- Publication number
- CN104878874A CN104878874A CN201510255612.XA CN201510255612A CN104878874A CN 104878874 A CN104878874 A CN 104878874A CN 201510255612 A CN201510255612 A CN 201510255612A CN 104878874 A CN104878874 A CN 104878874A
- Authority
- CN
- China
- Prior art keywords
- cover plate
- ultra
- performance concrete
- pier nose
- pier
- Prior art date
Links
- 239000011374 ultra-high-performance concrete Substances 0.000 title claims abstract description 56
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 238000009826 distribution Methods 0.000 claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 210000001331 Nose Anatomy 0.000 claims description 47
- 230000002787 reinforcement Effects 0.000 claims description 22
- 239000010410 layer Substances 0.000 claims description 10
- 238000002360 preparation method Methods 0.000 claims description 8
- 230000002708 enhancing Effects 0.000 claims description 7
- 239000000835 fiber Substances 0.000 claims description 7
- 239000011241 protective layer Substances 0.000 claims description 6
- 229910000754 Wrought iron Inorganic materials 0.000 claims description 4
- 210000002356 Skeleton Anatomy 0.000 claims description 3
- 238000007667 floating Methods 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 2
- 238000005336 cracking Methods 0.000 description 16
- 101700078171 KNTC1 Proteins 0.000 description 10
- 239000000463 material Substances 0.000 description 9
- 238000005259 measurement Methods 0.000 description 8
- 239000004567 concrete Substances 0.000 description 7
- 230000003014 reinforcing Effects 0.000 description 6
- 238000005260 corrosion Methods 0.000 description 4
- 230000003111 delayed Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000003351 stiffener Substances 0.000 description 4
- 238000003756 stirring Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000011372 high-strength concrete Substances 0.000 description 3
- 238000010998 test method Methods 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 239000003638 reducing agent Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Abstract
The invention discloses a pier head reinforced ultra-high performance concrete cover plate. The pier head reinforced ultra-high performance concrete cover plate comprises an ultra-high performance concrete layer, wherein a steel bar framework parallel to the lower end surface of a cover plate body is arranged at the position, which is far away from the lower end surface and four sides of the cover plate body by a distance of 10-20mm, in the ultra-high performance concrete layer; the steel bar framework comprises longitudinally arranged stress bars and horizontally arranged distribution bars; pier heads are arranged at two ends of each stress bar; the outer diameter of the pier heads is 1.3-2.0 times to the diameter of the stress bars. The invention also discloses a production method of the pier head reinforced ultra-high performance concrete cover plate. The pier head reinforced ultra-high performance concrete cover plate can be used for improving the sliding resistance between the steel bars and ultra-high performance concrete in the cover plate, delaying the occurrence of cracks of the cover plate, improving the crack load of the cover plate and improving the durability of cover plate products, and has a very good economic benefit.
Description
Technical field
The invention belongs to building material field, be specifically related to ultra-high performance concrete cover plate of a kind of pier nose enhancing and preparation method thereof.
Background technology
Ultra-high performance concrete, be called for short UHPC (Ultra-High Performance Concrete), be the most innovative cement based engineering material in past 30 years, achieve the Great span of engineering material performance, its one of them representative is RPC.
RPC (Reactive Powder Concrete, be abbreviated as RPC): be made up of composite fibre such as multicomponent reactive powder blend material, inorganic coagulation material, continuous grading fines, steel fibres, by optimization gradation design, make the defect of material internal (hole and microcrack) be reduced to minimum, there is the novel concrete based composites of superhigh intensity, high tenacity, high-durability, high crack-resistant and good volume stability.Because in RPC, the existence of steel fibre strengthens the interlocking of Behavior of Hardened Cement Paste, the tensile strength of this material is largely increased, reach 4 ~ 6 times of high-strength concrete, limit tensile strain can reach 70 ~ 80 times of high-strength concrete especially, fracture toughness is more than 250 times of ordinary concrete, and its mechanical property and deformability are obviously better than ordinary concrete and high-strength concrete.Therefore this material is applicable to there is high-strength, lightweight to structure, resistance is split, the Structural Engineering field of life requirement.
Ultra-high performance concrete cover plate, relative to traditional concrete cover, its supporting capacity and endurance quality are all enhanced.But under accidental larger impact load or action of long-term load, cover plate still can more early ftracture, and causes the problem of inner reinforcement corrosion, and this causes very large adverse effect by the endurance quality of cover plate, greatly shortens the application life of cover plate.Although there is the way being improved cover plate cracking load by Shi Hanzhang at present, due to its complex procedures and construction cost high and be not widely adopted, the cracking therefore how postponing cover plate simply and effectively becomes the problem that is needed badly exploration.
Pier nose is added at the principal rod two ends of cage of reinforcement, be conducive to the adhesion stress between stiffener and ultra-high performance concrete and anchored force, and then improve the resistant slide ability of reinforcing bar, the appearance of delayed fracture, thus improve the cracking load of cover plate, efficiently solve the inside corrosion of reinforcing steel bar caused because of premature rupture bottom conventional cover plate, there is good economic benefit.
Summary of the invention
The object of the present invention is to provide ultra-high performance concrete cover plate that a kind of pier nose strengthens and preparation method thereof, adhesion stress between stiffener and ultra-high performance concrete and anchored force, and then improve the resistant slide ability of reinforcing bar, the appearance of delayed fracture, final cracking load and the endurance quality improving cover plate.
For achieving the above object, the present invention can take following technical scheme:
The ultra-high performance concrete cover plate that a kind of pier nose strengthens, comprise ultra-high performance concrete layer, in described ultra-high performance concrete layer, the position of distance cover plate lower surface 10 ~ 20mm, distance cover plate four side 10 ~ 20mm is provided with the cage of reinforcement being parallel to cover plate lower surface, described cage of reinforcement comprises the longitudinally principal rod of setting, the distribution bar of horizontally set, the two ends of described principal rod are provided with pier nose, and the external diameter of described pier nose is 1.3-2.0 times of principal rod diameter.
Further, described principal rod diameter is 6 ~ 20mm, principal rod diameter 2mm more than larger than distribution bar.
Further, described cage of reinforcement adopts hot-rolled reinforced bar, hard drawn wire reinforcement or PC rod iron.
Further, the compressive strength of described ultra-high performance concrete is more than or equal to 140MPa.
The present invention additionally provides the preparation method of the ultra-high performance concrete cover plate that a kind of pier nose strengthens on the other hand, comprises step:
1) according to the pattern of pier nose, pier nose is added at each principal rod two ends;
2) according to cover plate size and protective layer thickness screwing steel bars skeleton;
3) hang in mould cavity by cage of reinforcement, during placement, principal rod upward, and lower surface and four limits respectively reserve the protective layer thickness of 10 ~ 20mm;
4) ultra-high performance concrete mixed is toppled over injection mould cavity, floating cover plate external surface after vibration moulding;
5) cover plate is carried out maintenance together with mould, continue maintenance after the demoulding and meet the demands to performance, obtain the ultra-high performance concrete cover plate that pier nose strengthens.
Further, described step 5) specifically comprises: cover plate is carried out stream curing together with mould, environment temperature remains 40 DEG C of maintenances 24 hours, takes out form removal afterwards and under 85 DEG C of conditions, continues maintenance 48 hours again, obtain the ultra-high performance concrete cover plate that pier nose strengthens.
Further, first by Cold header, principal rod two ends pier is thick when in described step 1), pier nose adds, and then utilize special purpose machine tool to carry out mantle fiber to the thick section of pier to form.
Described ultra-high performance concrete is all prepared from optimizing mixing proporiton, and compressive strength should lower than 140MPa;
The ultra-high performance concrete cover plate that pier nose provided by the invention strengthens, have the following advantages relative to prior art tool: the existence of principal rod two ends pier nose can adhesion stress between stiffener and ultra-high performance concrete and anchored force, and then improve the resistant slide ability of reinforcing bar, the appearance of delayed fracture, improve the cracking load of cover plate, thus improve the anti-cracking performance of cover plate and impervious outlet capacity, reduce the possibility of cage of reinforcement corrosion, the endurance quality of final raising cover plate, has good economic benefit.
The present invention will play a great role at building, power domain, have a extensive future.
Accompanying drawing explanation
Fig. 1 is the pier nose pattern schematic diagram of the embodiment of the present invention.
The arrangement of reinforcement schematic top plan view of Fig. 2 embodiment of the present invention.
Fig. 3 be in Fig. 2 A-A to cross-sectional schematic.
Fig. 4 be in Fig. 2 B-B to cross-sectional schematic.
Shown in figure be: 1-principal rod; 2-distribution bar; 3-ultra-high performance concrete layer; 4-bearing rod; 5-pier nose.
Detailed description of the invention
Be described in further detail object of the present invention below in conjunction with the drawings and specific embodiments, embodiment can not repeat one by one at this, but therefore embodiments of the present invention are not defined in following examples.
embodiment 1
As shown in Figures 1 to 4, the ultra-high performance concrete cover plate that a kind of pier nose strengthens, comprise ultra-high performance concrete layer 3, in described ultra-high performance concrete layer 3, the position of distance cover plate lower surface 10mm, distance cover plate four side 15mm is provided with the cage of reinforcement being parallel to cover plate lower surface, the cage of reinforcement of the present embodiment is double layer grid, comprise the longitudinally principal rod 1 of setting, the distribution bar 2 of horizontally set, bearing rod 4 connects two-layer rack and plays supporting upper strata rack.
In the present embodiment, described cover plate is of a size of 1400mm × 500mm × 80mm.
In the present embodiment, described principal rod 1 adopts diameter to be the PC rod iron of 10.7mm, and tensile strength values is 1400MPa, and distribution bar 2 and bearing rod 4 adopt diameter to be the HPB300 reinforcing bar of 8mm.
Described in the present embodiment, the two ends of principal rod 1 are provided with pier nose 5, and the external diameter of described pier nose 5 is 1.3 times of principal rod 1 diameter, i.e. 13.9mm.
Described in the present embodiment, ultra-high performance concrete actual measurement compressive strength is 152.6MPa.
The actual measurement cover plate cracking load of the present embodiment is 130.4kN, and rupture load is 240.8kN, and method of testing is with reference to CHINA SOUTHERN POWER " cable channel cover plate standard technique bidding documents ".
In the contrast experiment not carrying out pier nose enhancing, actual measurement cracking load 117.6kN, rupture load is 232.6kN.
With do not add compared with ultra-high performance concrete cover plate that pier nose strengthens, cracking load improves 11%, and rupture load improves 4%.
embodiment 2
The difference of the present embodiment and embodiment 1 is: the external diameter of described pier nose 5 is 2.0 times of principal rod 1 diameter, i.e. 21.4mm, and described ultra-high performance concrete actual measurement compressive strength is 154.6MPa;
The actual measurement cover plate cracking load of the present embodiment is 162.4kN, and rupture load is 258.5kN, and method of testing is with reference to CHINA SOUTHERN POWER " cable channel cover plate standard technique bidding documents ".
With do not add compared with ultra-high performance concrete cover plate that pier nose strengthens, cracking load improves 38%, and rupture load improves 11%.
embodiment 3
The ultra-high performance concrete cover plate preparation method that pier nose strengthens, comprises step:
1) according to the pattern of pier nose 5, pier nose 5 is added at each principal rod 1 two ends, first by Cold header, principal rod (1) two ends pier is thick when pier nose 5 adds, and then utilize special purpose machine tool to carry out mantle fiber to the thick section of pier to form; Described principal rod 1 adopts diameter to be the PC rod iron of 10.7mm, and tensile strength values is 1400MPa, and distribution bar 2 and bearing rod 4 adopt diameter to be the HPB300 reinforcing bar of 8mm; The external diameter of described pier nose 5 is 2.0 times of principal rod 1 diameter, i.e. 21.4mm;
2) described cover plate is of a size of 1400mm × 500mm × 50mm, lower protective layer thickness is 15mm, according to cover plate size and protective layer thickness screwing steel bars skeleton, cage of reinforcement is the individual layer rack being parallel to the setting of cover plate lower surface, cage of reinforcement is made up of distribution bar 2 and principal rod 1, distribution bar 2 is near cover plate upper surface, and principal rod 1 is near cover plate lower surface;
3) hang in mould cavity by cage of reinforcement, during placement, principal rod (1) upward, and 15mm above the upper surface distance die cavity of principal rod, this 15mm space is thickness of concrete cover.Cage of reinforcement surrounding distance mould intracavity wall distance is 15mm, and this 15mm space is thickness of concrete cover;
4) ultra-high performance concrete mixed is toppled over injection mould cavity, vibrate 60 seconds shaping rear floating cover plate external surfaces, by cementitious material required in ultra-high performance concrete, sand, steel fibre, water, water reducing agent mixing during mix, stir, stirring system, for first to add sand and steel fibre, stirs 3 minutes; Add cementitious material again, stir 3 minutes; Finally add water and water reducing agent, stir 8 minutes;
5) cover plate is sent into stream curing together with mould indoor, environment temperature remains 40 DEG C of maintenances 24 hours, takes out form removal afterwards and under 85 DEG C of conditions, continues maintenance 48 hours again, obtain the ultra-high performance concrete cover plate that pier nose strengthens.
The actual measurement of ultra-high performance concrete described in the present embodiment compressive strength is 148.8MPa.
The ultra-high performance concrete cover plate that pier nose described in the present embodiment strengthens, actual measurement cracking load is 44.8kN, and rupture load is 80.8kN, and method of testing is with reference to CHINA SOUTHERN POWER " cable channel cover plate standard technique bidding documents ".
In the contrast experiment not carrying out pier nose enhancing, actual measurement cracking load 32kN, rupture load is 72.8kN.
With do not add compared with ultra-high performance concrete cover plate that pier nose strengthens, cracking load improves 40%, and rupture load improves 11%.
In sum, the ultra-high performance concrete cover plate that pier nose of the present invention strengthens, principal rod two ends in the cage of reinforcement of cover plate add pier nose, be conducive to the adhesion stress between stiffener and ultra-high performance concrete and anchored force, and then improve the resistant slide ability of reinforcing bar, appearance also effective control critical eigenvalue width of delayed fracture, improve the cracking load of cover plate, thus improve the anti-cracking performance of cover plate and impervious outlet capacity, reduce the possibility of cage of reinforcement corrosion, finally greatly improve endurance quality and the application life of cover plate.
The above; be only patent preferred embodiment of the present invention; but the protection domain of patent of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the scope disclosed in patent of the present invention; be equal to according to the technical scheme of patent of the present invention and inventive concept thereof and replace or change, all belonged to the protection domain of patent of the present invention.
Claims (7)
1. the ultra-high performance concrete cover plate of a pier nose enhancing, comprise ultra-high performance concrete layer (3), the interior distance cover plate lower surface 10 ~ 20mm of described ultra-high performance concrete layer (3), the position of distance cover plate four side 10 ~ 20mm is provided with the cage of reinforcement being parallel to cover plate lower surface, described cage of reinforcement comprises the principal rod (1) longitudinally arranged, the distribution bar (2) of horizontally set, it is characterized in that: the two ends of described principal rod (1) are provided with pier nose (5), the external diameter of described pier nose (5) is 1.3-2.0 times of principal rod (1) diameter.
2. the ultra-high performance concrete cover plate of pier nose enhancing according to claim 1, is characterized in that: described principal rod (1) diameter is 6 ~ 20mm, principal rod (1) diameter 2mm more than larger than distribution bar.
3. the ultra-high performance concrete cover plate of pier nose enhancing according to claim 1, is characterized in that: described cage of reinforcement adopts hot-rolled reinforced bar, hard drawn wire reinforcement or PC rod iron.
4. the ultra-high performance concrete cover plate of pier nose enhancing according to claim 1, is characterized in that: the compressive strength of described ultra-high performance concrete is more than or equal to 140MPa.
5. a preparation method for the ultra-high performance concrete cover plate that the pier nose as described in any one of Claims 1-4 strengthens, is characterized in that, comprise step:
1) according to the pattern of pier nose, pier nose (5) is added at each principal rod (1) two ends;
2) according to cover plate size and protective layer thickness screwing steel bars skeleton;
3) hang in mould cavity by cage of reinforcement, during placement, principal rod (1) upward, and lower surface and four limits respectively reserve the protective layer thickness of 10 ~ 20mm;
4) ultra-high performance concrete mixed is toppled over injection mould cavity, floating cover plate external surface after vibration moulding;
5) cover plate is carried out maintenance together with mould, continue maintenance after the demoulding and meet the demands to performance, obtain the ultra-high performance concrete cover plate that pier nose strengthens.
6. preparation method according to claim 5, it is characterized in that, described step 5) specifically comprises: cover plate is carried out stream curing together with mould, environment temperature remains 40 DEG C of maintenances 24 hours, take out form removal afterwards and under 85 DEG C of conditions, continue maintenance 48 hours again, obtain the ultra-high performance concrete cover plate that pier nose strengthens.
7. preparation method according to claim 5, is characterized in that, first by Cold header, principal rod (1) two ends pier is thick when in described step 1), pier nose (5) adds, and then utilizes special purpose machine tool to carry out mantle fiber to the thick section of pier to form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510255612.XA CN104878874A (en) | 2015-05-19 | 2015-05-19 | Pier head reinforced ultra-high performance concrete cover plate and production method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510255612.XA CN104878874A (en) | 2015-05-19 | 2015-05-19 | Pier head reinforced ultra-high performance concrete cover plate and production method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104878874A true CN104878874A (en) | 2015-09-02 |
Family
ID=53946534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510255612.XA CN104878874A (en) | 2015-05-19 | 2015-05-19 | Pier head reinforced ultra-high performance concrete cover plate and production method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104878874A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11324214A (en) * | 1998-05-18 | 1999-11-26 | Taisei Corp | Reinforced concrete material |
CN201713933U (en) * | 2010-03-29 | 2011-01-19 | 南京大地建设集团有限责任公司 | Trench cover plate |
CN202492858U (en) * | 2012-01-10 | 2012-10-17 | 浙江省建工集团有限责任公司 | Concrete wear-resistant cover plate |
CN104153287A (en) * | 2014-07-07 | 2014-11-19 | 上海应用技术学院 | Segmental assembled concrete frame pier system with self-reset function and method |
CN204645394U (en) * | 2015-05-19 | 2015-09-16 | 华南理工大学 | The ultra-high performance concrete cover plate that a kind of pier nose strengthens |
-
2015
- 2015-05-19 CN CN201510255612.XA patent/CN104878874A/en not_active Application Discontinuation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11324214A (en) * | 1998-05-18 | 1999-11-26 | Taisei Corp | Reinforced concrete material |
CN201713933U (en) * | 2010-03-29 | 2011-01-19 | 南京大地建设集团有限责任公司 | Trench cover plate |
CN202492858U (en) * | 2012-01-10 | 2012-10-17 | 浙江省建工集团有限责任公司 | Concrete wear-resistant cover plate |
CN104153287A (en) * | 2014-07-07 | 2014-11-19 | 上海应用技术学院 | Segmental assembled concrete frame pier system with self-reset function and method |
CN204645394U (en) * | 2015-05-19 | 2015-09-16 | 华南理工大学 | The ultra-high performance concrete cover plate that a kind of pier nose strengthens |
Non-Patent Citations (2)
Title |
---|
文亚平: "《雪峰山特长隧道沟槽盖板塑钢模具施工技术》", 《铁道技术监督》 * |
李云红: "《高速铁路桥隧工》", 31 July 2013 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104831617B (en) | Steel-ultra-high performance concrete combination beam based on fin-plate type bridge floor and construction method | |
Shariati et al. | Behaviour of C-shaped angle shear connectors under monotonic and fully reversed cyclic loading: An experimental study | |
Peyvandi et al. | Enhancement of the structural efficiency and performance of concrete pipes through fiber reinforcement | |
CN105421652B (en) | A kind of composite thermo-insulating wall board | |
CN104594210B (en) | A kind of concrete prefabricated board and its preparation method and application | |
CN103938614B (en) | Reinforced prestressed concrete waveform sheet pile | |
Ferrari et al. | Flexural strengthening of reinforcement concrete beams using high performance fiber reinforcement cement-based composite (HPFRCC) and carbon fiber reinforced polymers (CFRP) | |
CN102392420B (en) | Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate | |
CN101328753B (en) | Fiber reinforcement composite material - concrete combination beam | |
CN103938803A (en) | High toughness cement-based material-nonmetal fiber rib composite structure as well as application and application method thereof | |
CN105041336A (en) | Ultra-high performance hybrid fiber concrete shield segment and preparation method thereof | |
Conforti et al. | Precast tunnel segments reinforced by macro-synthetic fibers | |
Carbonari et al. | Flexural behaviour of light-weight sandwich panels composed by concrete and EPS | |
CN102561213B (en) | Steel plate-concrete composite structure reinforcement method of structural negative moment region | |
CN105418010A (en) | Ultra-high-performance concrete prefabricated component and preparation method thereof | |
Kuntal et al. | Efficient near surface mounted CFRP shear strengthening of high strength prestressed concrete beams–An experimental study | |
CN102296776A (en) | Three-dimensional fiber inorganic composite product and production method thereof | |
Liu et al. | Transverse fatigue behaviour of steel-UHPC composite deck with large-size U-ribs | |
Wang et al. | Push-out tests of demountable headed stud shear connectors in steel-UHPC composite structures | |
CN1936206A (en) | Steel-continuous-fiber composite-rib reinforced concrete earthquake-resisting structure | |
CN104675141B (en) | A kind of FRP pipe constraint cement-base composite material reinforces pillarwork | |
CN101899907A (en) | Reinforced concrete column replacing and reinforcing method and device for unloading load of reinforced concrete column | |
CN202055393U (en) | High-strength reinforcement high-ductility fiber reinforced engineered cementitious composite compressed member | |
CN101487332A (en) | Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab | |
CN107675812B (en) | Ultra-high performance concrete plate seam connection structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150902 |