CN104790586A - Production process for light-weight steel floorslab - Google Patents

Production process for light-weight steel floorslab Download PDF

Info

Publication number
CN104790586A
CN104790586A CN201510208220.8A CN201510208220A CN104790586A CN 104790586 A CN104790586 A CN 104790586A CN 201510208220 A CN201510208220 A CN 201510208220A CN 104790586 A CN104790586 A CN 104790586A
Authority
CN
China
Prior art keywords
light
board
steel joist
weight steel
lightgage steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510208220.8A
Other languages
Chinese (zh)
Inventor
李成滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Hai Rong New Material Co Ltd
Original Assignee
Dongying Hai Rong New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Hai Rong New Material Co Ltd filed Critical Dongying Hai Rong New Material Co Ltd
Priority to CN201510208220.8A priority Critical patent/CN104790586A/en
Publication of CN104790586A publication Critical patent/CN104790586A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a production process for a light-weight steel floorslab. The production process comprises the following steps: sequentially putting light-weight steel keels, sequentially superposing the light-weight steel keels in a specified direction and placing the light-weight steel keels in a foaming box of a large plate forming machine at intervals, and then supporting the light-weight steel keels; then closing the foaming box, adding a foamable material, heating and foaming, and curing the material, cooling and molding, and then discharging from a mould; then conveying the material in a drying chamber, drying to remove water, and naturally volatilizing water and hot gas to form an EPS foamed plate with the light-weight steel keels; cutting the EPS foamed plate to a certain thickness through a large plate electrothermal cutting machine, cutting L-shaped grooves in the both sides of the EPS foamed plate through an electrothermal cutting knife, and finishing one-time cutting to form the light-weight steel floorslab; and finally unloading and warehousing the cut light-weight steel floorslab. The keels and the EPS floorslab are integrally formed during foaming, the process is simple, the overall strength of a building can be improved, and moreover, a stress distortion can be prevented, and the stability can be improved; detachment and installation for a template are reduced, so that the cost can be reduced, and the sound insulation, heat insulation and moisture resistance can be improved.

Description

The production technology of soft steel board
Technical field
The present invention relates to a kind of soft steel board, be specifically related to a kind of production technology of soft steel board.
Background technology
At present, it is high that the traditional architecture production mode of China also exists building energy consumption, resource consumption is large, workmanship and the problem such as safety problem is more, especially the Insulation one that building is taked is by pasting heat insulating material outward at body of wall, but this mode exists the defect such as easily produce crack, seepage, hollowing, come off to such an extent as to greatly shortens its application life and needs periodic maintenance or again fit up, and causes a large amount of wastings of resources, increase building costs, extend the duration.
One is also had to be floor, its production method has cast-in-situ floor and precast floor slab, cast-in-situ floor good integrity, but need on-the-spot support template, concreting, after reaching freezing period, sea needs to dismantle template, heat insulation effect is poor, long construction period, difficulty is large, template consume is large, cost is high, precast floor slab does not need on-the-spot formwork, short construction period, cost is low, but prefabricated units are from great, lifting difficulty, component assembly position easily produces crack, globality is poor, and the intensity of floor is low, difficult quality controls, so this structure generally sets up keel in exterior wall, but after existing keel are generally and have produced EPS floor, fill after manufacturing hole, such EPS floor and keel are not integral structures, bulk strength is caused obviously to reduce.
Summary of the invention
Object of the present invention is exactly the defect existed for prior art, there is provided a kind of technique simple, keel and EPS floor one-body molded, whole building intensity can be improved, prevent stressed distortion, improve stability, decrease dismounting template, can reduce costs, the production technology of the soft steel board of sound-insulating and heat-insulating humidity resistance can be improved.
Its technical scheme is: the production technology of soft steel board, and described soft steel board comprises EPS foamed board and is evenly arranged on the lightgage steel joist in the middle of EPS foamed board, and the production technology of described soft steel board is as follows:
First put successively by lightgage steel joist, two ends fixed mould is fixed, and the lightgage steel joist fixed is put into large panel moulding apparatus foaming box body by the laminated structure interval, direction of regulation, then is supported by the block foaming benzene plate in the middle part of lightgage steel joist;
And then close the large panel moulding apparatus foaming box body of sealing, adding can foamed material, cools to 30 °, depanning after cooling forming after heating material foaming, slaking;
Material after depanning enters drying chamber, carries out after oven dry dewaters, shifting out drying chamber, depositing, the moisture that naturally volatilizees, hot gas to appointment warehouse, form the EPS foamed board that inside has lightgage steel joist;
EPS foamed board carries out being cut into certain thickness through large plate electrothermal cutting machine, and " L " type groove is cut by electric cutter in EPS foamed board both sides, disposable cutting completes formation soft steel board simultaneously;
Finally by machine under the soft steel board that cut, warehouse-in.
Described every bar lightgage steel joist keeping parallelism state when putting, every layer of lightgage steel joist thickness as required carries out interval.
Steam pressure in described foamable process is 0.6Mpa.
The cycle of depositing in described warehouse reaches more than 15 days.
Described fixed mould is the fixed bar with multiple hole suitable with lightgage steel joist cross section.
When putting, the direction order of the regulation of lightgage steel joist is according to fixed mould hole location successively laid parallel.
During cutting, the EPS foamed board containing lightgage steel joist is carried out stationary knife along the parallel lines of lightgage steel joist by predetermined thickness.
The present invention compared with prior art, have the following advantages: by before making EPS floor, add lightgage steel joist, like this foam time keel and EPS floor one-body molded, technique is simple, whole building intensity can be improved, and stressed distortion can be prevented, improve stability, decrease dismounting template, can reduce costs, sound-insulating and heat-insulating humidity resistance can be improved.
Accompanying drawing explanation
Fig. 1 is the structural representation of soft steel board of the present invention.
Detailed description of the invention
With reference to Fig. 1, the production technology of soft steel board, described soft steel board comprises EPS foamed board 1 and is evenly arranged on the lightgage steel joist 2 in the middle of EPS foamed board, and the production technology of described soft steel board is as follows:
First put successively by lightgage steel joist 2, two ends fixed mould is fixed, and the lightgage steel joist 2 fixed is put into large panel moulding apparatus foaming box body by the laminated structure interval, direction of regulation, then is supported by the block foaming benzene plate in the middle part of lightgage steel joist 2;
And then close the large panel moulding apparatus foaming box body of sealing, adding can foamed material, cools to 30 °, depanning after cooling forming after heating material foaming, slaking;
Material after depanning enters drying chamber, carries out after oven dry dewaters, shifting out drying chamber, depositing, the moisture that naturally volatilizees, hot gas to appointment warehouse, form the EPS foamed board 1 that inside has lightgage steel joist 2;
EPS foamed board carries out being cut into certain thickness through large plate electrothermal cutting machine, and " L " type groove is cut by electric cutter in EPS foamed board 1 both sides, disposable cutting completes formation soft steel board simultaneously;
Finally by machine under the soft steel board that cut, warehouse-in.
Described every bar lightgage steel joist 2 keeping parallelism state when putting, every layer of lightgage steel joist 2 thickness as required carries out interval.
Steam pressure in described foamable process is 0.6Mpa.
The cycle of depositing in described warehouse reaches more than 15 days.
Described fixed mould is the fixed bar with multiple hole suitable with lightgage steel joist 2 cross section.
When putting, the direction order of the regulation of lightgage steel joist 2 is according to fixed mould hole location successively laid parallel.
During cutting, the EPS foamed board containing lightgage steel joist 2 is carried out stationary knife along the parallel lines of lightgage steel joist by predetermined thickness.
Floor of the present invention is formed in one, and the surface of lightgage steel joist is provided with multiple hole, making EPS foamed board and lightgage steel joist be integral type structure like this, can improve bulk strength, prevent stressed distortion, improve stability when building foaming.
The present invention integrate go along with sb. to guard him, be incubated, decorate, the function such as waterproof, all process steps settles at one go, need not set up outer scaffold in installation process, and speed of application is fast, and economic benefit is obvious.

Claims (7)

1. the production technology of soft steel board, described soft steel board comprises EPS foamed board and is evenly arranged on the lightgage steel joist in the middle of EPS foamed board, it is characterized in that: the production technology of described soft steel board is as follows:
First put successively by lightgage steel joist, two ends fixed mould is fixed, and the lightgage steel joist fixed is put into large panel moulding apparatus foaming box body by the laminated structure interval, direction of regulation, then is supported by the block foaming benzene plate in the middle part of lightgage steel joist;
And then close the large panel moulding apparatus foaming box body of sealing, adding can foamed material, cools to 30 °, depanning after cooling forming after heating material foaming, slaking;
Material after depanning enters drying chamber, carries out after oven dry dewaters, shifting out drying chamber, depositing, the moisture that naturally volatilizees, hot gas to appointment warehouse, form the EPS foamed board that inside has lightgage steel joist;
EPS foamed board carries out being cut into certain thickness through large plate electrothermal cutting machine, and " L " type groove is cut by electric cutter in EPS foamed board both sides, disposable cutting completes formation soft steel board simultaneously;
Finally by machine under the soft steel board that cut, warehouse-in.
2. the production technology of soft steel board according to claim 1, is characterized in that: described every bar lightgage steel joist keeping parallelism state when putting, and every layer of lightgage steel joist thickness as required carries out interval.
3. the production technology of soft steel board according to claim 1, is characterized in that: the steam pressure in described foamable process is 0.6Mpa.
4. the production technology of soft steel board according to claim 1, is characterized in that: the cycle of depositing in described warehouse reaches more than 15 days.
5. the production technology of soft steel board according to claim 1, is characterized in that: described fixed mould is the fixed bar with multiple hole suitable with lightgage steel joist cross section.
6. the production technology of soft steel board according to claim 5, is characterized in that: when putting, the direction order of the regulation of lightgage steel joist is according to fixed mould hole location successively laid parallel.
7. the production technology of soft steel board according to claim 1, is characterized in that: during cutting, the EPS foamed board containing lightgage steel joist is carried out stationary knife along the parallel lines of lightgage steel joist by predetermined thickness.
CN201510208220.8A 2015-04-29 2015-04-29 Production process for light-weight steel floorslab Pending CN104790586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510208220.8A CN104790586A (en) 2015-04-29 2015-04-29 Production process for light-weight steel floorslab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510208220.8A CN104790586A (en) 2015-04-29 2015-04-29 Production process for light-weight steel floorslab

Publications (1)

Publication Number Publication Date
CN104790586A true CN104790586A (en) 2015-07-22

Family

ID=53555733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510208220.8A Pending CN104790586A (en) 2015-04-29 2015-04-29 Production process for light-weight steel floorslab

Country Status (1)

Country Link
CN (1) CN104790586A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109093927A (en) * 2018-08-09 2018-12-28 杭州晨基住工科技有限公司 A kind of combined wall board and roof boarding and its manufacturing process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248379U (en) * 2011-09-30 2012-05-30 新疆万通人钢结构有限公司 High-strength thermal insulation wall
CN102808461A (en) * 2012-08-20 2012-12-05 重庆龙者低碳环保科技有限公司 EPS (expandable polystyrene) fireproof thermal-insulating plate
CN102825716A (en) * 2012-08-30 2012-12-19 河北广兴机械科技有限公司 Production process of EPS (Expanded Polystyrene) plate
CN102952288A (en) * 2012-11-09 2013-03-06 大连申达建筑保温材料有限公司 Preparation method of secondary medium-temperature soaking highly difficult burning molding polystyrene insulation board
WO2013043735A1 (en) * 2011-09-20 2013-03-28 Iframe Building Solutions, Llc System and method of manufacture for building panels
CN203174869U (en) * 2013-01-15 2013-09-04 陈廷武 Concrete foaming board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013043735A1 (en) * 2011-09-20 2013-03-28 Iframe Building Solutions, Llc System and method of manufacture for building panels
CN202248379U (en) * 2011-09-30 2012-05-30 新疆万通人钢结构有限公司 High-strength thermal insulation wall
CN102808461A (en) * 2012-08-20 2012-12-05 重庆龙者低碳环保科技有限公司 EPS (expandable polystyrene) fireproof thermal-insulating plate
CN102825716A (en) * 2012-08-30 2012-12-19 河北广兴机械科技有限公司 Production process of EPS (Expanded Polystyrene) plate
CN102952288A (en) * 2012-11-09 2013-03-06 大连申达建筑保温材料有限公司 Preparation method of secondary medium-temperature soaking highly difficult burning molding polystyrene insulation board
CN203174869U (en) * 2013-01-15 2013-09-04 陈廷武 Concrete foaming board

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109093927A (en) * 2018-08-09 2018-12-28 杭州晨基住工科技有限公司 A kind of combined wall board and roof boarding and its manufacturing process

Similar Documents

Publication Publication Date Title
CN200975041Y (en) Concrete form panel precast concrete exterior wall decoration heat preservation formwork
CN103321376B (en) Enhanced foaming cement heat preserving decorative integrated plate and preparation method thereof
CN205100427U (en) Compound concrete outer wall board of prefabricated heat preservation
CN111519797A (en) Heat-preservation, heat-insulation and waterproof composite wallboard building structure and building method thereof
CN105619686A (en) Vacuum insulation composite decoration insulation board and preparation mold thereof
CN101280582A (en) Sandwich heat preserving wall body and building method thereof
CN103758260A (en) External-wall removal-free building formwork and manufacturing method thereof
KR20030030642A (en) Light weight prominence and depression beauty treatment block for construction and method thereof
CN104790586A (en) Production process for light-weight steel floorslab
CN205242685U (en) Cast -in -place compound self preservation temperature wall body of assembled
CN108265854B (en) On-site foaming polyurethane external wall external heat insulation system and construction method thereof
CN212453220U (en) Heat-preservation, heat-insulation and waterproof composite wallboard building structure
CN203654525U (en) Cast-in-place sandwich self-insulation composite wall
CN103938763A (en) Nonbearing wall easy to dismount and mount
CN102251595B (en) Manufacturing process of metal surface heat-insulation board based on ultralight foaming cement core
CN103934950A (en) Mould for manufacturing wall insulation layer and application method thereof
CN101200920A (en) Construction process for integral composite adiabatic insulation wall
CN205380823U (en) High vacuum insulation composite decoration heated board and preparation mould thereof
CN101871237A (en) Exterior wall insulated structure and building method thereof
CN206591709U (en) A kind of preformed self thermal insulation pre-stress concrete box ventilation roofing plate
CN201539040U (en) New fiberglass building wall panels
CN202299092U (en) self-insulating brick
CN103498526A (en) Self-heat-preservation module for steel wire net rack
CN206053048U (en) A kind of composite graphite fireproof heat insulating template
CN203270922U (en) Post-foam-forming foam concrete sandwich composite insulation fireproof building block

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722

RJ01 Rejection of invention patent application after publication