CN104790970A - 一种采用组合结构进行盾构隧道加固的方法 - Google Patents

一种采用组合结构进行盾构隧道加固的方法 Download PDF

Info

Publication number
CN104790970A
CN104790970A CN201510148385.0A CN201510148385A CN104790970A CN 104790970 A CN104790970 A CN 104790970A CN 201510148385 A CN201510148385 A CN 201510148385A CN 104790970 A CN104790970 A CN 104790970A
Authority
CN
China
Prior art keywords
concrete
tunnel
steel plate
jurisdiction
shield tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510148385.0A
Other languages
English (en)
Other versions
CN104790970B (zh
Inventor
柳献
蒋首超
蒋子捷
叶宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tonghe Engineering Technology Co ltd
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510148385.0A priority Critical patent/CN104790970B/zh
Publication of CN104790970A publication Critical patent/CN104790970A/zh
Application granted granted Critical
Publication of CN104790970B publication Critical patent/CN104790970B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种采用组合结构进行盾构隧道加固的方法,包括以下步骤:在隧道原管片内表面上进行植筋;在隧道原管片内侧设置钢筋网片,所述的钢筋网片固定在植筋上;制作与隧道原管片形状吻合的钢板,并在钢板的外侧焊接栓钉;将钢板靠近隧道原管片,在钢板与隧道原管片之间浇注混凝土,混凝土将钢筋网片固定在内,将混凝土养护到设计强度。与现有技术相比,本发明首次将包括钢板、钢筋网片、植筋、栓钉及混凝土在内的组合结构用于盾构隧道加固,该方法具有耐久性好、取材方便、施工快捷、经济效益好、加固强度高、加固刚度大、控制裂缝有效等优点。

Description

一种采用组合结构进行盾构隧道加固的方法
技术领域
本发明涉及一种盾构隧道的加固方法,尤其是涉及一种采用组合结构进行盾构隧道加固的方法。
背景技术
随着运营年限的增长,部分地铁盾构隧道结构逐渐暴露出一些结构病害问题。主要可分为局部破损和隧道结构整体大变形两类。局部破损包括:渗漏水、裂缝、缺角等;隧道结构的整体变形包括:接缝张开、管片错动、管片变形等;部分隧道还存在纵向沉降的问题。结构局部损伤已影响到了盾构隧道的正常运营,若继续发展可能会影响到正常的行车安全;而隧道结构大变形会严重影响到盾构隧道的安全运营和结构的安全可靠度。究其原因,主要有以下几个方面:(1)设计建设时期对盾构隧道的认识深度不足;(2)施工区域土层状态复杂,且存在区域性沉降;(3)列车振动造成运营初期结构响应较大;(4)周边扰动如上部覆土及周边基坑开挖影响较大等。目前有关部门对超过变形范围的管片结构进行加固,普遍采用的方法有:
1、粘贴碳、芳纶纤维加固法
这种加固方法具有运输方便,施工快捷的优点,用碳、芳纶纤维对混凝土加固,可以明显提高结构强度,因而已被广泛应用于建筑结构的补强加固领域。但是,在对营运的地铁隧道结构加固时,粘结剂是否充分固化是一个不容忽视的问题,目前用于结构加固的粘结剂都是常温固化,2-3小时指触固化,1-7天100%固化,即粘结剂要达到100%的强度至少需要24小时以上的时间,但已营运地铁的特点,是只能利用地铁夜间停运的3-4小时进行施工。因此,在粘结剂还没达到强度之前,地铁又需要继续运行,振动的作用使粘结剂难于彻底固化,从而严重影响了结构加固的效果。
2.粘贴钢板加固法
采用专用举重臂,在隧道管片结构内侧分段安装厚钢板,再用膨胀螺栓分别固定,然后使用电焊将各钢板焊接成一体,形成与隧道内壁形状基本一致的钢环,最后,在钢环与管片结构的间隙中灌注环氧树脂。
该工法已用于营运的地铁隧道结构加固中,但在实践过程中也暴露了一些弊病,如钢板自重过大、专用举重设备需长距离进出场、焊缝多、焊接质量波动大、明火欠安全、钢板与管片的后灌浆粘结差使加固效果大打折扣、钢结构腐蚀问题及工期长、加固造价高等,这些问题至今困扰着这个行业。
3.工字钢螺栓连接加固
该方法利用螺栓、结构胶将工字钢构件可靠粘结在隧道内表面上,以形成组合劲性结构来对抗结构变形,具有重量轻、取材方便、施工快捷、经济效益好、加固强度高等优点。
但工字钢具有占用净空高度大,受压易失稳的缺点,且用螺栓进行连接保证构件整体工作的能力并不十分乐观
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种耐久性好、施工方便、加固强度高、加固刚度大的采用组合结构进行盾构隧道加固的方法。
本发明的目的可以通过以下技术方案来实现:
一种采用组合结构进行盾构隧道加固的方法,包括以下步骤:
(1)在隧道原管片内表面凿毛,进行植筋;
(2)在隧道原管片内侧设置钢筋网片,所述的钢筋网片在部分位置焊接固定在植筋上;
(3)制作与隧道原管片形状吻合的钢板,并在钢板的外侧焊接栓钉;
(4)将钢板靠近隧道原管片,在钢板与隧道原管片之间浇注混凝土,混凝土将钢筋网片固定在内,将混凝土养护到设计强度。
其中,在隧道原管片的表面凿毛,按照一定距离用植筋胶进行植筋,每环管片植筋分3-4列布置,为避免对同一个截面造成过大削弱,每列植筋沿横向相互错开(保证同一个截面不出现两根以上的植筋)或者按梅花状布置。使用植筋胶的好处为其具有粘接强度高、如同预埋,常温固化、硬化过程收缩小,耐温性能好、可在埋筋后焊接,耐久性、耐候性好,抗老化、耐介质(酸、碱、水)性能好,固化后韧性、抗冲击能力优异等特点,能保证有效连接。
所述的植筋伸出隧道原管片的一端设有弯钩,用以增加与新浇混凝土的粘结。
所述的钢筋网片上横向钢筋的间距与植筋间距相对应,纵向钢筋与植筋相错开。
所述的钢筋网片与植筋在部分位置焊接以使其位置得到固定。
所述的栓钉穿过钢筋网片的网孔,且栓钉位置要与植筋错开。
新浇注的混凝土的标号不小于原管片混凝土标号。浇注混凝土时,向混凝土内添加用于快速凝固的添加剂。
所述的钢板采用普通钢,在钢板的两侧采用冷弯薄型钢,作为混凝土浇筑的模板。并且根据放样测量得到加固面的弧度尺寸等参数,并依据此参数加工钢板使其形状与加固面基本吻合。
与现有技术相比,本发明具有以下优点及有益效果:
(1)首次将包括钢板、钢筋网片、植筋、栓钉及混凝土在内的组合结构用于盾构隧道加固,该方法具有耐久性好、取材方便、施工快捷、经济效益好、加固强度高、加固刚度大、控制裂缝有效等优点。
(2)通过在原结构植筋与钢板一侧焊接栓钉剪力连接件,能有效减少界面滑移,提高加固钢板与原结构的有效粘结,提升加固效果,并且由钢板包裹混凝土,能减少渗漏水对盾构隧道的影响。
(3)在新增混凝土层中布置钢筋网片,可以增强现浇混凝土层的整体性和防止混凝土出现干缩裂缝。
(4)本发明方法对盾构隧道进行加固,减小其结构整体变形(包括接缝张开、管片错动、管片变形等),并对局部破损(渗漏水、裂缝等)起到控制作用,提升结构的安全可靠度,保证盾构隧道的安全运营。
(5)加固利用的钢板、栓钉、植筋胶均为工程中常见的构件、工具,取材方便。使用的植筋胶具有粘接强度高、如同预埋,常温固化、硬化过程收缩小,耐温性能好、可在埋筋后焊接,耐久性、耐候性好,抗老化、耐介质(酸、碱、水)性能好,固化后韧性、抗冲击能力优异等特点,能保证有效连接。
(6)本发明方法主要应用于建筑、市政、交通工程结构及盾构法隧道结构的抗变形加固领域,用以提高上述结构的抗变形性能。
附图说明
图1为采用本发明方法加固后的盾构隧道的结构示意图;
图2为图1的A-A剖面图;
图3为图1的B-B剖面图。
图中标号:1为原管片,2为钢筋网片,3为钢板,4为混凝土,5为栓钉,6为植筋,7为接缝,8为道床。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
参考图1~图3,采用组合结构进行盾构隧道加固的方法,包括以下步骤:
(1)在隧道原管片1的内表面凿毛,按照一定距离用植筋胶进行植筋,每环管片植筋6分3-4列布置,为避免对同一个截面造成过大削弱,每列植筋6沿横向相互错开(保证同一个截面不出现两根以上的植筋6)或者按梅花状布置,其中,植筋6伸出隧道原管片1的一端设有弯钩。使用植筋胶的好处为其具有粘接强度高、如同预埋,常温固化、硬化过程收缩小,耐温性能好、可在埋筋后焊接,耐久性、耐候性好,抗老化、耐介质(酸、碱、水)性能好,固化后韧性、抗冲击能力优异等特点,能保证有效连接。
(2)在隧道原管片1外侧设置钢筋网片2,保持钢筋网片2上横向钢筋的间距与植筋6间距相对应,纵向钢筋与植筋6相错开,并且钢筋网片2与植筋6在部分位置焊接以使其位置得到固定。
(3)根据放样测量得到加固面的弧度尺寸等参数,并依据此参数加工钢板3使其形状与加固面基本吻合,并在钢板3的外侧焊接栓钉5,栓钉5穿过钢筋网片2的网孔,且栓钉5位置要与植筋6错开。
(4)将钢板3靠近隧道原管片1,在钢板3与隧道原管片1之间浇注混凝土4,新浇注的混凝土4的标号不小于原管片1混凝土标号,浇注混凝土4时,向混凝土内添加用于快速凝固的添加剂。混凝土4将钢筋网片2固定在内,将混凝土4养护到设计强度。
本实施例中,隧道原管片1厚度为350mm,隧道原管片1宽度为1200mm,道床8位于隧道的下端,隧道原管片1的接缝7分别在8°、73°、138°、222°、287°位置处。采用上述加固方法时,使用的钢板3的厚度为10mm,在钢板3与原管片1之间浇注的混凝土4层的厚度为60mm,钢筋网片2距离原管片1的距离为30mm。钢筋网片2采用A6钢筋,其间距为200mm×160mm,植筋6间距为100mm×160mm,植筋6采用B16钢筋,栓钉5间距为100mm×160mm,栓钉5采用直径16mm的钢筋。
上述的对实施例的描述是为便于该技术领域的普通技术人员能理解和使用发明。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本发明不限于上述实施例,本领域技术人员根据本发明的揭示,不脱离本发明范畴所做出的改进和修改都应该在本发明的保护范围之内。

Claims (7)

1.一种采用组合结构进行盾构隧道加固的方法,其特征在于,包括以下步骤:
(1)在隧道原管片内表面上进行植筋;
(2)在隧道原管片内侧设置钢筋网片,所述的钢筋网片固定在植筋上;
(3)制作与隧道原管片形状吻合的钢板,并在钢板的外侧焊接栓钉;
(4)将钢板靠近隧道原管片,在钢板与隧道原管片之间浇注混凝土,混凝土将钢筋网片固定在内,将混凝土养护到设计强度。
2.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,在隧道原管片的内表面凿毛,按照一定距离用植筋胶进行植筋,每环管片植筋分3-4列布置,每列植筋沿横向相互错开或者按梅花状布置。
3.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,所述的植筋伸出隧道原管片的一端设有弯钩,所述的钢筋网片与植筋焊接连接。
4.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,所述的钢筋网片上横向钢筋的间距与植筋间距相对应,纵向钢筋与植筋相错开。
5.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,所述的栓钉穿过钢筋网片的网孔,且栓钉位置与植筋相错开。
6.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,新浇注的混凝土的标号不小于原管片混凝土标号。
7.根据权利要求1所述的一种采用组合结构进行盾构隧道加固的方法,其特征在于,浇注混凝土时,向混凝土内添加用于快速凝固的添加剂。
CN201510148385.0A 2015-03-31 2015-03-31 一种采用组合结构进行盾构隧道加固的方法 Active CN104790970B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510148385.0A CN104790970B (zh) 2015-03-31 2015-03-31 一种采用组合结构进行盾构隧道加固的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510148385.0A CN104790970B (zh) 2015-03-31 2015-03-31 一种采用组合结构进行盾构隧道加固的方法

Publications (2)

Publication Number Publication Date
CN104790970A true CN104790970A (zh) 2015-07-22
CN104790970B CN104790970B (zh) 2017-11-07

Family

ID=53556104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510148385.0A Active CN104790970B (zh) 2015-03-31 2015-03-31 一种采用组合结构进行盾构隧道加固的方法

Country Status (1)

Country Link
CN (1) CN104790970B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761812A (zh) * 2017-01-17 2017-05-31 铁道第三勘察设计院集团有限公司 一种既有盾构隧道管片结构加固方法
CN106917469A (zh) * 2017-04-18 2017-07-04 沈阳理工大学 钢板‑混凝土组合加固钢筋混凝土梁抗疲劳性能结构及方法
CN107035385A (zh) * 2017-06-19 2017-08-11 湖南大学 一种盾构隧道管片的加固方法
CN107100648A (zh) * 2017-06-23 2017-08-29 中铁第四勘察设计院集团有限公司 隧道素混凝土衬砌施工用辅助设施及方法
CN107100644A (zh) * 2017-06-27 2017-08-29 华东交通大学 一种地铁盾构隧道纵向刚度加强结构及其施工方法
CN108518231A (zh) * 2018-03-30 2018-09-11 上海隧道工程有限公司 复合管片
CN109296383A (zh) * 2018-10-09 2019-02-01 中建隧道建设有限公司 一种隧道管片外部失水后维持加固方法
CN109322676A (zh) * 2018-08-17 2019-02-12 中铁隧道集团四处有限公司 隧道裂缝加固方法
CN109339818A (zh) * 2018-10-22 2019-02-15 宁波大学 一种机械法联络通道洞门镶边复合管片结构
CN110130930A (zh) * 2019-06-12 2019-08-16 上海隧道工程有限公司 用于大直径盾构隧道的补强方法
CN110159312A (zh) * 2019-06-26 2019-08-23 洛阳理工学院 一种直墙圆拱形隧道衬砌的修复方法
CN110241777A (zh) * 2019-04-18 2019-09-17 天津津港基础设施养护运营工程管理有限公司 一种箱筒防波堤的修复加固结构
CN111502693A (zh) * 2020-04-11 2020-08-07 中铁二院工程集团有限责任公司 一种内底填充型盾构隧道衬砌构造
CN111648787A (zh) * 2020-04-24 2020-09-11 同济大学 一种采用超高性能混凝土加固盾构隧道衬砌结构的方法
CN111852506A (zh) * 2020-07-01 2020-10-30 上海市政工程设计研究总院(集团)有限公司 一种盾构隧道内现浇基座与管片的连接构造及连接方法
CN113700333A (zh) * 2021-09-01 2021-11-26 中国建筑第七工程局有限公司 混凝土整体结构高密度加固方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3218642A1 (de) * 1982-05-18 1983-11-24 Philipp Holzmann AG, Hauptniederlassung Düsseldorf, 4000 Düsseldorf Unterirdisches tunnelbauwerk
CN1594833A (zh) * 2004-06-25 2005-03-16 清华大学 钢板—混凝土组合衬砌
CN102251784A (zh) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 一种双层衬砌盾构隧道管片与内衬叠合结构
JP2013129985A (ja) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd トンネル内巻補強覆工による耐震補強工法
CN103510965A (zh) * 2013-09-30 2014-01-15 招商局重庆交通科院设计院有限公司 公路隧道衬砌表面粘钢带加固方法及装置
CN203835403U (zh) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN203835404U (zh) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 一种既有隧道拱部衬砌严重开裂无净空加固体系
CN104121027A (zh) * 2014-07-24 2014-10-29 中南大学 一种运营隧道裂损衬砌补强加固方法
CN204060712U (zh) * 2014-08-11 2014-12-31 中铁十一局集团城市轨道工程有限公司 地铁区间箱型隧道施工缝的内置钢圈补强结构
CN204126653U (zh) * 2014-08-27 2015-01-28 中国电建集团华东勘测设计研究院有限公司 一种综合接地盾构衬砌圆环结构

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3218642A1 (de) * 1982-05-18 1983-11-24 Philipp Holzmann AG, Hauptniederlassung Düsseldorf, 4000 Düsseldorf Unterirdisches tunnelbauwerk
CN1594833A (zh) * 2004-06-25 2005-03-16 清华大学 钢板—混凝土组合衬砌
CN102251784A (zh) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 一种双层衬砌盾构隧道管片与内衬叠合结构
JP2013129985A (ja) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd トンネル内巻補強覆工による耐震補強工法
CN103510965A (zh) * 2013-09-30 2014-01-15 招商局重庆交通科院设计院有限公司 公路隧道衬砌表面粘钢带加固方法及装置
CN203835403U (zh) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 一种既有隧道拱部衬砌严重开裂有净空加固体系
CN203835404U (zh) * 2014-05-20 2014-09-17 中铁第一勘察设计院集团有限公司 一种既有隧道拱部衬砌严重开裂无净空加固体系
CN104121027A (zh) * 2014-07-24 2014-10-29 中南大学 一种运营隧道裂损衬砌补强加固方法
CN204060712U (zh) * 2014-08-11 2014-12-31 中铁十一局集团城市轨道工程有限公司 地铁区间箱型隧道施工缝的内置钢圈补强结构
CN204126653U (zh) * 2014-08-27 2015-01-28 中国电建集团华东勘测设计研究院有限公司 一种综合接地盾构衬砌圆环结构

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761812B (zh) * 2017-01-17 2019-05-17 中国铁路设计集团有限公司 一种既有盾构隧道管片结构加固方法
CN106761812A (zh) * 2017-01-17 2017-05-31 铁道第三勘察设计院集团有限公司 一种既有盾构隧道管片结构加固方法
CN106917469A (zh) * 2017-04-18 2017-07-04 沈阳理工大学 钢板‑混凝土组合加固钢筋混凝土梁抗疲劳性能结构及方法
CN107035385A (zh) * 2017-06-19 2017-08-11 湖南大学 一种盾构隧道管片的加固方法
CN107100648A (zh) * 2017-06-23 2017-08-29 中铁第四勘察设计院集团有限公司 隧道素混凝土衬砌施工用辅助设施及方法
CN107100648B (zh) * 2017-06-23 2024-03-12 中铁第四勘察设计院集团有限公司 隧道素混凝土衬砌施工用辅助设施及方法
CN107100644A (zh) * 2017-06-27 2017-08-29 华东交通大学 一种地铁盾构隧道纵向刚度加强结构及其施工方法
CN107100644B (zh) * 2017-06-27 2023-07-04 华东交通大学 一种地铁盾构隧道纵向刚度加强结构及其施工方法
CN108518231A (zh) * 2018-03-30 2018-09-11 上海隧道工程有限公司 复合管片
CN109322676B (zh) * 2018-08-17 2020-09-15 中铁隧道局集团建设有限公司 隧道裂缝加固方法
CN109322676A (zh) * 2018-08-17 2019-02-12 中铁隧道集团四处有限公司 隧道裂缝加固方法
CN109296383A (zh) * 2018-10-09 2019-02-01 中建隧道建设有限公司 一种隧道管片外部失水后维持加固方法
CN109339818A (zh) * 2018-10-22 2019-02-15 宁波大学 一种机械法联络通道洞门镶边复合管片结构
CN110241777A (zh) * 2019-04-18 2019-09-17 天津津港基础设施养护运营工程管理有限公司 一种箱筒防波堤的修复加固结构
CN110130930A (zh) * 2019-06-12 2019-08-16 上海隧道工程有限公司 用于大直径盾构隧道的补强方法
CN110159312A (zh) * 2019-06-26 2019-08-23 洛阳理工学院 一种直墙圆拱形隧道衬砌的修复方法
CN111502693A (zh) * 2020-04-11 2020-08-07 中铁二院工程集团有限责任公司 一种内底填充型盾构隧道衬砌构造
CN111648787A (zh) * 2020-04-24 2020-09-11 同济大学 一种采用超高性能混凝土加固盾构隧道衬砌结构的方法
CN111852506A (zh) * 2020-07-01 2020-10-30 上海市政工程设计研究总院(集团)有限公司 一种盾构隧道内现浇基座与管片的连接构造及连接方法
CN113700333A (zh) * 2021-09-01 2021-11-26 中国建筑第七工程局有限公司 混凝土整体结构高密度加固方法
CN113700333B (zh) * 2021-09-01 2023-11-10 中国建筑第七工程局有限公司 混凝土整体结构高密度加固方法

Also Published As

Publication number Publication date
CN104790970B (zh) 2017-11-07

Similar Documents

Publication Publication Date Title
CN104790970B (zh) 一种采用组合结构进行盾构隧道加固的方法
CN108952759A (zh) 一种使用钢管混凝土和叠合板的隧道衬砌结构及施工方法
CN204326566U (zh) 一种利用碳纤维加固钢筋混凝土柱的结构
CN103225285B (zh) 一种钢膜面板堆石坝
CN107575246A (zh) 一种预制钢—frp复合波纹板隧道底部支护结构的施工方法
CN106121658B (zh) 冻结法凿井井筒井壁支护结构及其施工方法
CN206189455U (zh) 一种管廊
CN105201530A (zh) 用于岩石隧道衬砌大裂缝的修补加固方法
CN100458102C (zh) 钢板-混凝土组合衬砌
CN111828053A (zh) 钢管混凝土与喷射混凝土劲性组合结构隧道支护体系及施工方法
CN207512622U (zh) 一种道路桥梁裂缝加固结构
CN107503767A (zh) 一种预制混凝土‑frp波纹板隧道底部支护施工方法
CN108708273A (zh) 一种分块式桥面板湿接缝连接形式
CN111648787A (zh) 一种采用超高性能混凝土加固盾构隧道衬砌结构的方法
CN114165269A (zh) 基于钢混组合支架及喷碹的复合支护系统及其施工工艺
CN114718605A (zh) 用于加固盾构隧道衬砌结构的超高性能混凝土-钢拱架组合结构及方法
CN113586084A (zh) 叠合预制双层管片结构
CN104389619A (zh) 一种盾构进出洞施工方法
CN102852530A (zh) 隧道缓冲多层防排水结构与施工方法
CN216477359U (zh) 叠合预制双层管片结构
CN107905368A (zh) 一种装配式梁与装配式柱连接结构及施工方法
CN201288377Y (zh) 一种非植筋和焊接筋接长钢筋混凝土柱节点结构
CN104453939B (zh) 轨道交通隧道用轻量化复合材料支护结构件及其安装方法
CN110080798A (zh) 适于护盾式tbm的夹层式钢组合管片制造方法
CN102912720A (zh) 一种框架桥诱导缝结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210427

Address after: Room 1111, 11 / F, section e, No. 1515, North Zhongshan Road, Hongkou District, Shanghai 200092

Patentee after: Shanghai Tonghe Engineering Technology Co.,Ltd.

Address before: 200092 Shanghai City, Yangpu District Siping Road No. 1239

Patentee before: TONGJI University

TR01 Transfer of patent right