CN104631479B - The construction method of the water-stop curtain of soil removal and replacement stirring - Google Patents
The construction method of the water-stop curtain of soil removal and replacement stirring Download PDFInfo
- Publication number
- CN104631479B CN104631479B CN201410813752.XA CN201410813752A CN104631479B CN 104631479 B CN104631479 B CN 104631479B CN 201410813752 A CN201410813752 A CN 201410813752A CN 104631479 B CN104631479 B CN 104631479B
- Authority
- CN
- China
- Prior art keywords
- hole
- water
- construction
- pile
- stirring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 238000003756 stirring Methods 0.000 title claims abstract description 26
- 239000002689 soil Substances 0.000 title claims abstract description 21
- 239000004568 cement Substances 0.000 claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 238000005266 casting Methods 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 210000002381 Plasma Anatomy 0.000 claims abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000005553 drilling Methods 0.000 claims description 7
- 210000000481 Breast Anatomy 0.000 claims description 6
- 239000011083 cement mortar Substances 0.000 claims description 3
- 230000000875 corresponding Effects 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 239000000428 dust Substances 0.000 description 3
- 239000011229 interlayer Substances 0.000 description 3
- 239000010410 layer Substances 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 235000019738 Limestone Nutrition 0.000 description 1
- 206010061274 Malocclusion Diseases 0.000 description 1
- HWKQNAWCHQMZHK-UHFFFAOYSA-N Trolnitrate Chemical compound [O-][N+](=O)OCCN(CCO[N+]([O-])=O)CCO[N+]([O-])=O HWKQNAWCHQMZHK-UHFFFAOYSA-N 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- 229910000278 bentonite Inorganic materials 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 210000001519 tissues Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
Abstract
The present invention relates to the construction method of the water-stop curtain of a kind of soil removal and replacement stirring, the steps include: (1), discharge by cement mixing pile axis and draw stake position, hole;(2), burying steel pile casting underground, use mud to stablize hole wall, Spiral digging machine wet work will treat in hole that shoveling matter is taken out;(3), boring uses mud stablize hole wall until drawing hole and backfilling operation space meets requirement;(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material;(5) backfill distance to meet cement mixing pile and work continuously requirement, dig plasma discharge guide channel;(6) cement mixer is in place, cement mixing pile driving construction;The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring, completes the water-stop curtain construction of soil removal and replacement stirring.Design science of the present invention is reasonable, and for water seal for deep foundation pit curtain, technique is simple, construction cost is low, makes full use of common construction machinery, and the water-stop curtain stagnant water effect completed is good, and construction safety is reliable.
Description
Technical field
The invention belongs to water-stop curtain field, the construction of the water-stop curtain of a kind of soil removal and replacement stirring
Method.
Background technology
During the higher Construction of Deep Excavation Engineering of underground engineering particularly level of ground water, it is often necessary to
The outside of fender pile arranges water-stop curtain, and water-stop curtain typically uses continuous print cement mixing method to be formed.
When water-stop curtain design depth bounds in run into the geological stratification being difficult to pass through, as gravel layer,
When hard skerry and erratic boulder etc., use the cement-soil mixing pile machine tool of routine, such as two axle water
Earth mixing pile machine, triaxial cement mixing pile machine etc. are difficult to construction to be completed.
For being difficult to the skerry that passes through, single tube high-pressure rotary-spray equipment can be used its pointwise to be stirred in advance
Dynamic loose, cement mixing method of constructing the most again, but the method for deep gravel layer with
And erratic boulder still cannot implement.
Interlocking pile or ground-connecting-wall can be used for deep gravel layer and erratic boulder, simultaneously work as
Supporting and the effect of sealing.But during interlocking pile construction, the quality stability to ultra-retardation concrete
Require high, and easily owing to sending out in the direction being perpendicular to wall between the A stake of interlocking pile and B stake
Raw deflection and seepage.Ground-connecting-wall seam crossing is the easily position producing seepage, uses two-wheel flute milling machine
Joint seepage can be prevented effectively from, but this process costs is higher, and the cost of ground-connecting-wall own is relatively
Height, is not suitable for all engineerings.
TRD engineering method can easily tackle hardpan, such as cobblestone, viscosity mud, sandstone, oil mother
Shale, limestone, granite etc., stir, there is not malocclusion, it is ensured that body of wall is high continuously
Property and high sealing, but TRD engineering method cost is high.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that the sealing of a kind of soil removal and replacement stirring
The construction method of curtain, the method design science is reasonable, for water seal for deep foundation pit curtain, technique is simple,
Construction cost is low, makes full use of common construction machinery, and the water-stop curtain stagnant water effect completed is good, executes
Work is safe and reliable.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of construction method of the water-stop curtain of soil removal and replacement stirring, the step of its method is:
(1), discharge by cement mixing pile axis and draw stake position, hole;
(2), burying steel pile casting underground, use mud to stablize hole wall, Spiral digging machine wet work is dug waiting in hole
Soil property is taken out;
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth
Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired
Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge
Measure corresponding to backfill amount;
(5) backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axis
Plasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system runs pump slurry, starts stake machine and carries out cement
Mixing pile construction;
The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring,
Complete the water-stop curtain construction of soil removal and replacement stirring.
And, described stake position, hole of drawing is discharged by three axes agitating pile axis and is drawn stake position, hole φ
1000@1200。
And, described steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, steel pile casting
End face exceeds operation platform 30cm.
And, described Spiral digging machine wet work is jumped manual labour skill and is drawn stake holes, and drawing stake holes is φ 1000mm.
And, described treats that shoveling matter is gravel, cobble or erratic boulder.
And, it is the stirring of φ 850 1,200 3 axle that described startup stake machine carries out cement mixing pile driving construction
Pile driving construction.
Advantages of the present invention and having the beneficial effect that
1, the water-stop curtain of this soil removal and replacement stirring is to take out in containing stratum such as dust, cobble, erratic boulders
It is unfavorable for that the soil property of pile, backfill simultaneously are beneficial to the material of pile (one-tenth wall), proceed stirring
The construction of stake.This method construction quality is guaranteed, and construction machinery tissue is limited less by market.
2, this soil removal and replacement is stirred the technology maturation of water-stop curtain, technique are simple, with low cost, fully
Utilizing common construction machinery, the water-stop curtain stagnant water effect completed is good.
Accompanying drawing explanation
Fig. 1 is that the present invention is revolved and dug the schematic diagram drawing hole;
Fig. 2 is the schematic diagram that the present invention completes construction cement mixing pile.
Wherein 1 is cement mixing pile, and 2 for drawing hole, and 3 is original ground, and 4 is dust, cobble, drift
The unfavorable interlayer such as stone, 5 is the earth material of backfill, and 6 is level of ground water, and H1 is water-stop curtain supporting column length
Degree, H2 is the unfavorable interlayer geology such as dust, cobble, erratic boulder in water-stop curtain support post depth bounds
Buried depth, H3 is unfavorable interlayer geology thickness.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following example simply describe
Property, it not determinate, it is impossible to limit protection scope of the present invention with this.
A kind of construction method of the water-stop curtain of soil removal and replacement stirring, the step of its method is:
(1), discharge by cement mixing pile axis and draw stake position, hole;Draw stake position, hole by three axes agitating pile axis
Discharge and draw stake position, hole φ 1000@1200.
(2), burying steel pile casting underground, use mud to stablize hole wall, mud uses tonerde and water mix
Form and mix a certain proportion of bentonite, prepare mud.Spiral digging machine wet work is dug waiting in hole
Soil property is taken out;Steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, and steel pile casting end face is high
Go out operation platform 30cm.Spiral digging machine wet work is jumped manual labour skill and is drawn stake holes, and drawing stake holes is φ 1000mm.
Treat that shoveling matter is gravel, cobble or erratic boulder.
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth
Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired
Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge
Measure corresponding to backfill amount;
(5) backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axis
Plasma discharge guide channel is dug on both sides;
(6) cement mixer is in place, and cement mortar stirring system runs pump slurry, starts stake machine and carries out cement
Mixing pile construction;Starting stake machine and carrying out cement mixing pile driving construction is that φ 850 1200 three axes agitating pile is executed
Work.
The most adjacent two draw stake holes position, hole remains untreated sandwich portion, by Mixing Machine action of forced stirring,
Complete the water-stop curtain construction of soil removal and replacement stirring.
Claims (4)
1. the construction method of the water-stop curtain of a soil removal and replacement stirring, it is characterised in that: the step of the method
Suddenly it is:
(1), discharge by cement mixing pile axis and draw stake position, hole;
(2), burying steel pile casting underground, use mud to stablize hole wall, rotary drilling rig wet work is treated in hole
Shoveling matter is taken out;
(3), observing drilling bucket and take out and treat shoveling matter situation, determine and draw hole depth, boring reaches to draw hole depth
Removing rotary drilling rig after degree, continuing to use mud stablize hole wall until drawing hole and backfilling operation space is expired
Foot requirement;
(4), use gaslift plasma discharge machinery to get rid of mud in stake holes, backfill pile earth material, control plasma discharge
Measure corresponding to backfill amount;
(5), backfilled distance to meet cement mixing pile and work continuously requirement, at cement mixing pile axle
Plasma discharge guide channel is dug on line both sides;
, cement mixer in place, cement mortar stirring system run pump slurry, start stake machine carry out water
Mud mixing pile construction;
, adjacent two draw stake position, hole remain untreated sandwich portion, by Mixing Machine action of forced stirring,
Complete the water-stop curtain construction of soil removal and replacement stirring.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature
It is: described stake position, hole of drawing is discharged by three axes agitating pile axis and drawn stake position, hole φ 1000@1200.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature
Being: described steel pile casting height 2m, steel pile casting diameter is than the design big 20cm in stake footpath, steel pile casting end face
Exceed operation platform 30cm.
The construction method of the water-stop curtain of soil removal and replacement the most according to claim 1 stirring, its feature
It is: it is that φ 850 1200 three axes agitating pile is executed that described startup stake machine carries out cement mixing pile driving construction
Work.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410813752.XA CN104631479B (en) | 2014-12-23 | 2014-12-23 | The construction method of the water-stop curtain of soil removal and replacement stirring |
CN201610102949.1A CN105735332B (en) | 2014-12-23 | 2014-12-23 | A kind of soil removal and replacement stirring water-stop curtain construction method |
CN201610103716.3A CN105586978B (en) | 2014-12-23 | 2014-12-23 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410813752.XA CN104631479B (en) | 2014-12-23 | 2014-12-23 | The construction method of the water-stop curtain of soil removal and replacement stirring |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610103716.3A Division CN105586978B (en) | 2014-12-23 | 2014-12-23 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
CN201610102949.1A Division CN105735332B (en) | 2014-12-23 | 2014-12-23 | A kind of soil removal and replacement stirring water-stop curtain construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104631479A CN104631479A (en) | 2015-05-20 |
CN104631479B true CN104631479B (en) | 2016-08-31 |
Family
ID=53210677
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610103716.3A Active CN105586978B (en) | 2014-12-23 | 2014-12-23 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
CN201410813752.XA Active CN104631479B (en) | 2014-12-23 | 2014-12-23 | The construction method of the water-stop curtain of soil removal and replacement stirring |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610103716.3A Active CN105586978B (en) | 2014-12-23 | 2014-12-23 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105586978B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105586978A (en) * | 2014-12-23 | 2016-05-18 | 中冶天工集团有限公司 | Construction method of soil replacement stir waterproof curtain based on gravels |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241836A (en) * | 2019-07-04 | 2019-09-17 | 嘉盛建设集团有限公司 | A kind of construction method of embedding rock water-stop curtain |
CN111042061B (en) * | 2019-12-30 | 2020-09-25 | 中国水电基础局有限公司 | Construction method of ultra-deep impervious wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19832935C1 (en) * | 1997-11-19 | 1999-12-16 | Bauer Spezialtiefbau | Method of production high pressure injected building foundation |
CN1635223A (en) * | 2003-12-26 | 2005-07-06 | 上海市基础工程公司 | Bridge cofferdam waterstop construction process |
CN101255689A (en) * | 2008-03-12 | 2008-09-03 | 何世鸣 | Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof |
CN102286981A (en) * | 2011-07-15 | 2011-12-21 | 深圳市鸿荣轩建设工程有限公司 | Waterproof curtain and construction method thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105586978B (en) * | 2014-12-23 | 2019-01-18 | 中冶天工集团有限公司 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
-
2014
- 2014-12-23 CN CN201610103716.3A patent/CN105586978B/en active Active
- 2014-12-23 CN CN201410813752.XA patent/CN104631479B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19832935C1 (en) * | 1997-11-19 | 1999-12-16 | Bauer Spezialtiefbau | Method of production high pressure injected building foundation |
CN1635223A (en) * | 2003-12-26 | 2005-07-06 | 上海市基础工程公司 | Bridge cofferdam waterstop construction process |
CN101255689A (en) * | 2008-03-12 | 2008-09-03 | 何世鸣 | Long helical spraying-rotary stirring soilcement purdah pile as well as construction method thereof |
CN102286981A (en) * | 2011-07-15 | 2011-12-21 | 深圳市鸿荣轩建设工程有限公司 | Waterproof curtain and construction method thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105586978A (en) * | 2014-12-23 | 2016-05-18 | 中冶天工集团有限公司 | Construction method of soil replacement stir waterproof curtain based on gravels |
CN105586978B (en) * | 2014-12-23 | 2019-01-18 | 中冶天工集团有限公司 | Soil removal and replacement stirring water-stop curtain construction method based on gravel |
Also Published As
Publication number | Publication date |
---|---|
CN105586978A (en) | 2016-05-18 |
CN104631479A (en) | 2015-05-20 |
CN105586978B (en) | 2019-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103590425B (en) | A kind of Peaty soft soil stratum subway station construction technology | |
CN103938617B (en) | A kind of ultra-deep underground continuous wall and construction method thereof | |
KR101067707B1 (en) | The earth retaining wall and waterproof construction technique for which cast in place concrete pile and grouting column was used | |
CN204253056U (en) | A kind of shield machine export & import reinforcing structure | |
CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
CN106759297A (en) | A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits | |
CN106759473A (en) | The constructing structure and its construction method of underground pipe gallery and road | |
CN104963346A (en) | Support construction method for deep foundation pit in complex geological condition | |
CN104631479B (en) | The construction method of the water-stop curtain of soil removal and replacement stirring | |
CN201395793Y (en) | Long spiral high-pressure spraying mud injecting stirring pile-forming device | |
CN108265706A (en) | A kind of engineering pile and pile-formation process in solution cavity geology | |
CN111042249A (en) | Construction method of ultra-deep equal-thickness cement-soil mixing wall under complex geological condition | |
KR101527723B1 (en) | Complex Ground Improving Devive and Ground Improving Method Using The Same | |
CN110241836A (en) | A kind of construction method of embedding rock water-stop curtain | |
Brown | Practical considerations in the selection and use of continuous flight auger and drilled displacement piles | |
US3839871A (en) | Earthen dam repair | |
CN107060800A (en) | A kind of shield-tunneling construction huge stone handling construction method | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN110952528A (en) | Construction method of cement-soil underground continuous wall under complex geological conditions | |
CN105971637A (en) | Application of WSS construction method in shield end reinforcement of water-rich sand layer | |
KR101021915B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
CN106284295A (en) | Multichannel high-pressure vibro-grouting jet groutinl construction method | |
CN207862925U (en) | A kind of slip casting casing device | |
CN105350544A (en) | Waterproof curtain used for stone-contained area and construction method thereof | |
CN103774645B (en) | The construction method of a kind of soil cement and the stake of Combined concrete material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |