CN104790960A CN201510201266.7A CN201510201266A CN104790960A CN 104790960 A CN104790960 A CN 104790960A CN 201510201266 A CN201510201266 A CN 201510201266A CN 104790960 A CN104790960 A CN 104790960A
Authority
CN
China
Prior art keywords
shield
jacking
duct piece
pipe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510201266.7A
Other languages
Chinese (zh)
Inventor
郭广才
冼海欧
王欢贵
范星星
陈丹莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Mess Transit Engineering Consultant Co., Ltd.
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd filed Critical GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Priority to CN201510201266.7A priority Critical patent/CN104790960A/en
Publication of CN104790960A publication Critical patent/CN104790960A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Abstract

The invention discloses pipe jacking and shielding conversion equipment and a construction method thereof. The pipe jacking and shielding conversion equipment comprises a pipe jacking machine which is provided with a pipe jacking propelling system and a shielding propelling system, the shield tail is provided with a segment erector, and at least two rings of partial segments are assembled in advance; the segment erector is connected with a segment feeder; the shield tail of a shield is further connected with a shield segment and a pipe jacking joint connecting piece. By means of the pipe jacking and shielding conversion equipment, firstly, a planned pipe jacking tunnel is completed; secondly, the transition from a pipe jacking construction method to a shielding construction method is achieved by utilizing the shield segment and the pipe jacking joint connecting piece. The effective conversion equipment and the construction method are supplied in order to achieving the integration of the pipe jacking construction method and the shielding construction method, therefore, the fact that the pipe jacking construction method is adopted during a straight-line segment and the shielding construction method is adopted during a curve segment at the early stage of the project can be achieved, and the construction cost can be obviously saved.

Description

A kind of push pipe and shield structure conversion equipment and construction method thereof
Technical field
The present invention relates to underground construction technical field, be specifically related to a kind of technology realizing pipe jacking method and shield method and mutually change.
Background technology
The Underground Space Resource day of road is becoming tight, and plans the path of underground gallery, the relation of comprehensive coordination underground gallery and people's air defense, subway, subterranean tunnel, other municipal pipeline etc., and and guiding urban road pipeline layout to plan is a new difficult problem.Utilize shield structure or pipe-jacking technology to carry out network of underground to be constructed in order to a kind of trial newly.The construction costs of employing shield method construction tunnel is about 2 times of pipe jacking method, therefore only uses shield method that construction costs can be made expensive.Namely fusion pipe jacking method and shield method adopt pipe jacking method at engineering straightway in early stage, and curved section uses shield method, obviously can save construction costs.But, also do not have a kind of method effectively can realize the conversion of push pipe and shield structure at present.
Summary of the invention
For the deficiencies in the prior art, the present invention aims to provide a kind of push pipe and shield structure conversion equipment and construction method thereof, after completing the push pipe section in tunnel, effectively realizes the transition of pipe jacking method to shield method by utilizing push pipe and shield structure conversion equipment.
To achieve these goals, the present invention adopts following technical scheme:
A kind of push pipe and shield structure conversion equipment, comprise push-bench, described push-bench is provided with jacking system and shield propelling system, shield tail position is provided with duct piece assembling machine and shield duct piece and jacking pipe joints connector, described shield duct piece and the side in jacking pipe joints connector are for being connected shield duct piece, opposite side is then tube coupling socket, for connecting jacking pipe joints; Side wherein for connecting shield duct piece is embedded with at least 10 segment bolt holes, and installs at least two rings in advance by described segment bolt hole and bear endless tube sheet; The bottom of described duct piece assembling machine is equipped with feeds sheet machine.
It should be noted that, the shield duct piece that the negative endless tube sheet spliced in advance and shield tail are installed and jacking pipe joints connector are the key components of described push pipe and shield structure conversion equipment.Because shield tail length has certain length, and shield ventral brush is positioned at the end of shield tail, for ensureing the smooth realization of shield structure pattern, shield ventral brush encases section of jurisdiction and plays sealing function, therefore must bear endless tube sheet by assembled at least two rings, add shield structure jack length, can construction requirement be met.Described shield duct piece and jacking pipe joints connector then in from pipe jacking method to the process of shield method transition, for jacking pipe joints and shield duct piece provide transition bindiny mechanism.
Further, the middle part of described shield duct piece and jacking pipe joints connector is embedded with at least 5 one way valve injected holes.
Utilize the construction method of above-mentioned push pipe and shield structure conversion equipment, comprise the steps:
S1 completes the assembling of push-bench: install duct piece assembling machine and shield duct piece and jacking pipe joints connector in shield tail position; Shield duct piece with by pre-buried segment bolt hole, at least two rings are installed for the side being connected shield duct piece in advance in jacking pipe joints connector and bear endless tube sheet, and point to push-bench jacking direction; And the opposite side of shield duct piece and jacking pipe joints connector is connected to the jacking pipe joints that the later stage installs;
S2, by the jacking system of push-bench, carries out jacking to shaping pipe jacking tunnel, the pipe jacking tunnel in hitting the target;
S3, by set one way valve injected hole in the middle part of the reserved injected hole set by bell and spigot between the composition tube coupling of shaping pipe jacking tunnel and tube coupling and shield duct piece and jacking pipe joints connector, injects inert slurry, and adopts pair slurries shutoff portal after tube coupling wall.
It should be noted that, step S3 is one critical process that push pipe turns shield structure, because pipe jacking tunnel needs to inject drag reducer to play the effect of reduction thrust force after tube coupling wall, therefore before converting shield method to, must fill after tube coupling wall, to ensure the frictional force needed for shield driving.And step S3 plays the effect of shutoff bell and spigot and consolidation tube coupling.
S4 is attachment rail in pipe jacking tunnel, by feeding sheet machine transport section of jurisdiction to duct piece assembling machine, starting shield structure pattern, carrying out pipe sheet assembling.
It should be noted that, in step S3, described reserved injected hole is arranged on inside bell and spigot edge.
It should be noted that, the inert slurry injected in step S3 is cement grout, and the water/binder ratio of described cement grout is 1:1.
It should be noted that, in step S3, grouting pressure is 0.3Mpa-0.4Mpa.
It should be noted that, the two slurries in step S3 primarily of cement and water glass according to 1:(0.5 ± 0.05) weight ratio mix.
Beneficial effect of the present invention is:
1, the fusion for realizing merging pipe jacking method and shield method provides an effective conversion equipment and construction method, makes it possible to realize the straightway employing pipe jacking method in engineering early stage, and curved section uses shield method, thus obviously saves construction costs;
2, first take push pipe pattern, can carry out separate launching, because pipe jacking equipment is simple, row does not overlap chassis afterwards, and starting well floor space is relatively little, less on urban traffic impact.
Accompanying drawing explanation
Fig. 1 is the structural representation of push pipe of the present invention and shield structure conversion equipment;
Fig. 2 is the structural representation of jacking pipe joints and shield duct piece connector in Fig. 1;
Fig. 3 is for connecting the structural representation of the side of shield duct piece in Fig. 2.
Detailed description of the invention
Below with reference to accompanying drawing, the invention will be further described, it should be noted that, the present embodiment, premised on the technical program, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to the present embodiment.
As shown in Figure 1, a kind of push pipe and shield structure conversion equipment, comprise push-bench, described push-bench is provided with jacking system and shield propelling system.Shield propelling system mainly comprises shield structure jack 3, be positioned at that the active of shield structure jack 3 front portion is hinged 4, electro-motor 6, cutter spindle hold 5 and be attached thereto the blade 7 connect.The end of shield tail is provided with shield ventral brush 10.Shield tail position is provided with duct piece assembling machine 9, and splicing has the negative endless tube sheet 8 of at least two rings 1 meter of width in advance; Be equipped with bottom described duct piece assembling machine 9 and feed sheet machine; The shield tail position of shield structure is also connected with shield duct piece and jacking pipe joints connector 2.
It should be noted that, the shield duct piece that the negative endless tube sheet 8 spliced in advance and shield tail are installed and jacking pipe joints connector 2 are key components of described push pipe and shield structure conversion equipment.Because shield tail length is 3 meters, and shield ventral brush is positioned at shield tail end, and for ensureing the smooth realization of shield structure pattern, shield ventral brush encases section of jurisdiction and plays sealing function, therefore must bear endless tube sheet by assembled two rings, add shield structure jack length, can meet construction requirement.Described shield duct piece and jacking pipe joints connector then in from pipe jacking method to the process of shield method transition, for jacking pipe joints and shield duct piece provide transition bindiny mechanism.
Further, as shown in Figure 2 and Figure 3, shield duct piece and jacking pipe joints connector 2 are steel work, overall width 800mm, and pre-buried 10 the segment bolt holes 211, side 21 for being connected with shield duct piece, and being connected side 23 with jacking pipe joints 1 for reserved tube coupling socket, the thick steel loop of 12mm, width is 145mm.In addition, in the middle part of shield duct piece and jacking pipe joints connector 2,5 pre-buried one way valve injected holes 22 are set.
Utilize the construction method of above-mentioned push pipe and shield structure conversion equipment, comprise the steps:
S1 completes the assembling of push-bench: install duct piece assembling machine and shield duct piece and jacking pipe joints connector in shield tail position; Shield duct piece with by pre-buried segment bolt hole, at least two rings are installed for the side being connected shield duct piece in advance in jacking pipe joints connector and bear endless tube sheet, and point to push-bench jacking direction; And the opposite side of shield duct piece and jacking pipe joints connector is connected to the jacking pipe joints that the later stage installs;
S2, by the jacking system of push-bench, carries out jacking to shaping pipe jacking tunnel, the pipe jacking tunnel in hitting the target;
S3, by set one way valve injected hole in the middle part of the reserved injected hole set by bell and spigot between the composition tube coupling of shaping pipe jacking tunnel and tube coupling and shield duct piece and jacking pipe joints connector, injects inert slurry, and adopts pair slurries shutoff portal after tube coupling wall.
It should be noted that, step S3 is one critical process that push pipe turns shield structure, because pipe jacking tunnel needs to inject drag reducer to play the effect of reduction thrust force after tube coupling wall, therefore before converting shield method to, must fill after tube coupling wall, to ensure the frictional force needed for shield driving.And step S3 plays the effect of shutoff bell and spigot and consolidation tube coupling.
S4 is attachment rail in pipe jacking tunnel, by feeding sheet machine transport section of jurisdiction to duct piece assembling machine, starting shield structure pattern, carrying out pipe sheet assembling.
It should be noted that, in step S3, described reserved injected hole is arranged on inside bell and spigot edge.
It should be noted that, the inert slurry injected in step S3 is cement grout, and the water/binder ratio of described cement grout is 1:1.
It should be noted that, in step S3, grouting pressure is 0.3Mpa-0.4Mpa.
It should be noted that, the two slurries in step S3 primarily of cement and water glass according to 1:(0.5 ± 0.05) weight ratio mix.
For a person skilled in the art, according to above technical scheme and design, various corresponding change and distortion can be provided, and all these change and distortion all should be included within the protection domain of the claims in the present invention.

Claims (7)

1. a push pipe and shield structure conversion equipment, comprise push-bench, it is characterized in that, described push-bench is provided with jacking system and shield propelling system, shield tail position is provided with duct piece assembling machine and shield duct piece and jacking pipe joints connector, described shield duct piece and the side in jacking pipe joints connector are for being connected shield duct piece, and opposite side is then tube coupling socket, for connecting jacking pipe joints; Side wherein for connecting shield duct piece is embedded with at least 10 segment bolt holes, and installs at least two rings in advance by described segment bolt hole and bear endless tube sheet; The bottom of described duct piece assembling machine is equipped with feeds sheet machine.
2. a kind of push pipe according to claim 1 and shield structure conversion equipment, is characterized in that, the middle part of described shield duct piece and jacking pipe joints connector is embedded with at least 5 one way valve injected holes.
3. utilize a construction method for the arbitrary described push pipe of claim 1-2 and shield structure conversion equipment, it is characterized in that, comprise the steps:
S1 completes the assembling of push-bench: install duct piece assembling machine and shield duct piece and jacking pipe joints connector in shield tail position; Shield duct piece with by pre-buried segment bolt hole, at least two rings are installed for the side being connected shield duct piece in advance in jacking pipe joints connector and bear endless tube sheet, and point to push-bench jacking direction; And shield duct piece is connected the jacking pipe joints that the later stage installs with the opposite side of jacking pipe joints connector;
S2, by the jacking system of push-bench, carries out jacking to shaping pipe jacking tunnel, the pipe jacking tunnel in hitting the target;
S3, by set one way valve injected hole in the middle part of the reserved injected hole set by bell and spigot between the composition tube coupling of shaping pipe jacking tunnel and tube coupling and shield duct piece and jacking pipe joints connector, injects inert slurry, and adopts pair slurries shutoff portal after tube coupling wall;
S4 is attachment rail in pipe jacking tunnel, by feeding sheet machine transport section of jurisdiction to duct piece assembling machine, starting shield structure pattern, carrying out pipe sheet assembling.
4. construction method according to claim 3, is characterized in that, described reserved injected hole is arranged on inside bell and spigot edge.
5. construction method according to claim 3, is characterized in that, in step S3, the inert slurry of injection is cement grout, and the water/binder ratio of described cement grout is 1:1.
6. construction method according to claim 3, is characterized in that, in step S3, grouting pressure is 0.3Mpa-0.4Mpa.
7. construction method according to claim 3, is characterized in that, in step S3, the described pair of slurries primarily of cement and water glass according to 1:(0.5 ± 0.05) weight ratio mix.
CN201510201266.7A 2015-04-23 2015-04-23 Pipe jacking and shielding conversion equipment and construction method thereof Pending CN104790960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510201266.7A CN104790960A (en) 2015-04-23 2015-04-23 Pipe jacking and shielding conversion equipment and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510201266.7A CN104790960A (en) 2015-04-23 2015-04-23 Pipe jacking and shielding conversion equipment and construction method thereof

Publications (1)

Publication Number Publication Date
CN104790960A true CN104790960A (en) 2015-07-22

Family

ID=53556095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510201266.7A Pending CN104790960A (en) 2015-04-23 2015-04-23 Pipe jacking and shielding conversion equipment and construction method thereof

Country Status (1)

Country Link
CN (1) CN104790960A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561154A (en) * 2018-03-30 2018-09-21 上海隧道工程有限公司 The node structure of section of jurisdiction and tube coupling in the interface channel of shield section
CN109838241A (en) * 2017-11-27 2019-06-04 中国石油天然气集团公司 A kind of push pipe-shield conversion equipment and construction equipment
CN111102256A (en) * 2020-02-26 2020-05-05 中铁工程装备集团有限公司 Multi-mode synchronous propelling and assembling system of shield tunneling machine and control method thereof
CN111894613A (en) * 2020-08-06 2020-11-06 中国铁建重工集团股份有限公司 Tunneling equipment
CN112377199A (en) * 2020-11-11 2021-02-19 扬州地龙机械有限公司 Top shield machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838241A (en) * 2017-11-27 2019-06-04 中国石油天然气集团公司 A kind of push pipe-shield conversion equipment and construction equipment
CN108561154A (en) * 2018-03-30 2018-09-21 上海隧道工程有限公司 The node structure of section of jurisdiction and tube coupling in the interface channel of shield section
CN111102256A (en) * 2020-02-26 2020-05-05 中铁工程装备集团有限公司 Multi-mode synchronous propelling and assembling system of shield tunneling machine and control method thereof
CN111102256B (en) * 2020-02-26 2021-11-26 中铁工程装备集团有限公司 Multi-mode synchronous propelling and assembling system of shield tunneling machine and control method thereof
CN111894613A (en) * 2020-08-06 2020-11-06 中国铁建重工集团股份有限公司 Tunneling equipment
CN112377199A (en) * 2020-11-11 2021-02-19 扬州地龙机械有限公司 Top shield machine

Similar Documents

Publication Publication Date Title
CN104790960A (en) Pipe jacking and shielding conversion equipment and construction method thereof
CN100529329C (en) Socket shield machine construction method
CN102425433B (en) Minus-ring-free originating construction method for constructing sectional shield tunnel
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN102425427B (en) Method for constructing tunnel by utilizing shield empty-pushing crossing mine method
CN103032078B (en) Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN105822312A (en) Construction method for earth pressure balance shield construction pressure launching in subway tunnel engineering
CN103046933B (en) Shield station-crossing tunneling and station parallel construction method
CN102777189B (en) A kind of ultra-long tube curtain non-relay jacking construction device and method
CN103375171B (en) Start in a kind of shield structure hole counter-force frame
CN102518441B (en) Method for constructing karren stratum shield tunnel
CN103437789B (en) Build waterproof structure, adopt the method for water proof mode constructing underground building
CN103437772B (en) Pipe-jacking construction method of underground passage and tunnel structure
CN206175812U (en) Powder sandy soil stratum push pipe construction structures based on steel bushing head instrument pipe
CN104295814B (en) Underground steel and concrete structure pipeline of a kind of inner wall belt spiral compound stiffening ring and preparation method thereof
CN205778883U (en) Jacking construction and the connection transfer device of shield-tunneling construction in a kind of tunnel
CN104790974A (en) City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN204691776U (en) A kind of push pipe and shield structure conversion equipment
CN103032081A (en) Cross-river large-diameter slurry shield excavation and double-lining parallel construction method
CN110439574A (en) It is originated for shield lateral translation and the tunnel structure and construction method of haul of slagging tap
CN204187155U (en) A kind of underground steel and concrete structure pipeline of inner wall belt spiral compound stiffening ring
CN104847393A (en) Mobile tunnel supporting structure and tunnel construction method implemented under protection effect of mobile tunnel supporting structure
CN203412585U (en) Initial reaction frame in shield hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160422

Address after: Yuexiu District city of Guangdong province Guangzhou 510010 Ring Road No. 204 No. 4 No. 2 building, 3 floor

Applicant after: Guangzhou Mess Transit Engineering Consultant Co., Ltd.

Applicant after: Guangzhou Power Supply Bureau

Address before: Yuexiu District city of Guangdong province Guangzhou 510010 Ring Road No. 204 No. 4 No. 2 building, 3 floor

Applicant before: Guangzhou Mess Transit Engineering Consultant Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722