CN104692261A - 塔式起重机附着装置的对称拆除施工方法 - Google Patents
塔式起重机附着装置的对称拆除施工方法 Download PDFInfo
- Publication number
- CN104692261A CN104692261A CN201510128019.9A CN201510128019A CN104692261A CN 104692261 A CN104692261 A CN 104692261A CN 201510128019 A CN201510128019 A CN 201510128019A CN 104692261 A CN104692261 A CN 104692261A
- Authority
- CN
- China
- Prior art keywords
- arm side
- ring beam
- steel rope
- crane arm
- dismounted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
本发明公开了一种塔式起重机附着装置的对称拆除施工方法首先将塔机调整平衡之后,将撑杆用钢丝绳与标准节通过紧绳器绑牢,拆除附着连接基座的穿墙螺栓,先行用塔机吊钩悬吊拆除起重臂方向的撑杆;然后在主卷扬机上背扎对称拆除钢丝绳,通过固定在平衡臂上的定滑轮使背扎钢丝绳与主卷扬绳同步运行的方式将平衡臂方向附着的环梁套架和撑杆拆除。在拆除平衡臂方向的半边附着装置的环梁套架时,要先将起重臂方向附着的环梁套架用钢丝绳与标准节通过紧绳器绑牢,防止卸除法兰连接螺栓时脱落。最后用塔机吊钩悬吊拆除起重臂方向的环梁套架。本发明施工安全、可靠、简便、科学、高效,最大限度的保证了文明施工和施工环境。
Description
技术领域
本发明涉及一种塔式起重机附着装置的拆除施工方法。
背景技术
随着社会的不断进步和建筑技术的日益完善,高层商住楼、城市综合体已成为市场的潮流,这类建筑物的特点一般都是采用钢筋混凝土剪力墙结构或框架结构。主体施工速度快,需垂直运输的材料及构件单件重量大,垂直运输机械满负荷运转,这就是对施工过程中的垂直运输提出了挑战;固定附着式塔式起重机的起重量、起升高度都能满足施工需要。为了既能保证工程进度,确保施工安全,又能做到经济合理。固定附着式塔式起重机成为各单位首选的垂直运输设备。但是,塔机安装拆除过程中事故频发,特别是拆除过程中发生事故的机率较大,这与操作人员的不规范操作有关,更重要的是拆除过程与安装过程面临的环境不同,拆除过程受制约的因素很多,如何在保护墙面及成品的前提下安全拆除塔机,是确保施工进度及安全的保证。因此完善固定附着式塔式起重机的拆除方法就成了一个新的课题。
固定附着式塔式起重机拆除时,附着装置拆除是受制约的因素最多的一个环节,也是安全隐患最多的一个步骤,拆除中采用的方法五花八门,塔机吊钩辅助悬吊拆除的方法应用较多,此方法在拆除平衡臂方向的半边附着构件时存在摆动大、操作人员易受伤及破坏墙面成品等缺点,安全隐患很大。
发明内容
本发明的目的在于提供一种结构合理,操作方便、安全的塔式起重机附着装置的对称拆除施工方法。
本发明的技术解决方案是:
一种塔式起重机附着装置的对称拆除施工方法,其特征是:包括下列步骤:
(1)了解施工现场的情况,清理障碍物,对参加塔机拆卸人员做好安全技术交底工作,并对所拆卸的塔机做好整机检查工作;
(2)用经纬仪测量塔机的垂直度并确定平衡吊点位置;
(3)塔机平衡之后,先用紧绳器将所有撑杆用钢丝绳与塔机固定好,然后依次将附着连接基座穿墙螺栓卸除;
(4)收回变幅小车至起重臂根部,用起重吊钩吊住起重臂侧撑杆,卸除起重臂侧撑杆撑杆与环梁套架的连接销;松掉起重臂侧撑杆撑杆与塔机固定的紧绳器钢丝绳,将起重臂侧撑杆撑杆拆除并摆放到指定位置;
(5)在平衡臂与塔顶架铰接处约1.5米处中部安装一个定向滑轮;
(6)将起重吊钩落至距地面1米左右,将背接的钢丝绳的一端与主卷扬钢丝绳用绳卡锁死,将另一端穿过滑轮落至地面并与吊索用绳卡连接;
(7)收起起重吊钩至背接钢丝绳的连接吊索一端,升到可将平衡臂侧撑杆锁住时停止,然后用吊索固定好平衡臂侧撑杆;
(8)卸除平衡臂侧撑杆与环梁套架的连接销;松掉平衡臂侧撑杆与塔机固定的紧绳器钢丝绳,起降平衡臂侧背接钢丝绳吊钩,将撑杆拆除并摆放到指定位置;
(9)用紧绳器钢丝绳将起重臂侧环梁套架与标准节固定好;
(10)起升起重吊钩至背接钢丝绳连接的吊索一端,升到平衡臂侧环梁套架锁住时停止,然后用吊索固定好平衡臂侧环梁套架;
(11)拆除环梁套架连接法兰板上的螺丝;
(12)吊离平衡臂侧环梁套架并摆放到指定位置;
(13)卸除背接的对称拆除钢丝绳;
(14)收回变幅小车至起重臂根部,用起重吊钩索具吊住起重臂侧环梁套架,松掉起重臂侧环梁套架与标准节固定的紧绳器钢丝绳;
(15)吊离起重臂侧环梁套架并摆放至指定位置;
(16)依次降标准节并清洁墙面。
现有的塔式起重机附着装置包括环梁套架、扶墙撑杆、连接基座、调整螺栓等。
本发明施工安全、可靠、简便、科学、高效,最大限度的保证了文明施工和施工环境。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种塔式起重机附着装置的对称拆除施工方法,包括下列步骤:
(1)了解施工现场的情况,清理障碍物,对参加塔机拆卸人员做好安全技术交底工作,并对所拆卸的塔机做好整机检查工作;
(2)用经纬仪测量塔机的垂直度并确定平衡吊点位置;
(3)塔机平衡之后,先用紧绳器将所有撑杆用钢丝绳与塔机固定好,然后依次将附着连接基座穿墙螺栓卸除;
(4)收回变幅小车至起重臂根部,用起重吊钩吊住起重臂侧撑杆,卸除起重臂侧撑杆撑杆与环梁套架的连接销;松掉起重臂侧撑杆撑杆与塔机固定的紧绳器钢丝绳,将起重臂侧撑杆撑杆拆除并摆放到指定位置;
(5)在平衡臂与塔顶架铰接处约1.5米处中部安装一个定向滑轮;
(6)将起重吊钩落至距地面1米左右,将背接的钢丝绳的一端与主卷扬钢丝绳用绳卡锁死,将另一端穿过滑轮落至地面并与吊索用绳卡连接;
(7)收起起重吊钩至背接钢丝绳的连接吊索一端,升到可将平衡臂侧撑杆锁住时停止,然后用吊索固定好平衡臂侧撑杆;
(8)卸除平衡臂侧撑杆与环梁套架的连接销;松掉平衡臂侧撑杆与塔机固定的紧绳器钢丝绳,起降平衡臂侧背接钢丝绳吊钩,将撑杆拆除并摆放到指定位置;
(9)用紧绳器钢丝绳将起重臂侧环梁套架与标准节固定好;
(10)起升起重吊钩至背接钢丝绳连接的吊索一端,升到平衡臂侧环梁套架锁住时停止,然后用吊索固定好平衡臂侧环梁套架;
(11)拆除环梁套架连接法兰板上的螺丝;
(12)吊离平衡臂侧环梁套架并摆放到指定位置;
(13)卸除背接的对称拆除钢丝绳;
(14)收回变幅小车至起重臂根部,用起重吊钩索具吊住起重臂侧环梁套架,松掉起重臂侧环梁套架与标准节固定的紧绳器钢丝绳;
(15)吊离起重臂侧环梁套架并摆放至指定位置;
(16)依次降标准节并清洁墙面。
Claims (1)
1.一种塔式起重机附着装置的对称拆除施工方法,其特征是:包括下列步骤:
(1)了解施工现场的情况,清理障碍物,对参加塔机拆卸人员做好安全技术交底工作,并对所拆卸的塔机做好整机检查工作;
(2)用经纬仪测量塔机的垂直度并确定平衡吊点位置;
(3)塔机平衡之后,先用紧绳器将所有撑杆用钢丝绳与塔机固定好,然后依次将附着连接基座穿墙螺栓卸除;
(4)收回变幅小车至起重臂根部,用起重吊钩吊住起重臂侧撑杆,卸除起重臂侧撑杆撑杆与环梁套架的连接销;松掉起重臂侧撑杆撑杆与塔机固定的紧绳器钢丝绳,将起重臂侧撑杆撑杆拆除并摆放到指定位置;
(5)在平衡臂与塔顶架铰接处约1.5米处中部安装一个定向滑轮;
(6)将起重吊钩落至距地面1米左右,将背接的钢丝绳的一端与主卷扬钢丝绳用绳卡锁死,将另一端穿过滑轮落至地面并与吊索用绳卡连接;
(7)收起起重吊钩至背接钢丝绳的连接吊索一端,升到可将平衡臂侧撑杆锁住时停止,然后用吊索固定好平衡臂侧撑杆;
(8)卸除平衡臂侧撑杆与环梁套架的连接销;松掉平衡臂侧撑杆与塔机固定的紧绳器钢丝绳,起降平衡臂侧背接钢丝绳吊钩,将撑杆拆除并摆放到指定位置;
(9)用紧绳器钢丝绳将起重臂侧环梁套架与标准节固定好;
(10)起升起重吊钩至背接钢丝绳连接的吊索一端,升到平衡臂侧环梁套架锁住时停止,然后用吊索固定好平衡臂侧环梁套架;
(11)拆除环梁套架连接法兰板上的螺丝;
(12)吊离平衡臂侧环梁套架并摆放到指定位置;
(13)卸除背接的对称拆除钢丝绳;
(14)收回变幅小车至起重臂根部,用起重吊钩索具吊住起重臂侧环梁套架,松掉起重臂侧环梁套架与标准节固定的紧绳器钢丝绳;
(15)吊离起重臂侧环梁套架并摆放至指定位置;
(16)依次降标准节并清洁墙面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128019.9A CN104692261A (zh) | 2015-03-24 | 2015-03-24 | 塔式起重机附着装置的对称拆除施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128019.9A CN104692261A (zh) | 2015-03-24 | 2015-03-24 | 塔式起重机附着装置的对称拆除施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104692261A true CN104692261A (zh) | 2015-06-10 |
Family
ID=53339890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510128019.9A Pending CN104692261A (zh) | 2015-03-24 | 2015-03-24 | 塔式起重机附着装置的对称拆除施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104692261A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105060138A (zh) * | 2015-09-07 | 2015-11-18 | 鞍钢房产建设有限公司 | 一种塔式起重机附着的拆卸及安装方法 |
CN106315426A (zh) * | 2016-08-31 | 2017-01-11 | 安徽同济建设集团有限责任公司 | 一种装配建筑用平头式塔机安装、顶升方法 |
CN107161879B (zh) * | 2017-06-27 | 2018-08-03 | 中建二局第二建筑工程有限公司 | 塔式起重机后侧附墙拆卸装置及其拆卸方法 |
CN110094101A (zh) * | 2018-01-31 | 2019-08-06 | 中国二十冶集团有限公司 | 受限空间下塔吊拆除标准节的方法 |
CN114031002A (zh) * | 2021-11-03 | 2022-02-11 | 上海建工七建集团有限公司 | 塔吊附墙连接件拆除装置及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102583163A (zh) * | 2012-03-20 | 2012-07-18 | 西安市第四建筑工程公司 | 一种塔式起重机附着装置的钢丝绳对称拆除工艺流程 |
CN202390113U (zh) * | 2011-12-16 | 2012-08-22 | 西安市第四建筑工程公司 | 一种建筑用塔吊附着的起吊拆除装置 |
CN103935911A (zh) * | 2014-03-31 | 2014-07-23 | 中国建筑第八工程局有限公司 | 塔吊附墙支撑结构及其施工方法 |
CN103979438A (zh) * | 2014-06-05 | 2014-08-13 | 南通市达欣工程股份有限公司 | 一种用于拆除塔吊附着架的辅助装置 |
CN104386598A (zh) * | 2014-09-16 | 2015-03-04 | 陕西启源科技发展有限责任公司 | 塔机起重臂的拆除方法 |
-
2015
- 2015-03-24 CN CN201510128019.9A patent/CN104692261A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202390113U (zh) * | 2011-12-16 | 2012-08-22 | 西安市第四建筑工程公司 | 一种建筑用塔吊附着的起吊拆除装置 |
CN102583163A (zh) * | 2012-03-20 | 2012-07-18 | 西安市第四建筑工程公司 | 一种塔式起重机附着装置的钢丝绳对称拆除工艺流程 |
CN103935911A (zh) * | 2014-03-31 | 2014-07-23 | 中国建筑第八工程局有限公司 | 塔吊附墙支撑结构及其施工方法 |
CN103979438A (zh) * | 2014-06-05 | 2014-08-13 | 南通市达欣工程股份有限公司 | 一种用于拆除塔吊附着架的辅助装置 |
CN104386598A (zh) * | 2014-09-16 | 2015-03-04 | 陕西启源科技发展有限责任公司 | 塔机起重臂的拆除方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105060138A (zh) * | 2015-09-07 | 2015-11-18 | 鞍钢房产建设有限公司 | 一种塔式起重机附着的拆卸及安装方法 |
CN105060138B (zh) * | 2015-09-07 | 2017-04-19 | 鞍钢房产建设有限公司 | 一种塔式起重机附着的拆卸及安装方法及其使用的装置 |
CN106315426A (zh) * | 2016-08-31 | 2017-01-11 | 安徽同济建设集团有限责任公司 | 一种装配建筑用平头式塔机安装、顶升方法 |
CN106315426B (zh) * | 2016-08-31 | 2018-06-19 | 安徽同济建设集团有限责任公司 | 一种装配建筑用平头式塔机安装、顶升方法 |
CN107161879B (zh) * | 2017-06-27 | 2018-08-03 | 中建二局第二建筑工程有限公司 | 塔式起重机后侧附墙拆卸装置及其拆卸方法 |
CN110094101A (zh) * | 2018-01-31 | 2019-08-06 | 中国二十冶集团有限公司 | 受限空间下塔吊拆除标准节的方法 |
CN114031002A (zh) * | 2021-11-03 | 2022-02-11 | 上海建工七建集团有限公司 | 塔吊附墙连接件拆除装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107055347B (zh) | 一种高层安装的塔吊拆卸结构和方法 | |
CN104692261A (zh) | 塔式起重机附着装置的对称拆除施工方法 | |
CN100519396C (zh) | 扒杆综合拆卸塔式起重机方法 | |
CN202390113U (zh) | 一种建筑用塔吊附着的起吊拆除装置 | |
CN102285581B (zh) | 更换立式轧机万向接轴的专用吊杆及其使用方法 | |
CN101177959A (zh) | 幕墙单元吊装设备及其施工方法 | |
CN105438960A (zh) | 用于塔类设备吊装的u型活动抱箍式吊耳及其吊装方法 | |
CN103452043B (zh) | 一种斜拉桥实心索塔的检修系统及其应用 | |
CN107697817A (zh) | 一种新型塔吊起重臂空中变长度的方法 | |
CN208120584U (zh) | 一种用于地铁施工垂直输送系统的翻渣装置 | |
CN109797649A (zh) | 一种不影响桥面交通的检修车吊装方案 | |
CN207347033U (zh) | 一种土木工程用小型吊装装置 | |
CN101402436A (zh) | 内爬式塔式起重机起重臂拆卸方法及拆卸装置 | |
CN201307734Y (zh) | 折叠式高空作业平台 | |
CN103991800A (zh) | 建筑用屋面吊机 | |
CN206308626U (zh) | 用于安装桥墩墩身顶部吊篮的操作平台 | |
CN202963332U (zh) | 利用简易龙门架制作桩基钢筋笼的装置 | |
CN204185146U (zh) | 高层建筑双塔楼间钢结构施工用悬挂起重机 | |
CN102583163A (zh) | 一种塔式起重机附着装置的钢丝绳对称拆除工艺流程 | |
CN103979442B (zh) | 6400吨液压复式起重机吊装费托反应器的方法 | |
CN203845679U (zh) | 一种防脱吊钩 | |
CN204038917U (zh) | 可拆卸外挂式操作平台 | |
CN205998901U (zh) | 塔机及其所使用的扒杆吊 | |
CN102041784B (zh) | 一种重大、异形构件多点吊装平转施工方法及平转吊具 | |
CN204452802U (zh) | 无铰链式折叠桅 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150610 |