CN104763000A - Detection method for completeness of foundation pile - Google Patents

Detection method for completeness of foundation pile Download PDF

Info

Publication number
CN104763000A
CN104763000A CN201510151564.XA CN201510151564A CN104763000A CN 104763000 A CN104763000 A CN 104763000A CN 201510151564 A CN201510151564 A CN 201510151564A CN 104763000 A CN104763000 A CN 104763000A
Authority
CN
China
Prior art keywords
weight
foundation pile
acceleration transducer
detection
detection method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510151564.XA
Other languages
Chinese (zh)
Inventor
黄阳
张雄水
施峰
梁曦
顾金顺
林清意
章东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN BUILDING ENGINEERING QUALITY INSPECTION CENTER Co Ltd
Original Assignee
FUJIAN BUILDING ENGINEERING QUALITY INSPECTION CENTER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN BUILDING ENGINEERING QUALITY INSPECTION CENTER Co Ltd filed Critical FUJIAN BUILDING ENGINEERING QUALITY INSPECTION CENTER Co Ltd
Priority to CN201510151564.XA priority Critical patent/CN104763000A/en
Publication of CN104763000A publication Critical patent/CN104763000A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention provides a detection method for completeness of a foundation pile. The method comprises the steps 1, symmetrically mounting a plurality of acceleration sensors which are connected to a detection data acquiring analyzing instrument on the outer side surface of the foundation pile, close to the pile top; 2, providing a semispherical engineering plastic head heavy hammer being not less than 50kg in weight, lifting the heavy hammer and setting the lowering distance of the heavy hammer during detecting; 3, knocking within the grinding and treating range of the top surface of the foundation pile through the heavy hammer, transmitting the resulting stress wave to the detection data acquiring analyzing instrument through the acceleration sensor to acquire and analyze the data; 4, determining whether the acquired data are repeated; if not, knocking again; if so, entering step 5; 5, determining whether an obvious pile bottom signal appears; if so, calculating and analyzing and preparing detection report; if not so, increasing the lowering distance or increasing the weight of the heavy hammer, and returning to step 3. According to the method, the completeness of the pile body can be detected through the stress wave generated by medium energy excitation, so that no deviation occurs, and moreover, high-frequency interference can be reduced.

Description

A kind of detection method of foundation pile integrity
Technical field
The present invention relates to a kind of construction work detection technique, particularly a kind of detection method of the foundation pile integrity between Large strain method and low strain dynamic method.
Background technology
The integrity detection of pile foundation is the guarantee of pile foundation trouble free service, for building provides epochmaking safety guarantee.At present, the method of pile detection is divided into two large classes, one class is loading test method, and another kind of is integrity detection method, and that commonly uses at present in integrity detection method has: core drilling method, sound wave transmission method, Large strain method (simultaneously also for loading test) and low strain dynamic method detection method.These detection methods respectively have its applicable elements.Core drilling method, sound wave transmission method detection method are applicable to castinplace pile, and these two kinds of methods and Large strain method cost all higher, be difficult to require that engineering adopts them to generally investigate, and low strain dynamic method cost low velocity is fast, but because the energy excited is very little, limitation is strong, has significant limitation, even have very large supposition composition to the detection of long stake, large diameter pile.
The inventive method is that the stress wave utilizing medium energy exciting to produce between Large strain method and low strain dynamic method is to a kind of detection method of pile integrity detection.
Summary of the invention
The technical problem to be solved in the present invention, is the detection method providing a kind of foundation pile integrity, utilizes stress wave that medium energy exciting produces to pile integrity detection, bias can not occur, convenient operation, and can reduce High-frequency Interference.
The present invention is achieved in that a kind of detection method of foundation pile integrity, comprising:
Step 1, near the lateral surface place on stake top, a plurality of acceleration transducer is installed at foundation pile symmetrically; And a plurality of acceleration transducer is all connected to detection data collection and analysis instrument;
Step 2, adopt the nose heave hammer of hemispherical engineering plastics, and weight weight is not less than 50kg; Lift weight during detection and set the distance that falls of weight;
In step 3, the scope that allows weight knock to cross in foundation pile end face grinding process, the stress wave that weight knocks generation is delivered in described detection data collection and analysis instrument by acceleration transducer and carries out data acquisition and analysis;
Whether the data that step 4, judgement collect have repeatability, no, then again knock, be, then carry out next step;
Step 5, judging whether visible obviously signal at the bottom of stake, is then carry out computation and analysis and go out examining report, no, then strengthen apart from or strengthen weight weight, getting back to step 3.
Further, the installation site distance foundation pile end face 10 ± 1cm of described acceleration transducer.
Further, described a plurality of acceleration transducer all connects described detection data collection and analysis instrument by snap joint, and the stress wave that described weight knocks generation is delivered to detect in data collection and analysis instrument by this snap joint by described acceleration transducer and carries out data acquisition and analysis.
Further, in step 1, in 2 ~ 3 foundation stakes, installing acceleration transducer simultaneously, when detecting, being connected with described detection data collection and analysis instrument by the acceleration transducer on the different foundation pile of snap joint rotation dismounting.
Further, described weight weight is also not more than 200kg, to ensure the quick of detection speed.
Further, the lifting of described weight is fixed on the enough horizontal cross bars of rigidity by weight by guiding conduit into, this horizontal cross bar by machinery or artificial Fulcrum carry, and weight by one tripping gear adjust fall distance.
Tool of the present invention has the following advantages:
1, the inventive method is that a kind of stress wave utilizing medium energy exciting to produce between Large strain method and low strain dynamic method is to a kind of detection method of pile integrity detection, both can carry out pile foundation quality generaI investigation with lower cost, proterties at the bottom of pile quality and stake can be judged more accurately again.
2, the inventive method is different from low strain dynamic method, current low strain dynamic method is still at end face sensor installation, for preventing damaging sensor, the limited extent that the size of power hammer and weight increase, current maximum, force hammer weight is 15kg, sensor is arranged on the lateral surface place of foundation pile near stake top by the inventive method, thus more sufficient position can be had to knock, power bell weight is minimum is 50kg, according to the increase of pile length, diameter, also can strengthen weight, but quick in order to what detect, should not 200kg be greater than.
3, the inventive method is also different from Large strain method, and high strain monitoring method equipment is huge, and need mechanical assistance time mobile, cost is high, cannot generally investigate foundation pile.Because drop hammer, bottom is flat, needs large-scale saddle to prevent bias of dropping hammer.The power hammer average weight of the inventive method, can be operated by two workmans, the head of power hammer adopts hemispherical engineering plastic stub bar, bias can not occur, and can reduce High-frequency Interference.
Accompanying drawing explanation
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the checkout gear figure of foundation pile integrity of the present invention.
Fig. 2 is the flowchart of foundation pile integrity method of the present invention.
Detailed description of the invention
As depicted in figs. 1 and 2, the detection method of foundation pile integrity of the present invention, comprising:
Step 1, near the lateral surface place on stake top, a plurality of acceleration transducer 1 is installed at foundation pile A symmetrically; Preferably described acceleration transducer 1 is arranged on below foundation pile A end face 10 ± 1cm, and namely the installation site distance foundation pile end face of described acceleration transducer is 9-11cm place.Excavation is not needed to install to below ground like this.And a plurality of acceleration transducer 1 is all connected to detection data collection and analysis instrument 3 by snap joint 2.
Step 2, adopt the nose heave hammer 4 of hemispherical engineering plastics, and weight 4 weight is not less than 50kg; Make heavy bell weight medium like this, and be hemispherical, bias can not occur when knocking, therefore, foundation pile A pile crown large volume can not be caused to destroy, can not be corrupted to the concrete of foundation pile in the darker scope in side place yet, therefore sensor does not need to arrange excessively dark.In addition, for ensureing the quick of detection speed, also can limit weight weight and being not more than 200kg.
Lift weight 4 during detection and set the distance that falls of weight 4; The lifting of described weight 4 is fixed on the enough horizontal cross bars of rigidity 6 by weight 4 by guiding conduit 5 into, this horizontal cross bar 6 by machinery or artificial Fulcrum 52 carry, and weight 4 by one tripping gear 7 adjust fall distance.
In step 3, the scope that allows weight 4 knock to cross in foundation pile end face grinding process, the stress wave that weight 4 knocks generation to be delivered in described detection data collection and analysis instrument 3 by this snap joint 2 by acceleration transducer 1 and to carry out data acquisition;
Step 4, judge to detect the data that data collection and analysis instrument 3 collects and whether have repeatability, no, then getting back to step 3 and again knock and image data, is then carry out next step;
Step 5, judging to detect the whether visible obviously signal at the bottom of stake of data that data collection and analysis instrument 3 collects, is then carry out computation and analysis and go out examining report, no, then strengthen apart from or strengthen weight 4 weight, getting back to step 3.
Wherein, for improving detection efficiency, in step 1, in 2 ~ 3 foundation stake A, installing acceleration transducer 1 simultaneously, when detecting, being connected with described detection data collection and analysis instrument 3 by the acceleration transducer 1 on the different foundation pile of snap joint 2 rotation dismounting.
Tool of the present invention has the following advantages:
1, the inventive method is that the stress wave utilizing medium energy exciting to produce between Large strain method and low strain dynamic method is to a kind of detection method of pile integrity detection, both can carry out pile foundation quality generaI investigation with lower cost, proterties at the bottom of pile quality and stake can be judged more accurately again.
2, the inventive method is different from low strain dynamic method, current low strain dynamic method is still at stake end face sensor installation, for preventing damaging sensor, the limited extent that the size of power hammer and weight increase, current maximum, force hammer weight is 15kg, sensor is arranged on the lateral surface place of foundation pile near stake top by the inventive method, thus more sufficient position can be had to knock, power bell weight is minimum is 50kg, according to the increase of pile length, diameter, also can strengthen weight, but quick in order to what detect, should not 200kg be greater than.
3, the inventive method is also different from Large strain method, and high strain monitoring method equipment is huge, and need mechanical assistance time mobile, cost is high, cannot generally investigate foundation pile.Because drop hammer, bottom is flat, needs large-scale saddle to prevent bias of dropping hammer.The power hammer average weight of the inventive method, can be operated by two workmans, the head of power hammer adopts hemispherical engineering plastic stub bar, bias can not occur, and can reduce High-frequency Interference
Although the foregoing describe the specific embodiment of the present invention; but be familiar with those skilled in the art to be to be understood that; specific embodiment described by us is illustrative; instead of for the restriction to scope of the present invention; those of ordinary skill in the art, in the modification of the equivalence done according to spirit of the present invention and change, should be encompassed in scope that claim of the present invention protects.

Claims (6)

1. a detection method for foundation pile integrity, is characterized in that: comprising:
Step 1, near the lateral surface place on stake top, a plurality of acceleration transducer is installed at foundation pile symmetrically; And a plurality of acceleration transducer is all connected to detection data collection and analysis instrument;
Step 2, adopt the nose heave hammer of hemispherical engineering plastics, and weight weight is not less than 50kg; Lift weight during detection and set the distance that falls of weight;
In step 3, the scope that allows weight knock to cross in foundation pile end face grinding process, the stress wave that weight knocks generation is delivered in described detection data collection and analysis instrument by acceleration transducer and carries out data acquisition and analysis;
Whether the data that step 4, judgement collect have repeatability, no, then again knock, be, then carry out next step;
Step 5, judging whether visible obviously signal at the bottom of stake, is then carry out computation and analysis and go out examining report, no, then strengthen apart from or strengthen weight weight, getting back to step 3.
2. the detection method of a kind of foundation pile integrity according to claim 1, is characterized in that: the installation site distance foundation pile end face 10 ± 1cm of described acceleration transducer.
3. the detection method of a kind of foundation pile integrity according to claim 1 and 2, it is characterized in that: described a plurality of acceleration transducer all connects described detection data collection and analysis instrument by snap joint, the stress wave that described weight knocks generation is delivered to detect in data collection and analysis instrument by this snap joint by described acceleration transducer and carries out data acquisition and analysis.
4. the detection method of a kind of foundation pile integrity according to claim 3, it is characterized in that: in step 1, in 2 ~ 3 foundation stakes, install acceleration transducer simultaneously, when detecting, be connected with described detection data collection and analysis instrument by the acceleration transducer on the different foundation pile of snap joint rotation dismounting.
5. the detection method of a kind of foundation pile integrity according to claim 1, is characterized in that: described weight weight is also not more than 200kg.
6. the detection method of a kind of foundation pile integrity according to claim 1 or 5, it is characterized in that: the lifting of described weight is fixed on the enough horizontal cross bars of rigidity by weight by guiding conduit into, this horizontal cross bar by machinery or artificial Fulcrum carry, and weight by one tripping gear adjust fall distance.
CN201510151564.XA 2015-04-02 2015-04-02 Detection method for completeness of foundation pile Pending CN104763000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510151564.XA CN104763000A (en) 2015-04-02 2015-04-02 Detection method for completeness of foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510151564.XA CN104763000A (en) 2015-04-02 2015-04-02 Detection method for completeness of foundation pile

Publications (1)

Publication Number Publication Date
CN104763000A true CN104763000A (en) 2015-07-08

Family

ID=53645067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510151564.XA Pending CN104763000A (en) 2015-04-02 2015-04-02 Detection method for completeness of foundation pile

Country Status (1)

Country Link
CN (1) CN104763000A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326943A (en) * 2017-08-14 2017-11-07 厦门市工程检测中心有限公司 A kind of method that low strain dynamic for realizing pile foundation gathers signal conformance
CN107842045A (en) * 2017-11-29 2018-03-27 长沙宏宇建筑工程检测有限公司 It is a kind of to shake punching hammer hammer systems and its application method
CN108625391A (en) * 2018-08-14 2018-10-09 广东电网有限责任公司 A kind of electric power pylon foundation structure integrality low strain dynamic upgoing wave detection device
CN108732244A (en) * 2018-08-14 2018-11-02 广东电网有限责任公司 A kind of striking mechanism
CN109537649A (en) * 2018-12-20 2019-03-29 九江职业技术学院 A kind of pile's integrity testing small strain detection robot
CN114592550A (en) * 2022-03-02 2022-06-07 山东省水利科学研究院 A fully automatic foundation pile integrity test force hammer
CN115752989A (en) * 2022-11-07 2023-03-07 江苏中禧建设有限公司 Device and method for detecting building foundation piles
CN119373166A (en) * 2024-12-26 2025-01-28 中汽建工(洛阳)检测有限公司 An automatic drop-hammer vibration device for high-strain pile testing that is easy to assemble and install

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10239262A (en) * 1997-02-26 1998-09-11 Gio Top:Kk Method for diagnosing damage of pile and underground pile whose damage can be detected
CN102220768A (en) * 2010-04-19 2011-10-19 广东省建筑科学研究院 Method for detecting integrity of concrete foundation pile body

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10239262A (en) * 1997-02-26 1998-09-11 Gio Top:Kk Method for diagnosing damage of pile and underground pile whose damage can be detected
CN102220768A (en) * 2010-04-19 2011-10-19 广东省建筑科学研究院 Method for detecting integrity of concrete foundation pile body

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国水利工程协会等: "《岩土工程类(地基与基础)》", 31 December 2008, article "(二)低应变法现场检测技术)", pages: 150-152 *
左名麒等: "《桩基础工程 设计/施工/检测》", 31 May 1996, article "6.天津港高桩码头桩基检测实例", pages: 573-575 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326943A (en) * 2017-08-14 2017-11-07 厦门市工程检测中心有限公司 A kind of method that low strain dynamic for realizing pile foundation gathers signal conformance
CN107842045A (en) * 2017-11-29 2018-03-27 长沙宏宇建筑工程检测有限公司 It is a kind of to shake punching hammer hammer systems and its application method
CN108625391A (en) * 2018-08-14 2018-10-09 广东电网有限责任公司 A kind of electric power pylon foundation structure integrality low strain dynamic upgoing wave detection device
CN108732244A (en) * 2018-08-14 2018-11-02 广东电网有限责任公司 A kind of striking mechanism
CN108732244B (en) * 2018-08-14 2023-11-07 广东电网有限责任公司 a percussion mechanism
CN109537649A (en) * 2018-12-20 2019-03-29 九江职业技术学院 A kind of pile's integrity testing small strain detection robot
CN114592550A (en) * 2022-03-02 2022-06-07 山东省水利科学研究院 A fully automatic foundation pile integrity test force hammer
CN115752989A (en) * 2022-11-07 2023-03-07 江苏中禧建设有限公司 Device and method for detecting building foundation piles
CN115752989B (en) * 2022-11-07 2025-06-27 江苏中禧建设有限公司 Building foundation pile detection device and method
CN119373166A (en) * 2024-12-26 2025-01-28 中汽建工(洛阳)检测有限公司 An automatic drop-hammer vibration device for high-strain pile testing that is easy to assemble and install

Similar Documents

Publication Publication Date Title
CN104763000A (en) Detection method for completeness of foundation pile
CN103510502B (en) Real-time monitoring method and system for dynamic compaction machine construction based on impact acceleration measurement of rammer
CN102251510A (en) Dynamic tamping machine tamping sinking detection system
EP3239407A1 (en) Arrangement and method for measuring structural strengths of piles
CN112924061A (en) Wireless real-time monitoring system and method for non-uniform settlement stress of natural gas pipeline
CN103033304A (en) Steel spring and tension sensor based dangerous rock collapse detection device and steel spring and tension sensor based dangerous rock collapse detection method
CN113404095B (en) Detection equipment and detection method for high strain of foundation pile
CN211523299U (en) Foundation pit engineering safety monitoring and supervision device
CN107843743A (en) A kind of dynamic consolidation construction collecting method based on impact acceleration
CN204662519U (en) A kind of checkout gear of foundation pile integrity and weight thereof
CN111733899B (en) Real-time safety monitoring method for pile top in static load test process of concrete cast-in-place pile
CN202099794U (en) Dynamic tamping machine tamping sinking detection system
CN111637990B (en) A method for detecting the force at the key position of the cutter head system of a large-diameter shield machine
CN103898928A (en) Improved high strain method
CN104567809A (en) Device and method for measuring inclined angle of inclined PHC (pre-stressed high-strength concrete) pipe pile
CN203785660U (en) Wind turbine tower cylinder inclination deformation monitoring device
CN120142455A (en) Nondestructive testing method and system for foundation ring fan based on vibration response
CN209353385U (en) A kind of existing building pile's integrity testing device that can repeat hammering automatically
CN111579355A (en) Concrete cast-in-place pile static load test unbalance loading monitoring method based on piezoelectric impedance frequency shift
CN107202611B (en) Sensor-type fixed pulley test system and method for monitoring dynamic compaction operation process
CN207598434U (en) A kind of offshore wind farm set tower drum and the safe on-Line Monitor Device of pile foundation
CN212866077U (en) Concrete filling pile static load test unbalance loading monitoring device
CN112228093B (en) Method for judging damage of cutter head of shield tunneling machine
CN105222943B (en) Method for measuring tension of steel wire rope in lifting system
CN103590431B (en) Intelligent axial force instrument capable of being recycled

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150708