CN104879142B - Tunnel wide splash guard mounting platform pin-lift arrangement - Google Patents

Tunnel wide splash guard mounting platform pin-lift arrangement Download PDF

Info

Publication number
CN104879142B
CN104879142B CN201510197289.5A CN201510197289A CN104879142B CN 104879142 B CN104879142 B CN 104879142B CN 201510197289 A CN201510197289 A CN 201510197289A CN 104879142 B CN104879142 B CN 104879142B
Authority
CN
China
Prior art keywords
pin
jacking
reinforcing bar
lifting pin
splash guard
Prior art date
Application number
CN201510197289.5A
Other languages
Chinese (zh)
Other versions
CN104879142A (en
Inventor
周立新
邓卫东
郑杭蓉
Original Assignee
邓卫东
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 邓卫东 filed Critical 邓卫东
Priority to CN201510197289.5A priority Critical patent/CN104879142B/en
Publication of CN104879142A publication Critical patent/CN104879142A/en
Application granted granted Critical
Publication of CN104879142B publication Critical patent/CN104879142B/en

Links

Abstract

The invention discloses a kind of tunnel wide splash guard mounting platform pin-lift arrangement, including lifting pin, the two ends of the lifting pin are connected with jacking apparatus, the lifting pin is removably secured on jacking apparatus, the lifting pin surface is provided with some software jacking heads and steel bar positioning frame, the software jacking head, steel bar positioning frame are distributed along lifting pin length direction, the various location of the software jacking head and steel bar positioning frame on lifting pin surface;The pin-lift arrangement of the present invention is used on splash guard mounting platform, the installation of splash guard, geotextiles not only can be realized, multiple process procedures such as bar-mat reinforcement colligation can also be realized, the needs of sharp two kind tunneling operations are realized simultaneously, the process implementation method of equipment is simplified, equipment failure rate is reduced, is mitigated constructing tunnel and labour intensity is installed, efficiency of construction is improve, the installation positioning precision of reinforcing bar is improve.

Description

Tunnel wide splash guard mounting platform pin-lift arrangement

Technical field

The present invention relates to a kind of tunnel wide splash guard mounting platform pin-lift arrangement, belongs to tunnel water proofing panel mounting tool Technical field.

Background technology

The patent document of Publication No. CN103899337A discloses a kind of tunnel wide splash guard mounting platform and installation Method, the front laid rail of the platform, rear layings have on track respectively front laying dolly, lay dolly afterwards, front laying dolly, rear laying Support base being provided with dolly, the spool for placing rolling splash guard being installed between support base, spool is driven by driving means Dynamic rotation is unreeled and launches splash guard;Multiple lifting pins are set between front laying track and rear laying track, lifting pin is along arch Shape laying track ring is evenly arranged, the two ends of each lifting pin by jacking apparatus in mounting bracket, expansion anti- Water plate is laid on lifting pin, and lifting pin jacking, the splash guard being laid on lifting pin are lifted tunnel by jacking apparatus Contoured surface.

Above-mentioned mounting platform realizes mechanization, the automation of construction technology process and construction overall process, reduces artificial high-altitude Lifting work intensity, construction quality and efficiency of construction are greatly improved, and reduce the security risk in work progress.

As the lifting pin by jacking apparatus jacking needs to take into account splash guard jacking and reinforced bar engineering two kinds of functions of installation, Therefore inconvenience there is in use.

Content of the invention

It is an object of the invention to provide a kind of tunnel wide splash guard mounting platform top for effectively improving efficiency of construction Lever apparatus.

In order to reach above-mentioned technical purpose, the technical scheme is that:

A kind of tunnel wide splash guard mounting platform pin-lift arrangement, including lifting pin, the two ends and top of the lifting pin Device connection is risen, the lifting pin is removably secured on jacking apparatus, and the lifting pin surface is provided with some software tops Lifting head and steel bar positioning frame, the software jacking head, steel bar positioning frame are distributed along lifting pin length direction, the software jacking Head with steel bar positioning frame lifting pin surface various location.

The steel bar positioning frame includes that axle placed by reinforcing bar, and reinforcing bar is placed axle and is rotatably arranged at lifting pin surface, the steel Muscle is placed axle surface and is provided with the stopper slot for placing reinforcing bar.Slip in the stopper slot of axle is placed to reduce reinforcing bar in reinforcing bar Frictional force, the reinforcing bar are placed axle and are rotatably arranged at lifting pin surface.

Place in the stopper slot of axle in order to reinforcing bar is strapped in reinforcing bar, reinforcing bar is provided with above the reinforcing bar placement axle spacing Fix bar.

The reinforcing bar is placed axle, the spacing fix bar of reinforcing bar and is fixed in the following manner:Arrange on the lifting pin surface many Individual installing rack, the reinforcing bar are placed axle and are rotatably arranged on installing rack, place above axle in reinforcing bar, are provided with steel on installing rack The installing hole of the spacing fix bar insertion of muscle.After reinforcing bar is placed on reinforcing bar to be placed in the stopper slot of axle, reinforcing bar is spacing through side Fix bar is through the installing hole on installing rack.Place in the stopper slot of axle so as to reinforcing bar is strapped in reinforcing bar.

Balladeur train dolly is provided with the lifting pin, and the balladeur train dolly straddles reinforcing bar and places above axle, the cunning Frame dolly is walked on the length direction of lifting pin by roller.Balladeur train dolly is used for carrying reinforcing bar, and reinforcing bar is distributed to top On rising stem.

Walking track is provided with the lifting pin, and the roller of the balladeur train dolly is spacing to walk in walking track.OK On the one hand walk track is used for balladeur train carriage walking, and on the one hand balladeur train dolly can be fixed being limited in walking track.

Preferably, lifting pin is fixed on jacking apparatus in the following manner:The top of jacking apparatus is provided with fixation Hole, the end of the lifting pin are arranged in fixing hole, and in fixing hole, the end of the lifting pin is provided with location hole, institute The position for stating location hole is corresponding with the position of software jacking head, steel bar positioning frame;At fixing hole, set on the jacking apparatus Pin-and-hole is equipped with, latch is fixed on lifting pin on jacking apparatus through the pin-and-hole on jacking apparatus, the location hole on lifting pin.Insert When pin is extracted, lifting pin can be rotated on jacking apparatus, and when desired location is turned to, latch is through the pin on jacking apparatus Location hole on hole, lifting pin is fixed on lifting pin on jacking apparatus.Can thus realize to software jacking head or reinforcing bar The selection of positioning rack position, is easy to follow-up constructing operation.Preferably, the software jacking head, steel bar positioning frame are set respectively Put in the upper surface of lifting pin, lower surface, i.e. the installation site difference 180 degree of software jacking head, steel bar positioning frame, certainly, this Invention does not limit the angle differed between software jacking head, steel bar positioning frame installation site.

Pin-lift arrangement of the present invention realizes splash guard jacking, reinforcement installation function, is required for using according to two kinds of construction technologies The characteristics of jack-up system, by two kinds of Fixture Designs on same lifting pin, realize that function turns by the rotation of locus, conversion Change, in limited frame for movement space, while realizing the needs of sharp two kinds of tunneling operations, share a set of lifting body, save profit Equipment lifting body, simplifies the process implementation method of equipment, reduces equipment failure rate.And, can realize reinforcing bar positioning, Dispersion, mitigates constructing tunnel and installs labour intensity, improve efficiency of construction, improve the installation positioning precision of reinforcing bar, prevent reinforcing bar from sticking up Rise, after reinforcing bar colligation is finished, pin-lift arrangement freely can be given up the throne, improve reinforcing bar spatial positioning accuracy, protect splash guard.

Description of the drawings

The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.

Fig. 1 be pin-lift arrangement of the present invention in splash guard jacking view.

Fig. 2 be pin-lift arrangement of the present invention in reinforcement installation view.

Specific embodiment

As shown in Figure 1, 2, tunnel wide splash guard mounting platform pin-lift arrangement, including lifting pin 1, the lifting pin 1 Two ends be provided with jacking apparatus 3, the top of jacking apparatus 3 is provided with fixing hole, and the end of the lifting pin 1 is arranged on fixation In hole, in fixing hole, the end of the lifting pin 1 is provided with location hole, the position of the location hole and software jacking 2, The position of steel bar positioning frame is corresponding, and corresponding to herein is referred to:When select certain location hole when, can make software jacking 2 or Steel bar positioning frame is in running order.At fixing hole, pin-and-hole on the jacking apparatus 3, is provided with, latch 11 is filled through jacking The location hole that puts on the pin-and-hole on 3, lifting pin 1 is fixed on lifting pin 1 on jacking apparatus 3.Certain location hole is selected, i.e., by inserting The insertion of pin is selecting.

1 surface of lifting pin is provided with some software jackings 2 and steel bar positioning frame, and software jacking 2, steel bar positioning frame is equal It is distributed along 1 length direction of lifting pin, the various location of software jacking 2 and steel bar positioning frame on 1 surface of lifting pin, such as Fig. 1, Software jacking 2, steel bar positioning frame shown in 2 be separately positioned on the upper surface of lifting pin 1, lower surface, i.e. software jacking 2, The installation site difference 180 degree of steel bar positioning frame.

Steel bar positioning frame includes that axle 5 placed by reinforcing bar, and reinforcing bar is placed axle 5 and is rotatably arranged at 1 surface of lifting pin, and reinforcing bar is placed 5 surface of axle is provided with the stopper slot 10 for placing reinforcing bar.Specifically, multiple installing racks 4 are set on 1 surface of lifting pin, reinforcing bar is put Put axle 5 to be rotatably arranged on installing rack 4, place above axle 5 in reinforcing bar, on installing rack 4, be provided with installing hole, reinforcing bar is spacing solid In installing hole on the insertion installing rack 4 of fixed pole 6, the spacing fix bar 6 of reinforcing bar is just located at reinforcing bar and places above axle 5, for by reinforcing bar It is strapped in reinforcing bar to place in the stopper slot 10 on 5 surface of axle.

Balladeur train dolly 7 is additionally provided with lifting pin 1, and the balladeur train dolly 7 is straddled (also rides above reinforcing bar placement axle 5 Across above the spacing fix bar 6 of reinforcing bar), walking track is provided with lifting pin 1, the roller 9 of the balladeur train dolly 7 is spacing to be expert at Walk walking in track 8.

When anchor bar of waterproof plate in tunnels is constructed, using software jacking 2, software jacking 2 is upward.In tunnel reinforcement engineering construction When, latch 11 to be extracted, lifting pin 1 rotates 180 ° on jacking apparatus 3, then by latch 11 through the pin-and-hole on jacking apparatus 3 11st, the location hole on lifting pin 1 is fixed on lifting pin 1 on jacking apparatus 3.Now splash guard software jacking 2 rotates down, Using steel bar positioning frame, thus two sets of tool structures of effectively solving, space occupy-place, the problem that interferes, realize two kinds of function phases Mutually change.A load traveling balladeur train dolly 7 is designed on the lifting pin 1 of chassis, and binding reinforcement locating rack, reinforcing bar are lifted on cunning On frame dolly 7, using manually or mechanically mode, walk along lifting pin 1, in the process of walking, dispersion reinforcing bar places axle 5 in reinforcing bar On.

In splash guard jacking working condition, the latch 11 on lifting pin 1 is extracted, artificial operation upset lifting pin 1 makes soft Body jacking 2 inserts fixation upwards, then by latch 11, waits splash guard to be laid.

Reinforcing bar jacking working condition:Latch 11 on lifting pin 1 is extracted, artificial operation upset lifting pin 1 makes reinforcing bar fixed Position frame inserts fixation upwards, then by latch 11, takes out the spacing fix bar 6 of reinforcing bar, waits reinforcing bar to be placed to place the limit of axle 5 to reinforcing bar In the groove 10 of position.Reinforcing bar is placed on balladeur train dolly 7, using Manual-pushing balladeur train dolly 7, reinforcing bar dispersion is placed on reinforcing bar and is put Put in the stopper slot 10 of axle 5, after completing steel bar arrangement, manually spacing for reinforcing bar fix bar 6 is inserted on installing rack 4 one by one from side In the installing hole of setting, reinforcing bar is strapped in reinforcing bar and is placed in the stopper slot 10 of axle 5, wait subsequent construction.Jacking apparatus 3 will top 1 jacking of rising stem, now reinforcing bar top radially slide that (now reinforcing bar is placed axle 5 and rotated, and subtracts along the stopper slot 10 that axle 5 placed by reinforcing bar Few force of sliding friction), due to the effect of the spacing fix bar 6 of reinforcing bar, reinforcing bar without departing from fixed position, when by reinforcing bar jacking to When positioning is put, after reinforcing bar colligation is finished, the spacing fix bar 6 of reinforcing bar is manually exited, and lifting pin 1 freely can be given up the throne, so as to carry High reinforcing bar spatial positioning accuracy, protects splash guard.When balladeur train dolly 7 walk one end complete steel bar arrangement after, balladeur train dolly can To be unloaded from walking track 8 by dismounting.

The pin-lift arrangement of the present invention is used on splash guard mounting platform, not only can realize the peace of splash guard, geotextiles Dress, can also realize multiple process procedures such as bar-mat reinforcement colligation, while realizing the needs of sharp two kinds of tunneling operations, simplify equipment Process implementation method, reduce equipment failure rate, mitigate constructing tunnel and labour intensity is installed, improve efficiency of construction, improve The installation positioning precision of reinforcing bar.

Above-described embodiment limits the present invention never in any form, every is obtained by the way of equivalent or equivalent transformation Technical scheme all fall within protection scope of the present invention.

Claims (8)

1. a kind of tunnel wide splash guard mounting platform pin-lift arrangement, including lifting pin, the two ends of the lifting pin and jacking Device connects, it is characterised in that:The lifting pin is removably secured on jacking apparatus, if the lifting pin surface is provided with Dry software jacking head and steel bar positioning frame, the software jacking head, steel bar positioning frame are distributed along lifting pin length direction, described Software jacking head is arranged on the upper surface of lifting pin, and steel bar positioning frame is arranged on the lower surface of lifting pin.
2. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 1, it is characterised in that:The reinforcing bar Locating rack includes that axle placed by reinforcing bar, and reinforcing bar is placed axle and is arranged on lifting pin surface, and the reinforcing bar is placed axle surface and is provided with placement The stopper slot of reinforcing bar.
3. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 2, it is characterised in that:The reinforcing bar Place axle and be rotatably arranged at lifting pin surface.
4. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 2, it is characterised in that:The reinforcing bar Place the spacing fix bar of reinforcing bar is provided with above axle.
5. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 4, it is characterised in that:The jacking Bar surface is provided with multiple installing racks, and the reinforcing bar is placed axle and is rotatably arranged on installing rack, places above axle in reinforcing bar, peace Shelve the installing hole for being provided with the spacing fix bar insertion of reinforcing bar.
6. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 2, it is characterised in that:On the top Balladeur train dolly is provided with rising stem, and the balladeur train dolly straddles reinforcing bar and places above axle, and the balladeur train dolly is existed by roller Walk on the length direction of lifting pin.
7. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 6, it is characterised in that:The jacking Walking track is provided with bar, and the roller of the balladeur train dolly is spacing to walk in walking track.
8. tunnel wide splash guard mounting platform pin-lift arrangement according to claim 1, it is characterised in that:The jacking The top of device is provided with fixing hole, and the end of the lifting pin is arranged in fixing hole, in fixing hole, the lifting pin End is provided with location hole, and the position of the location hole is corresponding with the position of software jacking head, steel bar positioning frame;In fixing hole Place, is provided with pin-and-hole on the jacking apparatus, latch is through the pin-and-hole on jacking apparatus, the location hole on lifting pin by lifting pin It is fixed on jacking apparatus.
CN201510197289.5A 2015-04-24 2015-04-24 Tunnel wide splash guard mounting platform pin-lift arrangement CN104879142B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510197289.5A CN104879142B (en) 2015-04-24 2015-04-24 Tunnel wide splash guard mounting platform pin-lift arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510197289.5A CN104879142B (en) 2015-04-24 2015-04-24 Tunnel wide splash guard mounting platform pin-lift arrangement

Publications (2)

Publication Number Publication Date
CN104879142A CN104879142A (en) 2015-09-02
CN104879142B true CN104879142B (en) 2017-03-15

Family

ID=53946793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510197289.5A CN104879142B (en) 2015-04-24 2015-04-24 Tunnel wide splash guard mounting platform pin-lift arrangement

Country Status (1)

Country Link
CN (1) CN104879142B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105443148A (en) * 2015-12-25 2016-03-30 德阳思远重工有限公司 Jacking mechanism and trolley using same
CN105545329A (en) * 2016-01-19 2016-05-04 邓卫东 Jacking rod device for tunnel wide waterproof plate installation platform
CN106089268B (en) * 2016-08-18 2018-07-10 山东建筑大学 A kind of steel pipe concrete bracket fitting machine and installation method
CN106988764B (en) * 2017-05-19 2019-05-21 龚岗 Tunnel geotextiles waterproof cloth and two lined steel muscle are plated in technique
CN110486058A (en) * 2019-09-25 2019-11-22 中铁建大桥工程局集团第五工程有限公司 The comprehensive trolley method construction of tunnel wide splash guard, two lined steel muscle

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3062350B2 (en) * 1992-06-30 2000-07-10 岐阜工業株式会社 Tarpaulin equipment
KR101120267B1 (en) * 2009-09-11 2012-03-08 코오롱글로벌 주식회사 Work Platform for Tunnel
CN203463116U (en) * 2013-07-25 2014-03-05 重庆广播电视大学 Self-propelled tunnel waterproof board laying rack
CN103899337B (en) * 2014-04-09 2017-02-15 邓卫东 Wide tunnel waterproof board installation platform and installation method
CN104500105A (en) * 2014-11-04 2015-04-08 兖州煤业股份有限公司 Lifting installing device for metal support frame top arc section of coal mine tunnel

Also Published As

Publication number Publication date
CN104879142A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
KR101473821B1 (en) Method for hot line work of power distribution equipment
CN205977245U (en) Road multifunctional machinery ization tunnel supporting platform truck
CN102425433B (en) Minus-ring-free originating construction method for constructing sectional shield tunnel
RU2521007C2 (en) Method and device for mounting protective nets on tunnel walls or ceilings
KR100913381B1 (en) Slip form for concrete lining of shaft tunnel and method constructing concrete lining of shaft tunnel
US8439604B2 (en) Pipe support system and method for use in underground pipe ramming
CN102345381B (en) Hydraulic creeping formwork system and creeping formwork construction method
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN103321581A (en) Land rig
CN204312095U (en) A kind of soft rock tunnel hole anti-collapse process spreading cover arch
US10435896B2 (en) Apparatus and method for lifting and sliding a structure attached to the wall
CN202300407U (en) Lifting platform for construction operation over shaft wall of vertical shaft
CN104695984B (en) The multi-functional construction trolley in tunnel
US9982446B2 (en) Frame mounted hydrodemolition system for treating large inclined wall surfaces
KR100650435B1 (en) Plastic board drain apparatus multi-drain casing with improvement soft ground
CN102287209A (en) Tunnel arch center installation operation vehicle
KR101117490B1 (en) Loosening equipment of drum cable
CN106988764B (en) Tunnel geotextiles waterproof cloth and two lined steel muscle are plated in technique
CN105952474A (en) Rapid construction method for primary support of confined concrete of large-section tunnel
CN104389627B (en) Support mounting platform
CN202148909U (en) Operation vehicle for mounting tunnel arch trusses
EP1733096B1 (en) Railway rail handling apparatus and method
CN105507154A (en) Precast beam hoisting positioner and precast beam hoisting construction method
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
JP3942043B2 (en) Climbing formwork apparatus and method for continuous concrete placement of high vertical walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant