CN104912042A - Long water diversion tunnel stone collecting pit structure - Google Patents

Long water diversion tunnel stone collecting pit structure Download PDF

Info

Publication number
CN104912042A
CN104912042A CN201510339110.5A CN201510339110A CN104912042A CN 104912042 A CN104912042 A CN 104912042A CN 201510339110 A CN201510339110 A CN 201510339110A CN 104912042 A CN104912042 A CN 104912042A
Authority
CN
China
Prior art keywords
stone
diversion tunnel
pit structure
water
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510339110.5A
Other languages
Chinese (zh)
Inventor
苟芳蓉
杨怀德
陈子海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201510339110.5A priority Critical patent/CN104912042A/en
Publication of CN104912042A publication Critical patent/CN104912042A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a long water diversion tunnel stone collecting pit structure, in particular to the long water diversion tunnel stone collecting pit structure applied to the technical field of water resource and hydroelectric engineering. The long water diversion tunnel stone collecting pit structure effectively prevents block stone accumulated in stone collecting pits from being taken away by water flow to damage water resource and hydroelectric equipment. The long water diversion tunnel stone collecting pit structure comprises pit bodies arranged separately, and grille bars are arranged inside the pit bodies. The long water diversion tunnel stone collecting pit structure further comprises tooth grooves, the tooth grooves are fixed inside the pit bodies, and the two ends of each grille bar are placed in the corresponding tooth grooves. The grille bars arranged inside the pit bodies are used for preventing the block stone in the stone collecting pits from being taken away by the water flow. When the block stone in the stone collecting pits generates a trend to flow away in the water flow direction under the function of the water flow, the grille bars arranged inside the pit bodies generate corresponding resistance to the block stone, under the resistance function of the grille bars, the block stone can not be taken away by the water flow, and in this way, the block stone can be effectively avoided flowing away with the water flow to enter a water turbine after passing through a pressure balance chamber and a pressure pipeline to damage the water turbine.

Description

The long diversion tunnel collection stone pit structure
Technical field
The present invention relates to a kind of the long diversion tunnel collection stone pit structure, particularly a kind of the long diversion tunnel collection stone pit structure being applied to Hydraulic and Hydro-Power Engineering technical field.
Background technology
In Hydraulic and Hydro-Power Engineering, run because the long diversion tunnel mostly is the mode that shotcrete bolt lining is combined with concrete lining, quote flow large, diversion tunnel is long, be inconvenient to overhaul, a lot of spray-up concrete block and stone is had to drop in diversion tunnel in shotcrete bolt lining section, for the security of operation in power station is considered, according to diversion tunnel length, one or more snippets collection stone pit is set, collection stone pit is arranged along water (flow) direction usually, each section of collection stone pit is divided into a few railway carriage or compartment to separate setting, collect diversion tunnel drives walking along the line block stone through current, block stone falls into collection stone pit and piles up, block stone in stone pit will be collected remove when power station is overhauled.In the prior art, often pile up some block stones inside the collection stone pit that the long diversion tunnel is arranged, wherein some block stone will be taken away with current, and through surge-chamber, pressure pipeline enters the hydraulic turbine, produce destroy the hydraulic turbine.Therefore also do not have a kind of block stone piled up in collection stone pit that can effectively prevent to be taken away by current in prior art, and then destroy the long diversion tunnel collection stone pit structure of the hydraulic turbine.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of block stone piled up in collection stone pit that can effectively prevent and is taken away by current, and then destroys the long diversion tunnel collection stone pit structure of water conservancy and hydropower equipment.
For solving the problems of the technologies described above, the long diversion tunnel collection stone pit structure that the present invention adopts, comprise the hole body separated and arrange, the inside of described hole body is provided with grille strip.
Further, also comprise teeth groove, it is inner that described teeth groove is fixed on hole body, and the two ends of described grille strip are placed in teeth groove.
Further, the surrounding of described teeth groove is provided with muscle pawl, and described muscle pawl is imbedded in the body of hole.
Further, the two ends of described grille strip are provided with hanger.
Further, the mid portion of described grille strip is strip, and the scope of the included angle A of its normal orientation and horizontal direction is 10 ° of <A<80 °.
Further, the scope of the described normal orientation of grille strip mid portion and the included angle A of horizontal direction is 43 ° of <A<47 °.
Further, concora crush hole is also provided with between described adjacent pits body.
The invention has the beneficial effects as follows: the grille strip that the inside of hole body is arranged is used for preventing the block stone collected in stone pit from being taken away by current.Produce in the trend that water (flow) direction flows away under collecting the effect of the block stone in stone pit at current, the grille strip being arranged on body inside, hole produces corresponding resistance to block stone, under the drag effect of grille strip, block stone can not be taken away by current, so just can effectively avoid block stone with current, through surge-chamber, pressure pipeline enters the hydraulic turbine, produces destroy the hydraulic turbine.It is inner that teeth groove is used for grille strip being fixed on hole body.The surrounding of teeth groove is provided with muscle pawl, is imbedded by muscle pawl in the body of hole, reliably can fix like this to teeth groove during construction.The two ends of grille strip are provided with installation and replacing that hanger can facilitate grille strip.The mid portion of the strip of grille strip, from the horizontal by certain angle slant setting, better can play barrier effect to block stone.The concora crush hole arranged between adjacent pits body is used for balancing water pressure the ponding of discharging in time in the body of hole.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the longitudinal plan of the present invention along canal axes;
Fig. 3 is sectional view of the present invention;
Fig. 4 is the structural representation of teeth groove of the present invention;
Fig. 5 is the front view of grille strip of the present invention;
Fig. 6 is the left view of grille strip of the present invention;
Component, position and numbering in figure: hole body 1, grille strip 2, teeth groove 3, muscle pawl 4, hanger 5, mid portion 6, included angle A, concora crush hole 7.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, Figure 2 and Figure 3, the long diversion tunnel collection stone pit structure of the present invention, comprise spaced hole body 1, the inside of described hole body 1 is provided with grille strip 2.The grille strip 2 that the inside of hole body 1 is arranged is used for preventing the block stone collected in stone pit from being taken away by current.Produce in the trend that water (flow) direction flows away under collecting the effect of the block stone in stone pit at current, the grille strip 2 being arranged on body 1 inside, hole produces corresponding resistance to block stone, under the drag effect of grille strip 2, block stone can not be taken away by current, so just can effectively avoid block stone with current, through surge-chamber, pressure pipeline enters the hydraulic turbine, produces destroy the hydraulic turbine.
Also comprise teeth groove 3, it is inner that described teeth groove 3 is fixed on hole body 1, and the two ends of described grille strip 2 are placed in teeth groove 3.It is inner that teeth groove 3 is used for grille strip 2 being fixed on hole body 1.
The surrounding of described teeth groove 3 is provided with muscle pawl 4, and described muscle pawl 4 is imbedded in the body 1 of hole.The surrounding of teeth groove 3 is provided with muscle pawl 4, is imbedded by muscle pawl 4 in the body 1 of hole, reliably can fix like this to teeth groove 3 during construction.
The two ends of described grille strip 2 are provided with hanger 5.The two ends of grille strip 2 are provided with installation and replacing that hanger 5 can facilitate grille strip 2.
The mid portion 6 of described grille strip 2 is strip, and the scope of the included angle A of its normal orientation and horizontal direction is 10 ° of <A<80 °.The mid portion 6 of the strip of grille strip 2, from the horizontal by certain angle slant setting, better can play barrier effect to block stone.
The scope of the described normal orientation of grille strip 2 mid portion 6 and the included angle A of horizontal direction is 43 ° of <A<47 °.When aforementioned range is selected at the angle of inclination of grille strip 2, it be the best to the blocking effect of block stone.
Concora crush hole 7 is also provided with between described adjacent pits body 1.The concora crush hole 7 arranged between adjacent pits body 1 is used for balancing water pressure the ponding of discharging in time in the body 1 of hole.

Claims (7)

1. the long diversion tunnel collection stone pit structure, comprises the hole body (1) separated and arrange, it is characterized in that: the inside in described hole body (1) is provided with grille strip (2).
2. the long diversion tunnel collection stone pit structure as claimed in claim 1, it is characterized in that: also comprise teeth groove (3), it is inner that described teeth groove (3) is fixed on hole body (1), and the two ends of described grille strip (2) are placed in teeth groove (3).
3. the long diversion tunnel collection stone pit structure as claimed in claim 1, is characterized in that: the surrounding of described teeth groove (3) is provided with muscle pawl (4), and described muscle pawl (4) is imbedded in hole body (1).
4. the long diversion tunnel collection stone pit structure as claimed in claim 1, is characterized in that: the two ends of described grille strip (2) are provided with hanger (5).
5. as right 1 require as described in the long diversion tunnel collection stone pit structure, it is characterized in that: the mid portion (6) of described grille strip (2) is strip, the scope of the angle (A) of its normal orientation and horizontal direction is 10 ° of <A<80 °.
6. the long diversion tunnel collection stone pit structure as claimed in claim 5, is characterized in that: the scope of the normal orientation of described grille strip (2) mid portion (6) and the angle (A) of horizontal direction is 43 ° of <A<47 °.
7. the long diversion tunnel collection stone pit structure as claimed in claim 1, is characterized in that: be also provided with concora crush hole (7) between described adjacent pits body (1).
CN201510339110.5A 2015-06-17 2015-06-17 Long water diversion tunnel stone collecting pit structure Pending CN104912042A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510339110.5A CN104912042A (en) 2015-06-17 2015-06-17 Long water diversion tunnel stone collecting pit structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510339110.5A CN104912042A (en) 2015-06-17 2015-06-17 Long water diversion tunnel stone collecting pit structure

Publications (1)

Publication Number Publication Date
CN104912042A true CN104912042A (en) 2015-09-16

Family

ID=54081448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510339110.5A Pending CN104912042A (en) 2015-06-17 2015-06-17 Long water diversion tunnel stone collecting pit structure

Country Status (1)

Country Link
CN (1) CN104912042A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201473935U (en) * 2009-08-19 2010-05-19 中国水电顾问集团华东勘测设计研究院 Diversion tunnel stone-pit structure
CN201722673U (en) * 2010-05-19 2011-01-26 中国水电顾问集团华东勘测设计研究院 Hydraulic tunnel stone pit reconstructed according to TBM assembled in tunnel
US20120020734A1 (en) * 2010-07-22 2012-01-26 Ross James M Environmentally safe hydro-electric pipeline and water delivery system
CN203741796U (en) * 2013-12-24 2014-07-30 中国水电顾问集团贵阳勘测设计研究院有限公司 Water filling pressure and flatting structure used for long water diversion tunnel valve

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201473935U (en) * 2009-08-19 2010-05-19 中国水电顾问集团华东勘测设计研究院 Diversion tunnel stone-pit structure
CN201722673U (en) * 2010-05-19 2011-01-26 中国水电顾问集团华东勘测设计研究院 Hydraulic tunnel stone pit reconstructed according to TBM assembled in tunnel
US20120020734A1 (en) * 2010-07-22 2012-01-26 Ross James M Environmentally safe hydro-electric pipeline and water delivery system
CN203741796U (en) * 2013-12-24 2014-07-30 中国水电顾问集团贵阳勘测设计研究院有限公司 Water filling pressure and flatting structure used for long water diversion tunnel valve

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜跃良,何涛: "金沙江溪洛渡水电站进水口分层取水措施设计", 《水资源保护》 *
徐光亮: "渔子溪一级电站引水隧洞集石坑的设计与运用情况", 《水力发电》 *

Similar Documents

Publication Publication Date Title
CN204238170U (en) A kind of open channel scouring on bedrock model test apparatus
CN101886374B (en) Groove bottom-reinforced fully lined debris flow drainage groove and construction method thereof
CN101463593A (en) Design method and use of transversal dentated sill embedded depth of foundation based on debris flow soft foundation energy dissipating
CN107386285A (en) A kind of novel steel tube pile foundation rock borehole anchorage method
CN104863101A (en) Hydropower station water-reducing river reach fish habitat protection system
CN103603666B (en) Tailing pond sand excavation method
CN104747197B (en) A kind of balancing earth-pressure shielding machine soil storehouse mud cake detection device
CN204492828U (en) A kind of balancing earth-pressure shielding machine soil storehouse mud cake sniffer
CN204825931U (en) Protective structure is administered to side slope
CN104912042A (en) Long water diversion tunnel stone collecting pit structure
CN205100185U (en) Long diversion tunnel ji shikeng
CN205591174U (en) Interlocking brick slope protection structure that anti ice of energy dissipation pushed away
CN204940223U (en) River course water-reducing river reach fish habitat protection structure
CN204703157U (en) The supporting pile structure of the recoverable prestress anchorage cable that a kind of linear pattern is arranged
CN203977414U (en) Novel spiral stake
CN205116201U (en) Open caisson construction equipment
CN106013008B (en) Energy-dissipating structure for mountain channel diversion canal
CN210368862U (en) Dam middle level corridor turns over sediment structure
CN204644994U (en) A kind of outlet structure escape works structure
CN203821325U (en) Closure building on open and deep soft foundation river
CN102352617B (en) Bulb-tubular hydropower station plant diverting constructing method
CN207879338U (en) A kind of single-blade hob with cooling function
CN101691744A (en) Overflow pre-settling construction method for concrete face rock-fill dam
CN205742108U (en) Energy-dissipating structure for high flow rate diversion canal
CN205934877U (en) Stone collecting pit structure of diversion tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150916