CN104652651A - Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof - Google Patents
Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof Download PDFInfo
- Publication number
- CN104652651A CN104652651A CN201510000678.4A CN201510000678A CN104652651A CN 104652651 A CN104652651 A CN 104652651A CN 201510000678 A CN201510000678 A CN 201510000678A CN 104652651 A CN104652651 A CN 104652651A
- Authority
- CN
- China
- Prior art keywords
- wall
- water
- fair
- surface layer
- clear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Building Environments (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种清水混凝土墙体,更具体地说涉及一种保温式二次后浇清水混凝土墙体及其施工方法,属于建筑施工技术领域。 The invention relates to a fair-faced concrete wall, and more specifically relates to a heat-preservation type secondary post-poured clear-faced concrete wall and a construction method thereof, belonging to the technical field of building construction.
背景技术 Background technique
随着我国经济建设的快速发展和人民生活水平的提高,人们对建筑墙面的功能要求越来越高,除了美观、耐久,还要节能环保,以满足人们对居住与工作环境在审美和功能方面更高的要求。 With the rapid development of my country's economic construction and the improvement of people's living standards, people have higher and higher requirements for the function of building walls. In addition to being beautiful and durable, energy saving and environmental protection are also required to meet people's aesthetic and functional requirements for living and working environments. higher requirements.
目前,建筑墙面装饰装修方法各种各样;但是,传统的装饰装修方法,费工费时,造价高、不耐久,部分材料还散发对人体有害的化学成分,不节能环保。清水混凝土又称装饰混凝土,其属于一次浇注成型,不做任何外装饰,直接采用现浇混凝土的自然表面效果作为饰面,不同于普通混凝土,表面平整光滑、色泽均匀、无碰损和污染,只是在表面涂一层或两层透明的保护剂,舍去了涂料、饰面等化工产品,有利于环保;又因为清水混凝土一次浇注成型,不剔凿修补、不用抹灰,减少了大量建筑垃圾,有利于保护环境。同时,墙体具有保温性能在大力提倡节能环保的当下,显得日益重要;因此,在既有建筑美化装饰与节能改造中,如何既实现时尚的清水混凝土装饰效果、又能达到绿色节能保温墙面改造,是现今亟需解决的一大问题。 At present, there are various ways to decorate building walls; however, traditional decoration methods are labor-intensive, time-consuming, expensive, not durable, and some materials emit harmful chemical components, which are not energy-saving and environmentally friendly. Fair-faced concrete, also known as decorative concrete, belongs to one-time pouring molding, without any external decoration, and directly uses the natural surface effect of cast-in-place concrete as the finish, which is different from ordinary concrete , with smooth surface, uniform color, no damage and pollution Only one or two layers of transparent protective agent are applied on the surface, and chemical products such as coatings and finishes are discarded, which is conducive to environmental protection; and because the fair-faced concrete is cast in one time, it does not need to be chiseled or plastered, which reduces a lot of construction costs. Garbage, help protect the environment. At the same time, the thermal insulation performance of the wall is becoming more and more important at the moment when energy conservation and environmental protection are vigorously advocated; therefore, in the beautification decoration and energy-saving renovation of existing buildings, how to achieve both fashionable fair-faced concrete decoration effects and green energy-saving thermal insulation walls Transformation is a big problem that needs to be solved urgently.
发明内容 Contents of the invention
本发明针对传统的建筑墙面装饰装修方法不节能环保、同时需要实现墙面的保温功能等目的,提供一种保温式二次后浇清水混凝土墙体及其施工方法。 Aiming at the purpose that the traditional building wall surface decoration method is not energy-saving and environment-friendly, and at the same time needs to realize the thermal insulation function of the wall surface, etc., the invention provides a thermal insulation type secondary post-cast clear water concrete wall and a construction method thereof.
为实现上述目的,本发明的技术解决方案是:一种保温式二次后浇清水混凝土墙体,包括原结构墙体,还包括有清水混凝土面层和保温夹层,所述的保温夹层粘贴在原结构墙体外表面上,所述的清水混凝土面层浇筑于保温夹层上,所述的清水混凝土面层中设置有钢筋网,且清水混凝土面层、保温夹层和原结构墙体中设置有植筋。 In order to achieve the above object, the technical solution of the present invention is: a thermal insulation type secondary post-cast clear-water concrete wall, including the original structure wall, and also includes a clear-faced concrete surface and a heat-insulating interlayer, and the heat-insulating interlayer is pasted on the original On the outer surface of the structural wall, the clear-water concrete surface layer is poured on the thermal insulation interlayer, the clear-water concrete surface layer is provided with a steel mesh, and the clear-water concrete surface layer, the thermal insulation interlayer and the original structural wall are provided with planting ribs.
所述的清水混凝土面层厚度为60-80mm。 The thickness of the fair-faced concrete surface layer is 60-80mm.
所述的保温夹层厚度为30-40mm。 The thickness of the insulation interlayer is 30-40mm.
所述的保温夹层是规格为40×400×400mm的聚苯板。 The insulation interlayer is a polystyrene board with a specification of 40×400×400 mm.
一种保温式二次后浇清水混凝土墙体的施工方法,包括以下步骤: A construction method of thermal insulation type post-pouring fair-faced concrete wall twice, comprising the following steps:
步骤一、原结构墙体的处理:凿除原结构墙体外表面的粉刷层、疏松空鼓直至露出坚实的新鲜基面,清理粉尘及浮渣,并用修补砂浆修补平整; Step 1. Treatment of the original structure wall: chisel off the plaster layer on the outer surface of the original structure wall, loosen the hollows until a solid fresh base surface is exposed, clean up the dust and scum, and repair it with repair mortar;
步骤二、植入植筋:按规定的工艺流程植入植筋; Step 2. Implanting the planting bar: implanting the planting bar according to the prescribed process;
步骤三、安装保温夹层:用结构胶将保温材料粘贴到经过处理的原结构墙体外表面上; Step 3. Install the insulation interlayer: use structural glue to paste the insulation material on the outer surface of the treated original structure wall;
步骤四、挂装钢筋网:以植筋为支托,挂装钢筋网; Step 4. Hanging the steel mesh: use the planting bar as the support, and hang the steel mesh;
步骤五、支模板浇筑清水混凝土面层:按清水混凝土施工工艺,支模板,浇筑清水混凝土面层; Step 5, supporting the formwork to pour the clear-water concrete surface: according to the clear-water concrete construction technology, support the formwork, and pour the clear-water concrete surface;
步骤六、拆除模板,完成施工; Step 6, remove the formwork and complete the construction;
步骤七、养护:按清水混凝土施工工艺要求,通过保温保湿措施养护清水混凝土面层(1)到设计强度。 Step 7. Maintenance: According to the construction process requirements of clear-water concrete, maintain the clear-water concrete surface (1) to the design strength through heat preservation and moisturizing measures.
所述的步骤七之后还包括下面步骤:对清水混凝土面层表面进行修色与防护。 After the step seven, the following steps are also included: repairing and protecting the surface of the fair-faced concrete surface.
与现有技术相比较,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、本发明中的保温式清水混凝土墙体包括原结构墙体、清水混凝土面层和保温夹层,清水混凝土面层中设置有钢筋网,且清水混凝土面层、保温夹层和原结构墙体中设置有植筋。克服了传统的建筑墙面装饰装修方法费工费时、造价高、不耐久、不节能环保等缺陷,实现了清水混凝土的装饰效果;同时,实现了墙面的保温性能,满足了使用需求。 1, the thermal insulation type fair-faced concrete wall in the present invention comprises original structure wall, fair-faced concrete surface course and insulation interlayer, is provided with steel mesh in the fair-faced concrete surface course, and in the clear-water concrete surface course, heat preservation interlayer and original structure wall Set with planting bars. It overcomes the shortcomings of the traditional building wall decoration method, such as labor-intensive and time-consuming, high cost, not durable, not energy-saving and environmentally friendly, and realizes the decorative effect of fair-faced concrete; at the same time, it realizes the thermal insulation performance of the wall and meets the needs of use.
2、本发明中的墙体施工方法,通过原结构墙体处理、植入植筋、安装保温夹层、挂装钢筋网、支模板浇筑清水混凝土面层、拆除模板和养护等步骤,既实现了时尚的清水混凝土装饰效果,又能达到绿色节能墙体改造。 2. In the wall construction method of the present invention, through the steps of original structure wall treatment, planting reinforcement, installation of insulation interlayer, hanging steel mesh, supporting formwork to pour clear-faced concrete surface, removal of formwork and maintenance, both realized The stylish fair-faced concrete decoration effect can also achieve green and energy-saving wall renovation.
附图说明 Description of drawings
图1是本发明中一种保温式二次后浇清水混凝土墙体结构示意图。 Fig. 1 is a kind of thermal insulation type secondary post-pouring fair-faced concrete wall structure schematic diagram among the present invention.
图中,清水混凝土面层1,保温夹层2,原结构墙体3,钢筋网4,植筋5。 In the figure, clear water concrete surface layer 1, thermal insulation interlayer 2, original structure wall 3, steel mesh 4, planting bar 5.
具体实施方式 Detailed ways
以下结合附图说明和具体实施方式对本发明作进一步的详细描述。 The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
参见图1,一种保温式二次后浇清水混凝土墙体,包括原结构墙体3、清水混凝土面层1和保温夹层2。所述的保温夹层2粘贴在原结构墙体3外表面上,所述的清水混凝土面层1浇筑于保温夹层2上;保温夹层2达到保温隔热隔声等目的。所述的清水混凝土面层1中设置有钢筋网4,且清水混凝土面层1、保温夹层2和原结构墙体3中设置有植筋5;通过植筋5将清水混凝土面层1、保温夹层2与原结构墙体3连接锚固。 Referring to FIG. 1 , a heat-preserving type secondary post-cast fair-faced concrete wall includes an original structure wall 3 , a clear-faced concrete surface 1 and an insulating interlayer 2 . The thermal insulation interlayer 2 is pasted on the outer surface of the original structure wall 3, and the fair-faced concrete surface layer 1 is poured on the thermal insulation interlayer 2; the thermal insulation interlayer 2 achieves the purposes of thermal insulation, sound insulation, and the like. Described clear-water concrete surface course 1 is provided with reinforcement mesh 4, and in clear-water concrete surface course 1, insulation interlayer 2 and original structure wall body 3, planting reinforcement 5 is arranged; By planting reinforcement 5, clear-water concrete surface course 1, insulation The interlayer 2 is connected and anchored with the original structural wall 3 .
所述的清水混凝土面层1厚度为60-80mm。清水混凝土面层1由自密实细石混凝土浇筑而成,该自密实细石混凝土的强度等级为C20–C80。 The thickness of the fair-faced concrete surface layer 1 is 60-80mm. The fair-faced concrete surface layer 1 is poured from self-compacting fine stone concrete, and the strength grade of the self-compacting fine stone concrete is C20-C80.
所述的保温夹层2厚度为30-40mm。保温夹层2通常选择规格为40×400×400mm的聚苯板。 The thickness of the thermal insulation interlayer 2 is 30-40mm. The insulation interlayer 2 usually chooses a polystyrene board with a specification of 40×400×400mm.
所述的钢筋网4为6200(双向),此处的6表示钢筋网4中光面钢筋的直径为6mm,200(双向)表示钢筋网4中正交的钢筋在相互垂直的两个方向钢筋间距为200mm。 The steel mesh 4 is 6200 (two-way), where 6 means that the diameter of the smooth steel bar in the steel mesh 4 is 6mm, and 200 (two-way) means that the orthogonal steel bars in the steel mesh 4 are reinforced in two directions perpendicular to each other. The spacing is 200mm.
所述的植筋5为20400(双向),此处的20表示植筋5的螺纹钢筋直径为20mm,400(双向)表示在原结构墙体3水平和竖直两个方向植筋5间距为400mm。 The planting bar 5 is 20400 (two-way), where 20 means that the diameter of the threaded steel bar of the planting bar 5 is 20mm, and 400 (two-way) means that the distance between the planting bars 5 in the horizontal and vertical directions of the original structure wall 3 is 400mm .
一种保温式二次后浇清水混凝土墙体的施工方法,包括以下步骤: A construction method of thermal insulation type post-pouring fair-faced concrete wall twice, comprising the following steps:
步骤一、原结构墙体3的处理:凿除原结构墙体3外表面的粉刷层、疏松空鼓直至露出坚实的新鲜基面,清理粉尘及浮渣,并用修补砂浆修补平整。 Step 1. Treatment of the original structure wall 3: Chisel off the plaster layer on the outer surface of the original structure wall 3, loosen the hollows until a solid fresh base surface is exposed, clean up the dust and scum, and repair it with repair mortar.
步骤二、植入植筋5:按规定的工艺流程植入植筋5。此处规定的工艺流程通常为《建筑结构加固工程施工质量验收规范》(GB 50550-2010)规定的工艺流程。 Step 2, implanting the planting bar 5: implanting the planting bar 5 according to the prescribed process flow. The technological process specified here is generally the technological process stipulated in the "Code for Acceptance of Construction Quality of Building Structure Reinforcement Engineering" (GB 50550-2010).
步骤三、安装保温夹层2:用结构胶将保温材料2粘贴到经过处理的原结构墙体3外表面上。 Step 3: Install the insulation interlayer 2: Paste the insulation material 2 on the outer surface of the treated original structure wall 3 with structural glue.
步骤四、挂装钢筋网4:以植筋5为支托,挂装钢筋网4。 Step 4, Hanging the steel mesh 4: Hang the steel mesh 4 with the planting bar 5 as a support.
步骤五、支模板浇筑清水混凝土面层1:按清水混凝土施工工艺,支模板,浇筑清水混凝土面层1。 Step 5, supporting the formwork and pouring the fair-faced concrete surface layer 1: according to the fair-faced concrete construction process, supporting the formwork, and pouring the fair-faced concrete surface layer 1.
步骤六、拆除模板,完成施工。 Step 6. Remove the formwork and complete the construction.
步骤七、养护:按清水混凝土施工工艺要求,通过保温保湿措施养护清水混凝土面层1到设计强度。 Step 7. Maintenance: According to the construction process requirements of clear-water concrete, maintain the clear-water concrete surface layer 1 to the design strength through heat preservation and moisturizing measures.
优选的,所述的步骤七之后还包括下面步骤:对清水混凝土面层1表面进行修色与防护。 Preferably, after the step seven, the following steps are further included: repairing and protecting the surface of the fair-faced concrete surface layer 1 .
本发明中通过在原结构墙体3外表面上二次后浇一层高强度自密实细石清水混凝土面层1,达到饰面装修的目的和一定程度的加固补强效果,改善和提高了原结构墙体3的耐久性;且在外墙外保温效果高,不仅可以达到保温、隔热、隔声的节能环保目的,而且还能保护建筑物的主体结构,延长建筑物的使用寿命,实现了旧有建筑美化装饰与节能改造,满足了使用需求。 In the present invention, a layer of high-strength self-compacting fine stone fair-faced concrete surface layer 1 is poured twice on the outer surface of the original structure wall body 3 to achieve the purpose of decoration and a certain degree of reinforcement and reinforcement effect, and improve and enhance the original structure. The durability of the structural wall 3; and the high thermal insulation effect outside the external wall can not only achieve the energy-saving and environmental protection purposes of thermal insulation, heat insulation, and sound insulation, but also protect the main structure of the building and prolong the service life of the building. The beautification decoration and energy-saving renovation of old buildings meet the needs of use.
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,上述结构都应当视为属于本发明的保护范围。 The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field to which the present invention belongs, some simple deduction or replacement can also be made without departing from the concept of the present invention, and the above structures should be regarded as belonging to the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510000678.4A CN104652651A (en) | 2015-01-04 | 2015-01-04 | Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510000678.4A CN104652651A (en) | 2015-01-04 | 2015-01-04 | Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104652651A true CN104652651A (en) | 2015-05-27 |
Family
ID=53244238
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510000678.4A Pending CN104652651A (en) | 2015-01-04 | 2015-01-04 | Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104652651A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107130803A (en) * | 2016-02-29 | 2017-09-05 | 深圳市卓越工业化智能建造开发有限公司 | A kind of new external heat preservation decorative board and wall integrated construction technology |
| CN108560861A (en) * | 2018-06-01 | 2018-09-21 | 浙江大华建设集团有限公司 | A kind of connection structure and its construction method of cast-in-place concrete and decoration of exterior wall wall |
| CN115126139A (en) * | 2022-07-08 | 2022-09-30 | 宁海国基模材有限公司 | Operation method for secondary floor pouring |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4334394A (en) * | 1979-06-05 | 1982-06-15 | Idc Chemie Ag | Insulated outer coating of walls of building structures |
| JPS6012835Y2 (en) * | 1979-01-24 | 1985-04-24 | ダウ化工株式会社 | insulation wall |
| CN1920201A (en) * | 2005-05-23 | 2007-02-28 | 吴淑环 | Supported binding type composite insulation wall |
| CN101603335A (en) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | The precast concrete shear wall and the production method of one-shot forming band heat insulation facing |
| CN101806105A (en) * | 2009-09-29 | 2010-08-18 | 周金烈 | Outer thermal insulation wall with mechanically anchored metal mesh reinforced polystyrene boards |
| CN203080725U (en) * | 2012-11-27 | 2013-07-24 | 江苏省建筑科学研究院有限公司 | Heat insulation anchoring energy-saving processing structure of architectural structure anti-seismic outer wall surface layer |
| CN103470067A (en) * | 2013-10-08 | 2013-12-25 | 武汉武大巨成加固实业有限公司 | Transformation and construction method used for facing bare concrete of existing building outer wall |
| CN204418414U (en) * | 2015-01-04 | 2015-06-24 | 武汉武大巨成结构股份有限公司 | Bare concrete wall is watered after a kind of heat preserving type secondary |
-
2015
- 2015-01-04 CN CN201510000678.4A patent/CN104652651A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6012835Y2 (en) * | 1979-01-24 | 1985-04-24 | ダウ化工株式会社 | insulation wall |
| US4334394A (en) * | 1979-06-05 | 1982-06-15 | Idc Chemie Ag | Insulated outer coating of walls of building structures |
| CN1920201A (en) * | 2005-05-23 | 2007-02-28 | 吴淑环 | Supported binding type composite insulation wall |
| CN101603335A (en) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | The precast concrete shear wall and the production method of one-shot forming band heat insulation facing |
| CN101806105A (en) * | 2009-09-29 | 2010-08-18 | 周金烈 | Outer thermal insulation wall with mechanically anchored metal mesh reinforced polystyrene boards |
| CN203080725U (en) * | 2012-11-27 | 2013-07-24 | 江苏省建筑科学研究院有限公司 | Heat insulation anchoring energy-saving processing structure of architectural structure anti-seismic outer wall surface layer |
| CN103470067A (en) * | 2013-10-08 | 2013-12-25 | 武汉武大巨成加固实业有限公司 | Transformation and construction method used for facing bare concrete of existing building outer wall |
| CN204418414U (en) * | 2015-01-04 | 2015-06-24 | 武汉武大巨成结构股份有限公司 | Bare concrete wall is watered after a kind of heat preserving type secondary |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107130803A (en) * | 2016-02-29 | 2017-09-05 | 深圳市卓越工业化智能建造开发有限公司 | A kind of new external heat preservation decorative board and wall integrated construction technology |
| CN108560861A (en) * | 2018-06-01 | 2018-09-21 | 浙江大华建设集团有限公司 | A kind of connection structure and its construction method of cast-in-place concrete and decoration of exterior wall wall |
| CN108560861B (en) * | 2018-06-01 | 2024-06-04 | 浙江大华建设集团有限公司 | Connection structure of cast-in-place concrete and outer wall decorative wall and construction method thereof |
| CN115126139A (en) * | 2022-07-08 | 2022-09-30 | 宁海国基模材有限公司 | Operation method for secondary floor pouring |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105019675B (en) | Repairing construction method for grey brick outer wall of ancient building | |
| CN105525726A (en) | Aerated brick wall plastering construction method | |
| CN204357111U (en) | A kind of insulation compound exempts from demoulding exterior sheathing | |
| CN104652651A (en) | Heat insulation type secondary-post-poured fair-faced concrete wall and construction method thereof | |
| CN103556819A (en) | Construction method for reserving constructional column holes in beam plate | |
| CN104563282A (en) | Integral constructing method of house body structure and wall structure and house | |
| CN108277895A (en) | A kind of composite heat preserving external wall system and construction method | |
| CN206769073U (en) | A kind of compound insulation structure integration non-dismantling formwork | |
| CN205063052U (en) | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom | |
| CN204418414U (en) | Bare concrete wall is watered after a kind of heat preserving type secondary | |
| CN201190368Y (en) | Detaching-free template for concrete | |
| CN202280193U (en) | Aerated concrete building block suitable for building construction technology | |
| CN217379579U (en) | Wall structure based on external thermal insulation external wall theme sculpture is plastered | |
| CN204418564U (en) | Clear-water concrete metope is watered after the exposed secondary of a kind of peastone | |
| CN205777472U (en) | A kind of steel wood veneer template | |
| CN201649626U (en) | Die plate component for grouting wall | |
| CN207244942U (en) | A kind of heat preserving heat insulating noise insulation integration regenerated aggregate concrete curtain wall | |
| CN104563417A (en) | Pisolite exposure type secondary post-pouring water concrete wall surface and construction method thereof | |
| CN110700481A (en) | Template-free plastering-free structural heat-insulation decorative composite integrated board and processing technology thereof | |
| CN105297950A (en) | Infilled wall and horizontal load-bearing structure gap wall surface crack-controlling construction method | |
| CN104481157B (en) | Outer wall autoclaved aerated concrete self heat insulation system same material thermal bridge treatment construction method | |
| CN217053832U (en) | Heat-preservation, fire-prevention and modeling integrated decoration cleaning-free fast-assembly outer wall with built-in anchor bolt | |
| CN205100488U (en) | Portable vitrified tile hangs structure futilely | |
| CN204551727U (en) | A kind of agent structure house of building integrated with wall body structure | |
| CN219887239U (en) | A kind of phosphogypsum spray-cast composite hollow wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 430223 Hubei city of Wuhan province East Lake Development Zone Wuhan University Science Park Road No. 4 Applicant after: WUDA JUCHENG STRUCTURE CO., LTD. Address before: 430223 Hubei city of Wuhan province East Lake Development Zone Wuhan University Science Park Road No. 4 Applicant before: WUDA JUCHENG STRUCTURE CO., LTD. |
|
| COR | Change of bibliographic data | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |