CN104963412A - Hinge station plate-type support and mounting method thereof - Google Patents

Hinge station plate-type support and mounting method thereof Download PDF

Info

Publication number
CN104963412A
CN104963412A CN201510287840.5A CN201510287840A CN104963412A CN 104963412 A CN104963412 A CN 104963412A CN 201510287840 A CN201510287840 A CN 201510287840A CN 104963412 A CN104963412 A CN 104963412A
Authority
CN
China
Prior art keywords
bolt
grid
basic
crane
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510287840.5A
Other languages
Chinese (zh)
Inventor
高凤鑫
罗觊
蒋鹏
蒋武举
张世翔
林红星
计康生
张军峰
华恩峰
郑刚
张长根
王浩
董哲武
王明花
孙晖
刘川
唐权星
陈毕海
李运军
程艺兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Asia Anhui Structural Steelwork Co Ltd
Original Assignee
Central Asia Anhui Structural Steelwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Asia Anhui Structural Steelwork Co Ltd filed Critical Central Asia Anhui Structural Steelwork Co Ltd
Priority to CN201510287840.5A priority Critical patent/CN104963412A/en
Publication of CN104963412A publication Critical patent/CN104963412A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a hinge station plate-type support comprising four support arms; round slots are arranged on connecting portions of the four support arms, and bolt balls are placed in the round slots; the bolt ball is provided with a plurality of bolt holes; two opposite support arms are respectively fixed with a clamp plate; a card slot is arranged below the clamp plate, and clamped and fixed on the clamp plate; an upper portion of the clamp plate is provided with a round hole allowing a threadless nut to pass, the center of the round hole is provided with a through hole allowing a bolt to pass, and the bolts are screwed in the bolt holes; the bolts rotate to drive the bolt balls to spin. The invention also discloses a method using the hinge station plate-type support to mount a net rack; the method uses a single crane to adjust the height and angle of the net rack connected with the bolt balls, so the next net rack can be assembled, thus effectively solving the unstable, bending, hard construction and inaccurate positioning problems caused by basic cross-mounting usage of scaffolds and problems in multi-crane hoisting assembling; the hinge station plate-type support is simple in structure, high in safety, simple in operation, economic, and practical.

Description

一种铰接站板式支座及其安装方法A hinged stand plate support and its installation method

技术领域 technical field

本发明涉及网架安装领域,具体是一种铰接站板式支座及其安装方法。 The invention relates to the field of network frame installation, in particular to a hinged platform support and an installation method thereof.

背景技术 Background technique

筒壳网架高空散装或拼装工作都要基于基本跨网架完成的基础上进行。传统工艺下,基本跨网架的拼装方法有两种,第一种采用满堂脚手架搭建后进行拼装工作;或者采用多台吊车从中间基本片网架起吊后,两边同时逐步拼装并逐步提高,逐渐形成圆拱基本跨网架的拼装工作。第一种方法建设时间长,耗费大量钢材,成本高;第二种方法,多台吊车同时吊装,协调困难,基本跨拼装过程中易弯折、失稳,就位不准确,成本高。 The high-altitude bulk or assembly work of the cylindrical shell grid frame should be carried out on the basis of the completion of the basic span grid frame. Under the traditional craft, there are two ways to assemble the basic cross-network frame. The first one is to use a full house of scaffolding to build and assemble the work; Form the assembly work of the basic cross-network frame of the round arch. The first method takes a long time to construct, consumes a large amount of steel, and is costly; the second method requires multiple cranes to hoist at the same time, which makes coordination difficult, and the basic span is easy to bend and lose stability during the assembly process, resulting in inaccurate positioning and high cost.

发明内容 Contents of the invention

本发明的目的在于提供一种不需要脚手架辅助,仅需一台吊车,可直接拼装,施工简便,安全性高、能够准确定位且经济的一种铰接站板式支座,以解决上述背景技术中提出的问题。 The object of the present invention is to provide a kind of articulated stand plate support that does not need scaffolding assistance, only needs a crane, can be assembled directly, has simple construction, high safety, accurate positioning and economy, so as to solve the problems in the above-mentioned background technology. proposed question.

为实现上述目的,本发明提供如下技术方案: To achieve the above object, the present invention provides the following technical solutions:

一种铰接站板式支座,包括四个支座臂,所述四个支座臂交接处设有圆槽,所述圆槽内放有螺栓球,所述螺栓球上设有若干螺栓孔,所述相对两个支座臂上分别固定有夹板,所述夹板下部设有卡槽,所述卡槽可卡钳固定在夹板上,所述夹板上部设有圆孔,所述圆孔中穿过有无纹螺母,其中心设有通孔,所述通孔内穿过螺栓,所述螺栓螺旋固定在螺栓孔中,所述螺栓可转动,同时带动螺栓球转动。 A hinged stand plate support, including four support arms, a circular groove is provided at the intersection of the four support arms, a bolt ball is placed in the circular groove, and a number of bolt holes are arranged on the bolt ball. Clamps are respectively fixed on the two opposing support arms, and the lower part of the splint is provided with a slot, and the slot can be fixed on the splint by a caliper. The top of the splint is provided with a round hole through which the There is a threadless nut, the center of which is provided with a through hole, the through hole passes through a bolt, and the bolt is helically fixed in the bolt hole, and the bolt is rotatable, and at the same time drives the bolt ball to rotate.

所述无纹螺母与圆孔之间设有轴承。 A bearing is provided between the threadless nut and the round hole.

所述螺栓穿过杆件端部的锥头,所述锥头设有与螺栓的螺杆直径相适应的的圆孔。 The bolt passes through the conical head at the end of the rod, and the conical head is provided with a circular hole adapted to the diameter of the screw rod of the bolt.

所述螺栓的螺杆后端开有凹槽,无纹螺母上设有顶丝固定于所述凹槽中。 The rear end of the screw rod of the bolt is provided with a groove, and the threadless nut is provided with a top screw fixed in the groove.

铰接站板式支座用于安装网架的方法,包括如下步骤: A method for installing a network frame with a hinged stand plate support includes the following steps:

a、将两个铰接站板式支座分别焊接固定在相邻两个预埋钢板上; a. Weld and fix the two hinged platform supports on two adjacent pre-embedded steel plates respectively;

b、在地面上拼装起头跨网架,形成多个网格构成的基本网片; b. Assemble on the ground and start to span the grid to form a basic mesh composed of multiple grids;

c、吊车起吊基本网片,将网片上的两个螺栓球分别放于铰接站板式支座的圆槽内; c. The basic mesh is lifted by the crane, and the two bolt balls on the mesh are respectively placed in the circular grooves of the hinged platform support;

d、将无纹螺母套在轴承内,将轴承放于夹板上的圆孔中,螺栓球两侧的水平相连的无纹螺母内的螺栓依次穿过杆件、无纹螺母,并固定于螺柱球上水平的螺栓孔内,螺柱球另一侧同样方法固定,将基本网片与铰接站板式支座连接成整体,并与铰接站板式支座形成铰接; d. Put the threadless nut in the bearing, put the bearing in the round hole on the splint, and the bolts in the threadless nut connected horizontally on both sides of the bolt ball pass through the rod and the threadless nut in turn, and fix them on the threaded nut. In the horizontal bolt hole on the stud ball, the other side of the stud ball is fixed in the same way, and the basic mesh is connected with the hinged platform support as a whole, and forms a hinge with the hinged platform support;

e、用吊车吊起基本网片,利用无纹螺母和螺栓球形成的铰接点,可调节第一段基本网片的高度与角度,可使工人站在地面上把可形成网架组成的基本单元与第一段基本网片的拼装端安装在一起; e. Use a crane to lift the basic mesh, and use the hinge point formed by the non-threaded nut and the bolt ball to adjust the height and angle of the first section of the basic mesh, so that the workers can stand on the ground and form the basic mesh frame. The unit is installed together with the assembled end of the first basic mesh;

f、随着基本单元不断与起头跨网架基本网片拼装,网架逐渐沿跨度方向加长,吊车也不断提高网架高度,来调节网片拼装端高度,使之总是距离地面合适的高度方便工人地面拼装网架。 f. As the basic unit continues to be assembled with the basic mesh pieces across the grid at the beginning, the grid gradually lengthens along the span direction, and the crane also continuously increases the height of the grid to adjust the height of the mesh assembly end so that it is always at a suitable height from the ground It is convenient for workers to assemble the grid on the ground.

g、当后拼装部分网架到吊车的长度接近于吊车到制作螺栓球网架的距离时,吊车将吊起的网架重新放置到地面上,吊车移动到网架的拼装端,改变索具吊装位置重新起吊; g. When the length of the post-assembled part of the grid to the crane is close to the distance from the crane to the bolted ball grid, the crane will re-place the hoisted grid on the ground, and the crane will move to the assembly end of the grid and change the rigging Re-lift at the hoisting position;

h、重复e、f、g步骤,直到基本跨网架全部拼装完成达,到跨度的另一端,网架支座球就位,基本跨网架安装完毕。 h. Repeat steps e, f, and g until all the basic spanning grids are fully assembled, and at the other end of the span, the grid support balls are in place, and the basic spanning grids are installed.

与现有技术相比,本发明的有益效果是:本发明利用单台吊车调节与螺柱球相连网架的高度与角度,使之适于与下一段网架拼装,有效解决了基本跨安装使用脚手架、多台吊车起吊拼装易失稳、弯折、不易施工、定位不准的问题,同时本发明结构简单,安全性高,操作简单,经济实用。 Compared with the prior art, the beneficial effect of the present invention is: the present invention uses a single crane to adjust the height and angle of the grid connected to the stud balls, making it suitable for assembly with the next section of the grid, effectively solving the problem of basic span installation. Scaffolding and multiple cranes are used for hoisting and assembly, which are prone to instability, bending, difficult construction, and inaccurate positioning. At the same time, the invention has simple structure, high safety, simple operation, and is economical and practical.

附图说明 Description of drawings

图1为本发明结构示意图。 Fig. 1 is a schematic diagram of the structure of the present invention.

图2为本发明剖视图。 Fig. 2 is a sectional view of the present invention.

图3为本发明中夹板结构示意图。 Fig. 3 is a schematic diagram of the splint structure in the present invention.

图4为发明中左视图。 Fig. 4 is the middle left view of the invention.

图5为本发明安装网架示意图。 Fig. 5 is a schematic diagram of the installation grid of the present invention.

具体实施方式 Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。 The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

请参阅图1~4,本发明实施例中,一种铰接站板式支座,包括四个支座臂1,所述四个支座臂1交接处设有圆槽3,所述圆槽3内放有螺栓球2,所述螺栓球2上设有若干螺栓孔21,所述螺栓孔21内刻有螺纹,所述螺栓球2螺栓孔21的位置周围剖平。 Please refer to Figures 1 to 4. In an embodiment of the present invention, a hinged platform support includes four support arms 1, and a circular groove 3 is provided at the intersection of the four support arms 1. The circular groove 3 Bolt ball 2 is placed inside, and described bolt ball 2 is provided with several bolt holes 21, and thread is engraved in described bolt hole 21, and the position of bolt hole 21 of described bolt ball 2 is flattened around.

所述相对两个支座臂上分别固定有夹板5,所述夹板5下部设有卡槽52,所述卡槽52可卡钳固定在夹板5上,所述夹板5上部设有圆孔51,所述圆孔51中穿过有无纹螺母6,所述无纹螺母6的横截面呈六角形,其中心设有通孔,所述无纹螺母6内穿过螺栓7,所述螺栓7的螺杆前端刻有螺纹,可螺旋固定在螺栓孔21中,所述螺栓7的螺杆后端开有凹槽,无纹螺母6上设有顶丝固定于所述凹槽中,所述螺栓7可转动,同时带动螺栓球2转动。 Clamping plates 5 are respectively fixed on the two opposite support arms, and the lower part of the splint 5 is provided with a clamping groove 52, and the clamping groove 52 can be fixed on the clamping plate 5, and the upper part of the clamping plate 5 is provided with a round hole 51, There is a threadless nut 6 passing through the round hole 51, the cross section of the threadless nut 6 is hexagonal, and a through hole is provided in the center, the threadless nut 6 passes through a bolt 7, and the bolt 7 The front end of the screw rod is engraved with threads, which can be screwed and fixed in the bolt hole 21. The rear end of the screw rod of the bolt 7 has a groove, and the threadless nut 6 is provided with a top screw fixed in the groove, and the bolt 7 Can rotate, drive bolt ball 2 to rotate simultaneously.

较优地,所述无纹螺母6与圆孔51之间设有轴承9,所述轴承9内为六边形卡口,该六边形卡口与无纹螺母6的外形相匹配,所述轴承9使螺栓7转动更灵活、自由。 Preferably, a bearing 9 is provided between the threadless nut 6 and the round hole 51, and the inside of the bearing 9 is a hexagonal bayonet, and the hexagonal bayonet matches the shape of the threadless nut 6, so that Above-mentioned bearing 9 makes bolt 7 rotate more flexibly, freely.

较优地,所述螺栓7穿过杆件8内部,所述杆件8中部呈圆柱形,两端呈圆锥状,所述杆件8的两端为锥头81,所述锥头81设有与螺栓7的螺杆直径相适应的的圆孔,所述锥头81顶住无纹螺母6的一端。 Preferably, the bolt 7 passes through the inside of the rod 8, the middle of the rod 8 is cylindrical, and the two ends are conical, and the two ends of the rod 8 are cone heads 81, and the cone 81 is set There is a circular hole suitable for the screw rod diameter of the bolt 7 , and the cone head 81 bears against one end of the threadless nut 6 .

如图5所示,铰接站板式支座用于安装网架的方法,包括如下步骤: As shown in Figure 5, the method for installing the grid frame with the hinged platform support includes the following steps:

a、将两个铰接站板式支座分别焊接固定在两个相对设置的预埋钢板10上; a. Weld and fix the two hinged stand plate supports on the two oppositely arranged pre-embedded steel plates 10 respectively;

b、在地面上拼装起头跨网架,形成多个网格构成的基本网片11; b. Assemble on the ground and start crossing the network frame to form a basic mesh 11 composed of multiple grids;

c、吊车起吊基本网片11,将网片上的两个螺栓球2分别放于铰接站板式支座的圆槽3内; c. The basic mesh 11 is lifted by the crane, and the two bolt balls 2 on the mesh are respectively placed in the circular groove 3 of the hinged platform support;

d、将无纹螺母6套在轴承9内,将轴承9放于夹板5上的圆孔51中,螺栓球2两侧的水平相连的无纹螺母6内的螺栓7依次穿过杆件8、无纹螺母6,并固定于螺柱球2上水平的螺栓孔21内,螺柱球2另一侧同样方法固定,将基本网片11与铰接站板式支座连接成整体,并与铰接站板式支座形成铰接; d. Set the threadless nut 6 in the bearing 9, put the bearing 9 in the round hole 51 on the splint 5, and the bolts 7 in the threadless nut 6 connected horizontally on both sides of the bolt ball 2 pass through the rod 8 in turn , threadless nut 6, and be fixed in the horizontal bolt hole 21 on the stud ball 2, the other side of the stud ball 2 is fixed in the same way, the basic mesh 11 is connected with the hinged station plate type support as a whole, and connected with the hinged The standing plate support forms a hinge;

e、用吊车吊起基本网片11,利用无纹螺母6和螺栓球2形成的铰接点,可调节第一段基本网片11的高度与角度,可使工人站在地面上把可形成网架组成的基本单元12与第一段基本网片的拼装端安装在一起; e. Lift the basic mesh 11 with a crane, and use the hinge point formed by the non-threaded nut 6 and the bolt ball 2 to adjust the height and angle of the first section of the basic mesh 11, so that the worker can stand on the ground and form the mesh The basic unit 12 formed by the frame is installed together with the assembled end of the first section of the basic mesh;

f、随着基本单元12不断与起头跨网架基本网片拼装,网架逐渐沿跨度方向加长,吊车也不断提高网架高度,来调节网片拼装端高度,使之总是距离地面合适的高度方便工人地面拼装网架。 f. As the basic unit 12 is continuously assembled with the basic mesh pieces across the grid at the beginning, the grid gradually lengthens along the span direction, and the crane also continuously increases the height of the grid frame to adjust the height of the mesh assembly end so that it is always appropriate from the ground The height is convenient for workers to assemble the grid on the ground.

g、当后拼装部分网架到吊车的长度接近于吊车到制作螺栓球网架的距离时,吊车将吊起的网架重新放置到地面上,吊车移动到网架的拼装端,改变索具吊装位置重新起吊; g. When the length of the post-assembled part of the grid to the crane is close to the distance from the crane to the bolted ball grid, the crane will re-place the hoisted grid on the ground, and the crane will move to the assembly end of the grid and change the rigging Re-lift at the hoisting position;

h、重复e、f、g步骤,直到基本跨网架全部拼装完成达,到跨度的另一端,网架支座球就位,基本跨网架安装完毕。 h. Repeat steps e, f, and g until all the basic spanning grids are fully assembled, and at the other end of the span, the grid support balls are in place, and the basic spanning grids are installed.

本发明利用单台吊车调节与螺柱球相连网架的高度与角度,使之适于与下一段网架拼装,有效解决了基本跨安装使用脚手架、多台吊车起吊拼装易失稳、弯折、不易施工、定位不准的问题,同时本发明结构简单,安全性高,操作简单,经济实用。 The present invention uses a single crane to adjust the height and angle of the grid connected to the stud balls, making it suitable for assembly with the next segment of the grid, which effectively solves the problem of using scaffolding for basic span installation, and the easy instability and bending of multiple cranes for lifting and assembling , difficult construction, inaccurate positioning, and at the same time, the present invention has simple structure, high safety, simple operation, and is economical and practical.

对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。 It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。 In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (5)

1.一种铰接站板式支座,包括四个支座臂(1),所述四个支座臂(1)交接处设有圆槽(3),所述圆槽(3)内放有螺栓球(2),所述螺栓球(2)上设有若干螺栓孔(21),其特征在于,所述相对两个支座臂上分别固定有夹板(5),所述夹板(5)下部设有卡槽(52),所述卡槽(52)可卡钳固定在夹板(5)上,所述夹板(5)上部设有圆孔(51),所述圆孔(51)中穿过有无纹螺母(6),其中心设有通孔,所述通孔内穿过螺栓(7),所述螺栓(7)螺旋固定在螺栓孔(21)中,所述螺栓(7)可转动,同时带动螺栓球(2)转动。 1. A articulated platform support, including four support arms (1), where a circular groove (3) is provided at the intersection of the four support arms (1), and a circular groove (3) is placed in the circular groove (3) Bolt ball (2), the bolt ball (2) is provided with a number of bolt holes (21), characterized in that splints (5) are respectively fixed on the two opposite support arms, and the splints (5) The lower part is provided with a card slot (52), and the card slot (52) can be fixed on the splint (5) with a caliper. The upper part of the splint (5) is provided with a circular hole (51), and the circular hole (51) passes through There is a threadless nut (6), the center of which is provided with a through hole, and the bolt (7) passes through the through hole, and the bolt (7) is screwed in the bolt hole (21), and the bolt (7) It can be rotated and simultaneously drives the bolt ball (2) to rotate. 2.根据权利要求1所述的铰接站板式支座,其特征在于,所述无纹螺母(6)与圆孔(51)之间设有轴承(9)。 2. The articulated platform support according to claim 1, characterized in that a bearing (9) is provided between the non-threaded nut (6) and the round hole (51). 3.根据权利要求1所述的铰接站板式支座,其特征在于,所述螺栓(7)穿过杆件(8)端部的锥头(81),所述锥头(81)设有与螺栓(7)的螺杆直径相适应的的圆孔。 3. The articulated platform support according to claim 1, characterized in that, the bolt (7) passes through the conical head (81) at the end of the rod (8), and the conical head (81) is provided with A circular hole adapted to the screw diameter of the bolt (7). 4.根据权利要求1所述的铰接站板式支座,其特征在于,所述螺栓(7)的螺杆后端开有凹槽,无纹螺母(6)上设有顶丝固定于所述凹槽中。 4. The articulated platform support according to claim 1, characterized in that, the rear end of the screw of the bolt (7) has a groove, and the threadless nut (6) is provided with a top screw fixed to the groove. in the slot. 5.如权利要求1-4任一项所述的铰接站板式支座用于安装网架的方法,其特征在于,包括如下步骤: 5. The method for installing a network frame with a hinged stand plate support according to any one of claims 1-4, characterized in that it comprises the following steps: a、将两个铰接站板式支座分别焊接固定在两个相对设置的预埋钢板(10)上; a. Weld and fix the two articulated stand plate supports on the two opposite embedded steel plates (10); b、在地面上拼装起头跨网架,形成多个网格构成的基本网片(11); b. Assemble on the ground and start crossing the grid to form a basic grid composed of multiple grids (11); c、吊车起吊基本网片(11),将网片上的两个螺栓球(2)分别放于铰接站板式支座的圆槽(3)内; c. The basic mesh (11) is lifted by the crane, and the two bolt balls (2) on the mesh are respectively placed in the circular grooves (3) of the hinged stand plate support; d、将无纹螺母(6)套在轴承(9)内,将轴承(9)放于夹板(5)上的圆孔(51)中,螺栓球(2)两侧的水平相连的无纹螺母(6)内的螺栓(7)依次穿过杆件(8)、无纹螺母(6),并固定于螺柱球(2)上水平的螺栓孔(21)内,螺柱球(2)另一侧同样方法固定,将基本网片(11)与铰接站板式支座连接成整体,并与铰接站板式支座形成铰接; d. Put the non-threaded nut (6) in the bearing (9), put the bearing (9) in the round hole (51) on the splint (5), and the horizontally connected non-threaded nut on both sides of the bolt ball (2) The bolt (7) in the nut (6) passes through the bar (8) and the threadless nut (6) in turn, and is fixed in the horizontal bolt hole (21) on the stud ball (2), and the stud ball (2 ) The other side is fixed in the same way, and the basic mesh (11) is connected with the hinged platform support as a whole, and forms a hinge with the hinged platform support; e、用吊车吊起基本网片(11),利用无纹螺母(6)和螺栓球(2)形成的铰接点,可调节第一段基本网片(11)的高度与角度,可使工人站在地面上把可形成网架组成的基本单元(12)与第一段基本网片的拼装端安装在一起; e. Lift the basic mesh (11) with a crane, and use the hinge point formed by the non-threaded nut (6) and the bolt ball (2) to adjust the height and angle of the first basic mesh (11), allowing workers to Standing on the ground, install the basic unit (12) that can form a network frame with the assembled end of the first section of basic mesh; f、随着基本单元(12)不断与起头跨网架基本网片拼装,网架逐渐沿跨度方向加长,吊车也不断提高网架高度,来调节网片拼装端高度,使之总是距离地面合适的高度方便工人地面拼装网架; f. As the basic unit (12) continues to be assembled with the basic mesh pieces across the grid at the beginning, the grid gradually lengthens along the span direction, and the crane also continuously increases the height of the grid to adjust the height of the assembled end of the mesh so that it is always above the ground Appropriate height is convenient for workers to assemble the grid on the ground; g、当后拼装部分网架到吊车的长度接近于吊车到制作螺栓球网架的距离时,吊车将吊起的网架重新放置到地面上,吊车移动到网架的拼装端,改变索具吊装位置重新起吊; g. When the length of the post-assembled part of the grid to the crane is close to the distance from the crane to the bolted ball grid, the crane will re-place the hoisted grid on the ground, and the crane will move to the assembly end of the grid and change the rigging Re-lift at the hoisting position; h、重复e、f、g步骤,直到基本跨网架全部拼装完成达,到跨度的另一端,网架支座球就位,基本跨网架安装完毕。 h. Repeat steps e, f, and g until all the basic spanning grids are fully assembled, and at the other end of the span, the grid support balls are in place, and the basic spanning grids are installed.
CN201510287840.5A 2015-05-29 2015-05-29 Hinge station plate-type support and mounting method thereof Pending CN104963412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510287840.5A CN104963412A (en) 2015-05-29 2015-05-29 Hinge station plate-type support and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510287840.5A CN104963412A (en) 2015-05-29 2015-05-29 Hinge station plate-type support and mounting method thereof

Publications (1)

Publication Number Publication Date
CN104963412A true CN104963412A (en) 2015-10-07

Family

ID=54217482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510287840.5A Pending CN104963412A (en) 2015-05-29 2015-05-29 Hinge station plate-type support and mounting method thereof

Country Status (1)

Country Link
CN (1) CN104963412A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442702A (en) * 2015-12-14 2016-03-30 中国民航大学 Multi-layer bolt-sphere node for tensioned integral structure
CN105544992A (en) * 2015-12-15 2016-05-04 安徽中亚钢结构工程有限公司 Detachable hinged standing plate type support and method for installing net rack by means of detachable hinged standing plate type support
CN108571077A (en) * 2018-05-18 2018-09-25 中国二十二冶集团有限公司 Across the rotation axis assembly installation method of rack starting
CN108590204A (en) * 2018-06-11 2018-09-28 中建三局第二建设工程有限责任公司 A kind of frame ball node locating fast adjuster and its installation and adjustment method
CN108643357A (en) * 2018-05-21 2018-10-12 中国二十二冶集团有限公司 Across the installation on ground method of arch grid structure starting and its dedicated infrastructure
CN110552512A (en) * 2019-09-09 2019-12-10 中国一冶集团有限公司 Anti-slip device for assisting installation of net rack
CN111733968A (en) * 2020-06-28 2020-10-02 中建新疆安装工程有限公司 The node ball rotation fixing device of the arched grid frame and the installation system of the arched grid frame
CN112983013A (en) * 2021-02-22 2021-06-18 中国二十二冶集团有限公司 Construction method of large-span net frame walking frame
CN113431204A (en) * 2021-07-21 2021-09-24 安徽中亚钢结构工程有限公司 Stable rotatory rack support
CN116464299A (en) * 2023-04-11 2023-07-21 中国建筑第八工程局有限公司 Hoisting connection structure for lifting space grid

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314963A (en) * 2008-06-24 2008-12-03 浙江大学 A Horizontal Adjustable Stiffness Bearing of Grid Structure
JP2010156166A (en) * 2008-12-29 2010-07-15 Yoshio Suzuki Base isolating apparatus for wooden building structure
CN103485564A (en) * 2013-10-10 2014-01-01 安徽中亚钢结构工程有限公司 Clinker silo top and bottom ring supporting frame structure and construction method thereof
CN203891200U (en) * 2014-05-23 2014-10-22 浙江东南网架股份有限公司 Large-contact-surface rotatable support of large-span spatial lattice structure
CN204252280U (en) * 2014-11-20 2015-04-08 安徽中亚钢结构工程有限公司 A kind of hinged station sheet-type support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314963A (en) * 2008-06-24 2008-12-03 浙江大学 A Horizontal Adjustable Stiffness Bearing of Grid Structure
JP2010156166A (en) * 2008-12-29 2010-07-15 Yoshio Suzuki Base isolating apparatus for wooden building structure
CN103485564A (en) * 2013-10-10 2014-01-01 安徽中亚钢结构工程有限公司 Clinker silo top and bottom ring supporting frame structure and construction method thereof
CN203891200U (en) * 2014-05-23 2014-10-22 浙江东南网架股份有限公司 Large-contact-surface rotatable support of large-span spatial lattice structure
CN204252280U (en) * 2014-11-20 2015-04-08 安徽中亚钢结构工程有限公司 A kind of hinged station sheet-type support

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442702A (en) * 2015-12-14 2016-03-30 中国民航大学 Multi-layer bolt-sphere node for tensioned integral structure
CN105544992A (en) * 2015-12-15 2016-05-04 安徽中亚钢结构工程有限公司 Detachable hinged standing plate type support and method for installing net rack by means of detachable hinged standing plate type support
CN108571077A (en) * 2018-05-18 2018-09-25 中国二十二冶集团有限公司 Across the rotation axis assembly installation method of rack starting
CN108643357A (en) * 2018-05-21 2018-10-12 中国二十二冶集团有限公司 Across the installation on ground method of arch grid structure starting and its dedicated infrastructure
CN108590204A (en) * 2018-06-11 2018-09-28 中建三局第二建设工程有限责任公司 A kind of frame ball node locating fast adjuster and its installation and adjustment method
CN110552512A (en) * 2019-09-09 2019-12-10 中国一冶集团有限公司 Anti-slip device for assisting installation of net rack
CN110552512B (en) * 2019-09-09 2021-10-01 中国一冶集团有限公司 Anti-slip device for assisting installation of net rack
CN111733968A (en) * 2020-06-28 2020-10-02 中建新疆安装工程有限公司 The node ball rotation fixing device of the arched grid frame and the installation system of the arched grid frame
CN112983013A (en) * 2021-02-22 2021-06-18 中国二十二冶集团有限公司 Construction method of large-span net frame walking frame
CN113431204A (en) * 2021-07-21 2021-09-24 安徽中亚钢结构工程有限公司 Stable rotatory rack support
CN116464299A (en) * 2023-04-11 2023-07-21 中国建筑第八工程局有限公司 Hoisting connection structure for lifting space grid

Similar Documents

Publication Publication Date Title
CN104963412A (en) Hinge station plate-type support and mounting method thereof
CN203514794U (en) Adjustable large steel formwork support leg
CN203486802U (en) Balance arm and tower crane
CN103760659A (en) Cable truss type heliostat supporting device
CN202007090U (en) Tower Crane Attached to the Wall Device
CN210177688U (en) A support device for a single fulcrum inclined plane truss steel column group
CN210031517U (en) Be used for striding linear adjustment stop device of single track PC track roof beam of seat
CN220565704U (en) Temporary support template for building construction
CN207917234U (en) It is a kind of can protection against electric shock family line connection flower basket bolt
CN204435222U (en) A kind of cable detection robot for cable-stayed bridge
CN212957556U (en) Scaffold for building engineering convenient to build
CN205288698U (en) Gallows has been restrained to wet electrostatic precipitator positive pole
CN211498517U (en) Stable supporting device for bridge formwork
CN209837464U (en) Large-area roof truss force transfer layer
CN210529935U (en) Primary and secondary beam of steel structure platform
CN109653432B (en) Large area roof truss ceiling module, transfer layer, ground assembly bracket system
CN215805721U (en) Adjustable hinge structure
CN205134971U (en) Pipe truss is assembled and to be increased device
CN207469756U (en) A kind of wall guard board convenient for assembly and disassembly
CN222886983U (en) Steel roof truss interval adjusting device
CN221574774U (en) Hanger for electromechanical engineering
CN112870579A (en) Safety rope suspension device convenient to dismantle and transport
CN223634323U (en) A movable lifting lug device for cantilever scaffolding
CN204266600U (en) A kind of concrete planeness and height controller
CN218342452U (en) Steel bar positioning device for concrete prefabrication

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151007

RJ01 Rejection of invention patent application after publication