CN104675398B - The method crossing total rock section in seam mining process - Google Patents

The method crossing total rock section in seam mining process Download PDF

Info

Publication number
CN104675398B
CN104675398B CN201410814380.2A CN201410814380A CN104675398B CN 104675398 B CN104675398 B CN 104675398B CN 201410814380 A CN201410814380 A CN 201410814380A CN 104675398 B CN104675398 B CN 104675398B
Authority
CN
China
Prior art keywords
vibrations
lane
eye
measure
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410814380.2A
Other languages
Chinese (zh)
Other versions
CN104675398A (en
Inventor
冯月新
佘春
王应都
张强
弓宏飞
郭万忠
王爱国
季哲强
岳继宏
刘�文
张燕军
赫学斌
付茂全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201410814380.2A priority Critical patent/CN104675398B/en
Publication of CN104675398A publication Critical patent/CN104675398A/en
Application granted granted Critical
Publication of CN104675398B publication Critical patent/CN104675398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Abstract

The present invention is a kind of method crossing total rock section in seam mining process, is first positioned at the part of total rock section on the rib of return airway and constructs every 10m the measure lane of a long 5m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;Then, when working face extraction to distance total rock section 10m place, in measure lane, explosion treatment is carried out to work surface direction construction vibrations eye;Finally in measure lane, install monomer column, it is ensured that lane inside ceiling panel is complete.In the inventive method, the rock gangway in work surface can be excavated in advance in total rock section working measure lane, work surface perforating number is greatly reduced during back production, avoid and blow out the hidden danger brought to top board in a large number, decrease unit equal loss, reduce because blowing out the damage brought to equipment, accelerate advance rate, it is ensured that per unit area yield.

Description

The method crossing total rock section in seam mining process
Technical field
The present invention relates to Coal Mining Technology field, a kind of method specifically crossing total rock section in seam mining process.
Background technology
Carboniferous System coal mining geology complicated condition, washes away, the geological structure such as karst collapse col umn, tomography is the principal element of restriction per unit area yield ability.At present, crossing the conventional method that geological structural belt takes is the mode adopting vibrations big gun, but which fltting speed is slow, device damage is serious, and 0.8~1.5 meter of coal seam alternating layers of ubiquity above Taiyuan seam group, put roof control difficulty during vibrations big gun, be therefore badly in need of a kind of quick, safe method of tackling key problem and carried out geological structural belt.
Summary of the invention
The invention aims to solve above-mentioned problems of the prior art, and a kind of method crossing total rock section in seam mining process is provided.
The present invention is achieved through the following technical solutions:
A kind of method crossing total rock section in seam mining process, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance of two rows vibrations eye is that to shake the distance of eye distance measure lane top board be that to shake the distance of eye distance measure lane base plate be 1000mm for 1000mm, lower row for 1000mm, upper row;Often in row's vibrations eye, the distance of two adjacent vibrations eyes is 1500mm, and the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
Further, when working face extraction to total rock section, as rock still hard make unit to pass through time, carrying out locally drills and blasts again shakes rock, is conducive to back production, particularly as follows: at 3#-10# frame, often row's support makes a call to three rounds, spacing 1000mm, punches also with air rock drill.
In the inventive method, the rock gangway in work surface can be excavated in advance in total rock section working measure lane, work surface perforating number is greatly reduced during back production, avoid and blow out the hidden danger brought to top board in a large number, decrease unit equal loss, reduce because blowing out the damage brought to equipment, accelerate advance rate, it is ensured that per unit area yield.The inventive method compares the method putting vibrations big gun at work surface taking routine, and the time that can shift to an earlier date half is excessively complete, creates favourable guarantee for producing;The inventive method is combined to adopt and is cut about 1000 tons of rock less, greatly reduces the abrasion to equipment.
Accompanying drawing explanation
Fig. 1 is the construction schematic diagram of the inventive method.
Fig. 2 is the layout schematic diagram shaking eye in the inventive method.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described:
As shown in Figure 1, 2, a kind of method crossing total rock section in seam mining process, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance d of two rows vibrations eye1The distance d of eye distance measure lane top board is shaken for 1000mm, upper row2The distance d of eye distance measure lane base plate is shaken for 1000mm, lower row3For 1000mm;Often in row's vibrations eye, the distance d of two adjacent vibrations eyes4For 1500mm, the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
When working face extraction to total rock section, as rock still hard make unit to pass through time, then carry out local and drill and blast rock is shaken, be conducive to back production, particularly as follows: at 3#-10# frame, often three rounds made a call to by row's support, spacing 1000mm, punches also with air rock drill.

Claims (2)

1. the method crossing total rock section in a seam mining process, it is characterized in that, comprise the steps: 1) on the rib of return airway, it is positioned at the part of total rock section constructs every 10m the measure lane of a long 5m, the specification in measure lane is high 3.5m, wide 3m, and the end in all measure lanes is with a tunnel UNICOM of UNICOM;2) after constructing in measure lane, when working face extraction to distance total rock section 10m place, to work surface direction construction vibrations eye in measure lane, implement shallow blasting, particularly as follows: utilize air rock drill to beat two rows vibrations eye on the wall of lane, measure lane, wherein, the distance of two rows vibrations eye is that to shake the distance of eye distance measure lane top board be that to shake the distance of eye distance measure lane base plate be 1000mm for 1000mm, lower row for 1000mm, upper row;Often in row's vibrations eye, the distance of two adjacent vibrations eyes is 1500mm, and the aperture of vibrations eye is 42mm, and the degree of depth of vibrations eye is 2m, and the explosive payload of each vibrations ophthalmic is less than 500g, and the sealing clay length of each vibrations ophthalmic is not less than 500mm;Two rows vibrations eye is that three presbyopia are arranged, number of times of blowing out is 10 one batch of big guns;3) after explosion, in measure lane, monomer column is installed, it is ensured that lane inside ceiling panel is complete.
2. the method crossing total rock section in seam mining process according to claim 1, it is characterised in that: when working face extraction to total rock section, as rock still hard make unit to pass through time, then carry out local and drill and blast rock is shaken, be conducive to back production.
CN201410814380.2A 2014-12-25 2014-12-25 The method crossing total rock section in seam mining process Active CN104675398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410814380.2A CN104675398B (en) 2014-12-25 2014-12-25 The method crossing total rock section in seam mining process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410814380.2A CN104675398B (en) 2014-12-25 2014-12-25 The method crossing total rock section in seam mining process

Publications (2)

Publication Number Publication Date
CN104675398A CN104675398A (en) 2015-06-03
CN104675398B true CN104675398B (en) 2016-07-06

Family

ID=53310926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410814380.2A Active CN104675398B (en) 2014-12-25 2014-12-25 The method crossing total rock section in seam mining process

Country Status (1)

Country Link
CN (1) CN104675398B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5782539A (en) * 1995-11-16 1998-07-21 Peterson; Randall D. Wall-to-wall surface mining process
CN101191416A (en) * 2006-11-27 2008-06-04 杨仁树 Rock lane digging method
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
WO2011038449A1 (en) * 2009-09-29 2011-04-07 Orica Explosives Technology Pty Ltd A method of underground rock blasting
CN102787843A (en) * 2012-08-07 2012-11-21 新汶矿业集团有限责任公司协庄煤矿 Dirt band-containing coal seam working surface mining process
CN103557000A (en) * 2013-11-07 2014-02-05 北京科技大学 Method for preventing gob-side entry rock burst through side-drawing filling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5782539A (en) * 1995-11-16 1998-07-21 Peterson; Randall D. Wall-to-wall surface mining process
CN101191416A (en) * 2006-11-27 2008-06-04 杨仁树 Rock lane digging method
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
WO2011038449A1 (en) * 2009-09-29 2011-04-07 Orica Explosives Technology Pty Ltd A method of underground rock blasting
CN102787843A (en) * 2012-08-07 2012-11-21 新汶矿业集团有限责任公司协庄煤矿 Dirt band-containing coal seam working surface mining process
CN103557000A (en) * 2013-11-07 2014-02-05 北京科技大学 Method for preventing gob-side entry rock burst through side-drawing filling

Also Published As

Publication number Publication date
CN104675398A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN102128033B (en) Continuous caving mining method
CN109577979B (en) High-ground-stress large ore body downward segmented filling mining method
CN105674816A (en) Medium-length hole blasting one-time shaft-forming method used for non-coal mine mountain
CN103670412B (en) A kind of Mined-out Area control of high-dipping ore block exploitation and Depressurized mining method
CN102844522A (en) Underground mining
CN104564085B (en) Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city
CN104632219A (en) Large mining height gob-side entry retaining method for thick coal seams
CN105649635B (en) A kind of disaster type tunnelling method in goaf
CN110595308B (en) Method for treating goaf by ultra-deep hole blasting of strip mine
CN110644996B (en) Open stope subsequent filling mining method suitable for gently inclined medium-thickness ore body
CN111520183A (en) Method for treating gas generated by mining, blasting, roof cutting, pressure relief and permeability improvement of coal seam group under thick-layer sandstone
CN115012936A (en) Pressure relief and danger relieving method for coal mine TBM during tunneling and coal penetration
CN104847350A (en) Method for treating suspended roof by medium-length hole blasting
CN102269544A (en) One-end-closed cumulative blasting slotted pipe device
CN106523010B (en) Half-edge coal seam coal working face and coal-mining method
CN111878081B (en) Stope blasting stoping method for middle-hole and shallow-hole combined construction
CN104675398B (en) The method crossing total rock section in seam mining process
CN103670423B (en) A kind of method of tunneling on stratiform phyllite rock mass
CN216642102U (en) Mining structure of low-grade thick and large ore body under broken ore rock condition
CN105986821A (en) Mining method for steeply inclined coal seam
CN207847649U (en) A kind of superelevation tunnel gob side entry retaining suspension device
CN113738361B (en) Method for preventing and treating rock burst of circular arc section of fully mechanized caving face of steeply inclined coal seam
CN104879128A (en) Steep-dip ultra-thick coalbed mining technique based on top-coal advancing pre-detonation weakening
CN104790950A (en) Optimized mining middle-deep blasthole millisecond blasting slot cutting method
CN113338928A (en) Far-field roadway surrounding rock control method based on breakage and pressure relief of stope roof key layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant