CN104818726A - Connecting structure of steel pipe pile and reinforced concrete bearing platform - Google Patents

Connecting structure of steel pipe pile and reinforced concrete bearing platform Download PDF

Info

Publication number
CN104818726A
CN104818726A CN201510261250.5A CN201510261250A CN104818726A CN 104818726 A CN104818726 A CN 104818726A CN 201510261250 A CN201510261250 A CN 201510261250A CN 104818726 A CN104818726 A CN 104818726A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
pile
steel
connecting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510261250.5A
Other languages
Chinese (zh)
Inventor
査义强
陆元春
吴刚
姜海西
沙丽新
刘晓苹
杨光强
何晓光
聂志宏
卢兴
蔡亮
赵成栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201510261250.5A priority Critical patent/CN104818726A/en
Publication of CN104818726A publication Critical patent/CN104818726A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Abstract

The invention discloses a connecting structure of a steel pipe pile and a reinforced concrete bearing platform. The connecting structure comprises the steel pipe pile embedded in the bearing platform and a plurality of vertical connecting steel bars welded to the steel pipe pile. The steel pipe pile comprises a steel pipe pile upper section pile, a lengthened steel pipe section is welded to the top of the steel pipe pile upper section pile, an annular connecting plate is horizontally arranged on the top surface of the lengthened steel pipe section, and the vertical connecting steel bars are welded to the surface of the annular connecting plate at intervals. The connecting structure not only is easier to construct and has higher firmness in connector connection, but also greatly reduces field welding workload.

Description

The connecting structure of steel pipe pile and reinforced concrete pile cap
Technical field
The present invention relates to building and bridge field, the particularly connecting structure of a kind of steel pipe pile and reinforced concrete pile cap.
Background technology
The steel pipe pile of prior art is high owing to having supporting capacity, can adapt to the fluctuations of bearing course at pile end, spreading, prescinds conveniently, on advantages such as the impact of environment are little, becomes a kind of pile foundation form that building and bridge field often adopt.
As depicted in figs. 1 and 2, being rigidly connected of steel pipe pile 20 and cushion cap 10 is general by being imbedded by steel pipe pile 20 in cushion cap 10 after certain length, steel pipe pile outer wall 21 welds a vertical connecting reinforcement 40 of circle and stretches in cushion cap 10, in the certain length of steel pipe top, fill in reinforcing cage 30 simultaneously, in reinforcing cage 30, longitudinal reinforcement also stretches in cushion cap, with cushion cap reinforcing bar binding reinforcing cage integrally, then build wadding weft variation and the cushion cap concrete of steel pipe top, finally realize being rigidly connected of steel pipe pile 20 and cushion cap 10.
But, because steel pipe pile outer wall 21 generally needs the vertical connecting reinforcement 40 welding a greater number, be linear contact lay when adding and weld along steel pipe pile outside wall surface, therefore operate very inconvenient, and the welding job amount at scene is also larger.In addition, at steel pipe pile outer wall Site Welding reinforcing bar, length and the welding quality of vertical connecting reinforcement welding during welding are all difficult to ensure.And the welding quality of outer wall welded reinforcement realizes steel pipe pile and the rigidly connected important guarantee of cushion cap exactly.
Therefore, need to propose one and more easily ensure joint quality, facilitate the steel pipe pile of site operation and the connecting structure of reinforced concrete pile cap.
Summary of the invention
Because the above-mentioned defect of prior art, the invention provides one and more easily ensure joint quality, facilitate the steel pipe pile of site operation and the connecting structure of reinforced concrete pile cap, it comprises: imbed the steel pipe pile in cushion cap and some vertical connecting reinforcements being welded in described steel pipe pile, it is characterized in that, described steel pipe pile comprises on steel pipe pile and saves stake, the welded top one that described steel pipe pile saves stake lengthens lengths of steel pipes, the end face of described lengthening lengths of steel pipes has been horizontally disposed with an annular connecting plate, interval welding (such as adopting the welding manner of arc stud welding commonly known in the art) described vertical connecting reinforcement on the plate face of described annular connecting plate.
In certain embodiments, described steel pipe pile saves stake top and embed reinforcing cage, described reinforcing cage comprises and somely stretches into longitudinal reinforcement in cushion cap and stirrup.Arrange longitudinal reinforcement in reinforcing cage and cage in the present embodiment and stirrup portion can adopt technology commonly known in the art to realize, the improvement place of this reinforcing cage part non-invention, and therefore not to repeat here.
In certain embodiments, described annular connecting plate is a horizontal annular steel plate.Certainly, replacing as one, can also be that other has certain bonding strength and is convenient to the metal sheet of welding.
On the basis meeting this area general knowledge, above-mentioned each optimum condition, can be combined, and obtains each preferred embodiment of the present invention.
Beneficial effect of the present invention: the present invention adopts and save stake top place's connection one section lengthening lengths of steel pipes on steel pipe pile, due to lengthen lengths of steel pipes can in steel work factory prior overall processing shaping, take Site Welding again, so just need not be welded to connect reinforcing bar in side one by one around the side wall surface of steel pipe column at the scene again.And only connecting reinforcement need be welded on the doughnut-shaped steel plate of level by arc stud welding, therefore welding operation is very convenient, and Site Welding workload significantly reduces than traditional sidewall weld workload.
In addition, a kind of welding procedure that electric arc stud welding of the present invention the most often adopts when being the WELDING STUDS welding of compound beam steel work top, technical maturity, switching performance is reliable, easy construction, therefore, uses it for the connection of plain bars and steel pipe pile top steel plate in the present invention, construction is easier, and joint connects more firm.Greatly facilitate the steel pipe pile of site operation and the connection of reinforced concrete pile cap.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the steel pipe pile elevation of traditional method.
Fig. 2 is the sectional view of A-A in Fig. 1.
Fig. 3 is steel pipe pile elevation of the present invention.
Fig. 4 is the structure chart of the lengthening lengths of steel pipes in Fig. 3.
Fig. 5 is the amplification view of B-B in Fig. 4.
Description of reference numerals: conventional art: cushion cap 10, steel pipe pile 20, steel pipe pile outer wall 21, reinforcing cage 30, vertically connecting reinforcement 40,
The present invention: cushion cap 1, steel pipe pile 2, steel pipe pile save stake 201, top 2011, reinforcing cage 3, longitudinal reinforcement 31, stirrup 32, vertical connecting reinforcement 4, lengthen lengths of steel pipes 5, horizontal annular steel plate 51
Detailed description of the invention
Enumerate preferred embodiment below, and come by reference to the accompanying drawings clearlyer intactly the present invention to be described.
Embodiment
The object of the invention is to be achieved through the following technical solutions: as shown in Fig. 3 ~ Fig. 5, the connecting structure of the steel pipe pile that the present embodiment provides and reinforced concrete pile cap comprises: imbed the steel pipe pile 2 in cushion cap 1, described steel pipe pile 2 comprises on steel pipe pile and saves stake 201, the top 2011 that steel pipe pile saves stake 201 is welded with a trifle and lengthens lengths of steel pipes 5, the end face lengthening lengths of steel pipes 5 arranges horizontal annular steel plate 51, the mode of electric arc stud welding is adopted to weld required vertical connecting reinforcement 4 at the end face of horizontal annular steel plate 51, simultaneously fill in reinforcing cage 3 saving from steel pipe pile in the certain length of stake 201 top.
Reinforcing cage 3 is provided with some longitudinal reinforcements 31 and stirrup 32, and longitudinal reinforcement 31 stretches into cushion cap 1, fixes with the reinforcing bar binding in cushion cap 1, after building steel pipe pile wadding weft variation and cushion cap concrete, then realizes being rigidly connected of steel pipe pile 2 and cushion cap 1.
The present invention's one section of connecting owing to steel pipe pile saving stake 201 place lengthen lengths of steel pipes 5 can in steel work factory prior overall processing shaping, then take Site Welding, so just need not more extremely scene weld vertical connecting reinforcement 4 one by one around the side wall surface of steel pipe column.Therefore not only welding operation is convenient, and the welding job amount at scene significantly reduces than traditional on-the-spot sidewall weld workload.
In addition, a kind of welding procedure the most often adopted when electric arc stud welding of the present invention is the WELDING STUDS welding of compound beam steel work top, technical maturity, switching performance is reliable, easy construction.
Therefore, the present invention is used for the connection of plain bars and steel pipe pile top steel plate, construction is easier, and joint connects more firm; And greatly facilitate the steel pipe pile of site operation and the connection of reinforced concrete pile cap.
More than describe each preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (1)

1. the connecting structure of a steel pipe pile and reinforced concrete pile cap, it comprises: imbed the steel pipe pile in cushion cap and some vertical connecting reinforcements being welded in described steel pipe pile, it is characterized in that, described steel pipe pile comprises on steel pipe pile and saves stake, the welded top one that described steel pipe pile saves stake lengthens lengths of steel pipes, the end face of described lengthening lengths of steel pipes has been horizontally disposed with an annular connecting plate, the described vertical connecting reinforcement of interval welding on the plate face of described annular connecting plate; The top described steel pipe pile saving stake embeds reinforcing cage, and described reinforcing cage comprises and somely stretches into longitudinal reinforcement in cushion cap and stirrup; Described annular connecting plate is a horizontal annular steel plate.
CN201510261250.5A 2015-05-21 2015-05-21 Connecting structure of steel pipe pile and reinforced concrete bearing platform Pending CN104818726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510261250.5A CN104818726A (en) 2015-05-21 2015-05-21 Connecting structure of steel pipe pile and reinforced concrete bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510261250.5A CN104818726A (en) 2015-05-21 2015-05-21 Connecting structure of steel pipe pile and reinforced concrete bearing platform

Publications (1)

Publication Number Publication Date
CN104818726A true CN104818726A (en) 2015-08-05

Family

ID=53729191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510261250.5A Pending CN104818726A (en) 2015-05-21 2015-05-21 Connecting structure of steel pipe pile and reinforced concrete bearing platform

Country Status (1)

Country Link
CN (1) CN104818726A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018000879A1 (en) * 2016-06-28 2018-01-04 广东中科华大工程技术检测有限公司 Steel pipe prestressed cast-in-place stabilizing sealed pile device
CN108239919A (en) * 2017-07-26 2018-07-03 北京九州动脉隧道技术有限公司 The device and construction method of a kind of underwater cushion cap, the underwater cushion cap of structure
CN108914961A (en) * 2018-08-03 2018-11-30 福州铭林钢塔钢构制造有限公司 Using the communication iron tower foundation and construction method of Screw Anchor
CN112045285A (en) * 2020-07-15 2020-12-08 中交第一航务工程局有限公司 Steel pipe pile shear key installation process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458345A (en) * 2003-04-29 2003-11-26 立基工程有限公司 Combined pile section with reinfored horizontal bending strength and rigidity and its construction method
KR20060064994A (en) * 2004-12-09 2006-06-14 노춘복 A pile head reinforcement structure of precastconcrete pile
CN202073111U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Connection structure of a concrete pile and a bearing platform
CN102720206A (en) * 2012-07-16 2012-10-10 南京工业大学 Novel connecting structure of prestressed concrete pile and cushion cap
CN202809633U (en) * 2012-10-10 2013-03-20 上海市城市建设设计研究总院 Connecting structure of pre-stressed high-strength concrete (PHC) pipe pile and bearing platform
CN204645072U (en) * 2015-05-21 2015-09-16 上海市城市建设设计研究总院 The connecting structure of steel pipe pile and reinforced concrete pile cap

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458345A (en) * 2003-04-29 2003-11-26 立基工程有限公司 Combined pile section with reinfored horizontal bending strength and rigidity and its construction method
KR20060064994A (en) * 2004-12-09 2006-06-14 노춘복 A pile head reinforcement structure of precastconcrete pile
CN202073111U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Connection structure of a concrete pile and a bearing platform
CN102720206A (en) * 2012-07-16 2012-10-10 南京工业大学 Novel connecting structure of prestressed concrete pile and cushion cap
CN202809633U (en) * 2012-10-10 2013-03-20 上海市城市建设设计研究总院 Connecting structure of pre-stressed high-strength concrete (PHC) pipe pile and bearing platform
CN204645072U (en) * 2015-05-21 2015-09-16 上海市城市建设设计研究总院 The connecting structure of steel pipe pile and reinforced concrete pile cap

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马福临: "《电弧螺柱焊理论基础与应用》", 30 November 2002, 北京理工大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018000879A1 (en) * 2016-06-28 2018-01-04 广东中科华大工程技术检测有限公司 Steel pipe prestressed cast-in-place stabilizing sealed pile device
CN108239919A (en) * 2017-07-26 2018-07-03 北京九州动脉隧道技术有限公司 The device and construction method of a kind of underwater cushion cap, the underwater cushion cap of structure
CN108914961A (en) * 2018-08-03 2018-11-30 福州铭林钢塔钢构制造有限公司 Using the communication iron tower foundation and construction method of Screw Anchor
CN112045285A (en) * 2020-07-15 2020-12-08 中交第一航务工程局有限公司 Steel pipe pile shear key installation process

Similar Documents

Publication Publication Date Title
CN110616808B (en) Assembled floor type steel-wood combined node and assembling method thereof
CN104818726A (en) Connecting structure of steel pipe pile and reinforced concrete bearing platform
CN102535648B (en) Steel pipe column ring beam column node structure and construction method thereof
KR100992529B1 (en) A fabrication type lattice girder
KR101368218B1 (en) a concrete filled steel tube with the inner reinforcing structure
CN104499575A (en) Shock resistant connecting structure of reinforced concrete composite beam and steel pipe column
CN105064512A (en) Connecting structure of circular steel tube concrete column and steel beam
CN105714984A (en) Square-and-special-shaped concrete filled steel tubular column with built-in circular tubes and tie bars and construction method thereof
CN103485333B (en) Waveform hollow steel pipe friction pile and construction method
CN105803939A (en) Open steel tube and reinforced-concrete combined girder bridge structure
CN204645072U (en) The connecting structure of steel pipe pile and reinforced concrete pile cap
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN103866921B (en) Rebar connector between precast reinforced concrete structure, manufacture method and construction method
CN109667385B (en) Reinforced concrete ultra-short column
KR102276624B1 (en) the CFT column structure with diagonal line type internal diaphragm
CN205134531U (en) Shaped steel and steel -concrete structure system thereof
KR102069419B1 (en) Composite pile internally reinforced by steel tube
JP2012117328A (en) Structural member of steel plate concrete structure
CN109252691A (en) A kind of reinforced steel concrete framed floor structure and reinforcement means
CN106639072A (en) Assembly type thermal-insulating wall body construction structure
CN209211934U (en) A kind of reinforced steel concrete framed floor structure
CN203462651U (en) Insertion directly-embedded type steel truss connecting structure
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
JP5970211B2 (en) Strengthening structure of existing piles
CN108951681B (en) Connecting structure of anti-pulling type concrete pipe pile and bearing platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150805

RJ01 Rejection of invention patent application after publication