CN104947687A CN201510365010.XA CN201510365010A CN104947687A CN 104947687 A CN104947687 A CN 104947687A CN 201510365010 A CN201510365010 A CN 201510365010A CN 104947687 A CN104947687 A CN 104947687A
Authority
CN
China
Prior art keywords
piles
enclosure
underground structure
row
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510365010.XA
Other languages
English (en)
Inventor
王卫东
翁其平
陈永才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201510365010.XA priority Critical patent/CN104947687A/zh
Publication of CN104947687A publication Critical patent/CN104947687A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明属于固定建筑物基坑支护领域的一种地下结构外墙与围护排桩一体化竖向受荷构造。基本技术方案是:围护排桩嵌入地下结构外墙侧壁内,所述围护排桩上设有压顶圈梁,圈梁连接插筋的一端预埋在所述压顶圈梁内,另一端插入地下结构顶板内形成整体浇注连接;或者利用底板连接插筋的一端预埋在所述围护排桩内,另一端插入地下结构底板内整体浇注连接。由于上述地下结构外墙与围护排桩一体化竖向受荷构造的使用,实现了地下结构外墙与围护排桩共同作用,满足了地下结构边跨竖向受荷的要求,从而节省了常规工程中地下结构的边跨工程桩,减少钢筋混凝土材料浪费。

Description

一种地下结构外墙与围护排桩一体化竖向受荷构造
技术领域
本发明属于固定建筑物基坑支护领域与地下结构中利用基坑临时围护排桩共同作用并作为正常使用阶段地下结构边跨竖向受荷的一种地下结构外墙与围护排桩之间的构造,能被广泛应用于采用钻孔灌注桩作为围护体的基坑支护工程中。
背景技术
当前软土地区深大基坑支护工程通常采用大量的钻孔灌注排桩和水平支撑或锚杆等临时结构作为支挡。设置的多道临时水平支撑通常在工作半年至一年后拆除,而临时的钻孔灌注围护桩在施工完成后被遗弃于地下,在基坑周围地层遗留下大量固体障碍物,对地层造成“固体废弃物”污染,存在着能耗高、资源浪费等问题。
基坑围护排桩由于挡土稳定性要求通常插入基础底板以下一定的深度,而地下结构由于边跨受荷要求,通常在地下室外墙下方设置一定数量的工程桩,以抵抗地下结构边跨的水浮力或者压力。常规基坑围护排桩和地下室外墙之间的间距不大,满足地下室外墙施工即可,基坑围护排桩与地下室边桩之间的距离通常在三倍桩径范围内,并且地下室边桩和基坑围护排桩分别按照正常阶段和临时基坑开挖阶段不同工况受力计算,不考虑共同作用。如能够将地下室边桩和基坑支围护排桩相结合,考虑临时钻孔灌注排桩作为正常使用阶段地下室边桩,将常规废弃的临时围护桩作为地下结构的一部分,节约结构外墙下的边桩,节约工程造价,减少钢筋混凝土材料浪费,节能降耗显著,实现可持续发展。
发明内容
本发明所要解决的技术问题是提供了一种能承受竖向的双向受力要求的一种地下结构外墙与围护排桩一体化竖向受荷构造,实现了地下结构外墙与围护排桩共同作用。
为解决上述技术问题,本发明的基本技术方案是:围护排桩嵌入地下结构外墙侧壁内,所述围护排桩上设有压顶圈梁,圈梁连接插筋的一端预埋在所述压顶圈梁内,另一端插入地下结构顶板内形成整体浇注连接。
在上述基本技术方案的基础上,可同时采用底板连接插筋,底板连接插筋的一端预埋在所述围护排桩内,另一端插入地下结构底板内整体浇注连接。作为一种优化,底板连接插筋在所述围护排桩内的水平形状为沿桩壁弧度方向布置,并固定在所述围护排桩的主筋内侧。这样实施的优点是可避免底板连接插筋妨碍围护排桩的混凝土浇筑,因为为方便施工,底板连接插筋需预埋围护排桩内,若底板连接插筋未沿桩壁圆弧方向布置,则会阻碍围护排桩的导管下方,造成围护排桩浇筑混凝土困难。
本发明的另一基本技术方案为: 围护排桩嵌入地下结构外墙侧壁内,底板连接插筋的一端预埋在所述围护排桩内,另一端插入地下结构底板内整体浇注连接。本方案中,可不采用圈梁连接插筋,只使用底板连接插筋。作为一种优化,底板连接插筋在所述围护排桩内的水平形状为沿桩壁弧度方向布置,并固定在所述围护排桩的主筋内侧。
由于上述地下结构外墙与围护排桩一体化竖向受荷构造的使用,实现了地下结构外墙与围护排桩共同作用,满足了地下结构边跨竖向受荷的要求,从而节省了常规工程中地下结构的边跨工程桩,减少钢筋混凝土材料浪费,节能降耗显著,实现可持续发展。
附图说明
下面结合附图和实例及应用施工方法对本发明作进一步的描述。
图1是本发明的压顶圈梁连接示意图。
图2是本发明的基础底板连接示意图。
图3是本发明的基础底板连接剖面图。
具体实施方式
本发明通过将连接插筋将围护排桩和地下结构外墙连接起来,起到方便施工、满足地下结构边跨竖向受荷要求的作用。结合附图,具体描述如下:
如图1所示:围护排桩2嵌入地下结构外墙5侧壁内,围护排桩2上设有压顶圈梁3,在压顶圈梁3施工过程中,圈梁连接插筋1沿压顶圈梁3布置在地下结构顶板6范围内,圈梁连接插筋1在地下结构施工至顶板前,凿除压顶圈梁的保护层,将圈梁连接插筋1逐根掰出,与地下结构顶板6整体浇注,形成整体连接,共同受荷。圈梁连接插筋1应满足现有技术规范中要求的锚固长度,直径及数量应满足地下结构竖向受荷承载力要求。
如图2所示:在围护排桩2施工过程中,将底板连接插筋7预留在围护排桩2内,底板连接插筋7沿桩身布置在基础底板范围内,所述插筋7在地下结构底板8范围内可多排布置。底板连接插筋7在基坑开挖至基底标高后,凿除围护排桩2的保护层,将底板连接插筋7逐根掰出,与地下结构底板8整体浇注,形成整体连接,共同受荷。底板连接插筋7应满足现有建筑结构规范中对锚固长度要求,直径及数量应满足地下结构竖向受荷承载力要求。
圈梁连接插筋1和底板连接插筋7可同时使用,也可分别单独使用。
如图3所示:底板连接插筋7在围护排桩2内呈圆弧状分布,即底板连接插筋7在围护排桩2内的水平形状为沿桩壁弧度方向布置,且固定在围护排桩2主筋10内侧,底板连接插筋7在围护排桩内的长度满足现有建筑结构规范中对锚固长度要求。底板连接插筋7的连接段可事先弯折固定在围护排桩2混凝土保护层范围内,以便基坑开挖后凿除保护层,将底板连接插筋7掰直与地下结构底板8连接。
本发明技术方案中,连接插筋的预埋及连接方式属于现有技术,可采用现有成熟技术完成。
以上对本发明实例所提供的方案详细介绍,对于本领域的一般技术人员,依据本发明实施例的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制,凡依本发明设计思想所做的任何改变都在本发明的保护范围之内。

Claims (5)

1.一种地下结构外墙与围护排桩一体化竖向受荷构造,其特征在于:围护排桩(2)嵌入地下结构外墙(5)侧壁内,所述围护排桩(2)上设有压顶圈梁(3),圈梁连接插筋(1)的一端预埋在所述压顶圈梁(3)内,另一端插入地下结构顶板(6)内形成整体浇注连接。
2.根据权利要求1所述的一种地下结构外墙与围护排桩一体化竖向受荷构造,其特征在于:底板连接插筋(7)的一端预埋在所述围护排桩(2)内,另一端插入地下结构底板(8)内整体浇注连接。
3.根据权利要求2所述的一种地下结构外墙与围护排桩一体化竖向受荷构造,其特征在于:所述底板连接插筋(7)在所述围护排桩(2)内的水平形状为沿桩壁弧度方向布置,并固定在所述围护排桩(2)的主筋(10)内侧。
4.一种地下结构外墙与围护排桩一体化竖向受荷构造,其特征在于:围护排桩(2)嵌入地下结构外墙(5)侧壁内,底板连接插筋(7)的一端预埋在所述围护排桩(2)内,另一端插入地下结构底板(8)内整体浇注连接。
5.根据权利要求4所述的一种地下结构外墙与围护排桩一体化竖向受荷构造,其特征在于:所述底板连接插筋(7)在所述围护排桩(2)内的水平形状为沿桩壁弧度方向布置,并固定在所述围护排桩(2)的主筋(10)内侧。
CN201510365010.XA 2015-06-29 2015-06-29 一种地下结构外墙与围护排桩一体化竖向受荷构造 Pending CN104947687A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510365010.XA CN104947687A (zh) 2015-06-29 2015-06-29 一种地下结构外墙与围护排桩一体化竖向受荷构造

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510365010.XA CN104947687A (zh) 2015-06-29 2015-06-29 一种地下结构外墙与围护排桩一体化竖向受荷构造

Publications (1)

Publication Number Publication Date
CN104947687A true CN104947687A (zh) 2015-09-30

Family

ID=54162705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510365010.XA Pending CN104947687A (zh) 2015-06-29 2015-06-29 一种地下结构外墙与围护排桩一体化竖向受荷构造

Country Status (1)

Country Link
CN (1) CN104947687A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970976A (zh) * 2016-07-26 2016-09-28 华东建筑设计研究院有限公司 一种围护排桩与主体地下结构的竖向连接构造
CN107975043A (zh) * 2018-01-05 2018-05-01 沙焕焕 基坑支护结构与地下结构、基础一体化构造
CN108331015A (zh) * 2017-12-12 2018-07-27 上海市政工程设计研究总院(集团)有限公司 软粘土地基毗邻高填路基综合管廊及其施工工艺
CN111945778A (zh) * 2020-09-07 2020-11-17 哈尔滨工业大学建筑设计研究院 用于市政管网工程的地下排桩管道

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121500A (ja) * 1996-10-16 1998-05-12 Ohbayashi Corp 地下階の外周梁の構築法
CN103669402A (zh) * 2013-12-25 2014-03-26 华东建筑设计研究院有限公司 一种主体地下室外墙与围护桩相结合的桩墙一体化构造
CN204825920U (zh) * 2015-06-29 2015-12-02 华东建筑设计研究院有限公司 一种地下结构外墙与围护排桩一体化竖向受荷构造

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121500A (ja) * 1996-10-16 1998-05-12 Ohbayashi Corp 地下階の外周梁の構築法
CN103669402A (zh) * 2013-12-25 2014-03-26 华东建筑设计研究院有限公司 一种主体地下室外墙与围护桩相结合的桩墙一体化构造
CN204825920U (zh) * 2015-06-29 2015-12-02 华东建筑设计研究院有限公司 一种地下结构外墙与围护排桩一体化竖向受荷构造

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵波: "自支护逆作法在工程基础设计中的应用", 《林业科技情报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970976A (zh) * 2016-07-26 2016-09-28 华东建筑设计研究院有限公司 一种围护排桩与主体地下结构的竖向连接构造
CN108331015A (zh) * 2017-12-12 2018-07-27 上海市政工程设计研究总院(集团)有限公司 软粘土地基毗邻高填路基综合管廊及其施工工艺
CN107975043A (zh) * 2018-01-05 2018-05-01 沙焕焕 基坑支护结构与地下结构、基础一体化构造
CN111945778A (zh) * 2020-09-07 2020-11-17 哈尔滨工业大学建筑设计研究院 用于市政管网工程的地下排桩管道

Similar Documents

Publication Publication Date Title
CN101418569B (zh) 预制拱片、支护与主体结构结合的优化复合拱墙
CN104264688A (zh) 人工挖孔变截面桩支护施工工艺
CN103469798B (zh) 一种基坑支护结构及其施工方法
CN103790393B (zh) 一种既有建筑结构整体置换的施工方法
CN204590038U (zh) 一种永久性基坑支护结构
CN107035159A (zh) 一种适用于框架结构独立基础建筑物地下增层的方法
CN108343450B (zh) 一种新管幕法工作井加固结构及加固方法
CN102691302A (zh) 一种用于深基坑支护的混凝土结构
CN105421477A (zh) 一种塔吊基础的施工方法
CN106894420B (zh) 地下室支护施工方法
CN104947687A (zh) 一种地下结构外墙与围护排桩一体化竖向受荷构造
CN209509554U (zh) 既有建筑物下新增地下室用托换结构
CN204825920U (zh) 一种地下结构外墙与围护排桩一体化竖向受荷构造
KR101187170B1 (ko) 마이크로파일로 전달하는 경사기둥과 기초부 연장 기둥을 라멘골조로 이용한 수직하향증축 시공방법
CN105369799A (zh) 预制桩地下连续墙混凝土预制桩及施工方法
CN108149696A (zh) 一种临时支护土钉墙与永久抗浮锚杆相结合的复合支护结构及施工方法
CN102220764B (zh) 深基坑支护体系的施工方法
CN101793027A (zh) 一种桩心注浆静压锚杆桩
CN105735352A (zh) 一种基于基坑支护桩的地下室外墙装配式结构及施工方法
CN211006701U (zh) 桩墙合一的基坑支护结构
CN204266216U (zh) 一种边坡的竹梁锚固支护结构
CN101979777A (zh) 现浇空芯方桩及其组合型地下连续墙板和施工方法
CN104929137A (zh) 一种桩墙复合结构构造
CN106088762B (zh) 一种插槽式外包钢板预制装配式圆形地下粮仓
CN205502069U (zh) 一种基于基坑支护桩的地下室外墙装配式结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930