CN104934731A - 一种避雷器接地极降阻装置及其降阻方法 - Google Patents

一种避雷器接地极降阻装置及其降阻方法 Download PDF

Info

Publication number
CN104934731A
CN104934731A CN201510296421.8A CN201510296421A CN104934731A CN 104934731 A CN104934731 A CN 104934731A CN 201510296421 A CN201510296421 A CN 201510296421A CN 104934731 A CN104934731 A CN 104934731A
Authority
CN
China
Prior art keywords
resistance
cistern
water
lightning rod
reducing agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510296421.8A
Other languages
English (en)
Other versions
CN104934731B (zh
Inventor
吴天明
吴边尧
黄真辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges Technology Co ltd
China Three Gorges Corp
Original Assignee
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Corp filed Critical China Three Gorges Corp
Priority to CN201510296421.8A priority Critical patent/CN104934731B/zh
Publication of CN104934731A publication Critical patent/CN104934731A/zh
Application granted granted Critical
Publication of CN104934731B publication Critical patent/CN104934731B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Electrical Connectors (AREA)
  • Elimination Of Static Electricity (AREA)

Abstract

一种避雷器接地极降阻装置,该装置包括修建于地面土壤层上的蓄水池,蓄水池上部连通有进水管,蓄水池下部连通有排水管,蓄水池内填充有液体层,蓄水池的池底铺设有碳粉层,蓄水池下的地面土壤层内埋设有避雷针接地极和接地线,避雷针接地极和接地线电气连通,蓄水池的池底为地面土壤层。本发明提供的一种避雷器接地极降阻装置及其降阻方法,可以弥补现有的避雷针接地极电阻降阻方法的不足,从提高土壤含水量,并辅助物理降阻、化学降阻的综合途径,动态降低土壤电阻,实现避雷接地的降阻目的。

Description

一种避雷器接地极降阻装置及其降阻方法
技术领域
本发明涉及避雷安全领域,尤其是一种避雷器接地极降阻装置及其降阻方法。
背景技术
 避雷针包括接闪器、引下线、接地极组成,当大气层中雷云电荷聚集时,避雷针吸引电荷经过接闪器、引下线、接地极形成的放电通道释放进入地面,将电荷减低及中和,避免电荷大量积累而引发强烈雷击事故,或者雷电发生时,让雷电电流从避雷针流入地面,从而保护避雷针覆盖范围内的建筑物或设备。
为了确保避雷针接受的电荷能快速、可靠泄放到地面,接地极应具有尽可能小的接地电阻,国标要求独立的防雷保护接地电阻≤10Ω。
接地极的接地电阻值与接地方式、接地极材料、形状、深度和土壤电阻等多种因素有关。由于土壤电阻与地理环境相关,人工改造较为困难,且施工量大,费用高。当避雷建筑物处于山区、沙土、干旱等高土壤电阻区域时,其防雷保护接地电阻很难达到较低水平。为使防雷保护接地电阻符合国家标准,不得不投入巨资建设防雷接地系统,如增大接地网面积、增加垂直接地体、深埋接地体、土壤置换、土壤掺入降阻剂等方式以实现降阻的效果。但由于环境土壤基质的高阻抗特性,上述措施最终都受到土壤高阻抗制约,雷电放电通道形成瓶颈效应,降阻效果有时并不理想,或者持久性不强。
发明内容
本发明所要解决的技术问题是提供一种避雷器接地极降阻装置及其降阻方法,可以弥补现有的避雷针接地极电阻降阻方法的不足,从提高土壤含水量,并辅助物理降阻、化学降阻的综合途径,动态降低土壤电阻,实现避雷接地的降阻目的。
为解决上述技术问题,本发明所采用的技术方案是:一种避雷器接地极降阻装置,该装置包括修建于地面土壤层上的蓄水池,蓄水池上部连通有进水管,蓄水池下部连通有排水管,蓄水池内填充有液体层,蓄水池的池底铺设有碳粉层,蓄水池下的地面土壤层内埋设有避雷针接地极和接地线,避雷针接地极和接地线电气连通,蓄水池的池底为地面土壤层。
蓄水池侧面设置有水位计。
液体层为水层或含化学降阻剂水层。
碳粉层上还覆盖有黄泥层。
黄泥层的厚度为1~10厘米,黄泥层厚度根据液体渗透速率确定,厚度增加液体渗透速率减小,厚度减小液体渗透速率增加,以满足蓄水池液体容积维持渗透时间至少30天。
一种采用避雷器接地极降阻装置的降阻方法,该方法包括以下步骤:
1)向蓄水池内注满水,水通过碳粉层渗透到蓄水池池底的土壤层中,浸润接地极周围的土壤;
2)经过不少于72小时的自然渗透,测量避雷针接地电阻,根据所测量的避雷针接地电阻值是否≤10Ω,判断是否向蓄水池中加入化学降阻剂:
若避雷针接地电阻值≤10Ω,则无需向蓄水池中加入化学降阻剂,日常运行中保持蓄水池始终有水;
若避雷针接地电阻值>10Ω,则需向蓄水池中加入化学降阻剂,使避雷针接地电阻值≤10Ω,
则实现避雷器接地极长期有效降阻。
     若需向蓄水池中加入化学降阻剂时,先加入质量比例为蓄水池内水质量0.5%的化学降阻剂,再经过72小时自然渗透后,测量避雷针接地电阻值,
若避雷针接地电阻值≤10Ω,则无需再加入化学降阻剂,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%不变;
若避雷针接地电阻值>10Ω,则再加入质量比例为蓄水池内水质量0.5%的化学降阻剂,重复上述步骤,直至测量的避雷针接地电阻值≤10Ω,则无需再增加池水中化学降阻剂的质量比例,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%×加入次数不变;
则实现避雷器接地极长期有效降阻。
蓄水池的容积为一次注满至少维持30天。
本发明提供的一种避雷器接地极降阻装置及其降阻方法,有益效果如下:
1、利用水分缓慢渗透,长期保持接地极周围土壤湿润,降低电阻。实践证明,土壤含水量对电阻率影响明显,当地表土壤中的水份到达地下水位层时,接地极通过低电阻率的表层含水土壤与深层地下土壤连通,起到明显的降阻作用。
2、蓄水池池底的碳粉层中的碳粉,随水分渗透到土壤中,降低电阻。碳粉为导电物质,呈中性,对土壤无毒无害。随液体渗透到土壤中,起到物理降阻作用。
3、采取蓄水池中加入化学降阻剂的方式,形成含电解离子的溶液,随水份的渗透作用深入到土壤里,扩散范围较大,降阻效果好。
4、不受环境影响,降阻效果良好,接地性能稳定可靠。由于采用缓渗方式,水分渗透速度可按实际需要调整,一次补水至少使用30天,日常补水补剂维护工作量小;接地极周围土壤长久保持湿润,不受天气和环境影响,接地电阻值长期保持稳定,接地性能可靠。
5、可以弥补现有的避雷针接地极电阻降阻方法的不足,从提高土壤含水量,并辅助物理降阻、化学降阻的综合途径动态降低土壤电阻,实现避雷接地的降阻目的。
6、可方便地用于已建成避雷接地网的降阻改造。无需对原有接地系统进行重建,直接在原有接地网应用本发明,在接地极地表修建蓄水池等装置,即可实现降阻目标。
7、本发明也可用于其它埋入式接地网,实现降阻效果。
8、碳粉层上覆盖黄泥层的设计,可减缓渗透速度,达到缓渗的效果,并通过增减黄泥层厚度,调节液体渗透速率。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明避雷器接地极降阻装置的结构示意图。
具体实施方式
实施例一
一种避雷器接地极降阻装置,该装置包括修建于地面土壤层7上的蓄水池4,蓄水池4上部连通有进水管3,用于补水,蓄水池4下部连通有排水管6,用于检修排空,蓄水池4顶部铺有活动式盖板,以减少水份蒸发,并方便维护;蓄水池4内填充有液体层2,蓄水池4的池底铺设有碳粉层1,蓄水池4下的地面土壤层7内埋设有避雷针接地极9和接地线8,避雷针接地极9和接地线8电气连通,蓄水池4的池底为地面土壤层7。
蓄水池4侧面设置有水位计5,用于日常水位观测。
液体层2为水层。
碳粉层1上还覆盖有黄泥层, 可减缓渗透速度。
黄泥层的厚度为1~10厘米。黄泥层厚度根据液体渗透速率确定,厚度增加液体渗透速率减小,厚度减小液体渗透速率增加,以满足蓄水池液体容积维持渗透时间至少30天。
蓄水池4池底土壤保持自然渗透状态,蓄水池4其余端面做防渗处理。
向蓄水池4内注满水,水通过碳粉层1渗透到蓄水池4池底的土壤层7中,浸润接地极9周围的土壤;
经过不少于72小时的自然渗透,测量避雷针接地电阻≤10Ω,符合国标,避雷器接地极降阻装置满足要求。
则实现避雷器接地极长期有效降阻。
实施例二
一种采用避雷器接地极降阻装置的降阻方法,该方法包括以下步骤:
1)向蓄水池4内注满水,水通过碳粉层1渗透到蓄水池4池底的土壤层7中,浸润接地极9周围的土壤;
2)经过不少于72小时的自然渗透,测量避雷针接地电阻,根据所测量的避雷针接地电阻值是否≤10Ω,判断是否向蓄水池4中加入化学降阻剂:
若避雷针接地电阻值≤10Ω,则无需向蓄水池4中加入化学降阻剂,日常运行中保持蓄水池始终有水;
若避雷针接地电阻值>10Ω,则需向蓄水池4中加入化学降阻剂,使避雷针接地电阻值≤10Ω,
则实现避雷器接地极长期有效降阻。
    若需向蓄水池4中加入化学降阻剂时,先加入质量比例为蓄水池4内水质量0.5%的化学降阻剂,再经过72小时自然渗透后,测量避雷针接地电阻值,
若避雷针接地电阻值≤10Ω,则无需再加入化学降阻剂,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%不变;
若避雷针接地电阻值>10Ω,则再加入质量比例为蓄水池4内水质量0.5%的化学降阻剂,重复上述步骤,直至测量的避雷针接地电阻值≤10Ω,则无需再加入化学降阻剂,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%×加入次数不变;
则实现避雷器接地极长期有效降阻。
为降低日常运行维护工作量,节约用水用剂,蓄水池4中液体的渗透速度应适当,蓄水池4池底的渗水采用缓渗的方式,蓄水池4的容积为一次注满至少维持30天。
化学降阻剂选用尿醛型化学降阻剂、丙烯酰胺型化学降阻剂,中国专利公开号为CN1030666A公开的固体无机化学接地降阻剂、DJW969型化学降阻剂和XJZ2型化学降阻剂中的一种或多种。
进水管3上可安装自动水位检测和进水控制装置,实现低水位自动补水功能。

Claims (7)

1.一种避雷器接地极降阻装置,其特征在于:该装置包括修建于地面土壤层(7)上的蓄水池(4),蓄水池(4)上部连通有进水管(3),蓄水池(4)下部连通有排水管(6),蓄水池(4)内填充有液体层(2),蓄水池(4)的池底铺设有碳粉层(1),蓄水池(4)下的地面土壤层(7)内埋设有避雷针接地极(9)和接地线(8),避雷针接地极(9)和接地线(8)电气连通,蓄水池(4)的池底为地面土壤层(7)。
2.根据权利要求1所述的一种避雷器接地极降阻装置,其特征在于:蓄水池(4)侧面设置有水位计(5)。
3.根据权利要求1所述的一种避雷器接地极降阻装置,其特征在于:液体层(2)为水层或含化学降阻剂水层。
4.根据权利要求1所述的一种避雷器接地极降阻装置,其特征在于:碳粉层(1)上还覆盖有黄泥层。
5.一种采用避雷器接地极降阻装置的降阻方法,其特征在于该方法包括以下步骤:
1)向蓄水池(4)内注满水,水通过碳粉层(1)渗透到蓄水池(4)池底的土壤层(7)中,浸润接地极(9)周围的土壤;
2)经过不少于72小时的自然渗透,测量避雷针接地电阻,根据所测量的避雷针接地电阻值是否≤10Ω,判断是否向蓄水池(4)中加入化学降阻剂:
若避雷针接地电阻值≤10Ω,则无需向蓄水池(4)中加入化学降阻剂,日常运行中保持蓄水池始终有水;
若避雷针接地电阻值>10Ω,则需向蓄水池(4)中加入化学降阻剂,使避雷针接地电阻值≤10Ω,
则实现避雷器接地极长期有效降阻。
6.根据权利要求5所述的采用一种避雷器接地极降阻装置的降阻方法,其特征在于:若需向蓄水池(4)中加入化学降阻剂时,先加入质量比例为蓄水池(4)内水质量0.5%的化学降阻剂,再经过72小时自然渗透后,测量避雷针接地电阻值,
若避雷针接地电阻值≤10Ω,则无需再加入化学降阻剂,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%不变;
若避雷针接地电阻值>10Ω,则再加入质量比例为蓄水池(4)内水质量0.5%的化学降阻剂,重复上述步骤,直至测量的避雷针接地电阻值≤10Ω,则无需再增加池水中化学降阻剂的质量比例,日常运行中保持蓄水池始终有水并维持化学降阻剂的加入质量比例为0.5%×加入次数不变;
则实现避雷器接地极长期有效降阻。
7.根据权利要求5所述的采用一种避雷器接地极降阻装置的降阻方法,其特征在于:蓄水池(4)池底的渗水采用缓渗的方式,蓄水池(4)的容积为一次注满至少维持30天。
CN201510296421.8A 2015-06-03 2015-06-03 一种避雷器接地极降阻装置及其降阻方法 Active CN104934731B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510296421.8A CN104934731B (zh) 2015-06-03 2015-06-03 一种避雷器接地极降阻装置及其降阻方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510296421.8A CN104934731B (zh) 2015-06-03 2015-06-03 一种避雷器接地极降阻装置及其降阻方法

Publications (2)

Publication Number Publication Date
CN104934731A true CN104934731A (zh) 2015-09-23
CN104934731B CN104934731B (zh) 2017-03-01

Family

ID=54121779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510296421.8A Active CN104934731B (zh) 2015-06-03 2015-06-03 一种避雷器接地极降阻装置及其降阻方法

Country Status (1)

Country Link
CN (1) CN104934731B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105552594A (zh) * 2016-01-30 2016-05-04 武汉大学 一种变电站地网注水渗流降阻装置及方法
CN111786349A (zh) * 2020-06-09 2020-10-16 深圳供电局有限公司 输电线路杆塔跨步电压抑制方法
CN114267969A (zh) * 2021-12-29 2022-04-01 中国人民解放军陆军勤务学院 一种浸润式防雷防静电接地装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1249524A (zh) * 1998-09-30 2000-04-05 李黔鲁 防雷接地稀土降阻剂
CN201294271Y (zh) * 2008-10-21 2009-08-19 吕良 可监测低阻值模块接地装置
CN201352604Y (zh) * 2009-02-16 2009-11-25 陕西电力科学研究院 接地网用高效环保离子接地极
CN102904141A (zh) * 2012-10-30 2013-01-30 山东电力集团公司烟台供电公司 一种接地网的降阻装置
US20130228357A1 (en) * 2010-10-09 2013-09-05 R U Grounded Energy Inc. Electrical ground fault protection device
CN204011773U (zh) * 2014-08-19 2014-12-10 卢家雄 一种防雷接地装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1249524A (zh) * 1998-09-30 2000-04-05 李黔鲁 防雷接地稀土降阻剂
CN201294271Y (zh) * 2008-10-21 2009-08-19 吕良 可监测低阻值模块接地装置
CN201352604Y (zh) * 2009-02-16 2009-11-25 陕西电力科学研究院 接地网用高效环保离子接地极
US20130228357A1 (en) * 2010-10-09 2013-09-05 R U Grounded Energy Inc. Electrical ground fault protection device
CN102904141A (zh) * 2012-10-30 2013-01-30 山东电力集团公司烟台供电公司 一种接地网的降阻装置
CN204011773U (zh) * 2014-08-19 2014-12-10 卢家雄 一种防雷接地装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105552594A (zh) * 2016-01-30 2016-05-04 武汉大学 一种变电站地网注水渗流降阻装置及方法
CN111786349A (zh) * 2020-06-09 2020-10-16 深圳供电局有限公司 输电线路杆塔跨步电压抑制方法
CN111786349B (zh) * 2020-06-09 2021-12-07 深圳供电局有限公司 输电线路杆塔跨步电压抑制方法
CN114267969A (zh) * 2021-12-29 2022-04-01 中国人民解放军陆军勤务学院 一种浸润式防雷防静电接地装置
CN114267969B (zh) * 2021-12-29 2022-09-23 中国人民解放军陆军勤务学院 一种浸润式防雷防静电接地装置

Also Published As

Publication number Publication date
CN104934731B (zh) 2017-03-01

Similar Documents

Publication Publication Date Title
Berti et al. Physical interpretation of rainfall thresholds for runoff‐generated debris flows
Jin et al. Valley reshaping and damming induce water table rise and soil salinization on the Chinese Loess Plateau
Holden et al. Infiltration, runoff and sediment production in blanket peat catchments: implications of field rainfall simulation experiments
Poesen et al. Gully erosion: procedures to adopt when modelling soil erosion in landscapes affected by gullying
CN105786032B (zh) 一种试验区地下水位精确控制系统与方法
Shin et al. Sediment and hydrological response to vegetation recovery following wildfire on hillslopes and the hollow of a small watershed
CN201498612U (zh) 利用杆塔基础降低输电线路接地电阻的接地装置
CN207392215U (zh) 一种岩质边坡生态绿化护坡装置
Ng et al. Monitoring the performance of unsaturated soil slopes
Luo et al. Performance and application of a novel drainage anti-slide pile on accumulation landslide with a chair-like deposit-bedrock interface in the Three Gorges Reservoir area, China
CN104934731A (zh) 一种避雷器接地极降阻装置及其降阻方法
Huckleberry et al. Climatic, geomorphic, and archaeological implications of a late Quaternary alluvial chronology for the lower Salt River, Arizona, USA
CN203284786U (zh) 具备地下水收集利用功能的边坡抗滑及预警系统
CN101261262B (zh) 土壤淋溶原位检测方法
Moore et al. Does shrub removal increase groundwater recharge in southwestern Texas semiarid rangelands?
CN201868583U (zh) 一种防雷接地体埋设结构
CN106683745A (zh) 用于改变土壤电阻的改阻剂
CN207967337U (zh) 一种耐雷输电杆塔
Baiocchi et al. Sustainable yield of fractured rock aquifers: The case of crystalline rocks of Serre Massif (Calabria, Southern Italy)
CN201495465U (zh) 粉土填料公路路基结构
Josifovski et al. Some experience in numerical modelling of unsaturated slope instabilities
CN205581667U (zh) 一种试验区地下水位精确控制装置
Capra et al. Morphological characteristics of ephemeral gullies in Sicily, South Italy
Youngs et al. Hydraulic conductivity profiles of two clay soils
Miyazaki et al. Shallow groundwater dynamics controlled by Lisse and reverse Wieringermeer effects

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee after: CHINA THREE GORGES Corp.

Address before: 443002 No. 1, Jianshe Road, Hubei, Yichang

Patentee before: CHINA THREE GORGES Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20211210

Address after: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee after: CHINA THREE GORGES Corp.

Patentee after: Three Gorges Technology Co.,Ltd.

Address before: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee before: CHINA THREE GORGES Corp.

TR01 Transfer of patent right