CN104675398B - The method crossing total rock section in seam mining process - Google Patents
The method crossing total rock section in seam mining process Download PDFInfo
- Publication number
- CN104675398B CN104675398B CN201410814380.2A CN201410814380A CN104675398B CN 104675398 B CN104675398 B CN 104675398B CN 201410814380 A CN201410814380 A CN 201410814380A CN 104675398 B CN104675398 B CN 104675398B
- Authority
- CN
- China
- Prior art keywords
- vibrations
- lane
- eye
- measure
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Abstract
The present invention is a kind of method crossing total rock section in seam mining process, is first positioned at the part of total rock section on the rib of return airway and constructs every 10m the measure lane of a long 5m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;Then, when working face extraction to distance total rock section 10m place, in measure lane, explosion treatment is carried out to work surface direction construction vibrations eye;Finally in measure lane, install monomer column, it is ensured that lane inside ceiling panel is complete.In the inventive method, the rock gangway in work surface can be excavated in advance in total rock section working measure lane, work surface perforating number is greatly reduced during back production, avoid and blow out the hidden danger brought to top board in a large number, decrease unit equal loss, reduce because blowing out the damage brought to equipment, accelerate advance rate, it is ensured that per unit area yield.
Description
Technical field
The present invention relates to Coal Mining Technology field, a kind of method specifically crossing total rock section in seam mining process.
Background technology
Carboniferous System coal mining geology complicated condition, washes away, the geological structure such as karst collapse col umn, tomography is the principal element of restriction per unit area yield ability.At present, crossing the conventional method that geological structural belt takes is the mode adopting vibrations big gun, but which fltting speed is slow, device damage is serious, and 0.8~1.5 meter of coal seam alternating layers of ubiquity above Taiyuan seam group, put roof control difficulty during vibrations big gun, be therefore badly in need of a kind of quick, safe method of tackling key problem and carried out geological structural belt.
Summary of the invention
The invention aims to solve above-mentioned problems of the prior art, and a kind of method crossing total rock section in seam mining process is provided.
The present invention is achieved through the following technical solutions:
A kind of method crossing total rock section in seam mining process, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance of two rows vibrations eye is that to shake the distance of eye distance measure lane top board be that to shake the distance of eye distance measure lane base plate be 1000mm for 1000mm, lower row for 1000mm, upper row;Often in row's vibrations eye, the distance of two adjacent vibrations eyes is 1500mm, and the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
Further, when working face extraction to total rock section, as rock still hard make unit to pass through time, carrying out locally drills and blasts again shakes rock, is conducive to back production, particularly as follows: at 3#-10# frame, often row's support makes a call to three rounds, spacing 1000mm, punches also with air rock drill.
In the inventive method, the rock gangway in work surface can be excavated in advance in total rock section working measure lane, work surface perforating number is greatly reduced during back production, avoid and blow out the hidden danger brought to top board in a large number, decrease unit equal loss, reduce because blowing out the damage brought to equipment, accelerate advance rate, it is ensured that per unit area yield.The inventive method compares the method putting vibrations big gun at work surface taking routine, and the time that can shift to an earlier date half is excessively complete, creates favourable guarantee for producing;The inventive method is combined to adopt and is cut about 1000 tons of rock less, greatly reduces the abrasion to equipment.
Accompanying drawing explanation
Fig. 1 is the construction schematic diagram of the inventive method.
Fig. 2 is the layout schematic diagram shaking eye in the inventive method.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described:
As shown in Figure 1, 2, a kind of method crossing total rock section in seam mining process, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance d of two rows vibrations eye1The distance d of eye distance measure lane top board is shaken for 1000mm, upper row2The distance d of eye distance measure lane base plate is shaken for 1000mm, lower row3For 1000mm;Often in row's vibrations eye, the distance d of two adjacent vibrations eyes4For 1500mm, the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
When working face extraction to total rock section, as rock still hard make unit to pass through time, then carry out local and drill and blast rock is shaken, be conducive to back production, particularly as follows: at 3#-10# frame, often three rounds made a call to by row's support, spacing 1000mm, punches also with air rock drill.
Claims (2)
1. the method crossing total rock section in a seam mining process, it is characterized in that, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance of two rows vibrations eye is that to shake the distance of eye distance measure lane top board be that to shake the distance of eye distance measure lane base plate be 1000mm for 1000mm, lower row for 1000mm, upper row;Often in row's vibrations eye, the distance of two adjacent vibrations eyes is 1500mm, and the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
2. the method crossing total rock section in seam mining process according to claim 1, it is characterised in that: when working face extraction to total rock section, as rock still hard make unit to pass through time, then carry out local and drill and blast rock is shaken, be conducive to back production.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410814380.2A CN104675398B (en) | 2014-12-25 | 2014-12-25 | The method crossing total rock section in seam mining process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410814380.2A CN104675398B (en) | 2014-12-25 | 2014-12-25 | The method crossing total rock section in seam mining process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104675398A CN104675398A (en) | 2015-06-03 |
CN104675398B true CN104675398B (en) | 2016-07-06 |
Family
ID=53310926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410814380.2A Active CN104675398B (en) | 2014-12-25 | 2014-12-25 | The method crossing total rock section in seam mining process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104675398B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5782539A (en) * | 1995-11-16 | 1998-07-21 | Peterson; Randall D. | Wall-to-wall surface mining process |
CN101191416A (en) * | 2006-11-27 | 2008-06-04 | 杨仁树 | Rock lane digging method |
CN101509395A (en) * | 2009-03-16 | 2009-08-19 | 太原理工大学 | The roof caving and tunnel protecting method |
WO2011038449A1 (en) * | 2009-09-29 | 2011-04-07 | Orica Explosives Technology Pty Ltd | A method of underground rock blasting |
CN102787843A (en) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | Dirt band-containing coal seam working surface mining process |
CN103557000A (en) * | 2013-11-07 | 2014-02-05 | 北京科技大学 | Method for preventing gob-side entry rock burst through side-drawing filling |
-
2014
- 2014-12-25 CN CN201410814380.2A patent/CN104675398B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5782539A (en) * | 1995-11-16 | 1998-07-21 | Peterson; Randall D. | Wall-to-wall surface mining process |
CN101191416A (en) * | 2006-11-27 | 2008-06-04 | 杨仁树 | Rock lane digging method |
CN101509395A (en) * | 2009-03-16 | 2009-08-19 | 太原理工大学 | The roof caving and tunnel protecting method |
WO2011038449A1 (en) * | 2009-09-29 | 2011-04-07 | Orica Explosives Technology Pty Ltd | A method of underground rock blasting |
CN102787843A (en) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | Dirt band-containing coal seam working surface mining process |
CN103557000A (en) * | 2013-11-07 | 2014-02-05 | 北京科技大学 | Method for preventing gob-side entry rock burst through side-drawing filling |
Also Published As
Publication number | Publication date |
---|---|
CN104675398A (en) | 2015-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102128033B (en) | Continuous caving mining method | |
CN109577979B (en) | High-ground-stress large ore body downward segmented filling mining method | |
CN105674816A (en) | Medium-length hole blasting one-time shaft-forming method used for non-coal mine mountain | |
CN103670412B (en) | A kind of Mined-out Area control of high-dipping ore block exploitation and Depressurized mining method | |
CN102844522A (en) | Underground mining | |
CN104564085B (en) | Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city | |
CN104632219A (en) | Large mining height gob-side entry retaining method for thick coal seams | |
CN105649635B (en) | A kind of disaster type tunnelling method in goaf | |
CN110595308B (en) | Method for treating goaf by ultra-deep hole blasting of strip mine | |
CN110644996B (en) | Open stope subsequent filling mining method suitable for gently inclined medium-thickness ore body | |
CN111520183A (en) | Method for treating gas generated by mining, blasting, roof cutting, pressure relief and permeability improvement of coal seam group under thick-layer sandstone | |
CN115012936A (en) | Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration | |
CN104847350A (en) | Method for treating suspended roof by medium-length hole blasting | |
CN102269544A (en) | One-end-closed cumulative blasting slotted pipe device | |
CN106523010B (en) | Half-edge coal seam coal working face and coal-mining method | |
CN111878081B (en) | Stope blasting stoping method for middle-hole and shallow-hole combined construction | |
CN104675398B (en) | The method crossing total rock section in seam mining process | |
CN103670423B (en) | A kind of method of tunneling on stratiform phyllite rock mass | |
CN216642102U (en) | Mining structure of low-grade thick and large ore body under broken ore rock condition | |
CN105986821A (en) | Mining method for steeply inclined coal seam | |
CN207847649U (en) | A kind of superelevation tunnel gob side entry retaining suspension device | |
CN113738361B (en) | Method for preventing and treating rock burst of circular arc section of fully mechanized caving face of steeply inclined coal seam | |
CN104879128A (en) | Steep-dip ultra-thick coalbed mining technique based on top-coal advancing pre-detonation weakening | |
CN104790950A (en) | Optimized mining middle-deep blasthole millisecond blasting slot cutting method | |
CN113338928A (en) | Far-field roadway surrounding rock control method based on breakage and pressure relief of stope roof key layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |