紧邻正面泊位端的区域为堆场正面泊位端,集装箱堆场紧邻后方集疏运通道的区域为堆场陆侧端,集装箱堆场紧邻堆场侧面泊位端的区域为堆场侧面泊位端;
跨运车(1)用于集装箱由岸边作业区域至堆场正面泊位端或堆场侧面泊位端的水平运输;
集装箱堆场布置若干条ARMG(4)作业线,ARMG(4)作业线数量与正面泊位的岸桥(2)装卸船能力相匹配,每条ARMG(4)作业线配备的ARMG(4)数量不少于2台,ARMG(4)的运行轨迹垂直于正面泊位岸线方向;
ARMG(4)用于集装箱由堆场正面泊位端至堆场间的垂直或水平运输以及堆场陆侧端至堆场间的垂直或水平运输;ARMG(4)还能用于集装箱在集装箱堆场内的堆垛、转运、接力作业;
集装箱堆场内还布置若干条高架行车(6)作业线,高架行车(6)的作业线数量与侧面泊位的岸桥装卸船能力相匹配;高架行车子系统用于集装箱由堆场侧面泊位端至堆场间的垂直及水平运输;每条高架行车作业线配备的高架行车(6)数量不少于2台;高架行车(6)的运行轨道敷设在高架桥(5)的轨道梁上,其方向垂直于ARMG(4)运行轨道。
2.如权利要求1所述的直角岸线多泊位布置的自动化集装箱码头装卸系统,其特征在于:所述高架行车(6)带箱的运行高度距离ARMG(4)的结构最高点至少留有1.5m的安全距离。
3.如权利要求1所述的直角岸线多泊位布置的自动化集装箱码头装卸系统,其特征在于:所述高架桥(5)的立柱架设于相邻ARMG(4)的轨道间隙内,采用混凝土结构或钢结构;所述高架桥(5)的上部支承所述高架行车(6)轨道的结构可采用预制混凝土结构或钢结构。
4.一种直角岸线多泊位布置的自动化集装箱码头装卸方法,其特征在于:包括如下步骤:
a.卸船:
先从岸桥(2)将集装箱从集装箱船(3)上卸下,放置在岸桥(2)后伸距下方的码头面上;卸下的集装箱的长边方向与码头泊位岸线方向平行;
跨运车(1)将集装箱从码头面上吊起,搬运至堆场正面泊位端或堆场侧面泊位端的卸箱位,然后将集装箱卸在地面上;卸下集装箱的长边方向与侧面码头泊位岸线方向平行;
ARMG(4)或高架行车(6)从地面上将集装箱吊起,将集装箱搬运至集装箱堆场中,通过ARMG(4)或高架行车(6)的相互配合可以将集装箱搬运至集装箱堆场的任意位置;
b.疏港:
港外集卡(7)空车从后方集疏运通道倒车进入堆场陆侧端的装卸位置;
ARMG(4)起吊堆场内的目标集装箱并运行至装卸位,ARMG(4)卸箱至港外集卡上;
装好集装箱后,港外集卡(7)由后方集疏运通道驶离集装箱码头。
5.如权利要求4所述的直角岸线多泊位布置的自动化集装箱码头装卸方法,其特征在于:所述步骤a和步骤b之间还包括装船方法,装船方法为卸船方法的反过程。
6.如权利要求4所述的直角岸线多泊位布置的自动化集装箱码头装卸方法,其特征在于:所述步骤a和步骤b之间还包括集港方法,集港方法为疏港方法的反过程。
7.如权利要求4所述的直角岸线多泊位布置的自动化集装箱码头装卸方法,其特征在于:所述步骤a和步骤b之间还包括集装箱在同一箱区内的倒箱方法:海侧第一ARMG(4)或陆侧第一ARMG(4)将集装箱吊起,海侧第一ARMG(4)或陆侧第一ARMG(4)带箱运行至堆场中的集装箱中转位,海侧第一ARMG(4)将集装箱卸至集装箱中转位,陆侧第二ARMG(4)或海侧第二ARMG(4)将集装箱吊起,陆侧第二ARMG(4)或海侧第二ARMG(4)带箱运行至集装箱目标位,陆侧第二ARMG(4)或海侧第二ARMG(4)将集装箱卸至集装箱目标位。
8.如权利要求4所述的直角岸线多泊位布置的自动化集装箱码头装卸方法,其特征在于:所述步骤a和步骤b之间还包括集装箱在不同箱区内的倒箱方法为:例如A箱区至B箱区:A箱区海侧第一ARMG(4)或A箱区陆侧第一ARMG(4)将目标集装箱吊起,A箱区海侧第一ARMG(4)或A箱区陆侧第一ARMG(4)带箱运行至A箱区集装箱中转位,A箱区海侧第一ARMG(4)或A箱区陆侧第一ARMG(4)卸箱至A箱区集装箱中转位,高架行车(6)将集装箱吊起,高架行车(6)带箱运行至B箱区集装箱中转位, 高架行车(6)卸箱至B箱区集装箱中转位,B箱区海侧第二ARMG(4)或B箱区陆侧第二ARMG(4)将集装箱吊起,B箱区海侧第二ARMG(4)或B箱区陆侧第二ARMG(4)带箱运行至B箱区集装箱目标位,B箱区海侧第二ARMG(4)或B箱区陆侧第二卸箱至B箱区集装箱目标位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510395744.2A CN104986581B (zh) | 2015-07-07 | 2015-07-07 | 直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510395744.2A CN104986581B (zh) | 2015-07-07 | 2015-07-07 | 直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104986581A true CN104986581A (zh) | 2015-10-21 |
CN104986581B CN104986581B (zh) | 2017-04-26 |
Family
ID=54298513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510395744.2A Expired - Fee Related CN104986581B (zh) | 2015-07-07 | 2015-07-07 | 直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104986581B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105314408A (zh) * | 2015-11-06 | 2016-02-10 | 三一机器人技术有限公司 | 一种集装箱码头自动化轨道运输系统及运行方法 |
CN105621264A (zh) * | 2016-03-21 | 2016-06-01 | 中交第三航务工程勘察设计院有限公司 | 港池式自动化集装箱码头装卸作业系统及作业方法 |
CN106241409A (zh) * | 2016-08-31 | 2016-12-21 | 孟喆 | 半自动码头高速重载轨道及码头装卸系统布局 |
WO2017107350A1 (zh) * | 2015-12-25 | 2017-06-29 | 上海振华重工(集团)股份有限公司 | 集装箱码头、集装箱装卸方法和集装箱集疏方法 |
CN108217220A (zh) * | 2018-01-23 | 2018-06-29 | 唐山港集团股份有限公司 | 一种集装箱自动化堆场转运系统布置方法 |
CN108275476A (zh) * | 2018-01-02 | 2018-07-13 | 清华大学 | 集装箱码头水平运输车辆调度系统 |
CN108298329A (zh) * | 2018-03-29 | 2018-07-20 | 中交第四航务工程勘察设计院有限公司 | 一种新型江海联运自动化集装箱码头装卸系统及平面布局 |
CN108466844A (zh) * | 2018-05-16 | 2018-08-31 | 青岛港国际股份有限公司 | 一种自动化集装箱码头 |
CN108516357A (zh) * | 2018-05-16 | 2018-09-11 | 青岛港国际股份有限公司 | 自动化集装箱装卸码头 |
CN108750694A (zh) * | 2018-06-08 | 2018-11-06 | 中交第四航务工程勘察设计院有限公司 | 立体式自动化集装箱码头的总体布置和装卸工艺及其系统 |
CN109436859A (zh) * | 2018-12-22 | 2019-03-08 | 王燏斌 | 一种集装箱码头 |
CN109626004A (zh) * | 2018-12-04 | 2019-04-16 | 中交第四航务工程勘察设计院有限公司 | 一种三边岸线的集装箱码头和装卸系统及其工作方法 |
CN110304469A (zh) * | 2019-07-29 | 2019-10-08 | 武汉新丝路快铁物流有限公司 | 一种集装箱的水-陆-水高效转运系统和方法 |
CN113879858A (zh) * | 2021-10-22 | 2022-01-04 | 武汉理工大学 | 立体轨道式自动化集装箱码头水平运输装置及其运输方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1556274A1 (de) * | 1967-08-16 | 1970-02-05 | Tax Hans Dipl Ing | Containerumschlaganlage |
JP2002362750A (ja) * | 2001-06-08 | 2002-12-18 | Mitsubishi Heavy Ind Ltd | コンテナターミナルシステム |
CN1721297A (zh) * | 2004-07-02 | 2006-01-18 | 法塔股份有限公司 | 用于港口设备的大型自动化仓库系统 |
CN1872643A (zh) * | 2006-04-20 | 2006-12-06 | 上海振华港口机械(集团)股份有限公司 | 集装箱码头布置方案及装卸流程 |
CN101711210A (zh) * | 2007-03-01 | 2010-05-19 | 查尔斯·贝内迪克特 | 用于国际海运集装箱的港口存储和分配系统 |
CN101920852A (zh) * | 2009-06-10 | 2010-12-22 | 张铁忠 | 一种集装箱自动化堆场 |
CN103723532A (zh) * | 2014-01-13 | 2014-04-16 | 上海海事大学 | 多层框架式集装箱自动化码头堆场装卸系统及其装卸方法 |
CN204917265U (zh) * | 2015-07-07 | 2015-12-30 | 中交第三航务工程勘察设计院有限公司 | 直角岸线多泊位布置的自动化集装箱码头装卸系统 |
-
2015
- 2015-07-07 CN CN201510395744.2A patent/CN104986581B/zh not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1556274A1 (de) * | 1967-08-16 | 1970-02-05 | Tax Hans Dipl Ing | Containerumschlaganlage |
JP2002362750A (ja) * | 2001-06-08 | 2002-12-18 | Mitsubishi Heavy Ind Ltd | コンテナターミナルシステム |
CN1721297A (zh) * | 2004-07-02 | 2006-01-18 | 法塔股份有限公司 | 用于港口设备的大型自动化仓库系统 |
CN1872643A (zh) * | 2006-04-20 | 2006-12-06 | 上海振华港口机械(集团)股份有限公司 | 集装箱码头布置方案及装卸流程 |
CN101711210A (zh) * | 2007-03-01 | 2010-05-19 | 查尔斯·贝内迪克特 | 用于国际海运集装箱的港口存储和分配系统 |
CN101920852A (zh) * | 2009-06-10 | 2010-12-22 | 张铁忠 | 一种集装箱自动化堆场 |
CN103723532A (zh) * | 2014-01-13 | 2014-04-16 | 上海海事大学 | 多层框架式集装箱自动化码头堆场装卸系统及其装卸方法 |
CN204917265U (zh) * | 2015-07-07 | 2015-12-30 | 中交第三航务工程勘察设计院有限公司 | 直角岸线多泊位布置的自动化集装箱码头装卸系统 |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105314408B (zh) * | 2015-11-06 | 2017-11-10 | 上海华兴数字科技有限公司 | 一种集装箱码头自动化轨道运输系统及运行方法 |
CN105314408A (zh) * | 2015-11-06 | 2016-02-10 | 三一机器人技术有限公司 | 一种集装箱码头自动化轨道运输系统及运行方法 |
US10647530B2 (en) | 2015-12-25 | 2020-05-12 | Shanghai Zhenhua Heavy Industries Co., Ltd. | Container terminal, container loading-unloading method and container collection- evacuation method |
WO2017107350A1 (zh) * | 2015-12-25 | 2017-06-29 | 上海振华重工(集团)股份有限公司 | 集装箱码头、集装箱装卸方法和集装箱集疏方法 |
CN105621264B (zh) * | 2016-03-21 | 2017-12-29 | 中交第三航务工程勘察设计院有限公司 | 港池式自动化集装箱码头装卸作业系统及作业方法 |
CN105621264A (zh) * | 2016-03-21 | 2016-06-01 | 中交第三航务工程勘察设计院有限公司 | 港池式自动化集装箱码头装卸作业系统及作业方法 |
CN106241409A (zh) * | 2016-08-31 | 2016-12-21 | 孟喆 | 半自动码头高速重载轨道及码头装卸系统布局 |
CN108275476A (zh) * | 2018-01-02 | 2018-07-13 | 清华大学 | 集装箱码头水平运输车辆调度系统 |
CN108217220A (zh) * | 2018-01-23 | 2018-06-29 | 唐山港集团股份有限公司 | 一种集装箱自动化堆场转运系统布置方法 |
CN108298329B (zh) * | 2018-03-29 | 2023-11-24 | 中交第四航务工程勘察设计院有限公司 | 一种新型江海联运自动化集装箱码头装卸系统 |
CN108298329A (zh) * | 2018-03-29 | 2018-07-20 | 中交第四航务工程勘察设计院有限公司 | 一种新型江海联运自动化集装箱码头装卸系统及平面布局 |
CN108466844A (zh) * | 2018-05-16 | 2018-08-31 | 青岛港国际股份有限公司 | 一种自动化集装箱码头 |
CN108516357A (zh) * | 2018-05-16 | 2018-09-11 | 青岛港国际股份有限公司 | 自动化集装箱装卸码头 |
CN108516357B (zh) * | 2018-05-16 | 2024-03-15 | 青岛港国际股份有限公司 | 自动化集装箱装卸码头 |
CN108466844B (zh) * | 2018-05-16 | 2024-01-09 | 青岛港国际股份有限公司 | 一种自动化集装箱码头 |
CN108750694A (zh) * | 2018-06-08 | 2018-11-06 | 中交第四航务工程勘察设计院有限公司 | 立体式自动化集装箱码头的总体布置和装卸工艺及其系统 |
CN108750694B (zh) * | 2018-06-08 | 2024-07-12 | 中交第四航务工程勘察设计院有限公司 | 立体式自动化集装箱码头的总体布置和装卸工艺及其系统 |
CN109626004A (zh) * | 2018-12-04 | 2019-04-16 | 中交第四航务工程勘察设计院有限公司 | 一种三边岸线的集装箱码头和装卸系统及其工作方法 |
CN109626004B (zh) * | 2018-12-04 | 2023-11-21 | 中交第四航务工程勘察设计院有限公司 | 一种三边岸线的集装箱码头和装卸系统及其工作方法 |
CN109436859A (zh) * | 2018-12-22 | 2019-03-08 | 王燏斌 | 一种集装箱码头 |
CN110304469A (zh) * | 2019-07-29 | 2019-10-08 | 武汉新丝路快铁物流有限公司 | 一种集装箱的水-陆-水高效转运系统和方法 |
CN113879858A (zh) * | 2021-10-22 | 2022-01-04 | 武汉理工大学 | 立体轨道式自动化集装箱码头水平运输装置及其运输方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104986581B (zh) | 2017-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104986581B (zh) | 直角岸线多泊位布置的自动化集装箱码头装卸系统及方法 | |
CN204917265U (zh) | 直角岸线多泊位布置的自动化集装箱码头装卸系统 | |
CN108750694B (zh) | 立体式自动化集装箱码头的总体布置和装卸工艺及其系统 | |
CN105621122A (zh) | 一种堆场自动化集装箱码头装卸系统及方法 | |
CN108298329A (zh) | 一种新型江海联运自动化集装箱码头装卸系统及平面布局 | |
US6802684B2 (en) | Container tranfer terminal system and method | |
AU2013290869B2 (en) | Overhead crane and assembly of at least two overhead cranes | |
CN109132610B (zh) | 一种单箱跨距堆场起重机自动化码头装卸系统及方法 | |
CN208856516U (zh) | 一种新型江海联运自动化集装箱码头结构 | |
CN112010053B (zh) | 一种立体式自动化集装箱码头 | |
CN103818734A (zh) | 一种高效的岸边集装箱转运方法及转运系统 | |
CN105417190A (zh) | 集装箱码头、集装箱装卸方法和集装箱集疏方法 | |
WO2022061509A1 (zh) | 一种立体式自动化集装箱码头 | |
CN108002070A (zh) | 一种引桥式自动化集装箱码头装卸作业系统及作业方法 | |
KR100737362B1 (ko) | 해항 또는 내륙항의 적환 시설 | |
CN114030906A (zh) | 一种自动化码头集装箱装卸系统及装卸方法 | |
CN112794108B (zh) | 一种集装箱铁水联运车船直取立体装卸作业系统及方法 | |
CN203877524U (zh) | 一种高效的岸边集装箱转运系统 | |
CN112794107A (zh) | 一种集装箱铁水联运车船直取连续装卸作业系统和方法 | |
CN112794110A (zh) | 集装箱铁水联运车船直取立体连续装卸作业系统及方法 | |
CN112850230B (zh) | 集装箱车船直取的立体连续装卸作业系统及方法 | |
JP2020132425A (ja) | コンテナターミナル | |
CN105314408A (zh) | 一种集装箱码头自动化轨道运输系统及运行方法 | |
CN215248288U (zh) | 一种集装箱车船直取的立体连续装卸作业系统 | |
CN215207460U (zh) | 码头前沿集装箱铁水联运车船直取装卸作业系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170426 |
|
CF01 | Termination of patent right due to non-payment of annual fee |