CN104790521A - 一种新型钢-混凝土组合梁 - Google Patents

一种新型钢-混凝土组合梁 Download PDF

Info

Publication number
CN104790521A
CN104790521A CN201510216158.7A CN201510216158A CN104790521A CN 104790521 A CN104790521 A CN 104790521A CN 201510216158 A CN201510216158 A CN 201510216158A CN 104790521 A CN104790521 A CN 104790521A
Authority
CN
China
Prior art keywords
steel
girder steel
flange
concrete
frame column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510216158.7A
Other languages
English (en)
Inventor
许耿群
王湛
陈红萍
卢钊柳
Original Assignee
许耿群
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 许耿群 filed Critical 许耿群
Priority to CN201510216158.7A priority Critical patent/CN104790521A/zh
Publication of CN104790521A publication Critical patent/CN104790521A/zh
Pending legal-status Critical Current

Links

Abstract

本发明提供了一种新型钢-混凝土组合梁,其特征在于,包括由上翼缘、腹板和下翼缘组成的钢梁,和设在钢梁上翼缘上面的混凝土楼板;在与框架柱或剪力墙接触的钢梁端部,设有开口或闭口的箱体,箱内灌浇混凝土;箱体另一侧与框架柱或剪力墙连接。本发明的结构提高了钢梁端部的承载力、刚度及整体稳定,可在构件生产厂家进行预装配,施工方便,能够有效降低梁高度,节省用钢量。

Description

—种新型钢-混凝土组合梁
技术领域
[0001] 本发明涉及应用于建筑工程的钢-混凝土组合结构,具体涉及一种框架钢-混凝土组合梁。
背景技术
[0002] 在现有钢-混凝土组合结构设计中,框架钢-混凝土组合梁由于其结构特点,存在着一种不合理的现象:
在实际结构过程中,当钢梁端部存在约束且约束较强时(如框架柱、剪力墙等),钢梁端部存在负弯矩且该弯矩大于跨中弯矩;而由于组合结构的特性,对于钢梁端部而言,由于混凝土楼板处于截面受拉区,所以楼板开裂退出工作对截面承载力无贡献,钢梁端部负弯矩完全由钢梁承担;而对于钢梁中部而言,混凝土楼板处于截面受压区而承担了截面受压区全部或大部分的压力,所以其截面承载力就远大于钢梁端部承载力。也就是说,钢梁中部能形成组合截面,钢梁端部不能形成组合截面。这就形成了这样一种状态:弯矩大的截面承载力小,弯矩小的截面承载力大。随着钢梁跨度增大,该矛盾更为突出,为了达到结构安全,设计常采用以下方法解决:
①按钢梁端部承载力取截面,这将大幅度提高用钢量。
[0003] ②钢梁高度不变,按钢梁端及梁中弯矩分别配置上下冀缘,但此方法会使钢梁端部冀缘板比钢梁中部厚得多,这样会增加用钢量及制作难度。
[0004] ③梁端及梁中采用不同高度,这样会降低建筑使用净高,影响美观,建筑专业难以接受。
[0005] 同时,以上方法钢梁端部截面稳定性都存在一定的安全隐患。
发明内容
[0006] 本发明的目的在于解决目前工程设计中存在的缺点,提供一种新型钢-混凝土组合梁。
[0007] 本发明所采用的技术方案是:一种新型钢-混凝土组合梁,其特征在于,包括由上翼缘、腹板和下翼缘组成的钢梁,和设在钢梁上翼缘上面的混凝土楼板;在与框架柱或剪力墙接触的钢梁端部,设有开口或闭口的箱体,箱内灌浇混凝土 ;箱体另一侧与框架柱或剪力墙连接。
[0008] 所述箱体可以是在钢梁的端部,用隔板与钢梁的上翼缘、腹板、下翼缘和框架柱(或剪力墙)侧面隔成;也可以是作为一个独立的箱体,两侧分别与钢梁、框架柱(或剪力墙)连接。
[0009] 为进一步提高钢梁端部的承载力,可以在钢梁端部上方的混凝土楼板中设置平行于钢梁方向的纵向受拉钢筋。
[0010] 本发明的结构提高了钢梁端部的承载力、刚度及整体稳定,可在构件生产厂家进行预装配,施工方便,能够有效降低梁高度,节省用钢量。具体是: 1、采用本发明结构,可在采用相同冀缘及梁高情况下,使钢梁端部及跨中截面承载力满足受力要求,从而克服常规设计组合梁存在的缺点,降低用钢量及提高建筑净空;
2、通过钢梁端部上方设置抗拉钢筋,增加钢梁端部受拉区抗拉能力,使钢梁上翼缘在保持厚度不变情况下,钢梁端部截面达到设计承载力要求,降低整根梁用钢量;
3、钢梁端部为箱型及箱中浇灌混凝土,增强下梁端截面稳定性。
附图说明
[0011] 图1为本发明的结构示意图(剖面图)。
[0012] 图2为图1的A-A剖视图。
具体实施方式
[0013] 下面结合附图对本发明的结构原理作进一步说明。
[0014] 附图标记:1一一上翼缘;2—一腹板;3—一下翼缘;4一一楼板;5—一框架柱;6--箱体内的混凝土 ;7--受拉钢筋;8--框架柱侧面;9--隔板。
[0015] 如图1〜2所示,本发明的钢-混凝土组合梁,其特征在于,包括由上翼缘、腹板和下翼缘组成的钢梁,和设在钢梁上翼缘上面的混凝土楼板;在与框架柱接触的钢梁端部,设有闭口的箱型,箱内灌浇混凝土,所述箱型由上翼缘、腹板、下翼缘和框架柱侧面、隔板组成;在钢梁端部上方的混凝土楼板中设置平行于钢梁方向的纵向受拉钢筋。

Claims (3)

1.一种新型钢-混凝土组合梁,其特征在于,包括由上翼缘、腹板和下翼缘组成的钢梁,和设在钢梁上翼缘上面的混凝土楼板;在与框架柱或剪力墙接触的钢梁端部,设有开口或闭口的箱体,箱内灌浇混凝土;箱体另一侧与框架柱或剪力墙连接。
2.根据权利要求1所述组合梁,其特征在于,所述箱体是在钢梁的端部,用隔板与钢梁的上翼缘、腹板、下翼缘和框架柱(或剪力墙)侧面隔成;或者是作为一个独立的箱体,两侧分别与钢梁、框架柱(或剪力墙)连接。
3.根据权利要求1或2所述组合梁,其特征在于,在钢梁端部上方的混凝土楼板中设置平行于钢梁方向的纵向受拉钢筋。
CN201510216158.7A 2015-05-02 2015-05-02 一种新型钢-混凝土组合梁 Pending CN104790521A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510216158.7A CN104790521A (zh) 2015-05-02 2015-05-02 一种新型钢-混凝土组合梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510216158.7A CN104790521A (zh) 2015-05-02 2015-05-02 一种新型钢-混凝土组合梁

Publications (1)

Publication Number Publication Date
CN104790521A true CN104790521A (zh) 2015-07-22

Family

ID=53555668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510216158.7A Pending CN104790521A (zh) 2015-05-02 2015-05-02 一种新型钢-混凝土组合梁

Country Status (1)

Country Link
CN (1) CN104790521A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718125A (zh) * 2009-12-21 2010-06-02 清华大学 带肋的双矩形管约束型h形截面装配式防屈曲耗能支撑
CN201991083U (zh) * 2011-01-19 2011-09-28 天津市建筑设计院 一种钢与混凝土组合结构体系的梁柱节点
CN203583672U (zh) * 2013-11-13 2014-05-07 大连海事大学 装配式钢管混凝土柱-钢梁节点连接结构
CN103953123A (zh) * 2014-05-14 2014-07-30 天津城建大学 梁端部分约束的h型钢框架节点及其施工方法
JP2014190102A (ja) * 2013-03-28 2014-10-06 Fujita Corp ハイブリッド梁
CN203891214U (zh) * 2014-05-14 2014-10-22 天津城建大学 预制混凝土框架狗骨式型钢连接节点
CN204252286U (zh) * 2014-10-27 2015-04-08 华北水利水电大学 一种矩形钢管混凝土柱-钢梁连接节点
CN204590234U (zh) * 2015-05-02 2015-08-26 许耿群 一种新型钢-混凝土组合梁

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718125A (zh) * 2009-12-21 2010-06-02 清华大学 带肋的双矩形管约束型h形截面装配式防屈曲耗能支撑
CN201991083U (zh) * 2011-01-19 2011-09-28 天津市建筑设计院 一种钢与混凝土组合结构体系的梁柱节点
JP2014190102A (ja) * 2013-03-28 2014-10-06 Fujita Corp ハイブリッド梁
CN203583672U (zh) * 2013-11-13 2014-05-07 大连海事大学 装配式钢管混凝土柱-钢梁节点连接结构
CN103953123A (zh) * 2014-05-14 2014-07-30 天津城建大学 梁端部分约束的h型钢框架节点及其施工方法
CN203891214U (zh) * 2014-05-14 2014-10-22 天津城建大学 预制混凝土框架狗骨式型钢连接节点
CN204252286U (zh) * 2014-10-27 2015-04-08 华北水利水电大学 一种矩形钢管混凝土柱-钢梁连接节点
CN204590234U (zh) * 2015-05-02 2015-08-26 许耿群 一种新型钢-混凝土组合梁

Similar Documents

Publication Publication Date Title
CN103981975B (zh) 竹木填充屈曲约束支撑
CN105421652A (zh) 一种复合保温墙板
CN202055373U (zh) 双钢板夹心混凝土墙和方钢管混凝土结合的结构
CN204326335U (zh) 一种预制钢筋混凝土楼板与叠合梁一体装配连接结构
CN204530418U (zh) 一种钢板组合梁桥
CN102359061B (zh) 波形钢板与混凝土的抗剪连接件
CN203097016U (zh) 装配式混凝土框架剪力墙结构
CN102108752B (zh) 消能减震型密肋复合墙板及其制作方法
CN101532310B (zh) 上下层冲压连接件及其轻钢结构
CN100510262C (zh) 竹材桥梁
CN101215855A (zh) 一种组合梁
CN205063127U (zh) 预制钢筋砼平板
CN204531233U (zh) 一种预制钢混组合楼梯
CN206090967U (zh) 穿孔肋拉杆约束双层钢板混凝土剪力墙
CN103114681B (zh) 高空大跨度钢筋混凝土梁的待浇筑结构
CN206693432U (zh) 装配式剪力墙及建筑物结构
CN107299699B (zh) 装配式空腔剪力墙水平接缝齿槽式干式连接结构
CN203716336U (zh) 一种侧边开洞薄钢板剪力墙
KR100969235B1 (ko) 층고 절감형 철골보 및 그 제조 방법
CN202039479U (zh) 大间距开竖缝组合钢板墙
CN203462615U (zh) 一种预制装配整体式剪力墙及其连接节点
CN203961338U (zh) 一种整体卫浴间底盘
CN202610694U (zh) 一种钢纤维轻混凝土与高强混凝土叠浇组合梁
CN201962792U (zh) 大跨度预应力混凝土梁板拟框架结构
CN203452228U (zh) 框架—剪力墙建筑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722