CN104631479B - The construction method of the water-stop curtain of soil removal and replacement stirring - Google Patents

The construction method of the water-stop curtain of soil removal and replacement stirring Download PDF

Info

Publication number
CN104631479B
CN104631479B CN201410813752.XA CN201410813752A CN104631479B CN 104631479 B CN104631479 B CN 104631479B CN 201410813752 A CN201410813752 A CN 201410813752A CN 104631479 B CN104631479 B CN 104631479B
Authority
CN
China
Prior art keywords
hole
water
construction
pile
stirring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410813752.XA
Other languages
Chinese (zh)
Other versions
CN104631479A (en
Inventor
张生雨
白汉民
王冬生
邱太刚
温支生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201410813752.XA priority Critical patent/CN104631479B/en
Priority to CN201610102949.1A priority patent/CN105735332B/en
Priority to CN201610103716.3A priority patent/CN105586978B/en
Publication of CN104631479A publication Critical patent/CN104631479A/en
Application granted granted Critical
Publication of CN104631479B publication Critical patent/CN104631479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Abstract

The present invention relates to the construction method of the water-stop curtain of a kind of soil removal and replacement stirring, the steps include: (1), discharge by cement mixing pile axis and draw stake position, hole;(2), burying steel pile casting underground, use mud to stablize hole wall, Spiral digging machine wet work will treat in hole that shoveling matter is taken out;(3), boring uses mud stablize hole wall until drawing hole and backfilling operation space meets requirement;(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material;(5) backfill distance to meet cement mixing pile and work continuously requirement, dig plasma discharge guide channel;(6) cement mixer is in place, cement mixing pile driving construction;The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring, completes the water-stop curtain construction of soil removal and replacement stirring.Design science of the present invention is reasonable, and for water seal for deep foundation pit curtain, technique is simple, construction cost is low, makes full use of common construction machinery, and the water-stop curtain stagnant water effect completed is good, and construction safety is reliable.

Description

The construction method of the water-stop curtain of soil removal and replacement stirring
Technical field
The invention belongs to water-stop curtain field, the construction of the water-stop curtain of a kind of soil removal and replacement stirring Method.
Background technology
During the higher Construction of Deep Excavation Engineering of underground engineering particularly level of ground water, it is often necessary to The outside of fender pile arranges water-stop curtain, and water-stop curtain typically uses continuous print cement mixing method to be formed. When water-stop curtain design depth bounds in run into the geological stratification being difficult to pass through, as gravel layer, When hard skerry and erratic boulder etc., use the cement-soil mixing pile machine tool of routine, such as two axle water Earth mixing pile machine, triaxial cement mixing pile machine etc. are difficult to construction to be completed.
For being difficult to the skerry that passes through, single tube high-pressure rotary-spray equipment can be used its pointwise to be stirred in advance Dynamic loose, cement mixing method of constructing the most again, but the method for deep gravel layer with And erratic boulder still cannot implement.
Interlocking pile or ground-connecting-wall can be used for deep gravel layer and erratic boulder, simultaneously work as Supporting and the effect of sealing.But during interlocking pile construction, the quality stability to ultra-retardation concrete Require high, and easily owing to sending out in the direction being perpendicular to wall between the A stake of interlocking pile and B stake Raw deflection and seepage.Ground-connecting-wall seam crossing is the easily position producing seepage, uses two-wheel flute milling machine Joint seepage can be prevented effectively from, but this process costs is higher, and the cost of ground-connecting-wall own is relatively Height, is not suitable for all engineerings.
TRD engineering method can easily tackle hardpan, such as cobblestone, viscosity mud, sandstone, oil mother Shale, limestone, granite etc., stir, there is not malocclusion, it is ensured that body of wall is high continuously Property and high sealing, but TRD engineering method cost is high.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that the sealing of a kind of soil removal and replacement stirring The construction method of curtain, the method design science is reasonable, for water seal for deep foundation pit curtain, technique is simple, Construction cost is low, makes full use of common construction machinery, and the water-stop curtain stagnant water effect completed is good, executes Work is safe and reliable.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of construction method of the water-stop curtain of soil removal and replacement stirring, the step of its method is:
(1), discharge by cement mixing pile axis and draw stake position, hole;
(2), burying steel pile casting underground, use mud to stablize hole wall, Spiral digging machine wet work is dug waiting in hole Soil property is taken out;
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge Measure corresponding to backfill amount;
(5) backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axis Plasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system runs pump slurry, starts stake machine and carries out cement Mixing pile construction;
The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring, Complete the water-stop curtain construction of soil removal and replacement stirring.
And, described stake position, hole of drawing is discharged by three axes agitating pile axis and is drawn stake position, hole φ 1000@1200。
And, described steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, steel pile casting End face exceeds operation platform 30cm.
And, described Spiral digging machine wet work is jumped manual labour skill and is drawn stake holes, and drawing stake holes is φ 1000mm.
And, described treats that shoveling matter is gravel, cobble or erratic boulder.
And, it is the stirring of φ 850 1,200 3 axle that described startup stake machine carries out cement mixing pile driving construction Pile driving construction.
Advantages of the present invention and having the beneficial effect that
1, the water-stop curtain of this soil removal and replacement stirring is to take out in containing stratum such as dust, cobble, erratic boulders It is unfavorable for that the soil property of pile, backfill simultaneously are beneficial to the material of pile (one-tenth wall), proceed stirring The construction of stake.This method construction quality is guaranteed, and construction machinery tissue is limited less by market.
2, this soil removal and replacement is stirred the technology maturation of water-stop curtain, technique are simple, with low cost, fully Utilizing common construction machinery, the water-stop curtain stagnant water effect completed is good.
Accompanying drawing explanation
Fig. 1 is that the present invention is revolved and dug the schematic diagram drawing hole;
Fig. 2 is the schematic diagram that the present invention completes construction cement mixing pile.
Wherein 1 is cement mixing pile, and 2 for drawing hole, and 3 is original ground, and 4 is dust, cobble, drift The unfavorable interlayer such as stone, 5 is the earth material of backfill, and 6 is level of ground water, and H1 is water-stop curtain supporting column length Degree, H2 is the unfavorable interlayer geology such as dust, cobble, erratic boulder in water-stop curtain support post depth bounds Buried depth, H3 is unfavorable interlayer geology thickness.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following example simply describe Property, it not determinate, it is impossible to limit protection scope of the present invention with this.
A kind of construction method of the water-stop curtain of soil removal and replacement stirring, the step of its method is:
(1), discharge by cement mixing pile axis and draw stake position, hole;Draw stake position, hole by three axes agitating pile axis Discharge and draw stake position, hole φ 1000@1200.
(2), burying steel pile casting underground, use mud to stablize hole wall, mud uses tonerde and water mix Form and mix a certain proportion of bentonite, prepare mud.Spiral digging machine wet work is dug waiting in hole Soil property is taken out;Steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, and steel pile casting end face is high Go out operation platform 30cm.Spiral digging machine wet work is jumped manual labour skill and is drawn stake holes, and drawing stake holes is φ 1000mm. Treat that shoveling matter is gravel, cobble or erratic boulder.
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge Measure corresponding to backfill amount;
(5) backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axis Plasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system runs pump slurry, starts stake machine and carries out cement Mixing pile construction;Starting stake machine and carrying out cement mixing pile driving construction is that φ 850 1200 three axes agitating pile is executed Work.
The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring, Complete the water-stop curtain construction of soil removal and replacement stirring.

Claims (4)

1. the construction method of the water-stop curtain of a soil removal and replacement stirring, it is characterised in that: the step of the method Suddenly it is:
(1), discharge by cement mixing pile axis and draw stake position, hole;
(2), burying steel pile casting underground, use mud to stablize hole wall, rotary drilling rig wet work is treated in hole Shoveling matter is taken out;
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge Measure corresponding to backfill amount;
(5), backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axle Plasma discharge guide channel is dug on line both sides;
, cement mixer in place, cement mortar stirring system run pump slurry, start stake machine carry out water Mud mixing pile construction;
, adjacent two draw stake position, hole remain untreated sandwich portion, by Mixing Machine action of forced stirring, Complete the water-stop curtain construction of soil removal and replacement stirring.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature It is: described stake position, hole of drawing is discharged by three axes agitating pile axis and drawn stake position, hole φ 1000@1200.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature Being: described steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, steel pile casting end face Exceed operation platform 30cm.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature It is: it is that φ 850 1200 three axes agitating pile is executed that described startup stake machine carries out cement mixing pile driving construction Work.
CN201410813752.XA 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring Active CN104631479B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201410813752.XA CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring
CN201610102949.1A CN105735332B (en) 2014-12-23 2014-12-23 A kind of soil removal and replacement stirring water-stop curtain construction method
CN201610103716.3A CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410813752.XA CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201610103716.3A Division CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel
CN201610102949.1A Division CN105735332B (en) 2014-12-23 2014-12-23 A kind of soil removal and replacement stirring water-stop curtain construction method

Publications (2)

Publication Number Publication Date
CN104631479A CN104631479A (en) 2015-05-20
CN104631479B true CN104631479B (en) 2016-08-31

Family

ID=53210677

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610103716.3A Active CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel
CN201410813752.XA Active CN104631479B (en) 2014-12-23 2014-12-23 The construction method of the water-stop curtain of soil removal and replacement stirring

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610103716.3A Active CN105586978B (en) 2014-12-23 2014-12-23 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Country Status (1)

Country Link
CN (2) CN105586978B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586978A (en) * 2014-12-23 2016-05-18 中冶天工集团有限公司 Construction method of soil replacement stir waterproof curtain based on gravels

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241836A (en) * 2019-07-04 2019-09-17 嘉盛建设集团有限公司 A kind of construction method of embedding rock water-stop curtain
CN111042061B (en) * 2019-12-30 2020-09-25 中国水电基础局有限公司 Construction method of ultra-deep impervious wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19832935C1 (en) * 1997-11-19 1999-12-16 Bauer Spezialtiefbau Method of production high pressure injected building foundation
CN1635223A (en) * 2003-12-26 2005-07-06 上海市基础工程公司 Bridge cofferdam waterstop construction process
CN101255689A (en) * 2008-03-12 2008-09-03 何世鸣 Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof
CN102286981A (en) * 2011-07-15 2011-12-21 深圳市鸿荣轩建设工程有限公司 Waterproof curtain and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586978B (en) * 2014-12-23 2019-01-18 中冶天工集团有限公司 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19832935C1 (en) * 1997-11-19 1999-12-16 Bauer Spezialtiefbau Method of production high pressure injected building foundation
CN1635223A (en) * 2003-12-26 2005-07-06 上海市基础工程公司 Bridge cofferdam waterstop construction process
CN101255689A (en) * 2008-03-12 2008-09-03 何世鸣 Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof
CN102286981A (en) * 2011-07-15 2011-12-21 深圳市鸿荣轩建设工程有限公司 Waterproof curtain and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586978A (en) * 2014-12-23 2016-05-18 中冶天工集团有限公司 Construction method of soil replacement stir waterproof curtain based on gravels
CN105586978B (en) * 2014-12-23 2019-01-18 中冶天工集团有限公司 Soil removal and replacement stirring water-stop curtain construction method based on gravel

Also Published As

Publication number Publication date
CN105586978A (en) 2016-05-18
CN104631479A (en) 2015-05-20
CN105586978B (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN103938617B (en) A kind of ultra-deep underground continuous wall and construction method thereof
KR101067707B1 (en) The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN106759473A (en) The constructing structure and its construction method of underground pipe gallery and road
CN104963346A (en) Support construction method for deep foundation pit in complex geological condition
CN104631479B (en) The construction method of the water-stop curtain of soil removal and replacement stirring
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN111042249A (en) Construction method of ultra-deep equal-thickness cement-soil mixing wall under complex geological condition
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
CN110241836A (en) A kind of construction method of embedding rock water-stop curtain
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
US3839871A (en) Earthen dam repair
CN107060800A (en) A kind of shield-tunneling construction huge stone handling construction method
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN110952528A (en) Construction method of cement-soil underground continuous wall under complex geological conditions
CN105971637A (en) Application of WSS construction method in shield end reinforcement of water-rich sand layer
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN207862925U (en) A kind of slip casting casing device
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof
CN103774645B (en) The construction method of a kind of soil cement and the stake of Combined concrete material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant