CN104794331A - 深基坑健康监测管理系统及其管理方法 - Google Patents

深基坑健康监测管理系统及其管理方法 Download PDF

Info

Publication number
CN104794331A
CN104794331A CN201510160043.0A CN201510160043A CN104794331A CN 104794331 A CN104794331 A CN 104794331A CN 201510160043 A CN201510160043 A CN 201510160043A CN 104794331 A CN104794331 A CN 104794331A
Authority
CN
China
Prior art keywords
data
deep basal
basal pit
dimensional
health monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510160043.0A
Other languages
English (en)
Other versions
CN104794331B (zh
Inventor
李春祥
谢云飞
应宇垦
付心建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN201510160043.0A priority Critical patent/CN104794331B/zh
Publication of CN104794331A publication Critical patent/CN104794331A/zh
Application granted granted Critical
Publication of CN104794331B publication Critical patent/CN104794331B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供一种深基坑健康监测管理系统及其管理方法,深基坑健康监测管理系统,其包括:三维激光扫描系统,包括三维激光扫描仪、数码相机、定位装置、电源及附属设备,用于获取建筑关键部位施工及历史健康监测信息,并传输数据给数据处理端;数据处理端,装载有小型数据库、BIM系统、AR系统;系统展示端包括健康监测系统和显示设备,进行实时交互分析,实现深基坑健康监测。本发明针对深基坑深、大和复杂的特点,利用BIM和三维激光测量技术,实现对深基坑的实时监测。

Description

深基坑健康监测管理系统及其管理方法
技术领域
本发明涉及一种管理系统及其管理方法,特别涉及一种深基坑健康监测管理系统及其管理方法。
背景技术
《规范》强制性条文规定“开挖深度大于等于5米或深度小于5米但现场地质情况和周围环境复杂的基坑工程及其它需要监测的基坑工程应实施监测”。传统的基坑健康监测以报表配合二维曲线、图形的方式显示变形趋势,发现问题后反馈并采取必要的补救措施,保证基坑的健康运行。这种方法的缺点是耗时耗力,不利于基坑变形的快速判断;靠人工阅读,易发生疏漏情况;无法直观查看整体基坑的变形趋势,迅速排除危险源,不利于深基坑的健康监测。通常深基坑的监测主要是对基坑维护结构与周边环境的健康监测,因此如何真实而准确地记录深基坑现场工况,实时自动监测基坑支护及周边环境的变形,并及时反映给工程技术人员,当变形超过控制值技术人员可以快速准确地采取控制措施,同时跟踪基坑后续状况,这是一个值得探讨的问题。
 BIM(Building Information Model)是建筑信息模型的简称, 1975 年, Chuck Eastman 提出 BIM 理念的源头“Building Description System”(建筑描述系统)。该系统的概念是 BIM 的概念的起源,提出了三维建筑模型、基于网络协作平台的自动更新视图、工程量自动计算和基于数据库的进度计划编排等 BIM 的关键词,目前BIM主要应用在在结构与管道碰撞检测、工程造价控制及施工模拟。三维激光扫描技术是一种新兴的现代化信息获取手段,原理是通过高速驱动及配准技术,向被测物体以每秒高达万次的高频发射激光束,获取反射信号并成像的一种技术。三维激光扫描能在测量中采集各物体表面点云数据,且速度快、精度高,生成的点云数据经处理可转换为BIM模型数据,常用于建筑物测量维护与仿真、位移控制与外观结构三维建模、地形测量等。AR(增强现实)技术借助计算机图形技术和可视化技术产生现实环境中不存在的虚拟对象,借助显示设备将虚拟对象与真实环境融为一体,呈现效果真实的新环境,具有虚实结合、实时交互和三维注册的特点。AR技术能突出对真实环境的增强效果,在医疗研究、解剖训练、精密仪器制造、装配与维修和工程设计等领域有广泛的应用。
发明内容
本发明的目的在于提供一种深基坑健康监测管理系统及其管理方法,其针对深基坑深、大和复杂的特点,利用BIM和三维激光测量技术,实现对深基坑的实时监测,并通过AR实现将其可视化和直观化,借助AR技术的实时交互进行深基坑的健康监测。
本发明提供一种深基坑健康监测管理系统,其特征在于,其包括:
三维激光扫描系统,包括三维激光扫描仪、数码相机、定位装置、电源及附属设备,用于获取建筑关键部位施工及历史健康监测信息,并传输数据给数据处理端;
数据处理端,装载有小型数据库、BIM系统、AR系统,其中AR系统包括虚实融合、实时交互和三维注册模块;数据处理端与三维激光扫描系统相连,通过数据处理端的小型数据库对三维激光扫描系统中的采样数据进行滤波处理,选取有用的数据,得到深基坑现场数据模型;利用BIM系统对地勘报告和图纸进行建模,得到深基坑的虚拟三维模型,最后通过AR系统对真实和虚拟数据进行合成,完成深基坑数据的AR实现;
系统展示端包括健康监测系统和显示设备,系统展示端与数据处理端相连,用于根据AR系统的数据进行分析对比,发现临界区域与危险点,监测到真实值超过虚拟值时,根据显示设备中深基坑的现场位置及时采取补救措施,同时返回三维激光扫描系统,进行实时交互分析,实现深基坑健康监测。
本发明还提供一种深基坑健康监测管理系统的管理方法,其特征在于,其包括以下步骤:
步骤一,以地勘报告为初始数据,将深基坑的二维地勘资料转换为三维地勘模型,并建立基坑结构的三维模型,完成BIM模型的建立;
步骤二,在完工基坑区域进行点云数据采集,首先进行现场踏勘,并布设合适控制点和建立控制网,进行设站扫描及标靶提取;
步骤三,对深基坑已完工的小区域,确定扫描区域并检查通视条件,对深基坑建立能确保相互控制点均通视的控制网且其能覆盖扫描区域,选择合适的分辨率进行标靶精度扫描,采集点云数据;
步骤四,对点云数据进行滤波处理,并建立三维模型;
步骤五,在数据库中分别导入BIM数据和三维激光扫描数据,从虚拟坐标系转换为真实坐标系,通过标识进行三维注册,将真实场景的数据与虚拟场景合成,完成深基坑数据的AR实现;
步骤六,在系统展示端呈现实时数据模型,对比真实数据与虚拟数据,发现临界区域与危险点,监测到真实值超限时及时补救,并返回步骤二,持续对比,直至满足要求,从而实现深基坑的健康监测。
优选地,所述步骤四中的三维模型是在数据库中建立完工基坑结构的实际三维模型。
本发明具有以下有益效果:本发明在不事先埋设监测设备和接触基坑下,通过点云模拟深基坑结构信息,结合BIM数据模型,利用AR技术实现对深基坑施工和完工后的有效监测,能起到基坑危害预报及防护功能,达到简单、准确和快速进行深基坑健康监测目的,为工程提供了一种全新而可视化的基坑监测管理办法。
附图说明
图1是本发明的系统框图;
图2是本发明中使用的ARToolkit技术在标记、相机和屏幕间的匹配关系的示意图。
具体实施方式
以下结合附图和深基坑对本发明提出的基于BIM与AR技术的深基坑健康监测管理系统作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。
本发明深基坑健康监测管理系统包括三维激光扫描系统、数据处理端、系统展示端;
三维激光扫描系统110,包括三维激光扫描仪、数码相机、定位装置、电源及附属设备,用于获取建筑关键部位施工及历史健康监测信息,并传输数据给数据处理端120;
数据处理端120,装载有小型数据库221、BIM系统222、AR系统223,其中AR系统包括虚实融合、实时交互和三维注册模块;数据处理端120与三维激光扫描系统110相连,通过数据处理端120的小型数据库对三维激光扫描系统110中的采样数据进行滤波处理,选取有用的数据,得到深基坑现场数据模型;利用BIM系统对地勘报告和图纸进行建模,得到深基坑的虚拟三维模型,最后通过AR系统对真实和虚拟数据进行合成,完成深基坑数据的AR实现;
系统展示端130包括健康监测系统和显示设备,系统展示端130与数据处理端120相连,用于根据AR系统的数据进行分析对比,发现临界区域与危险点,监测到真实值超过虚拟值时,根据显示设备中深基坑的现场位置及时采取补救措施,同时返回三维激光扫描系统110,进行实时交互分析,实现深基坑健康监测。
本发明深基坑健康监测管理系统的管理方法包括以下步骤:
步骤一,以地勘报告为初始数据,将深基坑的二维地勘资料转换为三维地勘模型,并建立基坑结构的三维模型,完成BIM模型的建立;在BIM数据库中与基坑结构模型合并,同时设置土层属性,在施工中发生设计变更时,对BIM模型进行同步修改。
步骤二,在完工基坑区域进行点云数据采集,首先进行现场踏勘,并布设合适控制点和建立控制网,进行设站扫描及标靶提取;具体是在BIM数据库中与基坑结构模型合并,同时设置土层属性,在施工中发生设计变更时,对BIM模型进行同步修改。
步骤三,对深基坑已完工的小区域,确定扫描区域并检查通视条件,对深基坑建立能确保相互控制点均通视的控制网且其能覆盖扫描区域,选择合适的分辨率进行标靶精度扫描,采集点云数据;
步骤四,对点云数据进行滤波处理,并建立三维模型;对扫描得到的深基坑点云数据进行滤波处理,去除非量测区域的数据,拟合标靶中心点,将控制点的坐标传递给标靶中心点,使扫描得到的点云归化至工程实际坐标系。三维模型是在数据库中建立完工基坑结构的实际三维模型。
步骤五,在数据库中分别导入BIM数据和三维激光扫描数据,从虚拟坐标系转换为真实坐标系,通过标识进行三维注册,将真实场景的数据与虚拟场景合成,完成深基坑数据的AR实现;对BIM技术生成的虚拟模型和三维激光扫描得到的真实模型精细化,通过数据模型格式IFC(Industry Foundation Classes)进行信息交换,对模型加工处理后导出WRL格式文件,利用ARToolKit开发调用上述文件的AR程序,调试成功后运行程序。其中在AR实现中,采用基于标识的三维注册方法,将三维激光扫描得到的深基坑模型输入数据库,与BIM虚拟模型合成。
步骤六,在系统展示端呈现实时数据模型,对比真实数据与虚拟数据,发现临界区域与危险点,监测到真实值超限时及时补救,并返回步骤二,持续对比,直至满足要求,从而实现深基坑的健康监测。对后台数据库的深基坑健康监测信息,在AR实现时通过健康状况分级评估系统进行进一步分析,以便及时准备分析结果;通过AR系统的实时交互实现对深基坑健康监测信息的监控、分析及处理;所述的健康状况分级评估系统在获得深基坑健康监测的BIM数据信息、三维激光扫描信息等基础上进行分级评估及预警报告,在发出预警报告后通过持续修正实现连续健康监测。
本发明采用BIM技术实现深基坑的虚拟模拟,通过三维激光扫描技术及时反映深基坑的现场工况,最终利用AR技术完成深基坑的BIM模型与现实环境的虚实融合,并通过人机实时交互进行深基坑健康监测,解决了现有信息技术无法应用于现场管理的缺点,对深基坑特别是超大面积、周边情况复杂的情况很有意义。本发明在不埋设监测设备和未接触基坑的条件下进行快速而准确的进行健康分级评估,并及时做出预警。

Claims (3)

1.一种深基坑健康监测管理系统,其特征在于,其包括:
三维激光扫描系统,包括三维激光扫描仪、数码相机、定位装置、电源及附属设备,用于获取建筑关键部位施工及历史健康监测信息,并传输数据给数据处理端;
数据处理端,装载有小型数据库、BIM系统、AR系统,其中AR系统包括虚实融合、实时交互和三维注册模块;数据处理端与三维激光扫描系统相连,通过数据处理端的小型数据库对三维激光扫描系统中的采样数据进行滤波处理,选取有用的数据,得到深基坑现场数据模型;利用BIM系统对地勘报告和图纸进行建模,得到深基坑的虚拟三维模型,最后通过AR系统对真实和虚拟数据进行合成,完成深基坑数据的AR实现;
系统展示端包括健康监测系统和显示设备,系统展示端与数据处理端相连,用于根据AR系统的数据进行分析对比,发现临界区域与危险点,监测到真实值超过虚拟值时,根据显示设备中深基坑的现场位置及时采取补救措施,同时返回三维激光扫描系统,进行实时交互分析,实现深基坑健康监测。
2.一种深基坑健康监测管理系统的管理方法,其特征在于,其包括以下步骤:
步骤一,以地勘报告为初始数据,将深基坑的二维地勘资料转换为三维地勘模型,并建立基坑结构的三维模型,完成BIM模型的建立;
步骤二,在完工基坑区域进行点云数据采集,首先进行现场踏勘,并布设合适控制点和建立控制网,进行设站扫描及标靶提取;
步骤三,对深基坑已完工的小区域,确定扫描区域并检查通视条件,对深基坑建立能确保相互控制点均通视的控制网且其能覆盖扫描区域,选择合适的分辨率进行标靶精度扫描,采集点云数据;
步骤四,对点云数据进行滤波处理,并建立三维模型;
步骤五,在数据库中分别导入BIM数据和三维激光扫描数据,从虚拟坐标系转换为真实坐标系,通过标识进行三维注册,将真实场景的数据与虚拟场景合成,完成深基坑数据的AR实现;
步骤六,在系统展示端呈现实时数据模型,对比真实数据与虚拟数据,发现临界区域与危险点,监测到真实值超限时及时补救,并返回步骤二,持续对比,直至满足要求,从而实现深基坑的健康监测。
3.根据权利要求2所述的深基坑健康监测管理系统的管理方法,其特征在于,所述步骤四中的三维模型是在数据库中建立完工基坑结构的实际三维模型。
CN201510160043.0A 2015-04-07 2015-04-07 深基坑健康监测管理系统及其管理方法 Expired - Fee Related CN104794331B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510160043.0A CN104794331B (zh) 2015-04-07 2015-04-07 深基坑健康监测管理系统及其管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510160043.0A CN104794331B (zh) 2015-04-07 2015-04-07 深基坑健康监测管理系统及其管理方法

Publications (2)

Publication Number Publication Date
CN104794331A true CN104794331A (zh) 2015-07-22
CN104794331B CN104794331B (zh) 2018-01-02

Family

ID=53559122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510160043.0A Expired - Fee Related CN104794331B (zh) 2015-04-07 2015-04-07 深基坑健康监测管理系统及其管理方法

Country Status (1)

Country Link
CN (1) CN104794331B (zh)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442642A (zh) * 2015-12-11 2016-03-30 上海现代建筑设计集团工程建设咨询有限公司 带有时间轴和变形色彩的三维可视化基坑监测数据方法
CN106368247A (zh) * 2016-09-22 2017-02-01 上海同筑信息科技有限公司 基于bim的基坑智能监测及主动预警方法和系统
CN106524920A (zh) * 2016-10-25 2017-03-22 上海建科工程咨询有限公司 基于三维激光扫描实测实量在建筑工程中的应用
CN106595565A (zh) * 2017-01-17 2017-04-26 中山大学 一种基于bim的智能化监测系统
EP3223221A1 (en) * 2016-03-22 2017-09-27 Hexagon Technology Center GmbH Construction management
CN108022415A (zh) * 2017-12-01 2018-05-11 福建工程学院 一种基于bim的围海造地的报警方法及终端
CN108053486A (zh) * 2017-11-10 2018-05-18 上海建工五建集团有限公司 基于虚拟技术的施工方法及系统
CN108427831A (zh) * 2018-02-09 2018-08-21 中建五局第三建设有限公司 一种利用实景建模及bim技术优化深坑建筑结构的方法
CN108645360A (zh) * 2018-06-22 2018-10-12 核工业西南勘察设计研究院有限公司 一种桥梁监测方法
CN108845663A (zh) * 2018-04-08 2018-11-20 中国航空规划设计研究总院有限公司 设计施工系统
CN109086833A (zh) * 2018-08-20 2018-12-25 贵州电网有限责任公司 一种基于激光点云雷达数据的输电线路危险点计算方法
CN109631846A (zh) * 2018-11-22 2019-04-16 中广核研究院有限公司 一种基于现实环境的现场踏勘方法和系统
CN109813219A (zh) * 2019-01-31 2019-05-28 北京市建筑工程研究院有限责任公司 对既有结构检测鉴定加固信息采集和处理的方法及系统
CN110031043A (zh) * 2019-05-08 2019-07-19 商丘工学院 一种土木工程建筑结构实时智能监测系统
CN110188505A (zh) * 2019-06-12 2019-08-30 中国建筑第七工程局有限公司 基于bim+3d激光扫描技术的复杂深基坑监测系统及方法
CN110411370A (zh) * 2019-07-26 2019-11-05 北京住总集团有限责任公司 一种基于空间时间参数的隧道施工风险管控系统
CN111046460A (zh) * 2019-11-23 2020-04-21 中国水利水电第七工程局有限公司 一种基于bim的基坑监测系统及监测方法
CN111535370A (zh) * 2020-03-25 2020-08-14 上海二十冶建设有限公司 一种深基坑实时监测系统
CN112530588A (zh) * 2020-11-30 2021-03-19 重庆电子工程职业学院 基于ar技术的健康管理系统
CN112580930A (zh) * 2020-11-20 2021-03-30 深圳城安软通科技集团有限公司 基于gis的深基坑工程风险识别技术的方法及系统
CN113656868A (zh) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 基于bim技术的医院建设协同管理平台
CN115183694A (zh) * 2022-09-09 2022-10-14 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN116122356A (zh) * 2023-04-14 2023-05-16 成都建工第三建筑工程有限公司 一种基于多模型融合的深基坑安全监测系统

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594591A (zh) * 2018-11-01 2019-04-09 中铁局集团有限公司 一种地铁车站基坑的实时监测预警系统及其监测预警方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204163120U (zh) * 2014-09-15 2015-02-18 中铁十二局集团有限公司 基坑开挖围护结构顶变形监测装置
CN104452836A (zh) * 2014-12-10 2015-03-25 青岛理工大学 一种深基坑支护结构的稳定性检测预警方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204163120U (zh) * 2014-09-15 2015-02-18 中铁十二局集团有限公司 基坑开挖围护结构顶变形监测装置
CN104452836A (zh) * 2014-12-10 2015-03-25 青岛理工大学 一种深基坑支护结构的稳定性检测预警方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
倪飞: "基于BIM基坑监测信息化管理新技术的应用", 《建筑时报》 *
刘茂华 等: "基于GIS的深基坑监测信息化管理系统的实现研究", 《第二届"测绘科学前沿技术论坛"》 *
葛纪坤 等: "三维激光扫描监测基坑变形分析", 《测绘科学》 *
郑加柱 等: "深基坑监测数据管理及可视化系统开发", 《城市勘测》 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442642A (zh) * 2015-12-11 2016-03-30 上海现代建筑设计集团工程建设咨询有限公司 带有时间轴和变形色彩的三维可视化基坑监测数据方法
EP3223221A1 (en) * 2016-03-22 2017-09-27 Hexagon Technology Center GmbH Construction management
US10664781B2 (en) 2016-03-22 2020-05-26 Hexagon Technology Center Gmbh Construction management system and method for linking data to a building information model
CN106368247A (zh) * 2016-09-22 2017-02-01 上海同筑信息科技有限公司 基于bim的基坑智能监测及主动预警方法和系统
CN106524920A (zh) * 2016-10-25 2017-03-22 上海建科工程咨询有限公司 基于三维激光扫描实测实量在建筑工程中的应用
CN106595565B (zh) * 2017-01-17 2019-05-03 中山大学 一种基于bim的智能化监测系统
CN106595565A (zh) * 2017-01-17 2017-04-26 中山大学 一种基于bim的智能化监测系统
CN108053486A (zh) * 2017-11-10 2018-05-18 上海建工五建集团有限公司 基于虚拟技术的施工方法及系统
CN108022415A (zh) * 2017-12-01 2018-05-11 福建工程学院 一种基于bim的围海造地的报警方法及终端
CN108022415B (zh) * 2017-12-01 2020-08-04 福建工程学院 一种基于bim的围海造地的报警方法及终端
CN108427831A (zh) * 2018-02-09 2018-08-21 中建五局第三建设有限公司 一种利用实景建模及bim技术优化深坑建筑结构的方法
CN108845663A (zh) * 2018-04-08 2018-11-20 中国航空规划设计研究总院有限公司 设计施工系统
CN108645360A (zh) * 2018-06-22 2018-10-12 核工业西南勘察设计研究院有限公司 一种桥梁监测方法
CN109086833A (zh) * 2018-08-20 2018-12-25 贵州电网有限责任公司 一种基于激光点云雷达数据的输电线路危险点计算方法
CN109631846A (zh) * 2018-11-22 2019-04-16 中广核研究院有限公司 一种基于现实环境的现场踏勘方法和系统
CN109813219B (zh) * 2019-01-31 2020-09-29 北京市建筑工程研究院有限责任公司 对既有结构检测鉴定加固信息采集和处理的方法及系统
CN109813219A (zh) * 2019-01-31 2019-05-28 北京市建筑工程研究院有限责任公司 对既有结构检测鉴定加固信息采集和处理的方法及系统
CN110031043A (zh) * 2019-05-08 2019-07-19 商丘工学院 一种土木工程建筑结构实时智能监测系统
CN110188505A (zh) * 2019-06-12 2019-08-30 中国建筑第七工程局有限公司 基于bim+3d激光扫描技术的复杂深基坑监测系统及方法
CN110411370B (zh) * 2019-07-26 2021-02-19 北京住总集团有限责任公司 一种基于空间时间参数的隧道施工风险管控系统
CN110411370A (zh) * 2019-07-26 2019-11-05 北京住总集团有限责任公司 一种基于空间时间参数的隧道施工风险管控系统
CN111046460A (zh) * 2019-11-23 2020-04-21 中国水利水电第七工程局有限公司 一种基于bim的基坑监测系统及监测方法
CN111535370A (zh) * 2020-03-25 2020-08-14 上海二十冶建设有限公司 一种深基坑实时监测系统
CN112580930A (zh) * 2020-11-20 2021-03-30 深圳城安软通科技集团有限公司 基于gis的深基坑工程风险识别技术的方法及系统
CN112530588A (zh) * 2020-11-30 2021-03-19 重庆电子工程职业学院 基于ar技术的健康管理系统
CN113656868A (zh) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 基于bim技术的医院建设协同管理平台
CN115183694A (zh) * 2022-09-09 2022-10-14 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN115183694B (zh) * 2022-09-09 2022-12-09 北京江河惠远科技有限公司 输电线路基础数字化测量系统及其控制方法
CN116122356A (zh) * 2023-04-14 2023-05-16 成都建工第三建筑工程有限公司 一种基于多模型融合的深基坑安全监测系统

Also Published As

Publication number Publication date
CN104794331B (zh) 2018-01-02

Similar Documents

Publication Publication Date Title
CN104794331A (zh) 深基坑健康监测管理系统及其管理方法
CN103644896B (zh) 一种基于三维激光扫描的工程地质测绘方法
CN108710732B (zh) 一种盾构刀具服役期磨损的评估和预测方法
US8244026B2 (en) Apparatus and method for automatic airborne LiDAR data processing and mapping using data obtained thereby
CN112282847B (zh) 一种煤矿井下巷道形变监测方法
CN105184859B (zh) 一种基于激光扫描的变电站三维建模方法
KR101944823B1 (ko) 증강현실 및 가상현실을 이용한 위치기반 지하시설물 탐지 시스템
CN104679822B (zh) 一种地理国情外业调绘方法
CN106524920A (zh) 基于三维激光扫描实测实量在建筑工程中的应用
KR20110127517A (ko) 대단면 기초 지질조사방법
CN109685886A (zh) 一种基于混合现实技术的配网三维场景建模方法
CN108007374A (zh) 一种建筑物变形激光点云数据坐标偏差分析方法
CN108681337B (zh) 一种涵洞或桥梁专用巡查无人机及无人机巡查方法
CN109472108B (zh) 一种施工区域勘察测算方法及系统
CN104933223A (zh) 一种输电线路通道数字化测绘方法
Van Son et al. A framework for reliable three-dimensional underground utility mapping for urban planning
CN108957507A (zh) 基于增强现实技术的燃气管道泄漏处置方法
CN103308902B (zh) 用于构建输变电三维数字电网的车载LiDAR三维数据采集方法
Sansoni et al. Feasibility of contactless 3D optical measurement for the analysis of bone and soft tissue lesions: new technologies and perspectives in forensic sciences
CN105023270A (zh) 用于地下基础设施结构监测的主动式3d立体全景视觉传感器
CN116680786A (zh) 一种适用于电力隧道运维的数字孪生建模系统
CN112017227A (zh) 点云融合生成的地形模型与潮汐数据混合可视化的方法
CN103335608A (zh) 用于构建输变电三维数字电网的机载LiDAR三维数据采集方法
CN104391340A (zh) 水电环境边坡危岩体地质检测方法
CN111754560B (zh) 基于稠密三维重建的高温冶炼容器侵蚀预警方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180102

Termination date: 20210407