CN104674772A - 一种改善闸坝进口拉沙效果的方法及结构 - Google Patents

一种改善闸坝进口拉沙效果的方法及结构 Download PDF

Info

Publication number
CN104674772A
CN104674772A CN201410833248.6A CN201410833248A CN104674772A CN 104674772 A CN104674772 A CN 104674772A CN 201410833248 A CN201410833248 A CN 201410833248A CN 104674772 A CN104674772 A CN 104674772A
Authority
CN
China
Prior art keywords
waterwall
dam
gate dam
bundle
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410833248.6A
Other languages
English (en)
Inventor
张高
贺双喜
金健
雷有栋
王联斌
李刚
李社凤
高传彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201410833248.6A priority Critical patent/CN104674772A/zh
Publication of CN104674772A publication Critical patent/CN104674772A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种改善闸坝进口拉沙效果的方法及结构,本发明是将冲沙闸中墩向上游延伸10~20米形成束水墙,通过束水墙提高电站进水口前流速,同时通过束水墙与进水口底板和拦沙坎的共同作用形成对泥沙的扰动,使电站进水口前的泥沙处于高流速高扰动的状态,无法停留而被水冲走,以改善闸坝进口处的拉沙效果。本发明电站进水口前横向流速增大,扰动增强,拉沙、冲沙效果显著。能保证电站进水口“门前清”。且束水墙断面不大,墙顶高程略低于坝前最低发电水位,工程投资较低。

Description

一种改善闸坝进口拉沙效果的方法及结构
技术领域
本发明涉及一种改善闸坝进口拉沙效果的方法及结构,属于水利水电工程中的水工建筑技术领域。
背景技术
对于输沙量较大的多泥沙河流,闸坝挡水后,库内拦淤泥沙较多,若闸坝进口拉沙、冲沙效果较差,入库泥沙主要落淤在库尾段,随着年限的增加,排沙时难以冲去,对电站回水影响较大,同时随着泥沙向坝前推进,泥沙淤积将影响到电站进水口的安全取水。因此,闸坝首部枢纽结构设计时必须充分考虑拦沙、拉沙及冲沙建筑物的布置。一般情况下,闸坝首部枢纽结构主要包含常规挡水坝段、泄洪闸坝段、冲沙闸坝段,进水口紧挨冲沙闸坝段布设,进水口前设置拦沙坎,拦沙坎端部顺接至冲沙闸坝段闸墩。该布置拦沙坎有阻流、拦挡推移泥沙的作用,当进行冲沙运行时,冲沙闸进口附近底流速较大,电站进水口门前流速较小,水流扰动较小,拉沙效果不明显。经过长时间运行后,电站进水口前泥沙淤积较为严重,不利于进水口的安全取水。
发明内容
本发明的目的在于,提供一种改善闸坝进口拉沙效果的方法及结构,以减少电站进水口前泥沙淤积、确保电站进水口的安全取水,从而克服现有技术的不足。
本发明的技术方案:
本发明的一种改善闸坝进口拉沙效果的方法为,该方法是将冲沙闸中墩向上游延伸10~20米形成束水墙,通过束水墙提高电站进水口前流速,同时通过束水墙与进水口底板和拦沙坎的共同作用形成对泥沙的扰动,使电站进水口前的泥沙处于高流速高扰动的状态下,无法停留而被水冲走,以改善闸坝进口处的拉沙效果。
前述方法中,所述束水墙的高度略低于坝前最低发电水位。
按上述方法构成的本发明的一种闸坝进口结构为,该闸坝进口结构的闸坝包括泄洪段和冲沙段,冲沙段上游侧设有进水口底板,泄洪段与冲沙段之间的中墩上游侧设有与中墩连接的束水墙,束水墙上游端与拦沙坎一端连接,拦沙坎另一端与进水口底板连接。
前述闸坝进口结构中,所述束水墙的高度略低于坝前最低发电水位。
前述闸坝进口结构中,所述闸坝前设有上游混凝土铺垫。
与现有技术相比,本发明将冲沙闸中墩向上游延伸形成束水墙,在进水口底板与拦沙坎、束水墙及冲沙闸之间形成一段冲沙明渠,相当于束水通道的作用,冲沙明渠内底流速增大,电站进水口前横向流速增大,扰动增强,拉沙、冲沙效果显著。能保证电站进水口“门前清”。且束水墙断面不大,墙顶高程略低于坝前最低发电水位,工程投资较低。
附图说明
图1是本发明的结构示意图。
附图中的标记为:1-闸坝、2-泄洪段、3-冲沙段、4-进水口底板、5-拦沙坎、6-束水墙、7-上游混凝土铺垫。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明,但不作为对本发明的任何限制。
本发明的一种改善闸坝进口拉沙效果的方法,如图1所示:访方法是将冲沙闸中墩向上游延伸10~20米形成束水墙,通过束水墙提高电站进水口前流速,同时通过束水墙与进水口底板和拦沙坎的共同作用形成对泥沙的扰动,使电站进水口前的泥沙处于高流速高扰动的状态,无法停留而被水冲走,以改善闸坝进口处的拉沙效果。束水墙的高度略低于坝前最低发电水位。
按上述方法构成的本发明的一种闸坝进口结构,如图1所示:所述闸坝1包括泄洪段2和冲沙段3,冲沙段3上游侧设有进水口底板4,泄洪段2与冲沙段3之间的中墩上游侧设有与中墩连接的束水墙6,束水墙6上游端与拦沙坎5一端连接,拦沙坎5另一端与进水口底板4连接。束水墙6的高度略低于坝前最低发电水位。闸坝1前设有上游混凝土铺垫7。
实施例
具体实施时,如图1所示,按照以下步骤实施:根据河流泥沙特性有针对性布置首部枢纽建筑物,进水口底板4紧挨冲沙段3布设,进水口底板4前设置拦沙坎5。将冲沙段3的中墩向上游延长15米形成束水墙6,束水墙顶高程略低于坝前最低发电水位,束水墙拦沙坎交接部位必须平顺衔接,拦沙坎沿轴线方向结构钢筋伸至束水墙墙体内,确保连接牢固。束水墙6长度应结合现场实际情况而定,对于结构复杂或非常重要的首部枢纽建筑物,宜通过水工模型试验确定束水墙长度。进水口底板4前缘高程不宜过低,以便束水墙与进水口底板、拦沙坎及冲沙闸之间形成一段有效的冲沙明渠,进一步优化拉沙效果。单开冲沙闸进行拉沙,会造成电站门前水流过于集中,从而导致床沙逼近电站进水口,对电站取水防沙反而不利。因此,在拉沙前宜关闭冲沙闸,先打开泄洪闸清除闸前淤沙后,再打开冲沙闸拉走拦沙坎内泥沙。本例的结构在进行坝前拉沙、冲沙运行时,应密切结合水库运行方式进行,以确保电站进水口“门前清”。

Claims (5)

1.一种改善闸坝进口拉沙效果的方法,其特征在于:该方法是将冲沙闸中墩向上游延伸10~20米形成束水墙,通过束水墙提高电站进水口前流速,同时通过束水墙与进水口底板和拦沙坎的共同作用形成对泥沙的扰动,使电站进水口前的泥沙处于高流速高扰动的状态下,无法停留而被水冲走,以改善闸坝进口处的拉沙效果。
2.根据权利要求1所述改善闸坝进口拉沙效果的方法,其特征在于:所述束水墙的高度略低于坝前最低发电水位。
3.一种按权利要求1或2所述方法构成的闸坝进口结构,其特征在于:所述闸坝(1)包括泄洪段(2)和冲沙段(3),冲沙段(3)上游侧设有进水口底板(4),泄洪段(2)与冲沙段(3)之间的中墩上游侧设有与中墩连接的束水墙(6),束水墙(6)上游端与拦沙坎(5)一端连接,拦沙坎(5)另一端与进水口底板(4)连接。
4.根据权利要求3所述闸坝进口结构,其特征在于:所述束水墙(6)的高度略低于坝前最低发电水位。
5.根据权利要求3所述闸坝进口结构,其特征在于:所述闸坝(1)前设有上游混凝土铺垫(7)。
CN201410833248.6A 2014-12-29 2014-12-29 一种改善闸坝进口拉沙效果的方法及结构 Pending CN104674772A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410833248.6A CN104674772A (zh) 2014-12-29 2014-12-29 一种改善闸坝进口拉沙效果的方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410833248.6A CN104674772A (zh) 2014-12-29 2014-12-29 一种改善闸坝进口拉沙效果的方法及结构

Publications (1)

Publication Number Publication Date
CN104674772A true CN104674772A (zh) 2015-06-03

Family

ID=53310319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410833248.6A Pending CN104674772A (zh) 2014-12-29 2014-12-29 一种改善闸坝进口拉沙效果的方法及结构

Country Status (1)

Country Link
CN (1) CN104674772A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400751A (zh) * 2016-09-09 2017-02-15 中国电建集团成都勘测设计研究院有限公司 一种拦沙坎结构及其施工工艺
CN106702968A (zh) * 2017-03-14 2017-05-24 长沙理工大学 一种可自动冲砂减淤的弧线型滚水坝及其运行方法
CN110258478A (zh) * 2019-07-03 2019-09-20 中国电建集团成都勘测设计研究院有限公司 生态电站与首部枢纽建筑集合布置结构
CN115045239A (zh) * 2022-06-14 2022-09-13 河南黄河勘测规划设计研究院有限公司 一种江河水库支流拦门沙自然拉沟破除系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003247222A (ja) * 2002-02-26 2003-09-05 Penta Ocean Constr Co Ltd 土砂の集積構造
CN201598621U (zh) * 2009-12-23 2010-10-06 中国水电顾问集团华东勘测设计研究院 一种排沙扰沙结构

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003247222A (ja) * 2002-02-26 2003-09-05 Penta Ocean Constr Co Ltd 土砂の集積構造
CN201598621U (zh) * 2009-12-23 2010-10-06 中国水电顾问集团华东勘测设计研究院 一种排沙扰沙结构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
游湘等: "红叶二级水电站首部枢纽引水防沙设计", 《水电站设计》 *
王凤波等: "古城水电站首都枢纽布置及优化设计", 《山西建筑》 *
肖西平: "姚河坝水电站枢纽设计", 《四川水力发电》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400751A (zh) * 2016-09-09 2017-02-15 中国电建集团成都勘测设计研究院有限公司 一种拦沙坎结构及其施工工艺
CN106702968A (zh) * 2017-03-14 2017-05-24 长沙理工大学 一种可自动冲砂减淤的弧线型滚水坝及其运行方法
CN106702968B (zh) * 2017-03-14 2019-05-21 长沙理工大学 一种可自动冲砂减淤的弧线型滚水坝及其运行方法
CN110258478A (zh) * 2019-07-03 2019-09-20 中国电建集团成都勘测设计研究院有限公司 生态电站与首部枢纽建筑集合布置结构
CN110258478B (zh) * 2019-07-03 2024-08-09 中国电建集团成都勘测设计研究院有限公司 生态电站与首部枢纽建筑集合布置结构
CN115045239A (zh) * 2022-06-14 2022-09-13 河南黄河勘测规划设计研究院有限公司 一种江河水库支流拦门沙自然拉沟破除系统
CN115045239B (zh) * 2022-06-14 2023-08-15 河南黄河勘测规划设计研究院有限公司 一种江河水库支流拦门沙自然拉沟破除系统

Similar Documents

Publication Publication Date Title
CN103276700B (zh) 一种泥石流排导槽规划设计方法及其应用
CN204543723U (zh) 悬移置泥沙的活动式过滤装置
CN204174574U (zh) 用于泥石流防护的挡排结构
CN104878829B (zh) 防淤堵式倒虹吸污水管道系统
CN203256704U (zh) 一种用于平面闸门的充水平压装置
CN104674772A (zh) 一种改善闸坝进口拉沙效果的方法及结构
CN103882838A (zh) 一种低水头河床式枢纽电站进水口的排沙方法
CN203320497U (zh) 一种电站的尾水检修闸门
CN104712010A (zh) 一种凸岸引水防淤系统
CN103882839A (zh) 一种低水头河床式枢纽电站进水口的排沙系统
CN204825802U (zh) 一种复合线型溢流堰
CN106759168A (zh) 一种兼顾环保及排沙需求的发电引水建筑物布置结构
CN202440787U (zh) 一种河道导流装置
CN204401576U (zh) 一种闸坝进口结构
CN104099908B (zh) 重力式拦沙导沙结构
CN204662344U (zh) 一种凸岸引水防淤系统
CN201598620U (zh) 一种倒l型拦沙坎结构
CN204875721U (zh) 一种导流洞出口消能装置
CN201598621U (zh) 一种排沙扰沙结构
CN202718071U (zh) 降低库区淤沙的拦河坝结构
CN101165277B (zh) 水库清淤方法
CN205776115U (zh) 导流洞闸室检修结构
CN213538900U (zh) 一种用于钢坝的清淤排沙装置
CN204418139U (zh) 水电站进水口的泥沙排除装置
CN205046656U (zh) 减缓冲刷跌水井

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150603