CN104716613B - De-icing method based on 500kV transmission line of electricity - Google Patents

De-icing method based on 500kV transmission line of electricity Download PDF

Info

Publication number
CN104716613B
CN104716613B CN201510161536.6A CN201510161536A CN104716613B CN 104716613 B CN104716613 B CN 104716613B CN 201510161536 A CN201510161536 A CN 201510161536A CN 104716613 B CN104716613 B CN 104716613B
Authority
CN
China
Prior art keywords
ice
split
melting
phase
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510161536.6A
Other languages
Chinese (zh)
Other versions
CN104716613A (en
Inventor
陆佳政
吴伟
方针
张红先
李波
赵纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hunan Electric Power Co Ltd, Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hunan Electric Power Co Ltd
Priority to CN201510161536.6A priority Critical patent/CN104716613B/en
Publication of CN104716613A publication Critical patent/CN104716613A/en
Application granted granted Critical
Publication of CN104716613B publication Critical patent/CN104716613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/16Devices for removing snow or ice from lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a kind of de-icing method based on 500kV transmission line of electricity, comprise the steps: (1), record strain section and conductor spacer quantity, optimize conductor spacer and realize sub-conductor all insulation;(2), test platform is built;(3), carry out A phase conductor ice-melt test, the high-voltage output end of movable DC ice melting device and earth terminal are connected respectively one or two in A phase quadripartion sub-conductor;(4), call through test ring current carries out the ice-melt test of A phase quadripartion sub-conductor;(5) open test power supply, connects remaining one by the high-voltage output end of movable DC ice melting device, and earth terminal connects any two in another root remaining or step 3, repeats step 4, until A phase conductor icing melts away completely;(6) repeat step 3~5, carry out B phase conductor ice-melt test;(7), repeat step 3~5, carry out C phase conductor ice-melt test.The present invention can meet the demand of 500kV transmission line de-icing capacity.

Description

基于500kV输电线路的融冰方法Ice melting method based on 500kV transmission line

技术领域technical field

本发明属于电气工程技术领域,尤其涉及一种基于500kV输电线路的融冰方法。The invention belongs to the technical field of electrical engineering, and in particular relates to a method for melting ice based on a 500kV transmission line.

背景技术Background technique

随着现代社会对电力的需求急剧增加,电网输电采用远距离大容量输送方式,湖南形成了电压等级为500kV主干输电网,相邻杆塔之间的档距很大;另一方面,我国在2007年年底至2008年年初,全国南方多省市因雨雪冰冻天气造成的断线倒塔事故给人民生活和国家财产造成了巨大损失,这对融冰装置的容量提出了更高的要求,融冰容量的增加必然会使融冰装置的重量和体积增加,不仅造价昂贵,在现场也不便于携带,受现场特殊复杂地形的限制也在一定程度上影响了其抵御冰灾的能力。With the sharp increase in the demand for electricity in modern society, the power grid transmission adopts the long-distance and large-capacity transmission method. Hunan has formed a backbone transmission network with a voltage level of 500kV, and the distance between adjacent towers is very large; on the other hand, my country in 2007 From the end of 2008 to the beginning of 2008, many provinces and cities in the south of the country caused huge losses to people's lives and national property due to line disconnection and tower collapse accidents caused by rainy, snowy and freezing weather. The increase in ice capacity will inevitably increase the weight and volume of the ice-melting device, which is not only expensive, but also not easy to carry on site. The limitation of the special and complex terrain on site also affects its ability to resist ice disasters to a certain extent.

目前我国的交流500kV输电线路普遍采用四分裂子导线,四分裂子导线每间隔40~100米就要安装一个四分裂间隔棒,用来保持四根子导线的间距不变和抑制振动,目前国内的四分裂间隔棒为金属材料制造,难以保持耐张段内四根子导线之间的绝缘。At present, my country's AC 500kV transmission lines generally use four-split sub-conductors, and a four-split spacer bar must be installed every 40 to 100 meters between the four-split sub-conductors to keep the distance between the four sub-conductors constant and suppress vibration. At present, domestic The four-split spacer is made of metal material, and it is difficult to maintain the insulation between the four sub-conductors in the tension section.

发明内容Contents of the invention

本发明的目的在于提供一种能在四分裂子导线全绝缘的基础上降低融冰装置的容量,对三相输电线路实现逐相融冰,实现融冰装置的小型化和便携式设计,使融冰装置更灵活的应用于大档距的超高压线路中的基于500kV输电线路的融冰方法。The object of the present invention is to provide a kind of can reduce the capacity of ice-melting device on the basis of full insulation of four-splitting sub-conductors, realize phase-by-phase melting of ice for three-phase transmission lines, realize miniaturization and portable design of ice-melting device, make melting The ice device is more flexibly applied to the ice-melting method based on 500kV transmission lines in ultra-high voltage lines with large spans.

本发明提供的这种基于500kV输电线路的融冰方法,包括如下步骤:This deicing method based on the 500kV transmission line provided by the present invention comprises the following steps:

(1)、记录待改造500kV四分裂输电线路各相导线的耐张段数量、各耐张段内的档距数量,以及每个档距内四分裂子导线间的四分裂间隔棒的数量。配备与所记录的四分裂间隔棒的数量相等的四分裂全绝缘间隔棒,实现500kV四分裂输电线路的四分裂子导线全绝缘;(1) Record the number of tension sections of each phase conductor of the 500kV four-split transmission line to be transformed, the number of spans in each stretch section, and the number of four-split spacers between the four-split sub-conductors in each span. Equipped with four-split fully insulated spacers equal to the number of recorded four-split spacers to realize full insulation of four-split sub-conductors of 500kV four-split transmission lines;

(2)、搭建试验平台,该试验平台具有调压器、电力变压器、移动式直流融冰装置、酒杯型铁塔和500kV四分裂输电线路的四分裂子导线;(2) Build a test platform, which has a voltage regulator, a power transformer, a mobile DC ice-melting device, a wine glass-shaped iron tower and four-split conductors of a 500kV four-split transmission line;

(3)、进行500kV四分裂输电线路的A相导线融冰试验,连接试验平台的回路,根据对移动式直流融冰装置容量的要求,将其高压输出端连接A相四分裂子导线中的一根或两根,对应的接地端连接A相四分裂子导线另外的一根或两根;(3) Carry out the ice-melting test of the A-phase wire of the 500kV four-split transmission line, connect the circuit of the test platform, and connect its high-voltage output end to the A-phase four-split sub-wire according to the capacity requirements of the mobile DC ice-melting device One or two, and the corresponding ground terminal is connected to the other one or two of the A-phase four-split sub-conductor;

(4)、接通试验平台的回路电源,通过调压器缓慢匀速地升压,直至电力变压器输出电压达到移动式直流融冰装置的额定电压。保持电压不变。进行A相四分裂子导线的融冰试验,记录下环境温度和融冰时间;(4) Connect the loop power supply of the test platform, and increase the voltage slowly and uniformly through the voltage regulator until the output voltage of the power transformer reaches the rated voltage of the mobile DC ice melting device. Keep the voltage constant. Carry out the ice-melting test of the A-phase four-split wire, and record the ambient temperature and ice-melting time;

(5)、当步骤3A相中存在没有进行融冰试验的四分裂子导线时,断开试验平台的回路电源,将移动式直流融冰装置的高压输出端或接地端连接A相四分裂子导线中未进行融冰试验中的一根,将其对应的接地端或高压输出端连接A相四分裂子导线未进行融冰试验中的另一根或已进行融冰试验的两根。重复步骤4,直至A相导线覆冰完全融掉,断开试验平台的回路电源;(5) When there is a four-split wire in phase A of step 3 that has not been subjected to the ice-melting test, disconnect the loop power supply of the test platform, and connect the high-voltage output terminal or ground terminal of the mobile DC ice-melting device to the four-split wire of phase A. For one of the wires that has not been subjected to the ice-melting test, connect its corresponding ground terminal or high-voltage output terminal to the other of the A-phase four-split sub-conductors that have not been subjected to the ice-melting test or to the two wires that have undergone the ice-melting test. Repeat step 4 until the ice on the phase A conductor is completely melted, and disconnect the loop power supply of the test platform;

(6)、进行500kV四分裂输电线路的B相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至B相导线覆冰完全融掉,断开试验平台的回路电源;(6) Carry out the ice-melting test of the B-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice on the B-phase conductor is completely melted, and disconnect the loop power supply of the test platform;

(7)、进行500kV四分裂输电线路的C相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至C相导线覆冰完全融掉,断开试验平台的回路电源,完成500kV四分裂输电线路A、B、C三相融冰。(7) Carry out the ice-melting test of the C-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice of the C-phase conductor is completely melted, disconnect the loop power supply of the test platform, and complete the 500kV Four-split transmission line A, B, C three-phase ice melting.

所述步骤1中四分裂全绝缘间隔棒采用环氧树脂绝缘材料制成。The four-split fully insulated spacers in step 1 are made of epoxy resin insulating material.

与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:

1、为500kV超高压全绝缘四分裂子导线直流融冰创造条件;1. Create conditions for 500kV ultra-high voltage fully insulated four-split sub-conductor DC ice melting;

2、本发明可以实现了移动式直流融冰装置容量和体积的小型化设计,适合于复杂的山区地形;2. The present invention can realize the miniaturized design of the capacity and volume of the mobile direct current ice-melting device, which is suitable for complex mountainous terrain;

3、降低了移动式直流融冰装置的容量能保障试验的安全,在500kV输电系统中,移动式直流融冰装置的容融冰电流最低能降低为传统设备的1/4;3. Reduce the capacity of the mobile DC ice melting device to ensure the safety of the test. In the 500kV power transmission system, the ice melting current of the mobile DC ice melting device can be reduced to a minimum of 1/4 of the traditional equipment;

4、方法简单易行,不需要对线路进行大范围改造;4. The method is simple and easy, and does not require large-scale modification of the line;

5、本发明适合推广到特高压多分裂子导线的直流融冰。5. The present invention is suitable to be extended to the DC deicing of UHV multi-splitting conductors.

具体实施方式detailed description

实施例1——两根子导线同时融冰:Example 1——Two sub-conductors melt ice at the same time:

本发明这种基于500kV输电线路的融冰方法,包括如下步骤:This ice-melting method based on 500kV transmission line of the present invention comprises the following steps:

(1)、记录待改造500kV四分裂输电线路各相导线的耐张段数量、各耐张段内的档距数量,以及每个档距内四分裂子导线间的四分裂间隔棒的数量。配备与所记录的四分裂间隔棒的数量相等的四分裂全绝缘间隔棒,实现500kV四分裂输电线路的四分裂子导线全绝缘;(1) Record the number of tension sections of each phase conductor of the 500kV four-split transmission line to be transformed, the number of spans in each stretch section, and the number of four-split spacers between the four-split sub-conductors in each span. Equipped with four-split fully insulated spacers equal to the number of recorded four-split spacers to realize full insulation of four-split sub-conductors of 500kV four-split transmission lines;

(2)、搭建试验平台,该试验平台具有调压器、电力变压器、移动式直流融冰装置、酒杯型铁塔和500kV四分裂输电线路的四分裂子导线;(2) Build a test platform, which has a voltage regulator, a power transformer, a mobile DC ice-melting device, a wine glass-shaped iron tower and four-split conductors of a 500kV four-split transmission line;

(3)、进行500kV四分裂输电线路的A相导线融冰试验,连接试验平台的回路,根据对移动式直流融冰装置容量的要求,将其高压输出端连接A相四分裂子导线中的第1根子导线,对应的接地端连接A相四分裂子导线的第2根子导线;(3) Carry out the ice-melting test of the A-phase wire of the 500kV four-split transmission line, connect the circuit of the test platform, and connect its high-voltage output end to the A-phase four-split sub-wire according to the capacity requirements of the mobile DC ice-melting device For the first sub-conductor, the corresponding ground terminal is connected to the second sub-conductor of the four-split sub-conductor of phase A;

(4)、接通试验平台的回路电源,通过调压器缓慢匀速地升压,直至电力变压器输出电压达到移动式直流融冰装置的额定电压。保持电压不变。进行A相四分裂子导线的融冰试验,记录下环境温度和融冰时间;(4) Connect the loop power supply of the test platform, and increase the voltage slowly and uniformly through the voltage regulator until the output voltage of the power transformer reaches the rated voltage of the mobile DC ice melting device. Keep the voltage constant. Carry out the ice-melting test of the A-phase four-split wire, and record the ambient temperature and ice-melting time;

(5)、断开试验平台的回路电源,将移动式直流融冰装置的高压输出端或接地端连接A相四分裂子导线的第3根子导线,将其对应的接地端或高压输出端连接A相四分裂子导线的第4根子导线。重复步骤4,直至A相导线覆冰完全融掉,断开试验平台的回路电源;(5) Disconnect the loop power supply of the test platform, connect the high-voltage output terminal or ground terminal of the mobile DC ice-melting device to the third sub-conductor of the A-phase four-split sub-conductor, and connect its corresponding ground terminal or high-voltage output terminal to The fourth sub-conductor of the phase A four-split sub-conductor. Repeat step 4 until the ice on the phase A conductor is completely melted, and disconnect the loop power supply of the test platform;

(6)、进行500kV四分裂输电线路的B相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至B相导线覆冰完全融掉,断开试验平台的回路电源;(6) Carry out the ice-melting test of the B-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice on the B-phase conductor is completely melted, and disconnect the loop power supply of the test platform;

(7)、进行500kV四分裂输电线路的C相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至C相导线覆冰完全融掉,断开试验平台的回路电源,完成500kV四分裂输电线路A、B、C三相融冰。(7) Carry out the ice-melting test of the C-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice of the C-phase conductor is completely melted, disconnect the loop power supply of the test platform, and complete the 500kV Four-split transmission line A, B, C three-phase ice melting.

本发明步骤1中的四分裂全绝缘间隔棒采用环氧树脂绝缘材料制成。The four-split fully insulated spacers in step 1 of the present invention are made of epoxy resin insulating material.

实施例2——三根子导线同时融冰:Example 2—Three sub-conductors melt ice at the same time:

本发明这种基于500kV输电线路的融冰方法,包括如下步骤:This ice-melting method based on 500kV transmission line of the present invention comprises the following steps:

(1)、记录待改造500kV四分裂输电线路各相导线的耐张段数量、各耐张段内的档距数量,以及每个档距内四分裂子导线间的四分裂间隔棒的数量。配备与所记录的四分裂间隔棒的数量相等的四分裂全绝缘间隔棒,实现500kV四分裂输电线路的四分裂子导线全绝缘;(1) Record the number of tension sections of each phase conductor of the 500kV four-split transmission line to be transformed, the number of spans in each stretch section, and the number of four-split spacers between the four-split sub-conductors in each span. Equipped with four-split fully insulated spacers equal to the number of recorded four-split spacers to realize full insulation of four-split sub-conductors of 500kV four-split transmission lines;

(2)、搭建试验平台,该试验平台具有调压器、电力变压器、移动式直流融冰装置、酒杯型铁塔和500kV四分裂输电线路的四分裂子导线;(2) Build a test platform, which has a voltage regulator, a power transformer, a mobile DC ice-melting device, a wine glass-shaped iron tower and four-split conductors of a 500kV four-split transmission line;

(3)、进行500kV四分裂输电线路的A相导线融冰试验,连接试验平台的回路,根据对移动式直流融冰装置容量的要求,将其高压输出端连接A相四分裂子导线中的第1根和第2根子导线,对应的接地端连接A相四分裂子导线的第3根子导线;(3) Carry out the ice-melting test of the A-phase wire of the 500kV four-split transmission line, connect the circuit of the test platform, and connect its high-voltage output end to the A-phase four-split sub-wire according to the capacity requirements of the mobile DC ice-melting device The first and second sub-conductors, the corresponding ground terminal is connected to the third sub-conductor of the four-split sub-conductor of phase A;

(4)、接通试验平台的回路电源,通过调压器缓慢匀速地升压,直至电力变压器输出电压达到移动式直流融冰装置的额定电压。保持电压不变。进行A相四分裂子导线的融冰试验,记录下环境温度和融冰时间;(4) Connect the loop power supply of the test platform, and increase the voltage slowly and uniformly through the voltage regulator until the output voltage of the power transformer reaches the rated voltage of the mobile DC ice melting device. Keep the voltage constant. Carry out the ice-melting test of the A-phase four-split wire, and record the ambient temperature and ice-melting time;

(5)、断开试验平台的回路电源,将移动式直流融冰装置的高压输出端或接地端连接A相四分裂子导线的第4根子导线,将其对应的接地端或高压输出端连接A相四分裂子导线的第1根和第2根子导线。重复步骤4,直至A相导线覆冰完全融掉,断开试验平台的回路电源;(5) Disconnect the loop power supply of the test platform, connect the high-voltage output terminal or ground terminal of the mobile DC ice-melting device to the fourth sub-conductor of the A-phase four-split sub-conductor, and connect its corresponding ground terminal or high-voltage output terminal to The first and second sub-conductors of the four-split sub-conductor of phase A. Repeat step 4 until the ice on the phase A conductor is completely melted, and disconnect the loop power supply of the test platform;

(6)、进行500kV四分裂输电线路的B相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至B相导线覆冰完全融掉,断开试验平台的回路电源;(6) Carry out the ice-melting test of the B-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice on the B-phase conductor is completely melted, and disconnect the loop power supply of the test platform;

(7)、进行500kV四分裂输电线路的C相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至C相导线覆冰完全融掉,断开试验平台的回路电源,完成500kV四分裂输电线路A、B、C三相融冰。(7) Carry out the ice-melting test of the C-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice of the C-phase conductor is completely melted, disconnect the loop power supply of the test platform, and complete the 500kV Four-split transmission line A, B, C three-phase ice melting.

本发明步骤1中的四分裂全绝缘间隔棒采用环氧树脂绝缘材料制成。The four-split fully insulated spacers in step 1 of the present invention are made of epoxy resin insulating material.

实施例3——四根子导线同时融冰:Embodiment 3——Four sub-conductors melt ice at the same time:

本发明这种基于500kV输电线路的融冰方法,包括如下步骤:This ice-melting method based on 500kV transmission line of the present invention comprises the following steps:

(1)、记录待改造500kV四分裂输电线路各相导线的耐张段数量、各耐张段内的档距数量,以及每个档距内四分裂子导线间的四分裂间隔棒的数量。配备与所记录的四分裂间隔棒的数量相等的四分裂全绝缘间隔棒,实现500kV四分裂输电线路的四分裂子导线全绝缘;(1) Record the number of tension sections of each phase conductor of the 500kV four-split transmission line to be transformed, the number of spans in each stretch section, and the number of four-split spacers between the four-split sub-conductors in each span. Equipped with four-split fully insulated spacers equal to the number of recorded four-split spacers to realize full insulation of four-split sub-conductors of 500kV four-split transmission lines;

(2)、搭建试验平台,该试验平台具有调压器、电力变压器、移动式直流融冰装置、酒杯型铁塔和500kV四分裂输电线路的四分裂子导线;(2) Build a test platform, which has a voltage regulator, a power transformer, a mobile DC ice-melting device, a wine glass-shaped iron tower and four-split conductors of a 500kV four-split transmission line;

(3)、进行500kV四分裂输电线路的A相导线融冰试验,连接试验平台的回路,根据对移动式直流融冰装置容量的要求,将其高压输出端连接A相四分裂子导线中的第1根和第2根子导线,对应的接地端连接A相四分裂子导线的第3根和第4根子导线;(3) Carry out the ice-melting test of the A-phase wire of the 500kV four-split transmission line, connect the circuit of the test platform, and connect its high-voltage output end to the A-phase four-split sub-wire according to the capacity requirements of the mobile DC ice-melting device For the first and second sub-conductors, the corresponding grounding terminals are connected to the third and fourth sub-conductors of the four-split sub-conductors of phase A;

(4)、接通试验平台的回路电源,通过调压器缓慢匀速地升压,直至电力变压器输出电压达到移动式直流融冰装置的额定电压。保持电压不变。进行A相四分裂子导线的融冰试验,记录下环境温度和融冰时间,直至A相导线覆冰完全融掉,断开试验平台的回路电源;(4) Connect the loop power supply of the test platform, and increase the voltage slowly and uniformly through the voltage regulator until the output voltage of the power transformer reaches the rated voltage of the mobile DC ice melting device. Keep the voltage constant. Carry out the ice-melting test of the A-phase four-split wire, record the ambient temperature and the ice-melting time until the ice on the A-phase wire is completely melted, and disconnect the loop power supply of the test platform;

(5)、进行500kV四分裂输电线路的B相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至B相导线覆冰完全融掉,断开试验平台的回路电源;(5) Carry out the ice-melting test of the B-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice on the B-phase conductor is completely melted, and disconnect the loop power supply of the test platform;

(6)、进行500kV四分裂输电线路的C相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至C相导线覆冰完全融掉,断开试验平台的回路电源,完成500kV四分裂输电线路A、B、C三相融冰。(6) Carry out the ice-melting test of the C-phase wire of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice of the C-phase wire is completely melted, disconnect the loop power supply of the test platform, and complete the 500kV Four-split transmission line A, B, C three-phase ice melting.

本发明步骤1中的四分裂全绝缘间隔棒采用环氧树脂绝缘材料制成。The four-split fully insulated spacers in step 1 of the present invention are made of epoxy resin insulating material.

经过长期的测试记录,上述实施例中均可将融冰电流降低为传统装置融冰电流的1/4。After long-term test records, in the above embodiments, the ice-melting current can be reduced to 1/4 of the ice-melting current of the traditional device.

Claims (2)

1.一种基于500kV输电线路的融冰方法,包括如下步骤:1. A method for melting ice based on 500kV transmission line, comprising the steps: (1)、记录待改造500kV四分裂输电线路各相导线的耐张段数量、各耐张段内的档距数量,以及每个档距内四分裂子导线间的四分裂间隔棒的数量;(1) Record the number of tension sections of each phase conductor of the 500kV four-split transmission line to be transformed, the number of spans in each stretch section, and the number of four-split spacers between the four-split sub-conductors in each span; 配备与所记录的四分裂间隔棒的数量相等的四分裂全绝缘间隔棒,实现500kV四分裂输电线路的四分裂子导线全绝缘;Equipped with four-split fully insulated spacers equal to the number of recorded four-split spacers to realize full insulation of four-split sub-conductors of 500kV four-split transmission lines; (2)、搭建试验平台,该试验平台具有调压器、电力变压器、移动式直流融冰装置、酒杯型铁塔和500kV四分裂输电线路的四分裂子导线;(2) Build a test platform, which has a voltage regulator, a power transformer, a mobile DC ice-melting device, a wine glass-shaped iron tower and four-split conductors of a 500kV four-split transmission line; (3)、进行500kV四分裂输电线路的A相导线融冰试验,连接试验平台的回路,根据对移动式直流融冰装置容量的要求,将其高压输出端连接A相四分裂子导线中的一根或两根,对应的接地端连接A相四分裂子导线另外的一根或两根;(3) Carry out the ice-melting test of the A-phase wire of the 500kV four-split transmission line, connect the circuit of the test platform, and connect its high-voltage output end to the A-phase four-split sub-wire according to the capacity requirements of the mobile DC ice-melting device One or two, and the corresponding ground terminal is connected to the other one or two of the A-phase four-split sub-conductor; (4)、接通试验平台的回路电源,通过调压器缓慢匀速地升压,直至电力变压器输出电压达到移动式直流融冰装置的额定电压,保持电压不变,进行A相四分裂子导线的融冰试验,记录下环境温度和融冰时间;(4) Connect the loop power supply of the test platform, and increase the voltage slowly and uniformly through the voltage regulator until the output voltage of the power transformer reaches the rated voltage of the mobile DC ice-melting device. The ice melting test, record the ambient temperature and ice melting time; (5)、当步骤3A相中存在没有进行融冰试验的四分裂子导线时,断开试验平台的回路电源,将移动式直流融冰装置的高压输出端或接地端连接A相四分裂子导线中未进行融冰试验中的一根,将其对应的接地端或高压输出端连接A相四分裂子导线未进行融冰试验中的另一根或已进行融冰试验的两根,重复步骤4,直至A相导线覆冰完全融掉,断开试验平台的回路电源;(5) When there is a four-split wire in phase A of step 3 that has not been subjected to the ice-melting test, disconnect the loop power supply of the test platform, and connect the high-voltage output terminal or ground terminal of the mobile DC ice-melting device to the four-split wire of phase A. One of the wires that has not been subjected to the ice-melting test, connect its corresponding ground terminal or high-voltage output terminal to the other wire that has not been subjected to the ice-melting test or the two wires that have been subjected to the ice-melting test, and repeat Step 4, until the ice on the A-phase conductor is completely melted, disconnect the loop power supply of the test platform; (6)、进行500kV四分裂输电线路的B相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至B相导线覆冰完全融掉,断开试验平台的回路电源;(6) Carry out the ice-melting test of the B-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice on the B-phase conductor is completely melted, and disconnect the loop power supply of the test platform; (7)、进行500kV四分裂输电线路的C相导线融冰试验,改变试验平台的回路接线重复步骤3~5,直至C相导线覆冰完全融掉,断开试验平台的回路电源,完成500kV四分裂输电线路A、B、C三相融冰。(7) Carry out the ice-melting test of the C-phase conductor of the 500kV four-split transmission line, change the loop wiring of the test platform and repeat steps 3 to 5 until the ice of the C-phase conductor is completely melted, disconnect the loop power supply of the test platform, and complete the 500kV Four-split transmission line A, B, C three-phase ice melting. 2.根据权利要求1所述的基于500kV输电线路的融冰方法,其特征在于:所述步骤1中四分裂全绝缘间隔棒采用环氧树脂绝缘材料制成。2. The ice-melting method based on 500kV transmission line according to claim 1, characterized in that: in the step 1, the four-split fully insulated spacers are made of epoxy resin insulating material.
CN201510161536.6A 2015-04-07 2015-04-07 De-icing method based on 500kV transmission line of electricity Active CN104716613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510161536.6A CN104716613B (en) 2015-04-07 2015-04-07 De-icing method based on 500kV transmission line of electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510161536.6A CN104716613B (en) 2015-04-07 2015-04-07 De-icing method based on 500kV transmission line of electricity

Publications (2)

Publication Number Publication Date
CN104716613A CN104716613A (en) 2015-06-17
CN104716613B true CN104716613B (en) 2016-07-06

Family

ID=53415690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510161536.6A Active CN104716613B (en) 2015-04-07 2015-04-07 De-icing method based on 500kV transmission line of electricity

Country Status (1)

Country Link
CN (1) CN104716613B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105572029B (en) * 2016-03-25 2018-02-02 中国南方电网有限责任公司超高压输电公司贵阳局 The method that ground wire produces white crystals corrosion when simulating 500kV earth wire of power transmission line ice-melts
CN109103806B (en) * 2018-08-24 2020-01-24 四川大学 Online anti-icing control method for self-melting ice wire embedded with insulating material

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409438B (en) * 2008-07-25 2011-10-05 中国电力工程顾问集团西北电力设计院 Ice-melting method suitable for transmission line with multiple fission conductor
CN101710683B (en) * 2009-12-25 2012-10-03 重庆大学 Intelligent circulation anti-icing method for transmitting current by split lead
CN103390874A (en) * 2013-07-24 2013-11-13 国家电网公司 Deicing method for deicing optical fiber composite overhead ground wire wound by insulated wires
CN104332928B (en) * 2014-11-20 2016-08-24 国家电网公司 Economic current anti-icing and deicing method for split conductor

Also Published As

Publication number Publication date
CN104716613A (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN102255274B (en) A DC deicing method for overhead ground wires and composite optical fiber ground wires
CN101325322A (en) Ice-melting wiring scheme for AC incoming line of converter station
CN102227074B (en) De-icing and anti-freezing system for transmission lines in operation
CN106384989A (en) Device and method for performing DC ice melting on overhead ground wire of power transmission line
CN203367934U (en) DC deicing system
CN102856869A (en) Wiring method for realizing direct-current deicing of ground wire of converter station
CN201341007Y (en) High-low voltage power line deicing vehicle
CN103701080A (en) Method for melting ice by utilizing power transmission circuit load current
CN103368122B (en) Ground wire DC ice melting automatic connection system
CN108923365B (en) Transmission line wire suitable for live online ice melting and use method thereof
CN102570369A (en) A Design Method of DC Icing Device Without Special Converter Transformer
CN104716613B (en) De-icing method based on 500kV transmission line of electricity
CN104880620A (en) Test platform of super-high voltage bundled sub-conductor ice-melting
CN110380340B (en) Substation power distribution device
CN108092182A (en) Ultra-high-tension power transmission line is segmented de-icing method and system
CN103326299B (en) A start-up method of DC ice-melting system for overhead ground wire and composite optical fiber ground wire
CN201656364U (en) Large-current wall bushing link end fitting
CN204928048U (en) A on -vehicle direct current ice -melt device for compound optic fibre overhead earth wire of all insulation
CN208127843U (en) A kind of electric power tower high pressure takes electricity gas-insulated transformer substation system
CN112102984A (en) Novel steel core ice melting insulated wire and ice melting system and method thereof
CN206364479U (en) A kind of device that DC ice melting is carried out to power transmission line overhead ground wire
CN103457225B (en) AC ice melting method based on flow battery
CN101394074A (en) Wiring Scheme for Parallel Unipolar Metal Circuits of Converters in Ice-melting Operation
CN103730201A (en) High-resistance steel core ice melting wire
CN101262125A (en) Method for removing ice of power transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant