Electric iron tower maintenance equipment and application method thereof Download PDFInfo
- Publication number
- CN104860159A CN104860159A CN201510210350.5A CN201510210350A CN104860159A CN 104860159 A CN104860159 A CN 104860159A CN 201510210350 A CN201510210350 A CN 201510210350A CN 104860159 A CN104860159 A CN 104860159A
- Authority
- CN
- China
- Prior art keywords
- installation portion
- equipment
- box
- vertical post
- drive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/02—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable
- B66B9/025—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable by screw-nut drives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/043—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
- B66B11/0446—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation with screw-nut or worm-screw gear
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Abstract
The invention discloses electric iron tower maintenance equipment and an application method thereof. The electric iron tower maintenance equipment is used for transporting maintenance devices in a lifting manner along a vertical column (91) of an electric iron tower (9) when the electric iron tower (9) is maintained and comprises an upper box body (7) and a lower box body (6), wherein an upper fastening installation part (73) and a lower fastening installation part (63) are respectively arranged on the sides, close to the vertical column (91), of the upper box body (7) and the lower box body (6) and used for being fixedly connected with the vertical column (91) in a dismountable manner; an upper device storage cavity (71) and a lower device storage cavity (61) are arranged on the other sides, opposite to the respective fastening installation parts, of the upper box body (7) and the lower box body (6).
Description
Technical field
The present invention relates to electric power transmission steel tower field, be specifically related to electric power tower maintenance equipment and using method thereof.
Background technology
Transmission of electricity steel tower in use needs workman to climb to carry out various upkeep operation.Also workman may be needed to climb in construction phase of steel tower and later stage teardown phase and carry out various operation.But, in workman's climbing process, the not maintenance equipment of Portable belt heavier-weight.And the equipment carried also easily causes the hidden danger in operation process.
Summary of the invention
The object of the present invention is to provide a kind of electric power tower maintenance equipment and using method thereof, the above-mentioned defect of prior art can be overcome.
According to the present invention, a kind of electric power tower maintenance equipment, for when safeguarding electric power tower, along the vertical post of described electric power tower, lifting mode transports maintenance package, comprise: upper box and lower box, upper box and lower box are respectively near the side of described vertical post and tighten solid installation portion and lower fastening installation portion, in order to be removably fixedly connected with described vertical post, the opposite side that upper box is relative with respective fastening installation portion with lower box is respectively upper equipment reservoir cavity and lower equipment reservoir cavity, for storing described maintenance package; Described upper box and lower box are respectively drive division and lower drive division between respective fastening installation portion and equipment reservoir cavity, wherein, described upper drive division near on equipment reservoir cavity place drive motor is installed, lower drive division is being provided with drive nut near lower equipment reservoir cavity place, described drive motor is connected with driving leading screw power, described driving leading screw and described drive nut screw thread fit
Described upper drive division is being installed with row's shape pilot bar near tightening Gu Anzhuanbuchu, described row's shape pilot bar is arranged by the many pilot bars be vertically oriented and forms, described lower drive division is being provided with the hole group corresponding with described row's shape pilot bar near lower fastening installation portion place, in order to described row's shape pilot bar bearing fit; Described driving leading screw is being connected with the housing of upper drive division by two-direction thrust bearing near described drive motor place.
As the using method of above-mentioned electric power tower maintenance equipment, wherein, first surfaceman will tighten solid installation portion and described vertical post is fastenedly connected, lower fastening installation portion is unclamped, thus, described drive motor drives described driving leading screw to rotate, to make described lower box rise along described row's shape pilot bar by the screw thread fit with described drive nut; Afterwards, the connection tightening solid installation portion and described vertical post is unclamped, be fastenedly connected between lower fastening installation portion and described vertical post, described drive motor drives described driving leading screw to rotate, and rises and together drive described row's shape pilot bar to rise under the guiding of described hole group to be made described upper box by the screw thread fit with described drive nut.
By the present invention, owing to have employed the aforesaid way that draws the two kinds of patterns in top, can walk along the vertical post of steel tower under without the need to the condition of other weight-lifting equipments, therefore, it is possible to save the cost of weight-lifting equipment.And by arranging the setting of shape guidepost, it can ensure the relative securement between upper box and lower box to greatest extent, while the rotation that antagonistic force causes when preventing electric motor starting, the capsizing moment of resisting and causing due to the weight of stored equipment can be played.Whole equipment is reliable, stabilized structure, and reduces cost.
Accompanying drawing explanation
Fig. 1 is the integral structure schematic diagram of electric power tower of the present invention and maintenance equipment;
Fig. 2 is the concrete structure schematic diagram of the maintenance equipment in Fig. 1, and wherein, upper box is in tightening state, and lower box is in releasing orientation; Now lower box can be rotated by screw rod the pulling force that causes and promote;
To be maintenance equipment in Fig. 2 be in releasing orientation and lower box is in the schematic diagram of tightening state at upper box to Fig. 3; Now, lower box is thus lifted to position, and the upper box top power that can be caused by spiral rotating and raising.
Fig. 4 shows the structural representation of row's shape pilot bar.
Fig. 5 shows the schematic diagram at the two-direction thrust bearing place at screw rod place.
Detailed description of the invention
Below in conjunction with Fig. 1-5, the present invention is described in detail.
With reference to Fig. 1, electric power tower is safeguarded with equipment 8, for when safeguarding electric power tower 9, along the vertical post 91 of described electric power tower 9, lifting mode transports maintenance package.
With reference to Fig. 2, described equipment 8 comprises: upper box 7 and lower box 6, upper box 7 and lower box 6 are respectively near the side of described vertical post 91 and tighten solid installation portion 73 and lower fastening installation portion 63, in order to be removably fixedly connected with described vertical post 91, the opposite side that upper box 7 is relative with respective fastening installation portion with lower box 6 is respectively upper equipment reservoir cavity 71 and lower equipment reservoir cavity 61, for storing described maintenance package; Described upper box 7 and lower box 6 are respectively drive division and lower drive division between respective fastening installation portion and equipment reservoir cavity, wherein, described upper drive division near on equipment reservoir cavity 71 place drive motor 72 is installed, lower drive division is being provided with drive nut 62 near lower equipment reservoir cavity 61 place, described drive motor 72 is connected with driving leading screw 76 power, described driving leading screw 76 and described drive nut 62 screw thread fit.
Described upper drive division is being installed with row's shape pilot bar 77 near tightening solid installation portion 73 place, described row's shape pilot bar 77 is arranged by the many pilot bars be vertically oriented 77 and forms, described lower drive division is being provided with the hole group corresponding with described row's shape pilot bar 77 near lower fastening installation portion 63 place, in order to described row's shape pilot bar 77 bearing fit; Described driving leading screw 76 is being connected with the housing of upper drive division by two-direction thrust bearing 74 near described drive motor 72 place.
According to embodiment, the using method of above-mentioned electric power tower maintenance equipment 8, referring again to Fig. 2, wherein, first surfaceman will tighten solid installation portion 73 and will be fastenedly connected with described vertical post 91, unclamped by lower fastening installation portion 63, thus, described drive motor 72 drives described driving leading screw 76 to rotate, to make described lower box 6 rise along described row's shape pilot bar 77 by the screw thread fit with described drive nut 62,, put in place until lower box 6 rises, with reference to Fig. 3; Afterwards, with reference to Fig. 3, unclamp tightening solid installation portion 73 with the connection of described vertical post 91, be fastenedly connected between lower fastening installation portion 63 and described vertical post 91, described drive motor 72 drives described driving leading screw 76 to rotate, and rises and together drive described row's shape pilot bar 77 to rise under the guiding of described hole group to be made described upper box 7 by the screw thread fit with described drive nut 62.Circulation like this, in use arrives finally to make equipment 8 and needs height.When equipment 8 declines by needs, carry out the operation of reverse procedure, thus make the height that equipment 8 decline needs.
Valuably, screw rod and thrust baring joint are provided with two set collars separated 761 and 762, to engage with carrying on twocouese with bearing.
Claims (2)
1. an electric power tower is safeguarded with equipment (8), for when safeguarding electric power tower (9), along the vertical post (91) of described electric power tower (9), lifting mode transports maintenance package, comprise: upper box (7) and lower box (6), upper box (7) and lower box (6) are respectively near the side of described vertical post (91) and tighten solid installation portion (73) and lower fastening installation portion (63), in order to be removably fixedly connected with described vertical post (91), the opposite side that upper box (7) is relative with respective fastening installation portion with lower box (6) is respectively upper equipment reservoir cavity (71) and lower equipment reservoir cavity (61), for storing described maintenance package, described upper box (7) and lower box (6) are respectively drive division and lower drive division between respective fastening installation portion and equipment reservoir cavity, wherein, described upper drive division near on equipment reservoir cavity (71) place drive motor (72) is installed, lower drive division is being provided with drive nut (62) near lower equipment reservoir cavity (61) place, described drive motor (72) is connected with driving leading screw (76) power, described driving leading screw (76) and described drive nut (62) screw thread fit
Described upper drive division is being installed with row's shape pilot bar (77) near tightening solid installation portion (73) place, described row's shape pilot bar (77) is formed by the arrangement of the many pilot bars be vertically oriented (77), described lower drive division is being provided with the hole group corresponding with described row's shape pilot bar (77) near lower fastening installation portion (63) place, in order to described row's shape pilot bar (77) bearing fit; Described driving leading screw (76) is being connected with the housing of upper drive division by two-direction thrust bearing (74) near described drive motor (72) place.
2. electric power tower as claimed in claim 1 safeguards the using method with equipment (8), wherein, first surfaceman will tighten solid installation portion (73) and described vertical post (91) and will be fastenedly connected, lower fastening installation portion (63) is unclamped, thus, described drive motor (72) drives described driving leading screw (76) to rotate, to make described lower box (6) rise along described row's shape pilot bar (77) by the screw thread fit with described drive nut (62); Afterwards, unclamp tightening the connection of solid installation portion (73) with described vertical post (91), be fastenedly connected between lower fastening installation portion (63) and described vertical post (91), described drive motor (72) drives described driving leading screw (76) to rotate, and rises and together drive described row's shape pilot bar (77) to rise under the guiding of described hole group to be made described upper box (7) by the screw thread fit with described drive nut (62).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510210350.5A CN104860159A (en) | 2015-04-29 | 2015-04-29 | Electric iron tower maintenance equipment and application method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510210350.5A CN104860159A (en) | 2015-04-29 | 2015-04-29 | Electric iron tower maintenance equipment and application method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104860159A true CN104860159A (en) | 2015-08-26 |
Family
ID=53906410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510210350.5A Pending CN104860159A (en) | 2015-04-29 | 2015-04-29 | Electric iron tower maintenance equipment and application method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104860159A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1986007041A1 (en) * | 1985-05-31 | 1986-12-04 | Ntd Hiss Närtransportdon Ab | Screw lift |
CN101704246A (en) * | 2009-10-24 | 2010-05-12 | 陈柳春 | Climbing detection robot for transmission towers |
CN101710681A (en) * | 2009-12-30 | 2010-05-19 | 江苏省电力公司镇江供电公司 | Special conductor lifting device for 220KV horizontal double bundle conductor |
CN101950939A (en) * | 2010-09-17 | 2011-01-19 | 浙江工业大学 | Iron tower deicing machine |
CN102407004A (en) * | 2011-10-21 | 2012-04-11 | 沈阳建筑大学 | Multifunctional automatic climbing device |
CN203953015U (en) * | 2014-06-25 | 2014-11-26 | 江苏慕林智能电器有限公司 | Automatically cleaning electric pushrod |
-
2015
- 2015-04-29 CN CN201510210350.5A patent/CN104860159A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1986007041A1 (en) * | 1985-05-31 | 1986-12-04 | Ntd Hiss Närtransportdon Ab | Screw lift |
CN101704246A (en) * | 2009-10-24 | 2010-05-12 | 陈柳春 | Climbing detection robot for transmission towers |
CN101710681A (en) * | 2009-12-30 | 2010-05-19 | 江苏省电力公司镇江供电公司 | Special conductor lifting device for 220KV horizontal double bundle conductor |
CN101950939A (en) * | 2010-09-17 | 2011-01-19 | 浙江工业大学 | Iron tower deicing machine |
CN102407004A (en) * | 2011-10-21 | 2012-04-11 | 沈阳建筑大学 | Multifunctional automatic climbing device |
CN203953015U (en) * | 2014-06-25 | 2014-11-26 | 江苏慕林智能电器有限公司 | Automatically cleaning electric pushrod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2396087B1 (en) | ASSEMBLY PROCEDURE OF A MOUNTAINER AND AEROGENERATOR ASSEMBLED ACCORDING TO THIS PROCEDURE | |
EP2770198B1 (en) | Offshore wind power complete machine floating method | |
TWI662186B (en) | Construction method of offshore windmill, offshore windmill and offshore wind power generation equipment | |
CN105977864A (en) | High-altitude operation workbench for multifunctional power transmission line | |
US10815687B2 (en) | Wind turbine assembly system and associated method | |
GB2561612B (en) | Method for assembling a wind turbine and a wind turbine system | |
JP6942264B2 (en) | Flange frames and assembly sets and methods for pre-assembling and / or transporting and / or assembling wind turbine tower segments. | |
CN104773673A (en) | Self-cleaning and tightness-adjustable equipment for maintaining iron power tower and application method of self-cleaning and tightness-adjustable equipment | |
CN104860160A (en) | Electric iron tower maintenance equipment with functions of illuminating lamp and use method of equipment | |
CN104828675A (en) | Electric iron tower maintenance equipment with limiting function and use method thereof | |
CN104767152A (en) | Electric iron tower maintenance equipment with alarm lamps and using method thereof | |
CN104828739A (en) | Heat-radiated-through-fan apparatus for maintenance of electric power iron tower and using method thereof | |
CN104828751A (en) | Equipment for maintaining power iron tower by using limit switch and use method of equipment | |
CN104860159A (en) | Electric iron tower maintenance equipment and application method thereof | |
CN104843606A (en) | Electric iron tower maintenance device with reminder light and use method thereof | |
CN104828673B (en) | Can self-cleaning electric power tower maintenance equipment and using method thereof | |
CN104860227A (en) | Equipment with limiting and shock-proof functions for maintenance of electric iron tower and using method of equipment | |
CN104828677A (en) | Stable-running equipment for electric iron tower maintenance and use method of equipment | |
CN104925708A (en) | Electric iron tower maintenance device with cooling function and using method thereof | |
CN104944253A (en) | Hydraulically-fixed equipment for maintenance of electric-power iron tower and application method of hydraulically-fixed equipment | |
CN104795762A (en) | Power tower maintenance equipment fixed via screw driving and application method thereof | |
CN104779557A (en) | Equipment for maintenance of electric power tower with good heat dissipation performance and using method thereof | |
CN104828676A (en) | Low-noise electric power iron tower maintenance equipment and use method thereof | |
CN106884546A (en) | A kind of application method of the electric power tower maintenance equipment for being easy to lubricate | |
CN104795759A (en) | Power iron tower maintenance equipment convenient to lubricate and capable of self-cleaning and application method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150826 |
|
RJ01 | Rejection of invention patent application after publication |