CN104746528A - Assembled tower foundation vertical connection bolt anchorage structure - Google Patents

Assembled tower foundation vertical connection bolt anchorage structure Download PDF

Info

Publication number
CN104746528A
CN104746528A CN201510098898.5A CN201510098898A CN104746528A CN 104746528 A CN104746528 A CN 104746528A CN 201510098898 A CN201510098898 A CN 201510098898A CN 104746528 A CN104746528 A CN 104746528A
Authority
CN
China
Prior art keywords
locating slot
nut locating
nut
bolt
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510098898.5A
Other languages
Chinese (zh)
Inventor
赵正义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510098898.5A priority Critical patent/CN104746528A/en
Publication of CN104746528A publication Critical patent/CN104746528A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

An assembled tower foundation vertical connection bolt anchorage structure comprises three types of vertical bolt lower end anchorage structures for a fixed tower crane and an assembled foundation and a connecting-positioning structure for vertical bolt upper ends and a tower crane bottom frame. Under the condition that vertical connecting bolts and a concrete foundation are combined and decomposed, adjustable and selectable longitudinal distances of vertical connecting bolts can be decreased, the assembly application range of the vertical connecting bolts is widened, meanwhile the hidden danger that nuts at the lower ends of the vertical connecting bolts loosen and drop is eliminated, the number of horizontal pipelines is decreased, accordingly the production and usage cost of the assembled tower foundation is reduced, and technical conditions are provided for industrialization of the assembled tower foundation.

Description

The anchoring structure of the vertical connecting bolt of assembling column foot
Technical field the present invention relates to the vertical connection construction that the cycle moves the concrete basis of the fixed base tower crane using or fix use and the underframe of top plant equipment.
Background technology is current, cycle in building, electric power, oil, information, Di Kuang, military each field move use as built fixed tower machine, wind-driven generator, oil production machine, signal pylon, rig, the tower mast-type mechanical equipment bases such as heavy ground-based radar, mostly adopt integral cast-in-situ concrete basis, its obvious drawback is, resource utilization is extremely low, long construction period, and cold district fabrication cycle is longer, can not reuse, cause ample resources to waste and environment pollution simultaneously.Existing concrete prefabricated parts assembling tower crane base comes out in recent years, opens foundation for tower crane assembling, reuses, the light-weighted direction and way-out of foundation concrete prefabricated units.But reuse for tower machine assembling type base and the large Technological Economy target of lightweight two, the waste that the combining form on basis fixedly causes by tower machine underframe restricts of existence foundation structure design and the narrow situation of adaptive surface; Prior art is to bearing tilting moment and the less plant equipment of vertical force, especially the fixed tower crane having underframe of China's tower crane recoverable amount more than 80% is accounted for, more be badly in need of solving technically the vertical connection construction of the same model tower machine underframe because of domestic each manufacturer production and the assembling type base of a kind of model of the different formation in basic vertical connection construction plan-position, cannot be connected from the vertical connection construction of the different underframe of the same model tower machine of several producer, that is the versatility on basis and applicability problem.Although more existing non-onces build displacement and diameter, a length conversion difficult problem that dead vertical positioning connection structure of fang bolt solves stone bolt, but all to some extent damage is caused to the cross section of concrete grade beam, simultaneously, the perpendicular bolt duct of presetting in concrete grade beam because of perpendicular bolt and the conditionality of structure space position of horizontal pipe, make the position in the perpendicular bolt duct of presetting can not the very near anchorage point of the distance along underframe longitudinal direction that requires of several tower of simultaneous adaptation machine underframe.The industrialization of concrete prefabricated parts assembling tower crane base facts have proved, this is that the tower machine assembling type base that affects that must break through accelerates to realize the technical bottleneck problem of industrialization.
Summary of the invention object of the present invention and task are under the prerequisite not damaging concrete grade beam, a kind of vertical connection request that can meet tower machine underframe and concrete basis is provided, at several vertical tie points of setting, stone bolt position can be located arbitrarily, in the restriction of the stone bolt position that it laterally makes the width of tower machine underframe be not fixed, the anticreep that there is nut be located in the horizontal pipe of the lower end, perpendicular bolt duct of perpendicular bolt moves back function, the diameter of stone bolt, length also can adjust by different detailing requiments, and the tower machine underframe adapting to different manufacturers and basic vertical connection construction are connected locating structure along the one of the nearer requirement of underframe fore-and-aft distance is vertical.Thus eliminate due to the tower mechanical equipment of the same service behaviour rank of each manufacturer production different underframe and from cannot be general between the concrete different vertical connection construction in basis and the concrete basis of having shaped of factorial praluction drawback, create conditions for accelerating to realize the standardization of foundation for tower crane, factorial praluction and reduction use cost.
Technical scheme the present invention includes 3 kinds of perpendicular bolt bottom anchoring structures No. 1 (101) of fixed tower machine and assembling type base or the connection locating structure (201) of perpendicular bolt bottom anchoring structure No. 2 (102) or perpendicular bolt bottom anchoring structure No. 3 (103) and perpendicular bolt upper end and tower machine underframe.
The structure of the connection locating structure (201) of perpendicular bolt upper end of the present invention and tower machine underframe:
The plane dead in line of the plane axis of the tower machine underframe (13) of tower machine and the concrete grade beam (10) of concrete single footing beam and slab structure (11), setting and concrete grade beam (10) vertical joints position the baseplane of tower machine underframe (13) and the concrete of concrete grade beam (10) on be provided with backing plate (18) and high strength cement mortar (19) from top to bottom between plane, backing plate (18) is provided with No. 2, the bolt hole (21) that confession perpendicular bolt (5) passes perpendicularly through; Crossbeam (12) is had on the upper plane of tower machine underframe (13), the plane longitudinal axis of crossbeam (12) is mutually vertical with the plane longitudinal axis of tower machine underframe (13), longitudinal axis along crossbeam (12) is arranged with No. 1, bolt hole (20) at the two ends of crossbeam (12) and passes perpendicularly through for perpendicular bolt (5), perpendicular bolt (5) is studs, the external screw thread that perpendicular bolt (5) upper and lower end is provided with respectively with the screw-internal thread fit of nut No. 2 (17) and nut No. 1 (6); As shown in Fig. 1,2,12;
The structure of perpendicular bolt bottom anchoring structure No. 1 (101):
The upright projection of the longitudinal axis center of horizontal pipe (8) is vertical with the plane longitudinal axis of tower machine underframe (13) with concrete grade beam (10), each section along the vertical axis of horizontal pipe (8) is the polygon of congruence, and horizontal pipe (8) inwall is rectangle plane above, along the axis of pitch with the vertical horizontal pipe (8) overlapped of concrete grade beam (10) longitudinal axis, be arranged with on horizontal pipe (8) often organize 2 nut locating slot base plate (9) n groups, this n be not less than 2 integer, the lower plane of nut locating slot base plate (9) is equal with plane on the inwall of horizontal pipe (8), the outer rim of nut locating slot base plate (9) is polygon or circle, the planar central of each nut locating slot base plate (9) is provided with No. 3, bolt hole (22), No. 3, bolt hole (22) overlaps with the vertical axes heart in the perpendicular bolt duct (7) be located in concrete grade beam (10), and No. 3, bolt hole (22) is the circle that internal diameter is identical with the horizontal profile of perpendicular bolt duct (7), the upper end in perpendicular bolt duct (7) is equal with the upper plane of concrete grade beam (10), the distance of the symmetrical alien invasion of regular hexagon vertical tube that No. 1, nut locating slot baffle plate (14) surrounds is not less than along the perpendicular bolt duct (7) of concrete grade beam (10) longitudinal axis and the vertical axes heart distance of bolt hole No. 3 (22), the horizontal profile of nut locating slot baffle plate No. 1 (14) is trapezoid, positive facade is rectangle, the geometry congruence of each nut locating slot baffle plate No. 1 (14), it is regular hexagon vertical tube that 6 No. 1, nut locating slot baffle plates (14) are connected into inner space horizontal profile around the vertical axes heart of bolt hole No. 3 (22), the vertical axes heart of this regular hexagon vertical tube overlaps with the vertical axes heart of perpendicular bolt duct (7) and bolt hole No. 3 (22), and gapless and being connected between the upper transverse plane of this regular hexagon vertical tube and the lower plane of nut locating slot base plate (9), nut locating slot baffle plate No. 1 (14) inwall is made to surround No. 1, the nut locating slot (1) formed down, No. 1, nut locating slot baffle plate (14) horizontal profile of facade in the regular hexagon vertical tube that formed that is connected is greater than the positive hexagonal horizontal profile of No. 1, nut (6) and cooperatively interacts, and the upper and lower displacement of vertical tube that No. 1, nut (6) can be formed along No. 1, nut locating slot baffle plate (14) but can not horizontally rotate, be located at the external screw thread of perpendicular bolt (5) lower end in perpendicular bolt duct (7) and the screw-internal thread fit of nut No. 1 (6), and 1 group 2 perpendicular bolt (5) and 2 No. 1, nuts (6) are only located at horizontal pipe (8) transversal line symmetrically arranged 1 group 2 perpendicular bolt ducts (7) and No. 1, nut locating slot (1), as shown in Fig. 1,2,3,4,5,
No. 2, perpendicular bolt bottom anchoring structure (102) is with the difference of perpendicular bolt bottom anchoring structure No. 1 (101): arrange around the vertical axes heart being symmetrical in perpendicular bolt duct (7) and bolt hole No. 3 (22), be connected in fold-line-shaped by often organizing 2 nut locating slot baffle plates No. 2 (15), No. 2, the nut locating slot (2) formed is with the difference of nut locating slot No. 1 (1): No. 2, the nut locating slot (2) be jointly made up of 4 nut locating slot baffle plates No. 2 (15) Nei Bao spaces and nut locating slot base plate (9) lower plane substitutes No. 1, nut locating slot (1), No. 2, nut locating slot (2) increases by 2 symmetrical rectangular gap formed by reducing symmetrical 2 nut locating slot baffle plates No. 1 (14) than the regular hexagon vertical tube of the nut locating slot No. 1 (1) be jointly made up of 6 nut locating slot baffle plates No. 1 (14) Nei Bao space, No. 2, nut locating slot baffle plate (15) is with the difference of nut locating slot baffle plate No. 1 (14): the horizontal profile of nut locating slot baffle plate No. 2 (15) is parallelogram or rectangle, horizontal profile be the vertical axes heart of the line of the 2 road vertical lines that 4 interior facade intersections of the nut locating slot No. 2 (2) of 2 groups of symmetrical fold-line-shapeds are formed and perpendicular bolt duct (7) and bolt hole No. 3 (22) at grade, as shown in Fig. 6,7,8,
The difference of perpendicular bolt bottom anchoring structure No. 3 (103) and perpendicular bolt bottom anchoring structure No. 1 (101) is: by 2 nut locating slot baffle plates No. 3 (16) vertical parallel interior facade between Nei Bao space and No. 3, the nut locating slot (3) that jointly forms of nut locating slot base plate (9) lower plane substitute No. 1, nut locating slot (1), around the vertical axes heart being symmetrical in perpendicular bolt duct (7) and bolt hole No. 3 (22), by No. 3 (16) the symmetrical parallel settings of 2 nut locating slot baffle plates, the upper transverse plane of nut locating slot baffle plate No. 3 (16) is with blind-mate between nut locating slot base plate (9) lower plane and be connected, the distance between symmetrical 2 nut locating slot baffle plates No. 3 (16) interior facades is made to be greater than the distance between the alien invasion of 2 Parallel Symmetrics of nut No. 1 (6) and to cooperatively interact, make No. 1, nut (6) can in No. 3, nut locating slot (3) on, lower displacement and can not horizontally rotating, the horizontal profile of nut locating slot baffle plate No. 3 (16) is rectangle or trapezoidal, and the take up an official post line of meaning 1 of the interior facade vertical centering control axis of 2 symmetrical parallel nut locating slot baffle plates No. 3 (16) overlaps with the vertical axes heart intersection of perpendicular bolt duct (7) and bolt hole No. 3 (22), as shown in Fig. 9,10,11.
Beneficial effect the present invention adopts the structure that be may be combined with concrete by stone bolt, be separated, achieve stone bolt along concrete grade beam axially at several vertical tie point regioselectives of setting, distance between this vertical tie point does not obviously shorten by the restriction of horizontal hole external diameter, and its dominance is:
One, achieve standardized basis to be connected with the effectively vertical of the different vertical tie point nearer along underframe fore-and-aft distance of multiple tower machine underframe of nonstandardized technique, expand the applicability on basis.
Two, the relative decrease cross section of horizontal pipe, decrease the quantity of horizontal tube, the concrete cross section being located at the grade beam of stone bolt place section is weakened, and ensure that the bulk strength on concrete basis.
Three, simplify the structure of perpendicular bolt lower end, save basic production and use cost.
Accompanying drawing illustrates that the present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
Accompanying drawing 1---the general layout plan of the anchoring structure of the vertical connecting bolt of assembling column foot
The total sectional drawing of A-A of the anchoring structure of accompanying drawing 2---the vertical connecting bolt of assembling column foot
Accompanying drawing 3---the D-D bottom plan view of perpendicular bolt bottom anchoring structure No. 1 (101)
Accompanying drawing 4---the B-B sectional drawing of perpendicular bolt bottom anchoring structure No. 1 (101)
Accompanying drawing 5---the C-C sectional drawing of perpendicular bolt bottom anchoring structure No. 1 (101)
Accompanying drawing 6---the G-G bottom plan view of perpendicular bolt bottom anchoring structure No. 2 (102)
Accompanying drawing 7---the E-E sectional drawing of perpendicular bolt bottom anchoring structure No. 2 (102)
Accompanying drawing 8---the F-F sectional drawing of perpendicular bolt bottom anchoring structure No. 2 (102)
Accompanying drawing 9---the K-K bottom plan view of perpendicular bolt bottom anchoring structure No. 3 (103)
Accompanying drawing 10---the H-H sectional drawing of perpendicular bolt bottom anchoring structure No. 3 (103)
Accompanying drawing 11---the J-J sectional drawing of perpendicular bolt bottom anchoring structure No. 3 (103)
The sectional drawing of the connection locating structure (201) of accompanying drawing 12---perpendicular bolt upper end and tower machine underframe
The anchoring structure of the vertical connecting bolt of detailed description of the invention assembling of the present invention column foot is as shown in Fig. 1,2,3,4,5,6,7,8,9,10,11,12;
Linkage editor of the present invention:
1, by the vertical link position that the tower machine underframe 13 intending supporting variant producer sets, in concrete grade beam 10, each perpendicular bolt duct 7 and horizontal pipe 8 is preset;
2, perpendicular bolt duct 7 and horizontal pipe 8 is selected by the position of specifically supporting tower machine underframe 13; First No. 1, nut 6 levels sent into horizontal pipes 8 and enter nut locating slot No. 11 or nut locating slot No. 22 or nut locating slot No. 33, after the lower end of perpendicular bolt 5 vertically being penetrated perpendicular bolt duct 7 and bolt hole No. 3 22 again, make the screw-internal thread fit of the lower end external screw thread of perpendicular bolt 5 and nut No. 16, rotational vertical bolt 5, makes gapless between the upper plane of nut No. 16 and the lower plane of nut locating slot base plate 9; Laying high-strength degree cement mortar 19 is above concrete grade beam 10, dress backing plate 18, to make on backing plate 18 lower plane and high strength cement mortar 19 gapless between plane, and make 2 bolts hole No. 2 21 be located on backing plate 18 that the perpendicular bolt 5 protruding from concrete grade beam 10 is coordinated, and make backing plate 18 level above;
3, erection tower machine underframe 13, makes tower machine underframe 13 be placed between each symmetrically arranged 2 perpendicular bolt 5 and to make on tower machine underframe 13 lower plane and backing plate 18 gapless between plane; Dress crossbeam 12, makes 2 perpendicular bolt 5 upper ends pass from 2 bolts hole No. 1 20 be located at crossbeam 12; Loading nut No. 2 17, makes nut No. 2 17 coordinate with perpendicular bolt 5 upper external screw thread, clamp nut No. 2 17, makes tower machine underframe 13 be connected location with concrete single footing beam and slab structure 11 is vertical; As shown in Fig. 1,2,12.

Claims (2)

1. the anchoring structure of the vertical connecting bolt of assembling column foot, comprise 3 kinds of perpendicular bolt bottom anchoring structures No. 1 (101) of fixed tower machine and assembling type base or the connection locating structure (201) of perpendicular bolt bottom anchoring structure No. 2 (102) or perpendicular bolt bottom anchoring structure No. 3 (103) and perpendicular bolt upper end and tower machine underframe, it is characterized in that:
The structure of perpendicular bolt bottom anchoring structure No. 1 (101):
The upright projection of the longitudinal axis center of horizontal pipe (8) is vertical with the plane longitudinal axis of tower machine underframe (13) with concrete grade beam (10), each section along the vertical axis of horizontal pipe (8) is the polygon of congruence, and horizontal pipe (8) inwall is rectangle plane above, along the axis of pitch with the vertical horizontal pipe (8) overlapped of concrete grade beam (10) longitudinal axis, be arranged with on horizontal pipe (8) often organize 2 nut locating slot base plate (9) n groups, this n be not less than 2 integer, the lower plane of nut locating slot base plate (9) is equal with plane on the inwall of horizontal pipe (8), the outer rim of nut locating slot base plate (9) is polygon or circle, the planar central of each nut locating slot base plate (9) is provided with No. 3, bolt hole (22), No. 3, bolt hole (22) overlaps with the vertical axes heart in the perpendicular bolt duct (7) be located in concrete grade beam (10), and No. 3, bolt hole (22) is the circle that internal diameter is identical with the horizontal profile of perpendicular bolt duct (7), the upper end in perpendicular bolt duct (7) is equal with the upper plane of concrete grade beam (10), the distance of the symmetrical alien invasion of regular hexagon vertical tube that No. 1, nut locating slot baffle plate (14) surrounds is not less than along the perpendicular bolt duct (7) of concrete grade beam (10) longitudinal axis and the vertical axes heart distance of bolt hole No. 3 (22), the horizontal profile of nut locating slot baffle plate No. 1 (14) is trapezoid, positive facade is rectangle, the geometry congruence of each nut locating slot baffle plate No. 1 (14), it is regular hexagon vertical tube that 6 No. 1, nut locating slot baffle plates (14) are connected into inner space horizontal profile around the vertical axes heart of bolt hole No. 3 (22), the vertical axes heart of this regular hexagon vertical tube overlaps with the vertical axes heart of perpendicular bolt duct (7) and bolt hole No. 3 (22), and gapless and being connected between the upper transverse plane of this regular hexagon vertical tube and the lower plane of nut locating slot base plate (9), nut locating slot baffle plate No. 1 (14) inwall is made to surround No. 1, the nut locating slot (1) formed down, No. 1, nut locating slot baffle plate (14) horizontal profile of facade in the regular hexagon vertical tube that formed that is connected is greater than the positive hexagonal horizontal profile of No. 1, nut (6) and cooperatively interacts, and the upper and lower displacement of vertical tube that No. 1, nut (6) can be formed along No. 1, nut locating slot baffle plate (14) but can not horizontally rotate, be located at the external screw thread of perpendicular bolt (5) lower end in perpendicular bolt duct (7) and the screw-internal thread fit of nut No. 1 (6), and 1 group 2 perpendicular bolt (5) and 2 No. 1, nuts (6) are only located at horizontal pipe (8) transversal line symmetrically arranged 1 group 2 perpendicular bolt ducts (7) and No. 1, nut locating slot (1),
No. 2, perpendicular bolt bottom anchoring structure (102) is with the difference of perpendicular bolt bottom anchoring structure No. 1 (101): arrange around the vertical axes heart being symmetrical in perpendicular bolt duct (7) and bolt hole No. 3 (22), be connected in fold-line-shaped by often organizing 2 nut locating slot baffle plates No. 2 (15), No. 2, the nut locating slot (2) formed is with the difference of nut locating slot No. 1 (1): No. 2, the nut locating slot (2) be jointly made up of 4 nut locating slot baffle plates No. 2 (15) Nei Bao spaces and nut locating slot base plate (9) lower plane substitutes No. 1, nut locating slot (1), No. 2, nut locating slot (2) increases by 2 symmetrical rectangular gap formed by reducing symmetrical 2 nut locating slot baffle plates No. 1 (14) than the regular hexagon vertical tube of the nut locating slot No. 1 (1) be jointly made up of 6 nut locating slot baffle plates No. 1 (14) Nei Bao space, No. 2, nut locating slot baffle plate (15) is with the difference of nut locating slot baffle plate No. 1 (14): the horizontal profile of nut locating slot baffle plate No. 2 (15) is parallelogram or rectangle, horizontal profile be the vertical axes heart of the line of the 2 road vertical lines that 4 interior facade intersections of the nut locating slot No. 2 (2) of 2 groups of symmetrical fold-line-shapeds are formed and perpendicular bolt duct (7) and bolt hole No. 3 (22) at grade,
The difference of perpendicular bolt bottom anchoring structure No. 3 (103) and perpendicular bolt bottom anchoring structure No. 1 (101) is: by 2 nut locating slot baffle plates No. 3 (16) vertical parallel interior facade between Nei Bao space and No. 3, the nut locating slot (3) that jointly forms of nut locating slot base plate (9) lower plane substitute No. 1, nut locating slot (1), around the vertical axes heart being symmetrical in perpendicular bolt duct (7) and bolt hole No. 3 (22), by No. 3 (16) the symmetrical parallel settings of 2 nut locating slot baffle plates, the upper transverse plane of nut locating slot baffle plate No. 3 (16) is with blind-mate between nut locating slot base plate (9) lower plane and be connected, the distance between symmetrical 2 nut locating slot baffle plates No. 3 (16) interior facades is made to be greater than the distance between the alien invasion of 2 Parallel Symmetrics of nut No. 1 (6) and to cooperatively interact, make No. 1, nut (6) can in No. 3, nut locating slot (3) on, lower displacement and can not horizontally rotating, the horizontal profile of nut locating slot baffle plate No. 3 (16) is rectangle or trapezoidal, and the take up an official post line of meaning 1 of the interior facade vertical centering control axis of 2 symmetrical parallel nut locating slot baffle plates No. 3 (16) overlaps with the vertical axes heart intersection of perpendicular bolt duct (7) and bolt hole No. 3 (22).
2. the anchoring structure of the vertical connecting bolt of assembling column foot as claimed in claim 1, is characterized in that:
The structure of the perpendicular bolt upper end of the anchoring structure of the vertical connecting bolt of assembling column foot and the connection locating structure (201) of tower machine underframe:
The plane dead in line of the plane axis of the tower machine underframe (13) of tower machine and the concrete grade beam (10) of concrete single footing beam and slab structure (11), setting and concrete grade beam (10) vertical joints position the baseplane of tower machine underframe (13) and the concrete of concrete grade beam (10) on be provided with backing plate (18) and high strength cement mortar (19) from top to bottom between plane, backing plate (18) is provided with No. 2, the bolt hole (21) that confession perpendicular bolt (5) passes perpendicularly through; Crossbeam (12) is had on the upper plane of tower machine underframe (13), the plane longitudinal axis of crossbeam (12) is mutually vertical with the plane longitudinal axis of tower machine underframe (13), longitudinal axis along crossbeam (12) is arranged with No. 1, bolt hole (20) at the two ends of crossbeam (12) and passes perpendicularly through for perpendicular bolt (5), perpendicular bolt (5) is studs, the external screw thread that perpendicular bolt (5) upper and lower end is provided with respectively with the screw-internal thread fit of nut No. 2 (17) and nut No. 1 (6).
CN201510098898.5A 2015-03-09 2015-03-09 Assembled tower foundation vertical connection bolt anchorage structure Pending CN104746528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510098898.5A CN104746528A (en) 2015-03-09 2015-03-09 Assembled tower foundation vertical connection bolt anchorage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510098898.5A CN104746528A (en) 2015-03-09 2015-03-09 Assembled tower foundation vertical connection bolt anchorage structure

Publications (1)

Publication Number Publication Date
CN104746528A true CN104746528A (en) 2015-07-01

Family

ID=53586728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510098898.5A Pending CN104746528A (en) 2015-03-09 2015-03-09 Assembled tower foundation vertical connection bolt anchorage structure

Country Status (1)

Country Link
CN (1) CN104746528A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2205263C2 (en) * 2000-03-21 2003-05-27 АОЗТ "Ленинградский Промстройпроект" Method of installation of anchor bolt in foundations for fastening of machines and equipment
JP2006057351A (en) * 2004-08-20 2006-03-02 Hitoshi Mori Pc foundation beam member and connection structure thereof
JP2011094385A (en) * 2009-10-29 2011-05-12 Nippon Steel Corp Method for replacing foundation bolt
CN102251536A (en) * 2011-04-18 2011-11-23 赵正义 Vertical positioning connecting structure of base frame of tower mast type mechanical equipment
CN104264705A (en) * 2014-10-14 2015-01-07 赵正义 Assembling type perpendicular connecting structure for fixed tower crane and concrete foundation
CN204456168U (en) * 2015-03-09 2015-07-08 赵正义 The anchoring structure of the vertical connecting bolt of assembling column foot

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2205263C2 (en) * 2000-03-21 2003-05-27 АОЗТ "Ленинградский Промстройпроект" Method of installation of anchor bolt in foundations for fastening of machines and equipment
JP2006057351A (en) * 2004-08-20 2006-03-02 Hitoshi Mori Pc foundation beam member and connection structure thereof
JP2011094385A (en) * 2009-10-29 2011-05-12 Nippon Steel Corp Method for replacing foundation bolt
CN102251536A (en) * 2011-04-18 2011-11-23 赵正义 Vertical positioning connecting structure of base frame of tower mast type mechanical equipment
CN104264705A (en) * 2014-10-14 2015-01-07 赵正义 Assembling type perpendicular connecting structure for fixed tower crane and concrete foundation
CN204456168U (en) * 2015-03-09 2015-07-08 赵正义 The anchoring structure of the vertical connecting bolt of assembling column foot

Similar Documents

Publication Publication Date Title
CN101798816B (en) Positioning and connecting structure of tower mast type mechanical equipment and foundation
CN107869195A (en) A kind of shaped steel steel column and column cap sizing punching block construction method
CN101225917B (en) Vertical locating connection construction for novel sill anchor
CN102162257B (en) Vertical connection structure of tower-type mechanical equipment and foundation
CN204456168U (en) The anchoring structure of the vertical connecting bolt of assembling column foot
CN202164620U (en) Positioning vertical connecting structure for underframe beam of tower machine
CN102251536B (en) Vertical positioning connecting structure of base frame of tower mast type mechanical equipment
CN101509262A (en) Vertical positioning connection structure of fang bolt
CN102108714B (en) Vertical locating and connecting structure of tower-type mechanical equipment underframe
CN104746528A (en) Assembled tower foundation vertical connection bolt anchorage structure
CN102352633B (en) Vertical connection structure for tower-type mechanical equipment and foundation
CN101565951B (en) Vertical connection construction of tower mast type mechanical equipment underframe cross beam
CN103215966B (en) Positioning structure of vertical connecting bolt of tower crane and foundation
CN202117070U (en) Vertical positioning connection structure of tower crane underframe beam
CN203498852U (en) Vertical connecting structure of tower crane chassis and foundation
CN202194154U (en) Vertical locating connection structure for tower mast type mechanical device and foundation
CN104234072B (en) Fixed tower machine and basic transition connecting construction
CN102296628B (en) Vertical location connecting structure of crane underframe beam
CN201660906U (en) Connection structure of underframe foundation of tower mast type mechanical equipment
CN203846522U (en) Underframe beam and concrete foundation perpendicular connecting structure of tower crane
CN202031106U (en) Vertical positioning and connecting structure for under frame of tower mast type mechanical equipment
CN202039380U (en) Vertical connecting and positioning structure for chassis beam and concrete foundation of tower mast type mechanical equipment
CN102425189A (en) Vertical connecting structure of tower mechanical equipment and foundation
CN204849803U (en) Fixed tower machine chassis and basic perpendicular joint construction
CN202273245U (en) Vertical connection structure between tower-type mechanical equipment and base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150701