CN104674827A - Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system - Google Patents

Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system Download PDF

Info

Publication number
CN104674827A
CN104674827A CN201510138817.XA CN201510138817A CN104674827A CN 104674827 A CN104674827 A CN 104674827A CN 201510138817 A CN201510138817 A CN 201510138817A CN 104674827 A CN104674827 A CN 104674827A
Authority
CN
China
Prior art keywords
water
foundation ditch
foundation pit
foundation
jet grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510138817.XA
Other languages
Chinese (zh)
Inventor
王国富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201510138817.XA priority Critical patent/CN104674827A/en
Publication of CN104674827A publication Critical patent/CN104674827A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention belongs to the technical field of constructional engineering, and particularly relates to a novel totally-closed water stopping system for a water-rich stratum foundation pit and a construction method of the novel totally-closed water stopping system. According to a totally-closed water stopping technique, a suspended water-stopping curtain is adopted as the lateral wall of the foundation pit; a horizontally sealed artificial water-resisting layer is adopted as the bottom of the foundation pit; the totally-closed water stopping system is formed by the suspended water-stopping curtain on the lateral wall and the horizontally sealed artificial water-resisting layer; no hydraulic connection is formed between the underground water within the range of the foundation pit and the underground water out of the pit; and the underground water in the foundation pit becomes static water. A totally-closed foundation pit with an excellent structure is provided by reasonably setting various construction parameters and various structure parameters; the construction method is simple; shortage of underground water resources due to the fact that the underground water resources are destroyed by a large amount of rainfall inside and outside the foundation pit when no a water-resisting layer foundation pit is constructed at the bottom of the foundation pit in a water-rich area at present is solved; the underwater resources are protected; and the novel totally-closed water stopping system has relatively important significance in spring water protection of the spring city.

Description

A kind of novel closed cutting off water system of water rich strata foundation ditch and construction method
Technical field
The invention belongs to the technical field of construction work, be specifically related to the novel closed cutting off water system of a kind of water rich strata foundation ditch and construction method.
Background technology
Traditional region of FuShui deep foundation pit precipitation generally adopts foundation pit side-wall to arrange water-stop curtain, water-stopping structure is combined with supporting and protection structure, water-stop curtain and substrate water barrier form closed water proof system, now within the scope of foundation ditch underground water with hole outer underground water without hydraulic connection, become Static Water, as long as extract the underground water of more than the following certain depth in the end, hole as required, and then carry out cheating interior precipitation, ensure that base pit engineering safety.But, extensively distribute at Jinan Spring Region karst crevice water, substrate Karst corridor is complicated and water barrier is thinner sometimes, substrate water proof weak effect, traditional water-stop curtain does not have due effect, in this case foundation pit construction usually adopts in suspension type water-stop curtain+hole and cheats the method for outer precipitation simultaneously, the water conservancy gradient formed meets the requirement of groundwater table lower than the end, hole, but this construction method needs continuously groundwater abstraction in work progress, huge waste is caused to groundwater resources, huge hidden danger is brought to the protection of Jinan Area spring, therefore, above-mentioned two kinds of conventional Method on Dewatering of Foundation Pits all have drawback in Jinan Area.
Summary of the invention
For the deficiency of above-mentioned construction method; the object of the present invention is to provide the novel closed cutting off water system of a kind of Jinan Area water rich strata foundation ditch and construction method; be specially the construction method of precipitation in artificial water barrier Horizontal seals+Foundation Pit bottom foundation pit side-wall suspension type water-stop curtain+foundation ditch; under this construction method; manufacture artificial horizontal water barrier back cover bottom foundation ditch; closed cutting off water system is formed with vertical water-stop curtain; avoid the outer precipitation in hole; decrease the waste of water resource, have prior meaning to the spring protection in spring city especially.
the technical solution used in the present invention is as follows:
The novel closed cutting off water system of a kind of water rich strata foundation ditch, comprise artificial water barrier Horizontal seals bottom foundation pit side-wall suspension type water-stop curtain and foundation ditch, bottom described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms closed cutting off water system; Described foundation pit side-wall suspension type water-stop curtain is got to bottom foundation ditch following without the need to arriving natural water barrier; Bottom described foundation ditch, artificial water barrier Horizontal seals is artificial horizontal water barrier bottom the foundation ditch that adopts high-pressure rotary jet grouting pile to expand within the scope of foundation ditch to form sealing behind the end, and described high-pressure rotary jet grouting pile expands end ability Reasonable Arrangement within the scope of foundation ditch according to it.
Carry out precipitation in foundation ditch after closed cutting off water system completes, meet after foundation ditch water level inside requires and carry out excavation of foundation pit.
The feature of the novel closed cutting off water system of water rich strata foundation ditch of the present invention also has:
The stake composition of described foundation pit side-wall suspension type water-stop curtain employing 600-800mm or employing thickness are the diaphragm wall composition of 600-800mm.
Described foundation pit side-wall suspension type water-stop curtain gets to the following 500-800mm degree of depth bottom foundation ditch, does not arrive natural water barrier.
Bottom described foundation ditch, the thickness of artificial water barrier Horizontal seals adopts 500-800mm thickness to be good, forms good Horizontal seals layer.
Sphere of action at the bottom of the expansion of described high-pressure rotary jet grouting pile is diameter 2-3m.
Described foundation pit side-wall suspension type water-stop curtain adopts diaphragm wall, fender post+waterproof between piles, high-pressure rotary jet grouting pile or three axes agitating pile construction to obtain.
the present invention also provides the construction method of the novel closed cutting off water system of a kind of water rich strata foundation ditch, and step is as follows:
Step (1), carry out foundation pit side-wall suspension type water-stop curtain according to designing requirement construction layout after excavate guide groove;
Step (2), configuration cement paste, mixer rear mixing-filling in place, completes the construction of described foundation pit side-wall suspension type water-stop curtain;
Step (3), employing high-pressure rotary jet grouting pile expand artificial water barrier Horizontal seals bottom end formation foundation ditch bottom foundation ditch, according to ability hole arranged position within the scope of foundation ditch at the bottom of the expansion of described high-pressure rotary jet grouting pile, and driller insertion;
Step (4), carry out described high-pressure rotary jet grouting pile and expand bottom application work, namely through preparing cement paste, after sleeve pipe drilling rod to the following degree of depth of substrate transferred by startup rig, inject high pressure water and air destroys the foundation soil organizational styucture below bottom foundation ditch, then inject high pressure cement grout and air, progressively promote afterwards and spray cement injection, spray after rising to foundation ditch elevation of bottom and terminate, lift lug pipe bit bar completes the working procedure of a high-pressure rotary jet grouting pile, the inner all Construction of High Pressure Jet Grouting Pile operations of foundation ditch are completed after telephone-moving is in place, after high-pressure rotary jet grouting pile expands the end, substrate is covered completely and form artificial water barrier Horizontal seals bottom foundation ditch, for guaranteeing the totally-enclosed of substrate, need after Construction of High Pressure Jet Grouting Pile completes to carry out supplementary slip casting,
After bottom step (5), described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms closed cutting off water system, carry out cheating interior precipitation within the scope of foundation ditch;
Step (6), excavation pit.
It is that the kinetic energy utilizing super-pressure churning body to have destroys foundation soil organizational styucture following bottom foundation ditch with grouting behind shaft or drift lining that described high-pressure rotary jet grouting pile expands end construction, mix and blend these destroyed grogs and hardened materials, form bigbore substrate modified body, each expansion after end modified body overlaps forms one deck level artificial water barrier as water barrier Horizontal seals artificial bottom foundation ditch.
Described foundation pit side-wall suspension type water-stop curtain generally adopts diaphragm wall, fender post+waterproof between piles, high-pressure rotary jet grouting pile or three axes agitating pile construction to construct, and gets to following bottom foundation ditch but do not need natural water barrier by described foundation pit side-wall suspension type water-stop curtain by water-stopping structure.
beneficial effect of the present invention is as follows:
The present invention is directed to water rich strata and provide a kind of closed cutting off water system and construction method, this totally-enclosed foundation ditch water-stop technology, foundation pit side-wall adopts suspension type water-stop curtain, the artificial water barrier of Horizontal seals is adopted bottom foundation ditch, described sidewall suspension type water-stop curtain and the artificial water barrier of described Horizontal seals define closed cutting off water system, within the scope of foundation ditch, underground water and the outer underground water in hole are without hydraulic connection, become Static Water, and by reasonably arranging each construction parameter and each structural parameters, provide the totally-enclosed foundation ditch that a kind of structure is excellent, and construction method is simple, solve existing when there is no a water barrier foundation pit construction bottom region of FuShui foundation ditch inside and outside foundation ditch a large amount of precipitation destroy the deficiency of groundwater resources, protect groundwater resources, prior meaning is had to the spring protection in spring city.
Accompanying drawing explanation
Fig. 1 is foundation pit side-wall suspension type water-stop curtain and foundation ditch inner high voltage rotary churning pile layout plan;
Fig. 2 is excavation of foundation pit front side wall suspension type water-stop curtain and hole inner high voltage rotary churning pile sectional drawing;
Fig. 3 is that foundation ditch defines the rear sectional drawing of closed water-stopping structure excavation;
In figure: 1-foundation pit side-wall suspension type water-stop curtain; 2-high-pressure rotary jet grouting pile expands end modified body; 3-foundation pit supporting construction; 4-high-pressure rotary-spray pipe casing; 5-groundwater table; 6-foundation ditch bottom surface absolute altitude; Artificial water barrier Horizontal seals bottom 7-foundation ditch; Groundwater table after precipitation in 8-foundation ditch.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme of the present invention is described in detail.
As shown in Figure 1, Figure 2, Figure 3 shows; this foundation ditch is Jinan Spring Region area foundation ditch; groundwater table 5 is higher; foundation ditch bottom surface absolute altitude 6 is positioned at below groundwater table; according to advance works geological mapping, without water barrier below substrate, therefore from protection spring and security of foundation ditch construction angle; the pattern foundation pit supporting structure precipitation scheme determined adopts foundation pit side-wall suspension type water-stop curtain 1, and the scheme that the end arranges artificial water barrier Horizontal seals 7 bottom foundation ditch is expanded by high-pressure rotary jet grouting pile in the end, hole.
The novel closed cutting off water system of a kind of water rich strata foundation ditch, comprise artificial water barrier Horizontal seals 7 bottom foundation pit side-wall suspension type water-stop curtain 1 and foundation ditch, bottom described foundation pit side-wall suspension type water-stop curtain 1 and described foundation ditch, artificial water barrier Horizontal seals 7 forms closed cutting off water system; Described foundation pit side-wall suspension type water-stop curtain adopts three axes agitating pile construction, water-stop curtain is got to following 500mm place bottom foundation ditch, and without the need to arriving natural water barrier, this foundation pit side-wall suspension type water-stop curtain adopts the stake composition of 600-800mm; Bottom described foundation ditch, artificial water barrier Horizontal seals is the artificial horizontal water barrier in bottom forming sealing after adopting high-pressure rotary jet grouting pile to expand the end within the scope of foundation ditch, described high-pressure rotary jet grouting pile expands end ability Reasonable Arrangement within the scope of foundation ditch according to it, and the sphere of action of high-pressure rotary jet grouting pile is diameter 2-3m; The kinetic energy utilizing super-pressure churning body to have destroys foundation soil organizational styucture following bottom foundation ditch with grouting behind shaft or drift lining, mix and blend these destroyed grogs and hardened materials, form bigbore high-pressure rotary jet grouting pile and expand end modified body 2, one deck level artificial water barrier is formed after modified body at the bottom of each expansion overlaps, bottom described foundation ditch, the thickness of artificial water barrier Horizontal seals adopts 500-800mm thickness to be good, forms good Horizontal seals layer.
Bottom described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms totally enclosed sealing system.
Diaphragm wall, fender post+waterproof between piles, Construction of High Pressure Jet Grouting Pile engineering method can also be adopted to obtain about foundation pit side-wall suspension type water-stop curtain.
The construction sequence of above-mentioned closed cutting off water system is as follows:
Step (1), according to providing coordinate basis point, release stake position, set up and control stake temporarily by figure, according to bracing of foundation pit sideline digging machine excavation agitation pile guide groove, and remove underground obstacle, groove dimensions is that 1 meter of wide × 1 is meter dark.
Step (2), three axes agitating pile center distance are 600mm, stake footpath 800mm, pile-forming machine perching.
Step (3), prepare cement grout and slurries and inject, the water/binder ratio of cement grout applies according to code requirement, cement mixing content 20%, slurry flow rate is 250L/min, grouting pressure is not less than 1.0MPa, complete three axes agitating pile construction, form foundation pit side-wall suspension type water-stop curtain, this foundation pit side-wall suspension type water-stop curtain 1 also can be used as foundation pit supporting construction 3;
Step (4), employing high-pressure rotary jet grouting pile expand artificial water barrier Horizontal seals bottom end formation foundation ditch bottom foundation ditch, according to ability hole arranged position within the scope of foundation ditch at the bottom of the expansion of described high-pressure rotary jet grouting pile, and driller insertion;
Step (5), carry out described high-pressure rotary jet grouting pile and expand bottom application work, namely through preparing cement paste, after below high-pressure rotary-spray pipe casing 4 drilling rod to the substrate 500mm degree of depth transferred by startup rig, inject high pressure water and air destroys the foundation soil organizational styucture below bottom foundation ditch, then inject high pressure cement grout and air, progressively promote afterwards and spray cement injection, spray after rising to foundation ditch elevation of bottom and terminate, lift lug pipe bit bar completes the working procedure of a high-pressure rotary jet grouting pile, the inner all Construction of High Pressure Jet Grouting Pile operations of foundation ditch are completed after telephone-moving is in place, after high-pressure rotary jet grouting pile expands the end, sleeve pipe extracted and continue slip casting with conduit, guarantee substrate to cover completely and form artificial water barrier Horizontal seals bottom foundation ditch,
After bottom step (6), described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms closed cutting off water system, carry out cheating interior precipitation within the scope of foundation ditch, in foundation ditch, after precipitation, groundwater table 8 is down to foundation ditch bottom surface absolute altitude less than 6;
Step (7), excavation pit.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (8)

1. the novel closed cutting off water system of water rich strata foundation ditch, comprise artificial water barrier Horizontal seals bottom foundation pit side-wall suspension type water-stop curtain and foundation ditch, bottom described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms closed cutting off water system; Described foundation pit side-wall suspension type water-stop curtain is got to bottom foundation ditch following without the need to arriving natural water barrier; Bottom described foundation ditch, artificial water barrier Horizontal seals is artificial horizontal water barrier bottom the foundation ditch that adopts high-pressure rotary jet grouting pile to expand within the scope of foundation ditch to form sealing behind the end, and described high-pressure rotary jet grouting pile expands end ability Reasonable Arrangement within the scope of foundation ditch according to it.
2. the novel closed cutting off water system of water rich strata foundation ditch according to claim 1, is characterized in that, the stake composition of described foundation pit side-wall suspension type water-stop curtain employing 600-800mm or employing thickness are the diaphragm wall composition of 600-800mm.
3. the novel closed cutting off water system of water rich strata foundation ditch according to claim 1, is characterized in that, described foundation pit side-wall suspension type water-stop curtain gets to the following 500-800mm degree of depth bottom foundation ditch, does not arrive natural water barrier.
4. the novel closed cutting off water system of water rich strata foundation ditch according to claim 1, is characterized in that, bottom described foundation ditch, the thickness of artificial water barrier Horizontal seals adopts 500-800mm thickness, forms good Horizontal seals layer.
5. the novel closed cutting off water system of water rich strata foundation ditch according to claim 1, is characterized in that, the sphere of action of described high-pressure rotary jet grouting pile is diameter 2-3m.
6. the novel closed cutting off water system of water rich strata foundation ditch according to claim 1, it is characterized in that, described foundation pit side-wall suspension type water-stop curtain adopts diaphragm wall, fender post+waterproof between piles, high-pressure rotary jet grouting pile or three axes agitating pile construction to obtain.
7. the construction method of the novel closed cutting off water system of the water rich strata foundation ditch as described in claim as arbitrary in claim 1-6, step is as follows:
Step (1), carry out foundation pit side-wall suspension type water-stop curtain according to designing requirement construction layout after excavate guide groove;
Step (2), configuration cement paste, mixer rear mixing-filling in place, completes the construction of described foundation pit side-wall suspension type water-stop curtain;
Step (3), employing high-pressure rotary jet grouting pile expand artificial water barrier Horizontal seals bottom end formation foundation ditch bottom foundation ditch, according to ability hole arranged position within the scope of foundation ditch at the bottom of the expansion of described high-pressure rotary jet grouting pile, and driller insertion;
Step (4), carry out described high-pressure rotary jet grouting pile and expand bottom application work, namely through preparing cement paste, after sleeve pipe drilling rod to the following degree of depth of substrate transferred by startup rig, inject high pressure water and air destroys the foundation soil organizational styucture below bottom foundation ditch, then inject high pressure cement grout and air, progressively promote afterwards and spray cement injection, spray after rising to foundation ditch elevation of bottom and terminate, lift lug pipe bit bar completes the working procedure of a high-pressure rotary jet grouting pile, the inner all Construction of High Pressure Jet Grouting Pile operations of foundation ditch are completed after telephone-moving is in place, after high-pressure rotary jet grouting pile expands the end, substrate is covered completely and form artificial water barrier Horizontal seals bottom foundation ditch,
After bottom step (5), described foundation pit side-wall suspension type water-stop curtain and described foundation ditch, artificial water barrier Horizontal seals forms closed cutting off water system, carry out cheating interior precipitation within the scope of foundation ditch;
Step (6), excavation pit.
8. the construction method of the novel closed cutting off water system of water rich strata foundation ditch according to claim 7, is characterized in that, the sphere of action of described high-pressure rotary jet grouting pile is diameter 2-3m.
CN201510138817.XA 2015-03-27 2015-03-27 Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system Pending CN104674827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510138817.XA CN104674827A (en) 2015-03-27 2015-03-27 Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510138817.XA CN104674827A (en) 2015-03-27 2015-03-27 Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system

Publications (1)

Publication Number Publication Date
CN104674827A true CN104674827A (en) 2015-06-03

Family

ID=53310374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510138817.XA Pending CN104674827A (en) 2015-03-27 2015-03-27 Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system

Country Status (1)

Country Link
CN (1) CN104674827A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569062A (en) * 2015-12-11 2016-05-11 武汉广益交通科技股份有限公司 Dewatering method implemented through permeation, weakening and emission reduction
CN106968264A (en) * 2017-04-25 2017-07-21 王继忠 A kind of construction method of deep foundation water shutoff system
CN108487240A (en) * 2018-04-23 2018-09-04 大连中交理工交通技术研究院有限公司 Churning method is molded lattice foundation
CN108570997A (en) * 2018-06-07 2018-09-25 深圳市市政设计研究院有限公司 Cofferdam and construction method are built in returning for seabed tunnel point storehouse construction
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN109026080A (en) * 2018-08-03 2018-12-18 中铁隆工程集团有限公司 A kind of Underground Subway Station water sealing structure and its construction method
CN110485460A (en) * 2018-05-15 2019-11-22 北京首尔工程技术有限公司 A kind of construction method of Station bottom waterstop
CN110528523A (en) * 2019-09-02 2019-12-03 湖南宏禹工程集团有限公司 A kind of highly permeable stratum building foundation pit horizontal grouting back cover construction method
CN110777832A (en) * 2019-11-08 2020-02-11 上海建工二建集团有限公司 Waterproof curtain at end of underwater channel foundation pit along two sides of water
CN111305282A (en) * 2020-04-06 2020-06-19 福建工程学院 Subway station anti-floating system in weak water-rich stratum and construction method thereof
CN111335319A (en) * 2020-04-25 2020-06-26 中国有色金属工业第六冶金建设有限公司 Construction method of high-pressure jet grouting pile water-stop curtain open caisson
CN111411970A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Shield starting construction method under water-rich sand layer geological condition
CN111691442A (en) * 2019-03-15 2020-09-22 包尔特殊基础工程有限公司 Foundation pit surrounding structure in foundation and manufacturing method thereof
CN112081176A (en) * 2020-09-11 2020-12-15 北京住总集团有限责任公司 Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1342815A (en) * 2000-09-14 2002-04-03 金怀娄 Method for lowering water level in foundation pit of building engineering
EP1233110A2 (en) * 2001-02-16 2002-08-21 Hochtief Aktiengesellschaft Underground seal, especially for securing an excavation
CN104196034A (en) * 2014-09-18 2014-12-10 中建交通建设集团有限公司 Foundation pit construction method employing steel sheet piles as support cofferdam
CN204530730U (en) * 2015-03-27 2015-08-05 济南轨道交通集团有限公司 The novel closed cutting off water system of a kind of water rich strata foundation ditch

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1342815A (en) * 2000-09-14 2002-04-03 金怀娄 Method for lowering water level in foundation pit of building engineering
EP1233110A2 (en) * 2001-02-16 2002-08-21 Hochtief Aktiengesellschaft Underground seal, especially for securing an excavation
CN104196034A (en) * 2014-09-18 2014-12-10 中建交通建设集团有限公司 Foundation pit construction method employing steel sheet piles as support cofferdam
CN204530730U (en) * 2015-03-27 2015-08-05 济南轨道交通集团有限公司 The novel closed cutting off water system of a kind of water rich strata foundation ditch

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于英武等人: "深基坑地下水控制技术研究", 《地下水》, vol. 29, no. 3, 31 May 2007 (2007-05-31) *
高瑞: "深基坑井点降水与封闭降水施工对比探讨", 《市政技术》, 31 May 2012 (2012-05-31) *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569062A (en) * 2015-12-11 2016-05-11 武汉广益交通科技股份有限公司 Dewatering method implemented through permeation, weakening and emission reduction
CN106968264A (en) * 2017-04-25 2017-07-21 王继忠 A kind of construction method of deep foundation water shutoff system
CN108487240A (en) * 2018-04-23 2018-09-04 大连中交理工交通技术研究院有限公司 Churning method is molded lattice foundation
CN110485460A (en) * 2018-05-15 2019-11-22 北京首尔工程技术有限公司 A kind of construction method of Station bottom waterstop
CN108570997A (en) * 2018-06-07 2018-09-25 深圳市市政设计研究院有限公司 Cofferdam and construction method are built in returning for seabed tunnel point storehouse construction
CN108570997B (en) * 2018-06-07 2023-11-17 深圳市市政设计研究院有限公司 Backfill cofferdam for sub-bin construction of submarine tunnel and construction method
CN108797641A (en) * 2018-07-20 2018-11-13 中铁十八局集团有限公司 A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN109026080A (en) * 2018-08-03 2018-12-18 中铁隆工程集团有限公司 A kind of Underground Subway Station water sealing structure and its construction method
CN111691442A (en) * 2019-03-15 2020-09-22 包尔特殊基础工程有限公司 Foundation pit surrounding structure in foundation and manufacturing method thereof
CN110528523A (en) * 2019-09-02 2019-12-03 湖南宏禹工程集团有限公司 A kind of highly permeable stratum building foundation pit horizontal grouting back cover construction method
CN110777832A (en) * 2019-11-08 2020-02-11 上海建工二建集团有限公司 Waterproof curtain at end of underwater channel foundation pit along two sides of water
CN111411970A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Shield starting construction method under water-rich sand layer geological condition
CN111411970B (en) * 2020-03-25 2022-05-13 中铁三局集团有限公司 Shield starting construction method under geological condition of water-rich sand layer
CN111305282A (en) * 2020-04-06 2020-06-19 福建工程学院 Subway station anti-floating system in weak water-rich stratum and construction method thereof
CN111335319A (en) * 2020-04-25 2020-06-26 中国有色金属工业第六冶金建设有限公司 Construction method of high-pressure jet grouting pile water-stop curtain open caisson
CN112081176A (en) * 2020-09-11 2020-12-15 北京住总集团有限责任公司 Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage
CN112081176B (en) * 2020-09-11 2022-02-01 北京住总集团有限责任公司 Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage

Similar Documents

Publication Publication Date Title
CN104674827A (en) Novel totally-closed water stopping system for water-rich stratum foundation pit and construction method of novel totally-closed water stopping system
CN204530730U (en) The novel closed cutting off water system of a kind of water rich strata foundation ditch
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN102606176B (en) Collapsible loess tunnel construction method
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
CN104695456B (en) Construction method vertical shaft horizontal rotation jet grouting pile foundation pit lateral wall water stopping curtain
CN203213124U (en) Steel sheet pile and cement-mixed pile combined support
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN205260041U (en) Method of freezing supporting construction is spouted soon to level
CN107023026A (en) A kind of sealing bottom type caisson wall and construction method
CN104404974A (en) High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN104695457B (en) The construction method of a kind of Novel silo horizontal jet grouting pile foundation hole back cover water barrier
CN102926392A (en) Foundation pit dewatering system and construction method thereof
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN105569062A (en) Dewatering method implemented through permeation, weakening and emission reduction
CN105019913A (en) Base rock uplift region shielding tool-changing in-situ reinforcement method
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN206800431U (en) A kind of sealing bottom type caisson wall
CN111424695B (en) Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN103437712A (en) Triaxial mixer drill bit suitable for pierce through boulder layer soil property
CN103866779B (en) A kind of construction method of sealing space enclosing structure of soft foundation building foundation pit
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150603