CN104847165A - Building demolition enclosed coaming facility construction method - Google Patents

Building demolition enclosed coaming facility construction method Download PDF

Info

Publication number
CN104847165A
CN104847165A CN201510177914.XA CN201510177914A CN104847165A CN 104847165 A CN104847165 A CN 104847165A CN 201510177914 A CN201510177914 A CN 201510177914A CN 104847165 A CN104847165 A CN 104847165A
Authority
CN
China
Prior art keywords
standpipe
string
support body
pin
frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510177914.XA
Other languages
Chinese (zh)
Inventor
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510177914.XA priority Critical patent/CN104847165A/en
Publication of CN104847165A publication Critical patent/CN104847165A/en
Pending legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a building demolition enclosed coaming facility construction method. The method comprises the step of part manufacturing, the step of coaming enclosure body manufacturing, the step of mesh enclosure body manufacturing, the step of member mounting, the step of coaming enclosure body mounting, the step of mesh enclosure body mounting, the step of digging a drainage ditch in the periphery of a member frame, the step of guaranteeing smooth drainage and the like. The building demolition enclosed coaming facility construction method has the advantages of being simple and convenient, and good in effect.

Description

Demolishing buildings is closed encloses a grade facility construction method
Technical field
The present invention relates to that a kind of demolishing buildings is closed encloses a grade facility construction method.
Background technology
In recent years; the many buildings of China scrap period to updating; need remove; separately some is built because the reasons such as planning also must be removed, and demolishing buildings amount is increasing, but during demolishing buildings; dust emission is very large; surrounding enviroment are polluted very serious, and numerous and confused appealing of society of government controls airborne dust protection of the environment, but all fail essence and deal with problems.
Summary of the invention
The object of the present invention is to provide that easy, the effective demolishing buildings of a kind of method is closed encloses a grade facility construction method.
Technical solution of the present invention is:
A kind of demolishing buildings is closed encloses a grade facility construction method, it is characterized in that: comprise the following steps:
(1) parts make
(1) pedal pin to make
Pedal pin and be set to round shape, diameter is 30cm, and thickness is 20cm, and centre arranges pore, and pore Φ is 15cm, adopts mortar concrete to build;
(2) standpipe makes: adopt coating steel pipe, steel pipe Φ is 15cm, and length is 3 ~ 4m, and circular hole is opened far from 10cm place, end in steel pipe two, and Circularhole diameter is 3cm; Apart from 30cm place, end, two ends open string pore, aperture is Φ 10cm;
(3) transverse tube makes: adopt steel plating pipe, steel pipe Φ 10cm, length 3 ~ 4m;
(4) cuff makes: adopt coating steel pipe, pipe diameter is Φ 15cm, and length is 20cm, opens circular hole in the middle part of length direction, and circular hole aperture is 1cm, for perforation;
(5) mortise lock makes: mortise lock is made up of lock pin and nut; Lock pin selects round steel, and round steel Φ is 9mm, and length is 20cm, and two ends are 5cm silk tooth; And make the nut of internal diameter 9mm;
(2) enclose grade cover body to make
(1) selection: select 1000D nylon cloth;
(2) varnish is adopted to carry out paint one time to selected nylon cloth stand-by;
(3) seam crossing is needed at the nylon cloth of setting, with machine seam sewing slide fastener;
(4) arrange string cord hole enclosing outside grade cover body of setting by 30cm spacing, string cord hole alloy makes, and circular, aperture is 10cm;
(3) net body makes
(1) choice for use nylon rope is that 6 strands of nylon ropes are twisted into;
(2) net body mesh is 10cm*10cm;
(4) structure body is installed
(1) pedal pin to install: to place by 3-4m along building periphery to be teared down and built and pedal pin, dig the pool and will pedal pin and be vertically buried in the earth, cannula port can not inject mud dirt, and cannula port is removed in time if any mud dirt;
(2) erection of frames: according to pedaling pin route, carry out erection of frames, support body is made up of wood based panel, and plank width is 10cm, plank arranges string pore hole at interval of 3-4m, and the position in string pipe cavity is corresponding with the position pedaling pin; Standpipe diameter+2cm≤string pore hole dia≤standpipe diameter+2.5cm, the length of the single standpipe of support body aspect ratio exceeds 20cm, and support body adopts bracing frame to support;
(3) first floor erection of frames: when after erection of frames, penetrates cuff by standpipe bottom, and is placed on by cuff in the string pore hole of support body, then is sealed in by transverse tube in riser upper string pore;
(4) second layer erection of frames: when after first floor erection of frames, second layer support body is installed, the standpipe bottom of second layer support body is penetrated cuff, the standpipe upper end of second layer support body heads in the cuff of first floor support body standpipe, above first floor riser bottom top to the circular hole of first floor support body standpipe cuff, lock pin is inserted in this circular hole, lock pin two ends nut screwing clamping, then continue after upper top to the standpipe string pore of second layer support body completes and expose support body surface, horizontal standpipe to be penetrated in string hole; Press second layer erection of frames method again and the second layer, third layer are installed, till meeting design height, form structure body frame;
(5) enclose grade cover body to install, connect balloon respectively at cover body limit eaves with lead-in wire, cover body, on weight basis, covers on support body by placement balloon, then by the string cord hole string rope of cover body, tighten, cover body limit pin is buried in the earth;
(6) net body is installed: net body under net body being used balloon and hand fit, covers on cover body, then tightens after installing by cover body;
(7) in excavation gutter, structure body frame periphery, and guarantee that draining is unobstructed.
The present invention adopts and makes closure with nylon cloth, and this material has the feature that ventilative property is tied mutually with closure, and removed building all contains wherein by this overall facility simultaneously, thus has closure technical characterstic.Closedly enclose 3 times that grade area is generally greater than buildings area, be highly greater than more than depth of building 3m, thus no matter scale of construction area all has property technical characterstic substantially.Be applicable to multilayer and bilayer, one storey house construction work, be applicable to town road construction work, be not suitable for colony's building engineering, high-rise Super High building engineering, particularity construction work etc.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
A kind of demolishing buildings is closed encloses a grade facility construction method, comprises the following steps:
(1) parts make
(1) pedal pin to make
Pedal pin and be set to round shape, diameter is 30cm, and thickness is 20cm, and centre arranges pore, and pore Φ is 15cm, adopts mortar concrete to build;
(2) standpipe makes: adopt coating steel pipe, steel pipe Φ is 15cm, and length is 3 ~ 4m, and circular hole is opened far from 10cm place, end in steel pipe two, and Circularhole diameter is 3cm; Apart from 30cm place, end, two ends open string pore, aperture is Φ 10cm;
(3) transverse tube makes: adopt steel plating pipe, steel pipe Φ 10cm, length 3 ~ 4m;
(4) cuff makes: adopt coating steel pipe, pipe diameter is Φ 15cm, and length is 20cm, opens circular hole in the middle part of length direction, and circular hole aperture is 1cm, for perforation;
(5) mortise lock makes: mortise lock is made up of lock pin and nut; Lock pin selects round steel, and round steel Φ is 9mm, and length is 20cm, and two ends are 5cm silk tooth; And make the nut of internal diameter 9mm;
(2) enclose grade cover body to make
(1) selection: select 1000D nylon cloth;
(2) varnish is adopted to carry out paint one time to selected nylon cloth stand-by;
(3) seam crossing is needed at the nylon cloth of setting, with machine seam sewing slide fastener;
(4) arrange string cord hole enclosing outside grade cover body of setting by 30cm spacing, string cord hole alloy makes, and circular, aperture is 10cm;
(3) net body makes
(1) choice for use nylon rope is that 6 strands of nylon ropes are twisted into;
(2) net body mesh is 10cm*10cm;
(4) structure body is installed
(1) pedal pin to install: to place by 3-4m along building periphery to be teared down and built and pedal pin, dig the pool and will pedal pin and be vertically buried in the earth, cannula port can not inject mud dirt, and cannula port is removed in time if any mud dirt;
(2) erection of frames: according to pedaling pin route, carry out erection of frames, support body is made up of wood based panel, and plank width is 10cm, plank arranges string pore hole at interval of 3-4m, and the position in string pipe cavity is corresponding with the position pedaling pin; Standpipe diameter+2cm≤string pore hole dia≤standpipe diameter+2.5cm, the length of the single standpipe of support body aspect ratio exceeds 20cm, and support body adopts bracing frame to support;
(3) first floor erection of frames: when after erection of frames, penetrates cuff by standpipe bottom, and is placed on by cuff in the string pore hole of support body, then is sealed in by transverse tube in riser upper string pore;
(4) second layer erection of frames: when after first floor erection of frames, second layer support body is installed, the standpipe bottom of second layer support body is penetrated cuff, the standpipe upper end of second layer support body heads in the cuff of first floor support body standpipe, above first floor riser bottom top to the circular hole of first floor support body standpipe cuff, lock pin is inserted in this circular hole, lock pin two ends nut screwing clamping, then continue after upper top to the standpipe string pore of second layer support body completes and expose support body surface, horizontal standpipe to be penetrated in string hole; Press second layer erection of frames method again and the second layer, third layer are installed, till meeting design height, form structure body frame;
(5) enclose grade cover body to install, connect balloon respectively at cover body limit eaves with lead-in wire, cover body, on weight basis, covers on support body by placement balloon, then by the string cord hole string rope of cover body, tighten, cover body limit pin is buried in the earth;
(6) net body is installed: net body under net body being used balloon and hand fit, covers on cover body, then tightens after installing by cover body;
(7) in excavation gutter, structure body frame periphery, and guarantee that draining is unobstructed.

Claims (1)

1. demolishing buildings is closed encloses a grade facility construction method, it is characterized in that: comprise the following steps:
(1) parts make
(1) pedal pin to make
Pedal pin and be set to round shape, diameter is 30cm, and thickness is 20cm, and centre arranges pore, and pore Φ is 15cm, adopts mortar concrete to build;
(2) standpipe makes: adopt coating steel pipe, steel pipe Φ is 15cm, and length is 3 ~ 4m, and circular hole is opened far from 10cm place, end in steel pipe two, and Circularhole diameter is 3cm; Apart from 30cm place, end, two ends open string pore, aperture is Φ 10cm;
(3) transverse tube makes: adopt steel plating pipe, steel pipe Φ 10cm, length 3 ~ 4m;
(4) cuff makes: adopt coating steel pipe, pipe diameter is Φ 15cm, and length is 20cm, opens circular hole in the middle part of length direction, and circular hole aperture is 1cm, for perforation;
(5) mortise lock makes: mortise lock is made up of lock pin and nut; Lock pin selects round steel, and round steel Φ is 9mm, and length is 20cm, and two ends are 5cm silk tooth; And make the nut of internal diameter 9mm;
(2) enclose grade cover body to make
(1) selection: select 1000D nylon cloth;
(2) varnish is adopted to carry out paint one time to selected nylon cloth stand-by;
(3) seam crossing is needed at the nylon cloth of setting, with machine seam sewing slide fastener;
(4) arrange string cord hole enclosing outside grade cover body of setting by 30cm spacing, string cord hole alloy makes, and circular, aperture is 10cm;
(3) net body makes
(1) choice for use nylon rope is that 6 strands of nylon ropes are twisted into;
(2) net body mesh is 10cm*10cm;
(4) structure body is installed
(1) pedal pin to install: to place by 3-4m along building periphery to be teared down and built and pedal pin, dig the pool and will pedal pin and be vertically buried in the earth, cannula port can not inject mud dirt, and cannula port is removed in time if any mud dirt;
(2) erection of frames: according to pedaling pin route, carry out erection of frames, support body is made up of wood based panel, and plank width is 10cm, plank arranges string pore hole at interval of 3-4m, and the position in string pipe cavity is corresponding with the position pedaling pin; Standpipe diameter+2cm≤string pore hole dia≤standpipe diameter+2.5cm, the length of the single standpipe of support body aspect ratio exceeds 20cm, and support body adopts bracing frame to support;
(3) first floor erection of frames: when after erection of frames, penetrates cuff by standpipe bottom, and is placed on by cuff in the string pore hole of support body, then is sealed in by transverse tube in riser upper string pore;
(4) second layer erection of frames: when after first floor erection of frames, second layer support body is installed, the standpipe bottom of second layer support body is penetrated cuff, the standpipe upper end of second layer support body heads in the cuff of first floor support body standpipe, above first floor riser bottom top to the circular hole of first floor support body standpipe cuff, lock pin is inserted in this circular hole, lock pin two ends nut screwing clamping, then continue after upper top to the standpipe string pore of second layer support body completes and expose support body surface, horizontal standpipe to be penetrated in string hole; Press second layer erection of frames method again and the second layer, third layer are installed, till meeting design height, form structure body frame;
(5) enclose grade cover body to install, connect balloon respectively at cover body limit eaves with lead-in wire, cover body, on weight basis, covers on support body by placement balloon, then by the string cord hole string rope of cover body, tighten, cover body limit pin is buried in the earth;
(6) net body is installed: net body under net body being used balloon and hand fit, covers on cover body, then tightens after installing by cover body;
(7) in excavation gutter, structure body frame periphery, and guarantee that draining is unobstructed.
CN201510177914.XA 2015-04-16 2015-04-16 Building demolition enclosed coaming facility construction method Pending CN104847165A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510177914.XA CN104847165A (en) 2015-04-16 2015-04-16 Building demolition enclosed coaming facility construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510177914.XA CN104847165A (en) 2015-04-16 2015-04-16 Building demolition enclosed coaming facility construction method

Publications (1)

Publication Number Publication Date
CN104847165A true CN104847165A (en) 2015-08-19

Family

ID=53847100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510177914.XA Pending CN104847165A (en) 2015-04-16 2015-04-16 Building demolition enclosed coaming facility construction method

Country Status (1)

Country Link
CN (1) CN104847165A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200456347Y1 (en) * 2009-07-27 2011-10-26 (합)현대철구산업 Combination structure of fence
CN202882373U (en) * 2012-10-16 2013-04-17 郑其雄 Improved scaffold
CN103046734A (en) * 2012-12-29 2013-04-17 上海建工一建集团有限公司 Environment-friendly flame-retardant scaffold system
KR101282747B1 (en) * 2012-11-30 2013-07-05 (주)일산금속 Width-pipe of expansion joint fence for possibility
CN103362349A (en) * 2012-03-30 2013-10-23 周国民 Wall guardrail with positioning bars
CN203742263U (en) * 2014-01-10 2014-07-30 舒华股份有限公司 Fencing framework connection structure
CN204128448U (en) * 2014-08-25 2015-01-28 叶建军 Demolishing buildings explosion flexible protection systems
CN204212383U (en) * 2014-10-29 2015-03-18 中建新疆建工集团第一建筑工程有限公司 Plug-in type steel pipe scaffold

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200456347Y1 (en) * 2009-07-27 2011-10-26 (합)현대철구산업 Combination structure of fence
CN103362349A (en) * 2012-03-30 2013-10-23 周国民 Wall guardrail with positioning bars
CN202882373U (en) * 2012-10-16 2013-04-17 郑其雄 Improved scaffold
KR101282747B1 (en) * 2012-11-30 2013-07-05 (주)일산금속 Width-pipe of expansion joint fence for possibility
CN103046734A (en) * 2012-12-29 2013-04-17 上海建工一建集团有限公司 Environment-friendly flame-retardant scaffold system
CN203742263U (en) * 2014-01-10 2014-07-30 舒华股份有限公司 Fencing framework connection structure
CN204128448U (en) * 2014-08-25 2015-01-28 叶建军 Demolishing buildings explosion flexible protection systems
CN204212383U (en) * 2014-10-29 2015-03-18 中建新疆建工集团第一建筑工程有限公司 Plug-in type steel pipe scaffold

Similar Documents

Publication Publication Date Title
CN106013052B (en) The construction method of steel sheet pile and open caisson Combined type underground garage parking
CN205776249U (en) A kind of combined inner supporting structure
CN106400813A (en) Foundation pit support system and construction method thereof
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN207063982U (en) Mechanical assistance sealing Station structure in a kind of pilot tunnel
CN106245657A (en) A kind of purlin anchor supporting construction for pattern foundation pit supporting structure
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN106759843A (en) A kind of outer wall of basement waterproof construction and its construction method
CN111663538A (en) Construction method for deep foundation pit miniature steel pipe pile support in complex geology of clearance limited area
CN102953373A (en) Construction method for manual digging filling pile under quick sand condition
CN106065668B (en) A construction method
CN107386453B (en) High-rise House on stilts construction method
CN105840216B (en) A kind of tunneling construction method of underground space development
CN202809600U (en) Elastic mesh cloth for heavy curtain type karst cave cast-in-place pile construction
CN209053021U (en) A kind of groove and tognue type precast concrete culvert pipe retaining wall and its artificial digging pile
CN201495555U (en) Cap tower-crane foundation of concrete cast-in-place high pile for tower erection at the house center
CN207047867U (en) Shaped steel formula double-row pile foundation pit supporting system is inserted after outer row
CN107503355A (en) Shaped steel formula double-row pile foundation pit supporting system and its construction method are inserted after outer row
CN106759438A (en) A kind of Landscape Architecture pin pin and its construction technology with Windproof anti-seismic function
CN207315379U (en) A kind of precast assembly vertical shaft
CN205576934U (en) Part increases ramus profundus watch box system behind former deep foundation pit construction
CN104847165A (en) Building demolition enclosed coaming facility construction method
CN106284415B (en) A kind of water intake caisson hangs floating construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819

RJ01 Rejection of invention patent application after publication