CN104751602A CN201510098198.6A CN201510098198A CN104751602A CN 104751602 A CN104751602 A CN 104751602A CN 201510098198 A CN201510098198 A CN 201510098198A CN 104751602 A CN104751602 A CN 104751602A
Authority
CN
China
Prior art keywords
railway
data
geological disaster
warning
early warning
Prior art date
Application number
CN201510098198.6A
Other languages
Chinese (zh)
Inventor
朱尔玉
刘中豪
王宏亮
潘卫兵
Original Assignee
北京交通大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京交通大学 filed Critical 北京交通大学
Priority to CN201510098198.6A priority Critical patent/CN104751602A/en
Publication of CN104751602A publication Critical patent/CN104751602A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning, or like safety means along the route or between vehicles or vehicle trains
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal operating condition and not elsewhere provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes

Abstract

The invention discloses a big data concept based railway geological disaster early warning system and belongs to the technical field of railway geological disaster early warning. The big data concept based railway geological disaster early warning system comprises a railway data mining system (1), a railway big data storage system (2), a railway big data analysis system (3) and a railway big data geological disaster early warning system (4) and is characterized in that railway geological disaster early warning big data streams are created by adopting multiple means, the big data streams collected by the system are processed by adopting a cloud storage technology, a cloud computing distributed processing technology, a virtualization technology and the like, and the data required by the railway geological disaster early warning system are quickly formed. The system is huge in data amount, various in data types, high in data processing speed and capable of achieving timely and accurate railway geological disaster early warning. The big data concept based railway geological disaster early warning system is reasonable in design, good in applicability, high in reliability and convenient to popularize and apply.

Description

A kind of railway Geological Disaster Warning System based on large data theory
Technical field
The invention belongs to railway geo-hazard early-warning technical field, relate to a kind of railway Geological Disaster Warning System based on large data theory.
Background technology
China is located in circum-Pacific tectonic belt and Himalaya structural belt converges position, and the underriding of Pacific-oceanic plate and Indian make China's Mainland subject topmost geodynamic effect to the collision of Asiatic plate northwards.These two kinds of active tectonic zones converge and west rises eastern physical features contrast of falling, and not only define the elementary contour of Tectonics of China and landform, are also form the miscellaneous basic reason of China's geologic hazard simultaneously.
In order to forecast with unerring accuracy to geologic hazard, Chinese scholars has carried out large quantifier elimination, such as utility model patent " Geological Hazards Monitoring early warning system " (application number: 201120283972.8) disclose a kind of Geological Hazards Monitoring early warning system, establish a set of geo-hazard early-warning monitoring system of carrying out detecting for surface displacement, solving the geologic hazard that caused by surface displacement can not the problem of accurately and timely prediction.Patent of invention " a kind of geologic hazard Real-Time Monitoring and early warning system " (application number: 201110374375.0) disclose a kind of geologic hazard Real-Time Monitoring and early warning system, comprise monitoring subsystem, data center subsystem, early warning subsystem and communication network, disaster monitoring and early warning information are timely provided, improve the work efficiency of disaster monitoring and early warning, to reduce the life and property loss that geologic hazard causes.
China not yet sets up railway Geological Disaster Warning System.Safety is transportation by railroad basis.Railway, because train speed is fast, density is high, is had higher requirement to travel safety ensuring system.In the disaster affecting railway operation safety, geologic hazard is the less but larger disaster of harm of a kind of probability of happening.Train in railway operation has huge inertia, when there is the geologic hazards such as surface collapse, sedimentation, avalanche, landslide along the railway, slows down in time or stops significant for railway operation safety.
The Geological Disaster Warning System just come into operation both at home and abroad at present, in Data Collection, be generally utilize monitoring station to obtain, the data volume obtained is little, data type is single, the multiple geologic hazard simultaneously cannot brought out under the acting in conjunction of Accurate Prediction many factors.In data management, because failing the potential value of abundant mining data by the restriction of data-handling capacity, data processing cycle is longer.Along with the arriving in cloud epoch, under the promoting technology being representative with cloud computing, large data technique is subject to the extensive concern of Chinese scholars.The feature of large data may be summarized to be that data volume is huge, data type is various, treatment cycle is short, large data technique refers in dissimilar mass data, fast processing obtains the ability of potential valuable information, the data being originally difficult to Collection and use are made to start easily to be utilized, fast processing mass data can also arrange the foundation becoming railway Geological Disaster Warning System and need in the short period of time, in railway Geological Disaster Warning System, there is great application potential.
Therefore, invent a kind of railway Geological Disaster Warning System based on large data theory and seem particularly important.
Summary of the invention
The key issue that the present invention will solve is for above-mentioned the deficiencies in the prior art, a kind of railway Geological Disaster Warning System based on large data theory is proposed, its data type is many, data volume is large, data processing cycle is short, analysis result fast and accurately can be drawn to imminent geologic hazard, and timely and accurately emergency deceleration or cutoff command be sent to the train that railway is running according to analysis result.
For solving above-mentioned key technical problem, invent a kind of railway Geological Disaster Warning System based on large data theory, it is characterized in that: based on the railway Geological Disaster Warning System of large data theory by the large data digging system 1 of railway, the large data-storage system 2 of railway, the large data analysis system 3 of railway, the large data Geological Disaster Warning System 4 of railway forms, system data amount is huge, data type is various, data processing cycle is short, analysis result fast and accurately can be drawn to imminent geologic hazard, and timely and accurately emergency deceleration or cutoff command are sent to the train that railway is running according to analysis result.
A kind of railway Geological Disaster Warning System based on large data theory, it is characterized in that: the large data digging system 1 of described railway, with geologic hazard research station co-operation, gather by gps system, mobile Internet etc. the geologic hazard that design, construction and the data of operation aspect and geologic hazard research station capture and bring out information creating railway geo-hazard early-warning high amount of traffic.
Based on a railway Geological Disaster Warning System for large data theory, it is characterized in that: the large data-storage system 2 of described railway, comprise cloud and store computing platform, internet and extendible storage system; Rapid, intelligently can read and write operation to railway geo-hazard early-warning high amount of traffic.
Based on a railway Geological Disaster Warning System for large data theory, it is characterized in that: the large data analysis system 3 of described railway, energy accurate discrimination noise data, effectively carries out the pretreatment work such as data cleansing; Can process mass data fast, extraction and integrated is carried out to the data source of extensive isomery; Rely on the distributed proccessing of cloud computing and Intel Virtualization Technology etc. to systematic collection to high amount of traffic handle it, form real-time analysis report.
A kind of railway Geological Disaster Warning System based on large data theory, it is characterized in that: the large data Geological Disaster Warning System 4 of described railway, be connected with the terminal of railway signal train control system, emergency deceleration or cutoff command are sent to the train that railway is running.
The above-mentioned railway Geological Disaster Warning System based on large data theory, can draw analysis result fast and accurately to imminent geologic hazard, and sends emergency deceleration or cutoff command to the train that railway is running timely and accurately according to analysis result.
The present invention is reasonable in design, and applicability is strong, and good reliability, has wide practical use.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Fig. 1 is the railway Geological Disaster Warning System theory diagram based on large data theory.
In figure: the large data digging system of 1-railway; The large data-storage system of 2-railway; The large data analysis system of 3-railway; The large data Geological Disaster Warning System of 4-railway.
Embodiment
Certain geologic hazard prone areas, for ensureing the security of operation of railroad train, employs the railway Geological Disaster Warning System based on large data theory that this patent provides.
Implementation step:
The large data digging system of step one railway 1 and geologic hazard research station co-operation, information creating railway geo-hazard early-warning high amount of traffic is brought out in the geologic hazard that the design gathered by gps system, mobile Internet etc., construction and operation aspect data and geologic hazard research station capture.
The large data-storage system 2 of step 2 railway reads and writes operation to railway geo-hazard early-warning high amount of traffic rapidly, intelligently.
Step 3 railway large data analysis system 3 accurate discrimination noise data, effectively carry out data cleansing, fast mass data is processed, extraction and integrated is carried out to the data source of extensive isomery, rely on the distributed proccessing of cloud computing and Intel Virtualization Technology etc. to systematic collection to high amount of traffic handle it, form real-time analysis report.
The large data Geological Disaster Warning System 4 of step 4 railway, according to being about to the analysis result that geologic hazard occurs, sends emergency deceleration or cutoff command to the railroad train run, to ensure train operating safety by the terminal of railway signal train control system.
Above-described specific implementation method, is illustrated the object of patent of the present invention, technical scheme and beneficial effect.It is emphasized that the foregoing is only the specific embodiment of patent of the present invention, can not be used for limiting the scope of the invention.Within the spirit and principles in the present invention all, any amendment made, equivalent replacement or improvement etc., all should be included within protection scope of the present invention.
In sum, the invention provides a kind of railway Geological Disaster Warning System based on large data theory, use this system realization railway geo-hazard early-warning promptly and accurately.The present invention has novelty, practicality, meets each requirement of patent of invention, therefore proposes application for a patent for invention in accordance with the law.

Claims (5)

1. the railway Geological Disaster Warning System based on large data theory, it is characterized in that: based on the railway Geological Disaster Warning System of large data theory by the large data digging system of railway (1), the large data-storage system of railway (2), the large data analysis system of railway (3), large data Geological Disaster Warning System (4) composition of railway, system data amount is huge, data type is various, data processing cycle is short, analysis result fast and accurately can be drawn to imminent geologic hazard, and timely and accurately emergency deceleration or cutoff command are sent to the train that railway is running according to analysis result.
2. according to a kind of railway Geological Disaster Warning System based on large data theory according to claim 1, it is characterized in that: the large data digging system of described railway (1), with geologic hazard research station co-operation, gather by gps system, mobile Internet etc. the geologic hazard that design, construction and the data of operation aspect and geologic hazard research station capture and bring out information creating railway geo-hazard early-warning high amount of traffic.
3. according to a kind of railway Geological Disaster Warning System based on large data theory according to claim 1, it is characterized in that: the large data-storage system of described railway (2), comprise cloud and store computing platform, internet and extendible storage system; Operation can be read and write rapidly, intelligently to railway geo-hazard early-warning high amount of traffic.
4. according to a kind of railway Geological Disaster Warning System based on large data theory according to claim 1, it is characterized in that: the large data analysis system of described railway (3), energy accurate discrimination noise data, effectively carries out the pretreatment work such as data cleansing; Can process mass data fast, extraction and integrated is carried out to the data source of extensive isomery; Rely on the distributed proccessing of cloud computing and Intel Virtualization Technology etc. to systematic collection to high amount of traffic handle it, form real-time analysis report.
5. according to a kind of railway Geological Disaster Warning System based on large data theory according to claim 1, it is characterized in that: the large data Geological Disaster Warning System (4) of described railway, be connected with the terminal of railway signal train control system, emergency deceleration or cutoff command are sent to the train that railway is running.
CN201510098198.6A 2015-03-05 2015-03-05 Big data concept based railway geological disaster early warning system CN104751602A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510098198.6A CN104751602A (en) 2015-03-05 2015-03-05 Big data concept based railway geological disaster early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510098198.6A CN104751602A (en) 2015-03-05 2015-03-05 Big data concept based railway geological disaster early warning system

Publications (1)

Publication Number Publication Date
CN104751602A true CN104751602A (en) 2015-07-01

Family

ID=53591214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510098198.6A CN104751602A (en) 2015-03-05 2015-03-05 Big data concept based railway geological disaster early warning system

Country Status (1)

Country Link
CN (1) CN104751602A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105549587A (en) * 2015-12-09 2016-05-04 北京交控科技股份有限公司 Train autopilot control method and train autopilot control system for rainy or snowy days
CN106886840A (en) * 2017-02-23 2017-06-23 上海喆之信息科技有限公司 A kind of earthquake early-warning system based on big data theory
RU180631U1 (en) * 2017-06-07 2018-06-19 Открытое Акционерное Общество "Российские Железные Дороги" Warning device on the fall of foreign objects on the way
RU183223U1 (en) * 2017-06-07 2018-09-13 Открытое Акционерное Общество "Российские Железные Дороги" Foreign objects fall warning device
CN108961688A (en) * 2018-07-13 2018-12-07 福建特力惠信息科技股份有限公司 A kind of big data support under Geological Hazards Monitoring and method for early warning

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201732170U (en) * 2010-07-29 2011-02-02 中国铁道科学研究院电子计算技术研究所 Railway earthquake monitoring and emergency treatment system
CN201800737U (en) * 2010-09-21 2011-04-20 中国铁道科学研究院电子计算技术研究所 Railway disaster prevention safety monitoring system
CN201820337U (en) * 2010-10-28 2011-05-04 成都智胜通科技有限责任公司 Railway geological disaster forecasting and monitoring system
CN202093657U (en) * 2011-06-24 2011-12-28 福州富海电子科技有限公司 Novel intelligent real-time monitoring and pre-warning system for geological environment
CN203118168U (en) * 2012-12-27 2013-08-07 同方威视技术股份有限公司 High speed railway disaster prevention safety monitoring three-level alarm system
CN103978996A (en) * 2014-05-15 2014-08-13 南京理工大学 High speed railway environmental information collection, assessment and early warning device and method
CN104157099A (en) * 2014-08-28 2014-11-19 蒋和平 Railway disaster prevention monitoring system and method based on Internet of Things
JP2014228325A (en) * 2013-05-21 2014-12-08 公益財団法人鉄道総合技術研究所 Detection of natural disaster other than earthquake using seismometer, and alarm output method to train

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201732170U (en) * 2010-07-29 2011-02-02 中国铁道科学研究院电子计算技术研究所 Railway earthquake monitoring and emergency treatment system
CN201800737U (en) * 2010-09-21 2011-04-20 中国铁道科学研究院电子计算技术研究所 Railway disaster prevention safety monitoring system
CN201820337U (en) * 2010-10-28 2011-05-04 成都智胜通科技有限责任公司 Railway geological disaster forecasting and monitoring system
CN202093657U (en) * 2011-06-24 2011-12-28 福州富海电子科技有限公司 Novel intelligent real-time monitoring and pre-warning system for geological environment
CN203118168U (en) * 2012-12-27 2013-08-07 同方威视技术股份有限公司 High speed railway disaster prevention safety monitoring three-level alarm system
JP2014228325A (en) * 2013-05-21 2014-12-08 公益財団法人鉄道総合技術研究所 Detection of natural disaster other than earthquake using seismometer, and alarm output method to train
CN103978996A (en) * 2014-05-15 2014-08-13 南京理工大学 High speed railway environmental information collection, assessment and early warning device and method
CN104157099A (en) * 2014-08-28 2014-11-19 蒋和平 Railway disaster prevention monitoring system and method based on Internet of Things

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105549587A (en) * 2015-12-09 2016-05-04 北京交控科技股份有限公司 Train autopilot control method and train autopilot control system for rainy or snowy days
CN106886840A (en) * 2017-02-23 2017-06-23 上海喆之信息科技有限公司 A kind of earthquake early-warning system based on big data theory
RU180631U1 (en) * 2017-06-07 2018-06-19 Открытое Акционерное Общество "Российские Железные Дороги" Warning device on the fall of foreign objects on the way
RU183223U1 (en) * 2017-06-07 2018-09-13 Открытое Акционерное Общество "Российские Железные Дороги" Foreign objects fall warning device
CN108961688A (en) * 2018-07-13 2018-12-07 福建特力惠信息科技股份有限公司 A kind of big data support under Geological Hazards Monitoring and method for early warning
CN108961688B (en) * 2018-07-13 2020-11-03 特力惠信息科技股份有限公司 Geological disaster monitoring and early warning method under support of big data

Similar Documents

Publication Publication Date Title
CN204010321U (en) A kind of traffic accident signaling system
CN202644547U (en) Side slope ecological restoration vegetation planting guarantee structural style
CN103646534B (en) A kind of road real-time traffic accident risk control method
CN103291364B (en) A kind of comprehensive sequential method for early warning of microseism multidimensional information of impulsion pressure
WO2015003488A1 (en) Optical fiber grating sensor-based coal mine underground safety comprehensive monitoring system
CN104058343B (en) A kind of tower crane safety monitoring system and method for supervising
CN104200669A (en) Fake-licensed car recognition method and system based on Hadoop
CN103256073B (en) Underground coal mine impulsion pressure degree and zoning Forecasting Methodology
CN104318503B (en) A kind of system and method according to typhoon forecast rainfall
CN203050785U (en) Mine micro-seismic monitoring system
CN103195447B (en) Construction method of quake-proof tunnel structure penetrating through flexible fracture zone
CN102169558A (en) Automatic generation method of emergency resource scheduling schemes in expressway network
CN103115602A (en) Mining subsidence monitoring information mobile acquisition terminal system and acquisition method thereof
CN205354288U (en) Mountain landslide monitoring and early warning device based on internet of things
CN103410565A (en) Monitoring system and early warning method for rock burst multi-parameter process
CN203838855U (en) Urban waterlogging and traffic safety guarantee early warning system
CN205642441U (en) Bridge safety monitoring and early warning system based on thing networking
CN203149775U (en) Real-time monitoring and early-warning system based on sensing detection and video detection for debris flow
CN104680785A (en) Method and device for determining traffic condition of road section
CN103019207A (en) Energy-saving emission reduction real-time monitoring system
CN103280100A (en) Bus IC card passenger transfer station judgment method combining intelligent dispatching data
CN1873674B (en) Estimating mining subsidence under turnout cluster of dedicated railroad, and governing expert system
CN105869398B (en) A kind of unimpeded degree judgment method of road traffic based on K-means clusters
CN204154913U (en) A kind of meteorological data collection device with portable circumscribed microsensor box
CN104408323A (en) Method for advanced forecasting of roof separation water disaster of stope based on multi-source information fusion

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150701

RJ01 Rejection of invention patent application after publication