CN104699801B - A kind of method and device of secondary device associated configuration - Google Patents

A kind of method and device of secondary device associated configuration Download PDF

Info

Publication number
CN104699801B
CN104699801B CN201510122993.4A CN201510122993A CN104699801B CN 104699801 B CN104699801 B CN 104699801B CN 201510122993 A CN201510122993 A CN 201510122993A CN 104699801 B CN104699801 B CN 104699801B
Authority
CN
China
Prior art keywords
configuration
function
intelligent substation
information
node
Prior art date
Application number
CN201510122993.4A
Other languages
Chinese (zh)
Other versions
CN104699801A (en
Inventor
王松
陆承宇
黄晓明
阮黎翔
方芳
丁峰
童凯
舒鹏
吴俊�
杨涛
吴栋萁
纪陵
檀庭方
张哲�
李楠
姚亮
Original Assignee
国家电网公司
国网浙江省电力公司电力科学研究院
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国家电网公司, 国网浙江省电力公司电力科学研究院 filed Critical 国家电网公司
Priority to CN201510122993.4A priority Critical patent/CN104699801B/en
Publication of CN104699801A publication Critical patent/CN104699801A/en
Application granted granted Critical
Publication of CN104699801B publication Critical patent/CN104699801B/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers

Abstract

The invention discloses a kind of method and device of secondary device associated configuration, increases the configuration of key function logical node in intelligent substation primary equipment object model;The standard knowledge storehouse of secondary equipment of intelligent converting station type and secondary device model is built, wherein, the standard knowledge storehouse is configured including secondary function key function logical node;Structure intelligent Substation System specification, which describes file, to be included:Build the secondary function knowledge base that intelligent substation primary equipment corresponds to configuration;File and intelligent Substation System configuration describing document are described according to the intelligent Substation System specification, configuration is associated using the corresponding key function logical node of key function logical node in the secondary function knowledge base and the standard knowledge storehouse, and secondary device is configured by the configuration relation of the key function logical node, this method can the work of simplified intelligent substation project integrated configuration, reduce the workload of system configuration.

Description

A kind of method and device of secondary device associated configuration
Technical field
The present invention relates to electrical system field, more particularly to a kind of method and device of secondary device associated configuration.
Background technology
At present, intelligent substation, especially large-scale load-center substation, its secondary device and its virtual terminator connection quantity Very more, secondary device virtual terminator connects and is completely dependent on manually configuring one by one in engineering, and workload is huge and extremely easy Error, usually because configuration error problem is done over again, engineering construction efficiency is very low, and if the problems such as not finding configuration error is gone back Can there are security risk.From another point of view, the advantage towards function modeling that IEC61850 standards are advocated does not embody, mould Type is completely nonsensical in GOOSE and SV communication aspects.In fact we simply apply the communication service of 61850 standards, Model simply performs practically no function, and does not fully demonstrate the advantage of standard.Therefore, how secondary device in simplified intelligent substation project Associated configuration is those skilled in the art's technical issues that need to address.
The content of the invention
The object of the present invention is to provide a kind of method and device of secondary device associated configuration, this method being capable of simplified intelligent Secondary device associated configuration in substation project, improves substation project construction efficiency.
In order to solve the above technical problems, the present invention provides a kind of method of secondary device associated configuration, in intelligent substation Increase the configuration of key function logical node in primary equipment object model;Structure secondary equipment of intelligent converting station type and secondary set The standard knowledge storehouse of standby model, wherein, the standard knowledge storehouse is configured including secondary function key function logical node;Build intelligence Energy transformer substation system specification, which describes file and intelligent Substation System configuration describing document, to be included:
Build the secondary function knowledge base that intelligent substation primary equipment corresponds to configuration;
File and intelligent Substation System configuration describing document are described according to the intelligent Substation System specification, utilize institute Key function logical node and the standard knowledge storehouse in secondary function knowledge base is stated to patrol the corresponding key function of primary equipment Collect node and be associated configuration, and secondary device is configured by the configuration relation of the key function logical node.
Wherein, the method for secondary device associated configuration further includes:
Build the secondary circuit function logic connection Association repository of secondary device;
Association repository is connected according to the associated configuration of the corresponding secondary device of primary equipment and secondary circuit function logic, Generate the communication association configuration between the secondary device based on the connection of secondary circuit function logic.
Wherein, the method for secondary device associated configuration further includes:Using the type and function of secondary device, structure is secondary to be set The two-dimentional nomenclature principle of standby type.
Wherein, the associated configuration for carrying out the corresponding secondary device of primary equipment includes:
Travel through the intelligent Substation System specification and describe secondary device in file, looked for according to the two-dimentional nomenclature principle To predetermined secondary device;
Link information table is exported according to primary equipment topological relation;
Primary equipment in file is described according to the intelligent Substation System specification and corresponds to the configuration of key function logical node The information of secondary device is obtained, and by described information storage into secondary device contingency table;
Complete secondary device contingency table is generated according to the link information table and the secondary device contingency table;
Secondary device model is imported into ICD files.
Wherein, the method for secondary device associated configuration further includes:
Closed according to the secondary circuit function logic connection in secondary device standard knowledge storehouse, and the secondary device parsed Connection, generates the virtual terminator associated configuration of secondary device secondary circuit;
The virtual terminator associated configuration is imported into corresponding virtual terminator association in intelligent Substation System configuration describing document In configuration.
Wherein, it is described that complete secondary device association is generated according to the link information table and the secondary device contingency table Table includes:
Voltage class element is parsed, obtains bus equipment information, and believe according to the key function logical node of bus equipment Breath, obtains the logic function information of corresponding busbar associated apparatus;
Parse space elements, be spaced in secondary device information;
Transformer element is parsed, obtains transformer equipment information, and according to the key function logical node of transformer equipment Information, obtains the logic function information of corresponding transformer associated apparatus;
Connecting node element and terminal element are parsed, obtains the incidence relation between secondary device.
Wherein, the parsing connecting node element and terminal element, the incidence relation obtained between secondary device include:
By the storage of connecting node element property into the attribute of connecting object, and update link information table;
When parsing terminal element, link information table is traveled through, and it is corresponding according to the connecting node attribute query of terminal element Connecting object;
Terminal information is put into connecting object, and updates link information table.
The present invention also provides a kind of device of secondary device associated configuration to include:
Primary equipment object model, increase key function logical node is matched somebody with somebody in intelligent substation primary equipment object model Put;
Standard knowledge library module, for building the standard knowledge of secondary equipment of intelligent converting station type and secondary device model Storehouse, wherein, the standard knowledge storehouse is configured including secondary function key function logical node;
System specifications module, file is described for building intelligent Substation System specification;
Secondary function base module, the secondary function knowledge of configuration is corresponded to for building intelligent substation primary equipment Storehouse;
Associated configuration module, for describing file according to the intelligent Substation System specification and intelligent Substation System is matched somebody with somebody Description file is put, using key function logical node in the secondary function knowledge base and the standard knowledge storehouse to primary equipment Corresponding key function logical node is associated configuration, and by the configuration relation of the key function logical node to secondary Equipment is configured.
Wherein, the device of secondary device associated configuration further includes:
Nomenclature principle module, utilizes the type and function of secondary device, the two-dimentional nomenclature principle of structure secondary device type.
Wherein, the device of secondary device associated configuration further includes:
Logical connection association knowledge library module, the secondary circuit function logic for building secondary device connect association knowledge Storehouse;
Communication association configuration module, for the associated configuration and secondary circuit work(according to the corresponding secondary device of primary equipment Energy logical connection Association repository, the communication association generated between the secondary device based on the connection of secondary circuit function logic are matched somebody with somebody Put.
The method and device of a kind of secondary device associated configuration provided by the present invention, by using the IEC of standardization 61850 models and System describe determine the contact between physical unit, that is, build standard knowledge storehouse, structure intelligent substation system System specification describes file (SSD), intelligent Substation System configuration describing document (SCD) and secondary function knowledge base etc. to determine thing Manage the contact between device;Advantage caused by IEC61850 models is made full use of, without connecting puzzlement for cumbersome terminal, Simplified intelligent substation project integrated configuration works, and reduces the workload of system configuration.
Brief description of the drawings
, below will be to embodiment or existing for the clearer explanation embodiment of the present invention or the technical solution of the prior art Attached drawing is briefly described needed in technology description, it should be apparent that, drawings in the following description are only this hair Some bright embodiments, for those of ordinary skill in the art, without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is schematic diagram of the IEC61850 standards to logical node and its connection description;
Fig. 2 is the flow chart of the method for secondary device associated configuration provided in an embodiment of the present invention;
Fig. 3 describes exemplary plot for intelligent Substation System provided in an embodiment of the present invention;
Fig. 4 is parsed for SSD provided in an embodiment of the present invention and is associated flow diagram with secondary device;
Fig. 5 is the structure diagram of the device of secondary device associated configuration provided in an embodiment of the present invention;
Fig. 6 is the structure diagram of the device of another secondary device associated configuration provided in an embodiment of the present invention;
Fig. 7 is the structure diagram of the device of another secondary device associated configuration provided in an embodiment of the present invention.
Embodiment
The core of the present invention is to provide a kind of method and device of secondary device associated configuration, and this method being capable of simplified intelligent Secondary device associated configuration in substation project, improves substation project construction efficiency.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiments obtained without making creative work, belong to the scope of protection of the invention.
61850 standards of IEC are the sole criterions that intelligent substation uses, and IEC 61850 is one and establishes with towards right As the standard on modeling basis, what which more focused on is each applied function module rather than device in substation, such as differential guarantor Protective function, failure protection function, breaker control function, interval measurement function etc..Therefore, 61850 standards are without clearly How to be associated between description device and device.From engineering, standard is not it is thought that thing inside each producer, standard are advised It is fixed.However, construction and the way of management engineering that this dependence producer is configured are designed with China's facing device, debug It is incompatible with the way of operation and maintenance.In traditional electric substation automation system, device open into, output, export and all correspond It is exactly to be coordinated by terminal between the cable connection realization device of terminal in specific terminal, traditional secondary circuit design, And device is to the outlet of primary equipment.But intelligent substation realizes information between each device using GOOSE and SV transmission modes Interaction, including breaker tripping and closing outlet etc., original traditional terminal concept disappears, and the substitute is the number based on optical cable transmission Word signal, original point-to-point cable connection are also substituted by optical cable connection, and an optical cable can transmit thousands of signals. The intelligent substation for going to communicate to GOOSE and SV modes to be employed according to traditional design concept, design method, design phase energy What is enough showed is only from each device to the optical cable connection interchanger or device.
Please refer to Fig.1, Fig. 1 is schematic diagram of the IEC61850 standards to logical node and its connection description;Can be with from figure See that logical node LN can be dispersed in different physical unit PD, function F can (can be in difference by multiple logical nodes Physical unit in) be composed, thing is then passed through by logical connection LC exchange data informations, physical unit between logical node Reason connection PC is attached.Any logical node is all a part for physical unit;Any logical connection is all physical connection A part.Logical node for describing physical unit is LN0.It can be seen that 61850 standards are come with logical node and its connection Description forms the contact between the physical unit of some function, and therefore, logical node and its connection are only standard and most pay close attention to and most The aspect of tool advantage, rather than " virtual terminator " connection between physical unit.But the logical node of 61850 standards define only The output data of mark does not define input, because standard thinks enough from output definition from the point of view of communication interoperability .Input how is associated for the logical node of different device in engineering, standard is in the 6th part to logical node example definition Inputs elements, for defining input data information.Reference path and internally comprising external signal in inputs elements Location intAddr, but intAddr is defined as using inside each producer, configured by electronic equipment (IED) configuration tool. That is, the configuration of input signal wants each producer oneself to complete, rather than system integration configuration, this is first with traditional substation The mode of distribution is different after design.Therefore, 61850 standards in China in application, introducing " virtual terminator " concept, it is specified that producer's thing Internal input model, i.e. virtual terminator are first defined, different device is associated by designing unit, system integrator is by design The virtual terminator of each device is associated by intention by the grammer of inputs elements, is then had and is attached under being exported by IED configuration tools In device.The construction of substation project can so be carried out by traditional mode.
Wherein, in actual substation, there may be multiple signals high-speed transfer at the same time in a communications optical cable.Each letter Number occur that what specific function does not provide in 61850 standards of IEC, determined by recipient oneself in engineering.It is but domestic User is more accustomed to receiving traditional terminal G- Design.At this stage, domestic all intelligent substations are all to use " empty end Son " carries out secondary device communication association.Virtual terminator is for the ease of intelligent substation design, configuration and maintenance, simulation tradition The product of concept terminal, is to fictionalize the terminal come.However, actual substation project, especially large-scale hinge power transformation Stand, its secondary device and its virtual terminator connection quantity are very more, and virtual terminator connects and is completely dependent on manually one by one matching somebody with somebody in engineering To put, workload is huge and extremely easy error, usually because configuration error problem is done over again, engineering construction inefficiency, if do not had It is found also that there are security risk.From another point of view, the advantage towards function modeling that 61850 standards of IEC are advocated does not have Embody, model is completely nonsensical in GOOSE and SV communication aspects.Therefore the present invention utilizes 61850 moulds of IEC standardized Type and System describe determine the contact between physical unit, that is, build standard knowledge storehouse, build intelligent Substation System specification File (SSD), intelligent Substation System configuration describing document (SCD) and secondary function knowledge base etc. are described to determine physical unit Between contact;Advantage caused by 61850 models of IEC is made full use of, without connecting puzzlement for cumbersome terminal, is simplified Intelligent substation engineering integrated configuration works, and reduces the workload of system configuration.
It is specific preferable, please refer to Fig.2, Fig. 2 is the method for secondary device associated configuration provided in an embodiment of the present invention Flow chart;This method can include:
Step s100, the secondary function knowledge base that intelligent substation primary equipment corresponds to configuration is built;
Wherein, to be determined using 61850 models of IEC and System describe of existing standardization between physical unit Contact, it is also necessary to many descriptions in logic of addition, such as increase crucial work(in intelligent substation primary equipment object model Can logical node configuration;Can so determine such as primary equipment with have the function of what secondary device be associated i.e. this one Secondary device model is contacted with secondary device model interaction.
The intelligent substation secondary mounted cast of standardization is the basis for realizing the configuration of secondary device virtual terminator auto-associating, The present invention proposes, is primarily based on《110 (66)~750kV intelligence intelligent substation common apparatus (secondary device)》、《Route protection And auxiliary device standardized designs specification》、《Transformer, high-voltage shunt reactor and bus protection and auxiliary device standardization are set Count specification》And《61850 engineering relay protection application models of IEC》It is secondary etc. relevant criterion, structure each quasi-representative of intelligent substation The standard knowledge storehouse of apparatus type and its model, i.e. structure secondary equipment of intelligent converting station type and secondary device model Standard knowledge storehouse, wherein, the standard knowledge storehouse also needs to include the configuration of secondary function key function logical node, because passing through Logical node configuration can determine connection relation between each equipment etc..
Original SSD and SCD are supplemented according to increased content, that is, build intelligent Substation System specification description text Part and intelligent Substation System configuration describing document.
After these work are completed, structure intelligent substation primary equipment corresponds to the secondary function knowledge base of configuration;Its In, it is preferred that patterned transformer substation system configuration tool, description transforming plant primary system structure, primary equipment can be utilized Corresponding secondary device configuration, generation SSD intelligent Substation System specifications describe file.
Step s110, file and intelligent Substation System configuration description text are described according to the intelligent Substation System specification Part, using key function logical node in the secondary function knowledge base and the standard knowledge storehouse to the corresponding pass of primary equipment Key function logic node is associated configuration, and secondary device is carried out by the configuration relation of the key function logical node Configuration.
Wherein, the association in substation between a secondary device is effectively connected by LN (function logic node) Connect.The secondary function knowledge base that transforming plant primary equipment corresponds to configuration is constructed, is increased in primary equipment object model crucial Function logic node LN is configured, while is described secondary device in the standard knowledge storehouse of secondary device type of device and its model and wrapped The standard secondary function contained, configuration include key LN attributes, are identified by crucial LN and matching relationship.
This method is illustrated by Fig. 3, Fig. 3 describes exemplary plot for transformer substation system provided in an embodiment of the present invention; By Fig. 3 it can be seen that transformer T1 has two windings W1 and W2 to be connected respectively to two voltage class of 110kV and 35kV, transformation Device differential protection PROT1 is configured with differential functional mode PDIF1 and is associated with transformer, high and low pressure side Trip Logic model PTRC1 Associated with PTRC2 with both sides breaker.High voltage side of transformer intelligent terminal RPIT1 be configured with breaker functional mode XCBR1 with High-pressure side breaker association, medium voltage side intelligent terminal RPIT2 are configured with breaker functional mode XCBR1 and are closed with medium voltage side breaker Connection.Transformer both sides electric current combining unit MU1, MU2 is respectively configured with TCTR1 and is associated with both sides current transformer, and both sides voltage closes And unit MU3, MU4 are respectively configured with TVTR1 and are associated with both sides voltage transformer.The above can pass through intelligent substation system System description file part is described in SCD, these are all based between logical node model and transforming plant primary system Association, goes up the contact it is also seen that between secondary device in real time.PROT1/PDIF1 is the differential guarantor for being allocated to transformer T1 Shield, must obtain the sampled value electric current of transformer both sides, it is necessary to obtained from MU1/TCTR1 and MU2/TCTR2;PROT1/ PTRC1 and PROT1/PTRC2 is the tripping outlet logic of main transformer protection PROT1 high and low pressure sides, it is necessary to which hair tripping GOOSE orders are given The intelligent terminal RPIT1 and PRIT2 of both sides.If thus, it will be seen that once opened up in transformer substation system description in SCD file It is correct to flutter structure description, functional mode association is clear, it is possible to automatically derive the practical communication association between each physical equipment.
Based on above-mentioned technical proposal, the embodiment of the present invention by using standardization 61850 models of IEC and System describe To determine the contact between physical unit, that is, standard knowledge storehouse is built, structure intelligent Substation System specification describes file (SSD), intelligent Substation System configuration describing document (SCD) and secondary function knowledge base etc. determine the connection between physical unit System;Advantage caused by 61850 models of IEC is made full use of, without connecting puzzlement, simplified intelligent power transformation for cumbersome terminal Engineering of standing integrated configuration works, and reduces the workload of system configuration.
Preferably, the method for secondary device associated configuration further includes:
Build the secondary circuit function logic connection Association repository of secondary device;
Association repository is connected according to the associated configuration of the corresponding secondary device of primary equipment and secondary circuit function logic, Generate the communication association configuration between the secondary device based on the connection of secondary circuit function logic.
Wherein, the configuration description of one electrical secondary system of intelligent substation, primary system topological relation description, primary system for Secondary device configuration be to realize foundation and the source of the configuration of secondary device auto-associating, the present invention can also be according to secondary device Secondary circuit linkage function logic association knowledge, build secondary device secondary circuit function logic connection Association repository. After completing substation's one electrical secondary system description and being associated with a secondary device, based on substation SSD (system specifications describes file) A secondary model and a secondary model incidence relation for middle transformer substation system description, and the secondary circuit for combining secondary device connects Connection function logic association knowledge, automatically generates the function logic connection based on secondary circuit between each secondary device in substation Communication association, that is, utilize the communication association between the association description generation physical connection between model.
Preferably, the method for secondary device associated configuration further includes:It is secondary using the type and function of secondary device, structure The two-dimentional nomenclature principle of device type.
Wherein, the various universal classes of secondary device are divided, and combine the function of secondary device, are set using secondary The mode of standby type codes+function code, builds general secondary device type two dimension nomenclature principle, if protective device type codes are " P ", Combining unit type codes " M ", it is " L " that circuit, which corresponds to secondary device function code, busbar corresponding function code " M ", then route protection Type designation is " PL ", the type designation of bus protection is " PM ", and the type designation of circuit combining unit is " ML ", and busbar merges The type designation of unit is " MM ".At the same time based on secondary device standardization nomenclature principle, describe all kinds of in transformer substation system Incidence relation between the configuration of type equipment and a secondary device.
And combine first and second Standardization instrument nomenclature principle, based on primary equipment correspond to configuration secondary function knowledge and The Auto-matching of the standard knowledge of secondary device type of device and its model, realizes that transforming plant primary equipment corresponds to secondary device Automatically configure the auto-associating with a secondary device.By the nomenclature principle can be more convenient configure.
Optionally, the associated configuration for carrying out the corresponding secondary device of primary equipment includes:
Travel through the intelligent Substation System specification and describe secondary device in file, looked for according to the two-dimentional nomenclature principle To predetermined secondary device;
Wherein, analysis travels through SSD elements, that is, secondary device first, and specified element is found based on standardization nomenclature principle.
Link information table is exported according to primary equipment topological relation;
Wherein, connecting node and terminal point information are obtained based on primary equipment topological relation, exports link information table.
Primary equipment in file is described according to the intelligent Substation System specification and corresponds to the configuration of key function logical node The information of secondary device is obtained, and by described information storage into secondary device contingency table;
Wherein, secondary device functional configuration is corresponded to based on primary equipment in SSD and obtains secondary device information, storage is arrived secondary The secondary device message part of equipment contingency table.
Complete secondary device contingency table is generated according to the link information table and the secondary device contingency table;
Wherein, SSD elements parsing finishes, and travels through link information table ConnectObjectList, draws the association between endpoint Relation, and incidence relation is inserted in the corresponding objects of iedRelateList, according to link information table and secondary device contingency table Secondary device message part, ultimately generate complete secondary device contingency table, and secondary device incidence relation can be exported, wherein Contain secondary device information and with the associated information of other equipment.
Secondary device model is imported into ICD files.
Wherein, according to secondary device standardized model gatherer ICD files, leading for IED devices in SCD file is completed Enter.
Optionally, the method for secondary device associated configuration further includes:
Closed according to the secondary circuit function logic connection in secondary device standard knowledge storehouse, and the secondary device parsed Connection, generates the virtual terminator associated configuration of secondary device secondary circuit;
The virtual terminator associated configuration is imported into corresponding virtual terminator association in intelligent Substation System configuration describing document In configuration.
Wherein, standard knowledge storehouse is connected according to secondary device virtual terminator, with reference to the our station secondary device for parsing generation Secondary circuit function logic incidence relation, be automatically performed secondary device secondary circuit virtual terminator auto-associating configuration, and from The corresponding virtual terminator associated configuration part in IED parts in dynamic write-in SCD file.
Optionally, it is described that complete secondary device pass is generated according to the link information table and the secondary device contingency table Connection table includes:
Voltage class element is parsed, obtains bus equipment information, and believe according to the key function logical node of bus equipment Breath, obtains the logic function information of corresponding busbar associated apparatus;
Wherein, voltage class Voltagelevel elements are parsed, the information of bus equipment is obtained, bus equipment is mapped as Busbar protective device, and closed according to corresponding busbar to the instantiation information of logical node, i.e. LN elements, is obtained in bus equipment The logic function information of coupling device, such as can be the logic function information for obtaining corresponding busbar protective device, busbar observing and controlling fills The logic function information put.
Parse space elements, be spaced in secondary device information;
Wherein, parse Voltagelevel elements under interval Bay elements, be spaced in secondary device information, wrap The compartment name belonging to secondary device, affiliated voltage class are included, the logic function which is related to.
Transformer element is parsed, obtains transformer equipment information, and according to the key function logical node of transformer equipment Information, obtains the logic function information of corresponding transformer associated apparatus;
Wherein, PowerTransformer elements are parsed, obtain the information of transformer equipment, and according in transformer equipment Description to logic function, i.e. LN elements, obtain the logic function information of corresponding transformer associated apparatus, such as can obtain The relevant information of protection equipment for transformer, the relevant information of transformer measure control device must be corresponded to.
Connecting node element and terminal element are parsed, obtains the incidence relation between secondary device.
Wherein it is possible to inquired about using these information, the operation such as renewal.
Optionally, the parsing connecting node element and terminal element, the incidence relation obtained between secondary device include:
By the storage of connecting node element property into the attribute of connecting object, and update link information table;
Wherein, such as the pathname pathName attribute storages of connecting node ConnectivityNode elements can be arrived In the connecting node path ConnectNodePath attributes of ConnectObject connecting objects, link information table is updated ConnectObjectList;
When parsing terminal element, link information table is traveled through, and it is corresponding according to the connecting node attribute query of terminal element Connecting object;
Terminal information is put into connecting object, and updates link information table.
Wherein, when parsing obtains terminal Terminal elements, link information table is traveled through, according to Terminal elements ConnectivityNode attributes, inquire about corresponding ConnectObject connecting objects, terminal point information are put into connecting object In, update link information table ConnectObjectList.
Wherein, the above process can be represented by Fig. 4, and Fig. 4 is parsed for SSD provided in an embodiment of the present invention and secondary device Associate the schematic diagram of flow.
Based on above-mentioned technical proposal, the method for secondary device associated configuration provided in an embodiment of the present invention, this method can So that secondary device is connected as automatically generating, it is thus only necessary to associates a second interface logical node, workload is small to be not easy out It is wrong.In addition, virtual terminator mode does not embody 61850 standards of IEC towards the advantage of function modeling, model is completely nonsensical. Of the invention then 61850 models of IEC and System describe using standardization determine the contact between physical unit, make full use of Advantage caused by master pattern, without connecting puzzlement, simplified intelligent substation project integrated configuration work for cumbersome terminal Make, reduce the workload of system configuration.
, being capable of simplified intelligent by the above method an embodiment of the present invention provides the method for secondary device associated configuration Substation project integrated configuration works, and reduces the workload of system configuration.
The device of secondary device associated configuration provided in an embodiment of the present invention is introduced below, it is described below secondary The device of equipment associated configuration can correspond reference with the method for above-described secondary device associated configuration.
Fig. 5 is refer to, Fig. 5 is the structure diagram of the device of secondary device associated configuration provided in an embodiment of the present invention;Should Device can include:
Primary equipment object model 100, increases key function logic section in intelligent substation primary equipment object model Point configuration;
Standard knowledge library module 200, for building the standard of secondary equipment of intelligent converting station type and secondary device model Knowledge base, wherein, the standard knowledge storehouse is configured including secondary function key function logical node;
System specifications module 300, file is described for building intelligent Substation System specification;
Secondary function base module 400, the secondary function that configuration is corresponded to for building intelligent substation primary equipment are known Know storehouse;
Associated configuration module 500, for describing file and intelligent substation system according to the intelligent Substation System specification System configuration describing document, using key function logical node in the secondary function knowledge base and the standard knowledge storehouse to once The corresponding key function logical node of equipment is associated configuration, and passes through the configuration relation pair of the key function logical node Secondary device is configured.
Fig. 6 is refer to, Fig. 6 is the structural frames of the device of another secondary device associated configuration provided in an embodiment of the present invention Figure;The device can also include:
Nomenclature principle module 600, using the type and function of secondary device, the two dimension name of structure secondary device type is former Then.
Fig. 7 is refer to, Fig. 7 is the structural frames of the device of another secondary device associated configuration provided in an embodiment of the present invention Figure;The device can also include:
Logical connection association knowledge library module 700, the secondary circuit function logic for building secondary device connect association Knowledge base;
Communication association configuration module 800, for the associated configuration and secondary returning according to the corresponding secondary device of primary equipment Road function logic connection Association repository, generates the communication association between the secondary device based on the connection of secondary circuit function logic Configuration.
Each embodiment is described by the way of progressive in specification, and what each embodiment stressed is and other realities Apply the difference of example, between each embodiment identical similar portion mutually referring to.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so description is fairly simple, related part is referring to method part illustration .
Professional further appreciates that, with reference to each exemplary unit of the embodiments described herein description And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and The interchangeability of software, generally describes each exemplary composition and step according to function in the above description.These Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical solution.Specialty Technical staff can realize described function to each specific application using distinct methods, but this realization should not Think beyond the scope of this invention.
Can directly it be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
The method and device of secondary device associated configuration provided by the present invention is described in detail above.Herein Apply specific case to be set forth the principle of the present invention and embodiment, the explanation of above example is only intended to help Understand the method and its core concept of the present invention.It should be pointed out that for those skilled in the art, do not taking off On the premise of from the principle of the invention, some improvement and modification can also be carried out to the present invention, these are improved and modification also falls into this In invention scope of the claims.

Claims (10)

1. a kind of method of secondary device associated configuration, increase key function is patrolled in intelligent substation primary equipment object model Collect node configuration;The standard knowledge storehouse of secondary equipment of intelligent converting station type and secondary device model is built, wherein, the standard Knowledge base is configured including secondary function key function logical node;Structure intelligent Substation System specification describes file and intelligence becomes Electric power station system configuration describing document, it is characterised in that including:
Build the secondary function knowledge base that intelligent substation primary equipment corresponds to configuration;
File and intelligent Substation System configuration describing document are described according to the intelligent Substation System specification, utilize described two Key function logical node and the standard knowledge storehouse in subfunction knowledge base is to the corresponding key function logic of primary equipment Node is associated configuration, and secondary device is configured by the configuration relation of the key function logical node.
2. the method for secondary device associated configuration as claimed in claim 1, it is characterised in that further include:
Build the secondary circuit function logic connection Association repository of secondary device;
Association repository is connected according to the associated configuration of the corresponding secondary device of primary equipment and the secondary circuit function logic, Generate the communication association configuration between the secondary device based on the connection of secondary circuit function logic.
3. the method for secondary device associated configuration as claimed in claim 2, it is characterised in that further include:Utilize secondary device Type and function, build secondary device type two-dimentional nomenclature principle.
4. the method for secondary device associated configuration as claimed in claim 3, it is characterised in that the primary equipment corresponding two The associated configuration of secondary device includes:
Travel through the intelligent Substation System specification and describe secondary device in file, found according to the two-dimentional nomenclature principle pre- Determine secondary device;
Link information table is exported according to primary equipment topological relation;
Primary equipment in file is described according to the intelligent Substation System specification and corresponds to the configuration acquisition of key function logical node The information of secondary device, and by described information storage into secondary device contingency table;
Complete secondary device contingency table is generated according to the link information table and the secondary device contingency table;
Secondary device model is imported into ICD files.
5. the method for secondary device associated configuration as claimed in claim 4, it is characterised in that further include:
According to secondary device standard knowledge storehouse, and two parsed from secondary circuit function logic connection Association repository The secondary circuit function logic connection association of secondary device, generates the virtual terminator associated configuration of secondary device secondary circuit;
The virtual terminator associated configuration is imported into corresponding virtual terminator associated configuration in intelligent Substation System configuration describing document In.
6. the method for secondary device associated configuration as claimed in claim 4, it is characterised in that described according to the link information Table and the secondary device contingency table, which generate complete secondary device contingency table, to be included:
Voltage class element is parsed, obtains bus equipment information, and according to the key function logical node information of bus equipment, obtain Obtain the logic function information of corresponding busbar associated apparatus;
Parse space elements, be spaced in secondary device information;
Transformer element is parsed, obtains transformer equipment information, and according to the key function logical node information of transformer equipment, Obtain the logic function information of corresponding transformer associated apparatus;
Connecting node element and terminal element are parsed, obtains the incidence relation between secondary device.
7. the method for secondary device associated configuration as claimed in claim 6, it is characterised in that the parsing connecting node element With terminal element, the incidence relation obtained between secondary device includes:
By the storage of connecting node element property into the attribute of connecting object, and update link information table;
When parsing terminal element, link information table is traveled through, and according to the corresponding connection of connecting node attribute query of terminal element Object;
Terminal information is put into connecting object, and updates link information table.
A kind of 8. device of secondary device associated configuration, it is characterised in that including:
Primary equipment object model, increases the configuration of key function logical node in intelligent substation primary equipment object model;
Standard knowledge library module, for building the standard knowledge storehouse of secondary equipment of intelligent converting station type and secondary device model, Wherein, the standard knowledge storehouse is configured including secondary function key function logical node;
System specifications module, file is described for building intelligent Substation System specification;
Secondary function base module, the secondary function knowledge base of configuration is corresponded to for building intelligent substation primary equipment;
Associated configuration module, for according to the intelligent Substation System specification describe file and intelligent Substation System configuration retouch File is stated, using the key function logical node in the secondary function knowledge base and the standard knowledge storehouse to primary equipment pair The key function logical node answered is associated configuration, and is set by the configuration relation of the key function logical node to secondary It is standby to be configured.
9. the device of secondary device associated configuration as claimed in claim 8, it is characterised in that further include:
Nomenclature principle module, utilizes the type and function of secondary device, the two-dimentional nomenclature principle of structure secondary device type.
10. the device of secondary device associated configuration as claimed in claim 8, it is characterised in that further include:
Logical connection association knowledge library module, the secondary circuit function logic for building secondary device connect Association repository;
Communication association configuration module, for the associated configuration according to the corresponding secondary device of primary equipment and the secondary circuit work( Energy logical connection Association repository, the communication association generated between the secondary device based on the connection of secondary circuit function logic are matched somebody with somebody Put.
CN201510122993.4A 2015-03-19 2015-03-19 A kind of method and device of secondary device associated configuration CN104699801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510122993.4A CN104699801B (en) 2015-03-19 2015-03-19 A kind of method and device of secondary device associated configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510122993.4A CN104699801B (en) 2015-03-19 2015-03-19 A kind of method and device of secondary device associated configuration

Publications (2)

Publication Number Publication Date
CN104699801A CN104699801A (en) 2015-06-10
CN104699801B true CN104699801B (en) 2018-04-27

Family

ID=53346921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510122993.4A CN104699801B (en) 2015-03-19 2015-03-19 A kind of method and device of secondary device associated configuration

Country Status (1)

Country Link
CN (1) CN104699801B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104915510B (en) * 2015-06-23 2017-10-31 国网新疆电力公司经济技术研究院 The virtual secondary circuit and optical fiber circuit design method of secondary system of intelligent substation
CN105045991B (en) * 2015-07-09 2017-11-10 国网浙江省电力公司电力科学研究院 The checking method of intelligent substation intelligent apparatus allocation plan and empty terminal
CN105184660B (en) * 2015-07-09 2018-06-26 国网浙江省电力公司电力科学研究院 Virtual secondary circuit checking method between intelligent station intelligent apparatus allocation plan and device
CN105005941B (en) * 2015-07-09 2018-06-26 国网新疆电力公司 Virtual secondary circuit checking method between intelligent station arrangement based on business rule
CN105160589A (en) * 2015-07-09 2015-12-16 中国能源建设集团山西省电力勘测设计院有限公司 Input virtual terminal and output virtual terminal check method for intelligent device of intelligent transformer station
CN105184659B (en) * 2015-07-09 2018-06-26 国网浙江省电力公司电力科学研究院 Virtual secondary circuit checking method between intelligent station intelligent apparatus virtual terminator and device
CN105117532B (en) * 2015-08-06 2018-10-26 中国电力科学研究院 A kind of modeling method of secondary equipment of intelligent converting station interval information model
CN105243212B (en) * 2015-10-09 2019-03-15 南京国电南自电网自动化有限公司 A kind of virtual terminator visualization associated configuration method based on functional information collection
CN105391581B (en) * 2015-11-27 2019-01-11 广州市优普计算机有限公司 A kind of adding method and device of secondary device
CN106776670A (en) * 2016-04-20 2017-05-31 海南电力技术研究院 A kind of power network common information model aids in mapping method and device
CN107358538A (en) * 2016-05-10 2017-11-17 国网北京市电力公司 Document handling method and device
CN106055786B (en) * 2016-05-31 2019-04-16 南京国电南自电网自动化有限公司 A kind of graphical SSD configuration method based on IED template
CN106528961A (en) * 2016-10-20 2017-03-22 国家电网公司 Method for automatically generating secondary equipment associating configuration based on system description
CN106408454A (en) * 2016-10-20 2017-02-15 国网浙江省电力公司电力科学研究院 Method and device for recognizing secondary equipment
CN107016105A (en) * 2017-04-12 2017-08-04 国网上海市电力公司 A kind of knowledge base modeling method of the intelligent substation operational system based on semantic net
CN107748819A (en) * 2017-10-24 2018-03-02 国网安徽省电力公司 A kind of electrical secondary equipment modeling method and system based on natural language processing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102708472A (en) * 2012-06-20 2012-10-03 江西省电力公司超高压分公司 Intelligent processing method for warning information of combined power grid
EP2557646A1 (en) * 2011-08-10 2013-02-13 ABB Technology AG Configuration of an IEC 61850 teleprotection IED for inter-substation communication
CN102967780A (en) * 2012-11-21 2013-03-13 国电南瑞科技股份有限公司 Modeling method for substation intelligent alarm
CN103001328A (en) * 2012-11-19 2013-03-27 山东大学 Fault diagnosis and assessment method of intelligent substation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7777366B2 (en) * 2006-12-08 2010-08-17 Attune Rtd Energy saving system for use with swimming pool filter systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2557646A1 (en) * 2011-08-10 2013-02-13 ABB Technology AG Configuration of an IEC 61850 teleprotection IED for inter-substation communication
CN102708472A (en) * 2012-06-20 2012-10-03 江西省电力公司超高压分公司 Intelligent processing method for warning information of combined power grid
CN103001328A (en) * 2012-11-19 2013-03-27 山东大学 Fault diagnosis and assessment method of intelligent substation
CN102967780A (en) * 2012-11-21 2013-03-13 国电南瑞科技股份有限公司 Modeling method for substation intelligent alarm

Also Published As

Publication number Publication date
CN104699801A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
Rohjans et al. Survey of smart grid standardization studies and recommendations
US8532944B2 (en) Intelligent electronic device configuration verification
CN102510127B (en) Method for unifying models of on-line monitored first and secondary equipment of power grid
CN102439818B (en) Method and device for auto-generating goose signal connection topology from substation level
CN102254074B (en) Automatic modeling method of intelligent transformer substation spacer
RU2431913C2 (en) Inspection of intelligent electronic device configuration
CN104133953B (en) Intelligent substation secondary design system
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN101272051B (en) Information system integration method of electric network production control region and management information region
US7111018B1 (en) System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
Mohagheghi et al. Communication protocols and networks for power systems-current status and future trends
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
Uslar et al. Standardization in smart grids: introduction to IT-related methodologies, architectures and standards
Baigent et al. IEC 61850 communication networks and systems in substations: An overview for users
EP2130349B1 (en) Method of configuring an intelligent electronic device
US10644538B2 (en) IEC 61850 substation gateway
CN101917067B (en) Method for integrating power equipment state monitoring devices
CN104734364B (en) The method and system of relay protection device of intelligent substation SV, GOOSE input test
CN101873008B (en) Method for converting SCD (Substation Configuration Description) model into dispatching center CIM (Common Information Model)
CN102957204B (en) Intelligent simulation method and system of power distribution network terminal
CN103715767B (en) Intelligent grid information integerated and display platform
CN105095600B (en) A kind of intelligent substation and regulation and control center cooperative modeling method
CN102801213B (en) Integrated method and integrated device of SCD (System Configuration Document) of transformer station
CN105429291B (en) The correlating method of intelligent substation primary connection figure and electrical secondary system logic connectivity diagram
CN102929911B (en) Substation and scheduling station method of integrated modeling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant