CN104614249B - Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information - Google Patents

Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information Download PDF

Info

Publication number
CN104614249B
CN104614249B CN201510036171.4A CN201510036171A CN104614249B CN 104614249 B CN104614249 B CN 104614249B CN 201510036171 A CN201510036171 A CN 201510036171A CN 104614249 B CN104614249 B CN 104614249B
Authority
CN
China
Prior art keywords
balancing gate
gate pit
sample
pressure
pressure chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510036171.4A
Other languages
Chinese (zh)
Other versions
CN104614249A (en
Inventor
林春金
袁永才
李利平
石少帅
杨为民
张乾青
周宗青
许振浩
王升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201510036171.4A priority Critical patent/CN104614249B/en
Publication of CN104614249A publication Critical patent/CN104614249A/en
Application granted granted Critical
Publication of CN104614249B publication Critical patent/CN104614249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information. The pressure chamber testing device includes a pressure chamber designed for anti-seepage sealing, wherein the pressure chamber is connected with an upper pressure plate tension transfer column system; a sample and a monitoring element are arranged inside the pressure chamber; the monitoring element is connected with data acquisition equipment outside the pressure chamber; the sample inside the pressure chamber is connected with the upper pressure plate tension transfer column system; the upper pressure plate tension transfer column system is connected with a header of the pressure chamber; a water pressing pipe is connected with the bottom of the sample; a base is arranged at the bottom of the pressure chamber; a confining pressure water inlet pipeline is arranged inside the base, and is communicated to the chamber body of the pressure chamber. According to the invention, the pressure chamber can be tested inside the chamber under the combined action of the confining pressure and water pressure on rock, so that the whole rock breaking process is visualized; besides, an osmotic pressure sensor, an acoustic emission sensor and an electrical resistivity sensor are all arranged on the sample to monitor the evolution law of breaking precursory information of rock under the action of the water pressure and the confining pressure, as a result, the rock breaking multivariate precursory information can be monitored under the action of water pressure.

Description

Balancing gate pit's experimental rig and experimental technique of the polynary precursor information of the monitoring rock failure mechanism of rock
Technical field
The present invention relates to the present invention relates to a kind of laboratory test pressure chamber arrangement, especially a kind of to make in hydraulic pressure for monitoring With balancing gate pit's experimental rig of the polynary precursor information of the lower rock failure mechanism of rock.
Background technology
With developing rapidly for China's tunnels and underground engineering, the scale of tunnels and underground engineering constantly expands, and buried depth is not Disconnected to increase, increasing engineering is transferred to Southwestern Karst Mountain Area.Affected by body of groundwater and karst, tunnel occurs the prominent mud of gushing water Accident is continuously increased, and thus results in substantial amounts of casualties and property loss.Substantial amounts of Engineering Projects shows, in prominent mud of gushing water etc. Geological disaster is bound to show a variety of precursor informations before occurring, by the accurate seizure to precursor information and identification, The Evolution of precursor information is fully grasped, the generation of disaster can be effectively forecast, it is to avoid casualties and property loss.Its In, by laboratory test to acting in hydraulic pressure under the polynary precursor information of the rock failure mechanism of rock study on monitoring be occur in research engineering it is prominent Gush disaster to provide fundamental basis.
Laboratory test is to carry out becoming more meticulous the effective means of test, by studying Practical Project in the key being badly in need of solving ask Topic and theory hypothesis, the Evolution for obtaining research object intension carrys out guiding construction.Traditional rock failure mechanism of rock information monitoring is difficult to Meet research requirement of the engineering project under complex geological condition, monitoring project is single, it is impossible to while realizing single shaft, three axle (σ23) stress;Meanwhile, the generation under by high-ground stress and high hydraulic pressure double action of non-study of rocks is destroyed before being discharged Million information;Lack the accurate test to sample inside osmotic pressure.
The content of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, there is provided the rock failure mechanism of rock is polynary under hydraulic pressure effect Precursor information monitors the pressure chamber arrangement of laboratory test, and the device integrates sound emission, resistivity and osmotic pressure monitoring and shortens Test period, strengthens the accuracy of data acquisition in process of the test;Simultaneously sample is met in single shaft and three axle (σ23) receive Experimental study under the conditions of power;The size of sample suitable for this pilot pressure chamber is devised, is conducive to building water under high pressure to rock The effect of sample;Sample realizes sample and confined pressure water, balancing gate pit and the sealing in the external world, truly simulates in bottom water pressure The overall process of the lower rock failure mechanism of rock of effect.
For achieving the above object, the present invention adopts following technical proposals:
Balancing gate pit's experimental rig of the polynary precursor information of the monitoring rock failure mechanism of rock, including balancing gate pit, balancing gate pit carries out antiseep Seal Design;The balancing gate pit is connected with upper platen power transmission column system, and sample and monitoring element are provided with the pressure room, described Data collection facility outside monitoring element connection pressure room, the sample in the pressure room connects with upper platen power transmission column system, The upper platen power transmission column system is connected with the top cover of balancing gate pit, and junction is provided with potted component;The bottom connection of the sample Pressure water pipe, junction is provided with potted component;The balancing gate pit bottom is pedestal, and confined pressure water water inlet pipe company is provided with the pedestal Balancing gate pit's chamber body is passed to, the opposite side of the pedestal is provided with Data Collection hole, and the monitoring element is carried out by Data Collection hole The collection of collection information and analysis.
The balancing gate pit is transparent pressure room, is made up of tempered glass materials, and thickness is 20mm, and strength and stiffness are larger, Transparent visual.
The top cover and pedestal of the balancing gate pit is provided with groove and carries out being engaged splicing, groove stitching position with the chamber body of balancing gate pit High-strength and waterproofing stickum is set, the sealing of balancing gate pit is enhanced.
The sample is cylinder, and the bottom hole of sample, the size of drilling is different, is simulated with this and is made in different injection amount With the rupture event of lower rock sample, rock sample ruptures many information under the conditions of collection different injection amount.
The monitoring element includes acoustic emission sensor, resistivity sensor and osmotic pressure sensor, the voice sending sensor Device and resistivity sensor are arranged on the wall of sample side, and carry out waterproof anti-explosion measure;The osmotic pressure sensor is located at sample It is internal.
The osmotic pressure sensor adopts miniature osmotic pressure sensor, it is ensured that the structural intergrity of rock sample.
High-strength and waterproofing stickum bonding is adopted at the Data Collection hole, is sealed.
Heat-shrink tube is enclosed with the sample outer wall, confined pressure medium is completely cut off with this and is infiltrated, affect test effect.
Air bleeding valve is provided with the top of the balancing gate pit.Air bleeding valve is carrying out three axle (σ23) drain in balancing gate pit before test Air, when triaxial test is carried out air bleeding valve is closed.
Tested using balancing gate pit's experimental rig, comprised the following steps:
Step 1:The placement of sample is carried out first, a small amount of butter is smeared in sample top and bottom, to reduce end friction;
Step 2:Monitoring element is laid, and is drawn data wire from Data Collection hole, then using high-strength anti- Water glass adhesive bonding, is sealed;
Step 3:Balancing gate pit's top cover is passed through into upper platen power transmission column system, along the groove and the groove of pedestal of balancing gate pit's top cover Transparent pressure room is laid, and using high-strength and waterproofing glass cement bonding;
Step 4:The installation of laboratory test balancing gate pit is finally completed, pressure water pipe is accessed and is goed deep into inside sample, in pedestal Lay confined pressure water water inlet pipe in portion.
When carrying out uniaxial test, confined pressure water water inlet pipe is closed in the step 4.
When carrying out triaxial test, in the step 4, confined pressure water water inlet pipe is opened, construct confined pressure σ of sample23
Balancing gate pit's experimental rig of the present invention is capable of achieving single shaft and three axle (σ23) test, close during uniaxial test There is no the confined pressure effect of water in confined pressure water inlet opening, sample.Three axle (σ23) under the conditions of confined pressure water, retain at pedestal and enclose The water inlet pipe of pressure water, water inlet pipe carries out fluid proof seal process with pedestal using high-strength and waterproofing glass cement.
Balancing gate pit's experimental rig of the present invention solves rock laboratory test balancing gate pit under confined pressure and hydraulic pressure collective effect Problem, realize the visualization of rock failure mechanism of rock overall process.Simultaneously osmotic pressure, sound emission and resistivity sensor are laid in into sample On, the Evolution that rock destroys precursor information under hydraulic pressure and confined pressure effect is monitored, realize the rock under hydraulic pressure effect and break The monitoring of bad polynary precursor information.Process of the test is more genuine and believable, and result of the test is more nearly with Practical Project.With following Advantage:
1st, balancing gate pit can strengthen the visualization of process of the test from the transparent material of high intensity, realize process of the test Observation directly perceived, is conducive to improving the accuracy of process of the test, it is ensured that the accuracy of result of the test;
2nd, balancing gate pit, using high-strength and waterproofing glass cement bonding, ensure that pressure from the larger tempered glass materials of rigidity The sealing of power room;
3rd, the various waterproof sealing means of pilot system appropriate design, according to device performance, give full play to respectively in different parts Plant the advantage of waterproof material;In particular according to seal request, devise be applied to repeatedly telescopic location be slidingly sealed method, can Ensure sealing of the balancing gate pit using process;
4th, using high-strength and waterproofing glass cement bonding, mounted inlet opening is sealed with Data Collection hole, materials letter Single, method is practical, reduces production cost.
5th, the construction of whole balancing gate pit is clear, and total quality is lighter, reduces difficulty of the equipment in moving process.
Description of the drawings
Fig. 1 is the structural representation of balancing gate pit's experimental provision of the present invention;
Fig. 2 is the vertical section schematic diagram of sample;
Fig. 3 a are the schematic cross section of the sample that cross section is 10mm × 10mm;
Fig. 3 b are the schematic cross section of the sample that cross section is 10mm × 15mm;
Fig. 3 c are the schematic cross section of the sample that cross section is 10mm × 20mm;
In figure, platen power transmission column system is 1. gone up;2. air bleeding valve;3.O type sealing rings;4. balancing gate pit's top cover;5. safety glass; 6. osmotic pressure sensor;7. resistivity sensor;8. acoustic emission sensor;9. pressure water pipe;10. confined pressure water inlet opening;11. data Collect hole;12. balancing gate pit's bottom bases;13. heat-shrink tubes;A is sample.
Specific embodiment
With reference to the accompanying drawings and examples the present invention is further described.
As shown in figure 1, for balancing gate pit's experimental rig of monitoring polynary precursor information of the rock failure mechanism of rock under hydraulic pressure effect, bag Transparent balancing gate pit is included, balancing gate pit includes balancing gate pit's top cover 4, safety glass 5, pedestal 12, and balancing gate pit adopts high-strength and waterproofing glass It is gluing to connect;Upper platen 1 is connected with balancing gate pit's top cover 4, and the two carries out sliding sealing process using O-ring seal;Upper platen 1 with Sample A connects, and Sample A top and bottom smears part butter;The bottom of Sample A is sealed using O-ring seal, has been prevented Pressure water seepage, confined pressure water enters balancing gate pit by confined pressure water inlet opening 10;Acoustic emission sensor 8, resistivity sensor 7 and osmotic pressure Sensor 6 is deployed to respectively in Sample A, and precursor information gathered data line connects external equipment by Data Collection hole 11;There is pressure Joint at the connection pedestal 12 of water pipe 9, there is provided water under high pressure.Sample closes confined pressure water inlet opening when uniaxial compression test is carried out 10, carry out three axle (σ23) test when, Sample A carries out waterproof using heat-shrink tube 13, during water filling open air bleeding valve 2, when filling Close air bleeding valve 2.Osmotic pressure sensor 6, resistivity sensor 7, acoustic emission sensor 8 are respectively adopted embedment and glue glutinous mode, In being laid in Sample A.
Transparent pressure room, is made using tempered glass materials, and thickness is 20mm, and strength and stiffness are larger, transparent visual.
As shown in Fig. 2-Fig. 3 c, sample is cylinder, and size is Φ 50mm × 100mm, bottom hole, hole depth 60mm, hole Cross-sectional area (long and wide) size be divided into 10mm × 10mm, 10mm × 15mm, 10mm × 20mm.
When carrying out uniaxial compression test, the placement of sample is carried out first, a small amount of butter is smeared in sample top and bottom, to subtract Small end rubs, and monitoring element is laid by test requirements document, and draws data wire from Data Collection hole, then adopts High-strength and waterproofing glass cement bonding, is sealed;The platen through on force-transmitting pole, along groove transparent pressure room is laid, and using high-strength Waterproof glass is gluing to be connect, and finally completes the installation of laboratory test balancing gate pit, is accessed pressure water pipe and is goed deep into inside sample, while confined pressure Water water inlet pipe is closed.Three axle (σ23) test need to only access confined pressure water, open the water inlet pipe of confined pressure water, construction examination Confined pressure (the σ of sample23)。
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not to present invention protection model The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need the various modifications made by paying creative work or deformation still within protection scope of the present invention.

Claims (9)

1. the experimental technique based on the balancing gate pit's experimental rig for monitoring the polynary precursor information of the rock failure mechanism of rock, is characterized in that,
Balancing gate pit's experimental rig includes balancing gate pit, and balancing gate pit carries out fluid proof seal design;The balancing gate pit and upper platen Power transmission column system is connected, and sample and monitoring element, the data outside the monitoring element connection pressure room are provided with the pressure room Collecting device, the sample in the pressure room connects with upper platen power transmission column system, the upper platen power transmission column system and pressure The top cover of room is connected, and junction is provided with potted component;The bottom of the sample is connected with pressure pipe, and junction is provided with sealing unit Part;The balancing gate pit bottom is pedestal, confined pressure water inlet channel is provided with the pedestal and is communicated to balancing gate pit's chamber body, the pedestal Opposite side be provided with Data Collection hole, the monitoring element is acquired the collection and analysis of information by Data Collection hole;
Experimental technique is comprised the following steps:
Step 1:The placement of sample is carried out first, a small amount of butter is smeared in sample top and bottom, to reduce end friction;
Step 2:Monitoring element is laid, and is drawn data wire from Data Collection hole, then using high-strength and waterproofing glass Glass is gluing to be connect, and is sealed;
Step 3:Balancing gate pit's top cover is passed through into upper platen power transmission column system, is laid along the groove of balancing gate pit's top cover and the groove of pedestal Transparent pressure room, and using high-strength and waterproofing glass cement bonding;
Step 4:The installation of laboratory test balancing gate pit is finally completed, pressure water pipe is accessed and is goed deep into inside sample, in base interior cloth If confined pressure water water inlet pipe.
2. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, described when carrying out uniaxial test Confined pressure water water inlet pipe is closed in step 4;When carrying out triaxial test, in the step 4, confined pressure water water inlet pipe is opened, Confined pressure σ of construction sample23
3. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, the balancing gate pit is transparent pressure Room, is made up of tempered glass materials.
4. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, the top cover and base of the balancing gate pit Seat is provided with groove and carries out being engaged splicing with the chamber body of balancing gate pit, and groove stitching position arranges high-strength and waterproofing stickum.
5. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, the sample is cylinder, is tried The bottom hole of sample, the size of drilling is different.
6. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, the monitoring element is sent out including sound Sensor, resistivity sensor and osmotic pressure sensor are penetrated, the acoustic emission sensor and resistivity sensor are arranged on sample side On wall;The osmotic pressure sensor is located at the inside of sample.
7. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, adopt at the Data Collection hole High-strength and waterproofing stickum bonding.
8. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, be enclosed with the sample outer wall Heat-shrink tube.
9. the experimental technique of balancing gate pit's experimental rig as claimed in claim 1, is characterized in that, be provided with the top of the balancing gate pit Air bleeding valve.
CN201510036171.4A 2015-01-23 2015-01-23 Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information Active CN104614249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510036171.4A CN104614249B (en) 2015-01-23 2015-01-23 Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510036171.4A CN104614249B (en) 2015-01-23 2015-01-23 Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information

Publications (2)

Publication Number Publication Date
CN104614249A CN104614249A (en) 2015-05-13
CN104614249B true CN104614249B (en) 2017-05-10

Family

ID=53148796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510036171.4A Active CN104614249B (en) 2015-01-23 2015-01-23 Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information

Country Status (1)

Country Link
CN (1) CN104614249B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106092396B (en) * 2015-05-19 2018-12-14 沈雪梅 A kind of test device of crustal stress
CN104977234B (en) * 2015-06-23 2018-02-27 安徽理工大学 Pressure-bearing rock failure mechanism of rock Instability and dynamic permeability characteristic test device and method
GB2543535A (en) * 2015-10-21 2017-04-26 Rolls Royce Plc Test methods and apparatus
CN105973712A (en) * 2015-12-21 2016-09-28 河南理工大学 Acoustic emission testing device used in gassy coal rock fracturing process
CN105974056B (en) * 2016-04-30 2019-03-26 山东大学 Tunnel water bursting disaster precursor information monitoring model pilot system and test method
CN108169028A (en) * 2018-01-29 2018-06-15 武汉龙澄环境装备有限公司 Container water test unit
CN108398342B (en) * 2018-02-28 2020-05-12 华东交通大学 Acoustic emission testing device for rock mass in high confining pressure unloading and operation method thereof
CN109374499A (en) * 2018-11-12 2019-02-22 华侨大学 A kind of rock seepage pressure room of receivable acoustic emission signal
CN109613119A (en) * 2019-01-11 2019-04-12 山东科技大学 A kind of acoustic-electric seeps quasi- triaxial cell and the test method of comprehensive monitoring
CN109708975B (en) * 2019-01-24 2021-07-30 河南城建学院 Anti-noise interference type single-shaft loading sample cylinder and using method thereof
CN113607541A (en) * 2021-08-12 2021-11-05 重庆大学 Visual survey device of rock mechanics experiment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5159828A (en) * 1990-08-31 1992-11-03 Exxon Production Research Company Microaccumulator for measurement of fluid volume changes under pressure
CN101231226A (en) * 2008-01-29 2008-07-30 成都理工大学 Rock high pressure infiltration experiment system
CN103868993A (en) * 2014-03-24 2014-06-18 长江水利委员会长江科学院 Method and device for acoustic discrimination of multistage yield points by rock triaxial single sample method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5159828A (en) * 1990-08-31 1992-11-03 Exxon Production Research Company Microaccumulator for measurement of fluid volume changes under pressure
CN101231226A (en) * 2008-01-29 2008-07-30 成都理工大学 Rock high pressure infiltration experiment system
CN103868993A (en) * 2014-03-24 2014-06-18 长江水利委员会长江科学院 Method and device for acoustic discrimination of multistage yield points by rock triaxial single sample method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"北山花岗岩三轴压缩条件下声发射特性研究";宗自华等;《铀矿地质》;20130331;第29卷(第2期);第123-128页 *

Also Published As

Publication number Publication date
CN104614249A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104614249B (en) Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information
WO2022088454A1 (en) Testing system and method for simulating change in tunnel excavation seepage under complex geological conditions
CN110578498B (en) Self-adaptive air release rod and shallow layer air controlled air release recovery system and method
CN105758561B (en) Based on the uniform water pressure supporing device and method of visualization
CN103293023B (en) Original state sampling method for constructed fractured rock mass
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN104614296B (en) The two-dimentional rock mass of fracture network seepage flow dynamic real-time monitoring system of visualization and method
CN103821183A (en) Testing apparatus for simulating phenomenon and law of soil heave-piping failure
CN108049847A (en) A kind of twin packer layering water plug and method
CN103091222A (en) Device for simulating and testing water burst of tunnel fissure
CN208969089U (en) The controllable seabed shield tunnel model test apparatus of leak source position, crack width
CN103035158A (en) Experiment device used for simulating goaf filling process
CN105699118A (en) Soil sampler directly used for undisturbed-sample dynamic characteristic test
CN110847250A (en) Visual test model and method considering influence of seepage loading on rail transit
CN206459937U (en) A kind of packer permeability test device of engineering geological investigation
CN107588877A (en) A kind of recyclable geostress survey device
CN110082220A (en) A kind of porous guiding fracturing experiments device of true triaxial
CN207882116U (en) A kind of rock permeability instrument pressure head equipped with point water plate
CN206397498U (en) A kind of downhole drill gas detection logging test device
CN203441447U (en) Visual horizontal well gravel filling simulation test device
CN206800384U (en) Steel conduit device for cast-in-situ bored pile
CN105401934B (en) A kind of visual simulation pit shaft experimental provision
CN208313767U (en) A kind of rock stress coupling test instrument
CN203069483U (en) Tunnel fracture water gushing simulation test equipment
CN216524522U (en) Outer water pressure test equipment of rich water stratum tunnel lining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lin Chunjin

Inventor after: Yuan Yongcai

Inventor after: Li Liping

Inventor after: Shi Shaoshuai

Inventor after: Yang Weimin

Inventor after: Zhang Qianqing

Inventor after: Zhou Zongqing

Inventor after: Xu Zhenhao

Inventor after: Wang Sheng

Inventor before: Li Shucai

Inventor before: Yuan Yongcai

Inventor before: Li Liping

Inventor before: Shi Shaoshuai

Inventor before: Yang Weimin

Inventor before: Zhang Qianqing

Inventor before: Zhou Zongqing

Inventor before: Xu Zhenhao

Inventor before: Wang Sheng

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant