CN104612303B - A kind of disassembly-free heat-insulation floor modules unit - Google Patents
A kind of disassembly-free heat-insulation floor modules unit Download PDFInfo
- Publication number
- CN104612303B CN104612303B CN201510007652.2A CN201510007652A CN104612303B CN 104612303 B CN104612303 B CN 104612303B CN 201510007652 A CN201510007652 A CN 201510007652A CN 104612303 B CN104612303 B CN 104612303B
- Authority
- CN
- China
- Prior art keywords
- floor
- floor body
- groove
- disassembly
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
- Building Environments (AREA)
Abstract
本发明涉及一种免拆保温楼板模块单元,包括加工为一体的楼板本体和骨架支撑构件,楼板本体采用采用高强度EPS苯板,防火、防水,保温、隔热性能好;楼板本体的两侧设有企口,相邻两个楼板本体之间无缝连接,操作方便,效率高,施工周期短;楼板本体上设有中心槽,中心槽内固定设有钢筋,楼板本体上表面固定设有钢丝网,现浇混凝土后,楼板本体与钢筋及钢丝网连接为一体,保证了楼板的高强度,有效避免混凝土粉碎裂缝现象的发生;楼板本体上表面设有用于容纳地暖管线的地暖管道凹槽,地暖管线三面包裹在楼板本体内,热量只能通过混凝土向上传递,有效避免了热量的损失,节能效果好;楼板本体可根据施工需要现场进行切割、排布,适应性强。
The invention relates to a disassembly-free thermal insulation floor module unit, which includes a floor body and a skeleton support member that are processed as one. The floor body adopts high-strength EPS benzene board, which is fireproof, waterproof, and has good heat preservation and heat insulation performance; the two sides of the floor body There is a tongue and groove, seamless connection between two adjacent floor bodies, convenient operation, high efficiency, and short construction period; there is a central groove on the floor body, steel bars are fixed in the center groove, and fixed on the upper surface of the floor body. Steel wire mesh, after cast-in-place concrete, the floor body is connected with steel bars and steel wire mesh as a whole, which ensures the high strength of the floor and effectively avoids the occurrence of concrete crushing and cracking; the upper surface of the floor body is provided with floor heating pipe grooves for accommodating floor heating pipelines , The floor heating pipeline is wrapped in the floor body on three sides, and the heat can only be transmitted upwards through the concrete, which effectively avoids heat loss and has a good energy-saving effect; the floor body can be cut and arranged on site according to the construction needs, and has strong adaptability.
Description
技术领域technical field
本发明涉及一种建筑模板,适用于绿色建筑,具体地说,涉及一种免拆保温楼板模块单元,属于建筑技术领域。The invention relates to a building formwork, which is suitable for green buildings, in particular to a modular unit of a non-dismantling thermal insulation floor, which belongs to the field of building technology.
背景技术Background technique
目前,多层和高层建筑主要采用现浇混凝土结构,在现浇钢筋混凝土结构施工中,模板是一种量大面广的重要施工工具,无论在占用时间、费用以及工程质量方面都占有很大比重。模板是在施工中使混凝土构件按设计的几何尺寸浇铸成型的模型,是钢筋混凝土工程的重要组成部分,现浇钢筋混凝土结构用模板的造价约占钢筋混凝土总造价的30%,总用工量的50%。At present, multi-storey and high-rise buildings mainly adopt cast-in-place concrete structures. In the construction of cast-in-place reinforced concrete structures, formwork is an important construction tool with a large quantity and a wide range. proportion. Formwork is a model that makes concrete components cast according to the designed geometric dimensions during construction. It is an important part of reinforced concrete engineering. The cost of formwork for cast-in-place reinforced concrete structures accounts for about 30% of the total cost of reinforced concrete. 50%.
建筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、构件按规定的位置、几何尺寸成形,保持其正确位置,并承受建筑模板自重及作用在其上的外部荷载。现有技术中采用的建筑模板主要为木质模板或组合钢模板,施工结束后,拆除所使用的建筑模板,还需要另外再做防火、防水和保温层,施工步骤繁琐;整体强度较低,抗震等级较低,且受到强大外力作用破坏时,居民楼呈粉碎性倒塌的现象屡有发生,给居民带来极大的安全隐患;节能效果差;施工周期长、成本高。The building formwork is a temporary support structure, which is manufactured according to the design requirements, so that the concrete structure and components are formed according to the specified position and geometric size, maintain their correct position, and bear the self-weight of the building formwork and the external load acting on it. The building formwork used in the prior art is mainly wooden formwork or combined steel formwork. After the construction is completed, the used building formwork needs to be removed, and additional fire protection, waterproof and insulation layers are required. The construction steps are cumbersome; the overall strength is low, and the earthquake resistance The grade is low, and when it is damaged by strong external force, the phenomenon of shattered collapse of residential buildings occurs frequently, which brings great safety hazards to residents; the energy saving effect is poor; the construction period is long and the cost is high.
发明内容Contents of the invention
本发明所要解决的技术问题是针对以上不足,提供一种免拆保温墙体模块单元,具有防火、防水和保温、隔热性能好的优点,相邻模块单元之间连接方便、紧密,效率高,施工周期短;整体强度高;节能效果好;适应性强。The technical problem to be solved by the present invention is to provide a dismantling-free thermal insulation wall module unit, which has the advantages of fire prevention, waterproof, heat preservation and heat insulation performance, and the connection between adjacent module units is convenient and tight, and the efficiency is high. , short construction period; high overall strength; good energy-saving effect; strong adaptability.
为解决上述技术问题,本发明的技术方案是:一种免拆保温楼板模块单元,其特征在于:所述模块单元包括连接为一体的楼板本体和骨架支撑构件;In order to solve the above technical problems, the technical solution of the present invention is: a modular unit of a non-dismantling thermal insulation floor, which is characterized in that: the modular unit includes a floor body and a skeleton support member connected as one;
所述楼板本体为长方体EPS苯板;The floor body is a cuboid EPS benzene board;
所述骨架支撑构件为镀锌钢板;The skeleton supporting member is a galvanized steel plate;
所述骨架支撑构件上贯穿有若干个通孔。Several through holes run through the skeleton supporting member.
一种优化方案,所述楼板本体上表面上设有地暖管道凹槽,地暖管道凹槽内用于容纳地暖管道。In an optimized solution, a floor heating pipe groove is provided on the upper surface of the floor body, and the floor heating pipe groove is used to accommodate the floor heating pipe.
另一种优化方案,所述楼板本体的中部沿长度方向设有中心槽,中心槽的底部与楼板本体的底面之间具有一定距离;Another optimization scheme, the middle part of the floor body is provided with a central groove along the length direction, and there is a certain distance between the bottom of the center groove and the bottom surface of the floor body;
所述中心槽包括底端和开口端,底端和开口端间设有中间部,中心槽的底端为燕尾槽,中心槽开口端的侧壁与楼板本体的顶面采用圆弧过渡连接,中间部的截面为矩形。The central groove includes a bottom end and an open end, and a middle part is arranged between the bottom end and the open end. The section of the part is rectangular.
再一种优化方案,所述骨架支撑构件包括呈L型的骨架本体,骨架本体连接有支撑部,支撑部贴合在骨架本体的外侧,支撑部的上端与骨架本体的上端连接为一体,支撑部的下端与骨架本体的底部之间具有间隙。In another optimized solution, the skeleton support member includes an L-shaped skeleton body, the skeleton body is connected with a support portion, the support portion is attached to the outside of the skeleton body, the upper end of the support portion is connected with the upper end of the skeleton body as a whole, and supports There is a gap between the lower end of the part and the bottom of the frame body.
进一步的优化方案,所述骨架本体的高度大于中心槽的底部与楼板本体的底面之间的距离,骨架本体的高度小于楼板本体高度的一半。In a further optimization solution, the height of the skeleton body is greater than the distance between the bottom of the central groove and the bottom surface of the floor body, and the height of the skeleton body is less than half of the height of the floor body.
再进一步的优化方案,所述楼板本体上设有钢筋支架,钢筋支架设置在中心槽的底部;In a further optimization scheme, the floor body is provided with a steel bar support, and the steel bar support is arranged at the bottom of the central groove;
所述钢筋支架包括底座和支架本体,底座设有两个,支架本体位于两个底座的中心上方,底座和支架本体之间连接有支撑架,支架本体的中部设有用于容纳钢筋的凹槽,底座的下方设有用于与模块本体固定连接的固定部,固定部采用尖端朝下的锲型结构。The steel bar support includes a base and a support body. There are two bases. The support body is located above the centers of the two bases. A support frame is connected between the base and the support body. The middle part of the support body is provided with a groove for accommodating steel bars. A fixing part for fixed connection with the module body is provided under the base, and the fixing part adopts a wedge-shaped structure with the tip pointing downward.
更进一步的优化方案,所述楼板本体上设有钢丝网支架,钢丝网支架设置在楼板本体的顶面上;In a further optimization scheme, the floor body is provided with a steel wire mesh support, and the steel wire mesh support is arranged on the top surface of the floor body;
所述钢丝网支架包括底座和支架本体,底座设有四个,支架本体位于四个底座的中心上方,底座和支架本体之间连接有支撑架,支架本体的中部设有用于容纳钢丝网的十字型凹槽,底座的下方设有用于与模块本体固定连接的固定部,固定部采用尖端朝下的锲型结构。The steel wire mesh support includes a base and a support body. There are four bases. The support body is located above the centers of the four bases. A support frame is connected between the base and the support body. The middle part of the support body is provided with a cross for accommodating the steel wire mesh. Type groove, the bottom of the base is provided with a fixing part for fixed connection with the module body, and the fixing part adopts a wedge-shaped structure with the tip facing down.
再进一步的优化方案,所述骨架支撑构件包括呈L型的骨架本体,骨架本体连接有支撑部,支撑部设置在骨架本体的外侧,支撑部的上端与骨架本体的上端之间设有连接部,支撑部、连接部和骨架本体三者连接为一体,支撑部的下端与骨架本体的底部之间具有间隙,骨架本体的高度大于中心槽的底部与楼板本体的底面之间的距离,骨架本体的高度小于楼板本体高度的一半。In a further optimization solution, the skeleton support member includes an L-shaped skeleton body, the skeleton body is connected with a support portion, the support portion is arranged outside the skeleton body, and a connection portion is provided between the upper end of the support portion and the upper end of the skeleton body , the supporting part, the connecting part and the skeleton body are connected as a whole, there is a gap between the lower end of the supporting part and the bottom of the skeleton body, the height of the skeleton body is greater than the distance between the bottom of the central groove and the bottom surface of the floor body, and the skeleton body The height is less than half of the height of the floor body.
再进一步的优化方案,所述骨架支撑构件包括两个相背设置的呈L型的骨架本体,两个骨架本体的上端连接为一体,骨架本体的高度大于中心槽的底部与楼板本体的底面之间的距离,骨架本体的高度小于楼板本体高度的一半。In a further optimization scheme, the skeleton support member includes two L-shaped skeleton bodies arranged opposite to each other, the upper ends of the two skeleton bodies are connected as one, and the height of the skeleton bodies is greater than the distance between the bottom of the central groove and the bottom surface of the floor body. The distance between them, the height of the skeleton body is less than half of the height of the floor body.
再进一步的优化方案,所述楼板本体上贯穿有若干个通孔,通孔的的方向与楼板本体的长度方向一致,通孔用于实现自然风的交换或容纳水电管线。In a further optimization scheme, there are several through holes running through the floor body, and the direction of the through holes is consistent with the length direction of the floor body. The through holes are used to realize the exchange of natural wind or accommodate water and electricity pipelines.
本发明采用以上技术方案,与现有技术相比,具有以下优点:楼板模块单元包括加工为一体的楼板本体和骨架支撑构件,楼板本体采用高强度EPS苯板,具有防火、防水和保温、隔热性能好的优点;楼板本体的两侧设有企口,相邻两个楼板本体之间无缝连接,操作方便,效率高,施工周期短;楼板本体上设有中心槽,中心槽内固定设有钢筋,楼板本体上表面固定设有钢丝网,现浇混凝土后,楼板本体与钢筋及钢丝网连接为一体,保证了楼板的高强度,有效避免混凝土粉碎裂缝现象的发生;楼板本体上表面设有用于容纳地暖管线的地暖管道凹槽,地暖管线三面包裹在楼板本体内,热量只能通过混凝土向上传递,有效避免了热量的损失,节能效果好;楼板本体可根据施工需要现场进行切割、排布,适应性强。The present invention adopts the above technical scheme, and compared with the prior art, it has the following advantages: the floor module unit includes a processed floor body and a skeleton support member, and the floor body adopts high-strength EPS benzene board, which has fireproof, waterproof, heat preservation, and insulation The advantages of good thermal performance; there are grooves on both sides of the floor body, seamless connection between two adjacent floor bodies, convenient operation, high efficiency, and short construction period; there is a central groove on the floor body, and the center groove is fixed Steel bars are provided, and steel wire mesh is fixed on the upper surface of the floor body. After pouring concrete, the floor body is connected with steel bars and steel wire mesh as a whole, which ensures the high strength of the floor slab and effectively avoids the occurrence of concrete crushing cracks; the upper surface of the floor body There is a floor heating pipeline groove for accommodating the floor heating pipeline. The floor heating pipeline is wrapped in the floor body on three sides, and the heat can only be transmitted upward through the concrete, which effectively avoids heat loss and has a good energy-saving effect; the floor body can be cut on site according to construction needs. Arrangement, strong adaptability.
下面结合附图和实施例对本发明进行详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
附图说明Description of drawings
附图1是本发明实施例1中模块单元的结构示意图;Accompanying drawing 1 is the structural representation of the module unit in the embodiment 1 of the present invention;
附图2是本发明实施例1中模块本体的结构示意图;Accompanying drawing 2 is the schematic structural diagram of the module body in Embodiment 1 of the present invention;
附图3是本发明实施例1中模块本体的另一结构示意图;Accompanying drawing 3 is another schematic structural diagram of the module body in Embodiment 1 of the present invention;
附图4是本发明实施例1中骨架支撑构件的结构示意图;Accompanying drawing 4 is the structural representation of skeleton support member in the embodiment 1 of the present invention;
附图5是本发明实施例1中钢筋支架的结构示意图;Accompanying drawing 5 is the structural representation of reinforcing bar support in the embodiment 1 of the present invention;
附图6是本发明实施例1中钢丝网支架的结构示意图;Accompanying drawing 6 is the structural representation of wire mesh support in the embodiment of the present invention 1;
附图7是本发明实施例2中骨架支撑构件的结构示意图;Accompanying drawing 7 is the structural representation of skeleton support member in the embodiment 2 of the present invention;
附图8是本发明实施例3中骨架支撑构件的结构示意图。Accompanying drawing 8 is the schematic structural view of the skeleton supporting member in the embodiment 3 of the present invention.
图中,In the figure,
1-楼板本体,11-中心槽,110-底端,111-中间部,112-开口端,12-通风孔,13-第一通孔,14-第二通孔,15-连接凹槽,16-连接凸榫,17-地暖管道凹槽,2-骨架支撑构件,21-骨架本体,22-支撑部,23-连接部,24-通孔,3-钢筋支架,31-底座,32-支架本体,33-凹槽,34-固定部,35-支撑架,4-钢丝网支架,41-底座,42-支架本体,43-凹槽,44-固定部,45-支撑架,5-钢筋,6-钢丝网。1-floor body, 11-central groove, 110-bottom, 111-middle part, 112-open end, 12-ventilation hole, 13-first through hole, 14-second through hole, 15-connecting groove, 16-connection tenon, 17-floor heating pipe groove, 2-skeleton support member, 21-skeleton body, 22-support part, 23-connection part, 24-through hole, 3-rebar support, 31-base, 32- Bracket body, 33-groove, 34-fixed part, 35-support frame, 4-wire mesh bracket, 41-base, 42-bracket body, 43-groove, 44-fixed part, 45-support frame, 5- Steel bars, 6-wire mesh.
具体实施方式detailed description
实施例1,如图1和图2所示,一种免拆保温楼板模块单元,包括模块本体,模块本体包括加工为一体的楼板本体1和骨架支撑构件2,所述楼板本体1采用高强度EPS苯板制作,骨架支撑构件2采用镀锌钢板制作。Embodiment 1, as shown in Figures 1 and 2, a modular unit for a non-disassembly-free thermal insulation floor, including a module body, the module body includes a floor body 1 and a skeleton support member 2 processed as one, and the floor body 1 adopts high-strength It is made of EPS benzene board, and the skeleton supporting member 2 is made of galvanized steel plate.
所述楼板本体1为矩形板,楼板本体1的一侧沿长度方向设有连接凹槽15,楼板本体1与连接凹槽15相对的侧面上沿长度方向设有连接凸榫16,所述连接凹槽15用于与相邻的楼板本体1上的连接凸榫16配合,实现相连两块楼板本体1的紧密配合。The floor body 1 is a rectangular plate, one side of the floor body 1 is provided with a connection groove 15 along the length direction, and the side surface of the floor body 1 opposite to the connection groove 15 is provided with a connection tenon 16 along the length direction. The groove 15 is used to cooperate with the connecting tenon 16 on the adjacent floor slab bodies 1 to realize the tight fit between two connected floor slab bodies 1 .
楼板本体1的中部沿长度方向设有中心槽11,所述中心槽11的底部与楼板本体1的底面之间具有一定距离,中心槽11包括底端110和开口端112,底端110和开口端112之间设有中间部111,中心槽11的底端110为燕尾槽,中心槽11开口端112的侧壁与楼板本体1的顶面采用圆弧过渡连接,中间部111的截面为矩形,所述中心槽11的结构有利于混凝土的灌注。The middle part of the floor body 1 is provided with a central groove 11 along the length direction. There is a certain distance between the bottom of the central groove 11 and the bottom surface of the floor body 1. The central groove 11 includes a bottom end 110 and an opening end 112. The bottom end 110 and the opening There is a middle part 111 between the ends 112, the bottom 110 of the central groove 11 is a dovetail groove, the side wall of the opening end 112 of the central groove 11 is connected with the top surface of the floor body 1 by a circular arc transition, and the cross section of the middle part 111 is rectangular , the structure of the central groove 11 is conducive to the pouring of concrete.
中心槽11两侧的楼板本体1上分别贯穿有用于交换自然风的通风孔12,通风孔12的方向与楼板本体1的长度方向一致,通风孔12与中心槽11之间的楼板本体1上贯穿有第一通孔13和第二通孔14,第一通孔13和第二通孔14的方向均与楼板本体1的长度方向一致,第一通孔13和第二通孔14可用于容纳水管、电线等。The floor body 1 on both sides of the central groove 11 is respectively pierced with ventilation holes 12 for exchanging natural wind. The direction of the ventilation holes 12 is consistent with the length direction of the floor body 1. There are a first through hole 13 and a second through hole 14, the direction of the first through hole 13 and the second through hole 14 are consistent with the length direction of the floor body 1, the first through hole 13 and the second through hole 14 can be used for Holds water pipes, wires, etc.
如图3所示,楼板本体1的上表面上设有地暖管道凹槽17,地暖管道凹槽17用于铺设地暖管道18,地暖管道凹槽17的设置方向与楼板本体1的宽度方向一致,地暖管道18在地暖管道凹槽17内迂回设置,采用此结构,供暖热效率高,无浪费能源。As shown in Figure 3, floor heating pipe grooves 17 are provided on the upper surface of the floor body 1, and the floor heating pipe grooves 17 are used for laying floor heating pipes 18. The setting direction of the floor heating pipe grooves 17 is consistent with the width direction of the floor body 1. The floor heating pipeline 18 is arranged circuitously in the floor heating pipeline groove 17. With this structure, the heating thermal efficiency is high and there is no waste of energy.
如图4所示,骨架支撑构件2包括呈L型的骨架本体21,骨架本体21连接有支撑部22,支撑部22贴合在骨架本体21的外侧,支撑部22的上端与骨架本体21的上端连接为一体,支撑部22的下端与骨架本体21的底部之间具有间隙,骨架本体21的高度大于中心槽11的底部与楼板本体1的底面之间的距离,骨架本体21的高度小于楼板本体1高度的一半,便于实现楼板本体1的切割,以满足工程布线需要。As shown in Figure 4, the skeleton supporting member 2 comprises the skeleton body 21 that is L-shaped, and the skeleton body 21 is connected with the support portion 22, and the support portion 22 is attached to the outside of the skeleton body 21, and the upper end of the support portion 22 is connected with the frame body 21. The upper end is connected as a whole, there is a gap between the lower end of the support part 22 and the bottom of the skeleton body 21, the height of the skeleton body 21 is greater than the distance between the bottom of the central groove 11 and the bottom surface of the floor body 1, and the height of the skeleton body 21 is smaller than that of the floor Half of the height of the body 1 is convenient for cutting the floor body 1 to meet the needs of engineering wiring.
一块楼板本体1上设有两个相对设置的骨架支撑构件2,骨架本体21设置在靠近楼板本体1侧面的一侧,骨架本体21的底面与楼板本体1的底面紧密贴合。A floor body 1 is provided with two opposite skeleton support members 2 , the skeleton body 21 is arranged on the side close to the side of the floor body 1 , and the bottom surface of the skeleton body 21 is closely attached to the bottom surface of the floor body 1 .
骨架支撑构件2上设有若干个贯穿骨架本体21和支撑部22的通孔24,所有通孔24的中心位于同一条直线上,该直线与楼板本体1的长度方向一致,通孔24的设置使得楼板本体1与骨架支撑构件2连接紧密,易于加工为一体。The frame supporting member 2 is provided with several through holes 24 that pass through the frame body 21 and the support portion 22. The centers of all the through holes 24 are located on the same straight line, which is consistent with the length direction of the floor body 1. The setting of the through holes 24 The floor slab body 1 is closely connected with the skeleton supporting member 2 and is easy to be processed into one body.
如图5所示,中心槽11的底部设有钢筋支架3,钢筋支架3用于支撑钢筋5,所述钢筋支架3包括底座31和支架本体32,底座31设有两个,支架本体32位于两个底座31的中心上方,底座31和支架本体32之间连接有支撑架35,支架本体32的中部设有用于容纳钢筋的凹槽33,底座31的下方设有用于与模块本体固定连接的固定部34,固定部34采用尖端朝下的锲型结构,以利于将钢筋支架3与模块本体固定连接。As shown in Figure 5, the bottom of the central groove 11 is provided with a reinforcement support 3, the reinforcement support 3 is used to support the reinforcement 5, the reinforcement support 3 includes a base 31 and a support body 32, the base 31 is provided with two, and the support body 32 is located at Above the centers of the two bases 31, a support frame 35 is connected between the base 31 and the bracket body 32, the middle part of the bracket body 32 is provided with a groove 33 for accommodating steel bars, and the bottom of the base 31 is provided with a fixed connection with the module body. The fixing part 34 adopts a wedge-shaped structure with the tip pointing down, so as to facilitate the fixed connection of the steel bar bracket 3 and the module body.
如图6所示,楼板本体1的顶面上设有钢丝网支架4,钢丝网支架4用于支撑楼板顶部灌注用钢丝网6,所述钢丝网支架4包括底座41和支架本体42,底座41设有四个,支架本体42位于四个底座41的中心上方,底座41和支架本体42之间连接有支撑架45,支架本体42的中部设有用于容纳钢丝网的十字型凹槽43,底座41的下方设有用于与模块本体固定连接的固定部44,固定部44采用尖端朝下的锲型结构,以利于将钢丝网支架4与模块本体固定连接。As shown in Figure 6, a steel wire mesh support 4 is provided on the top surface of the floor body 1, and the steel mesh support 4 is used to support the steel wire mesh 6 for filling the top of the floor. The steel mesh support 4 includes a base 41 and a support body 42, and the base 41 is provided with four, and the bracket body 42 is located above the centers of the four bases 41. A support frame 45 is connected between the base 41 and the bracket body 42. The middle part of the bracket body 42 is provided with a cross-shaped groove 43 for accommodating steel wire mesh. The bottom of the base 41 is provided with a fixed part 44 for fixed connection with the module body. The fixed part 44 adopts a wedge-shaped structure with the tip pointing down, so as to facilitate the fixed connection of the wire mesh support 4 with the module body.
实施例2,如图7所示,骨架支撑构件2包括呈L型的骨架本体21,骨架本体21连接有支撑部22,支撑部22设置在骨架本体21的外侧,支撑部22的上端与骨架本体21的上端之间设有连接部23,支撑部22、连接部23和骨架本体21三者连接为一体,支撑部22的下端与骨架本体21的底部之间具有间隙,骨架本体21的高度大于中心槽11的底部与楼板本体1的底面之间的距离,骨架本体21的高度小于楼板本体1高度的一半,便于实现楼板本体1的切割,以满足工程布线需要。Embodiment 2, as shown in Figure 7, the skeleton supporting member 2 comprises the skeleton body 21 that is L-shaped, and the skeleton body 21 is connected with the support portion 22, and the support portion 22 is arranged on the outside of the skeleton body 21, and the upper end of the support portion 22 is connected with the skeleton body. A connecting portion 23 is provided between the upper ends of the main body 21, the supporting portion 22, the connecting portion 23 and the skeleton body 21 are connected as one, and there is a gap between the lower end of the supporting portion 22 and the bottom of the skeleton body 21, the height of the skeleton body 21 Greater than the distance between the bottom of the central groove 11 and the bottom surface of the floor body 1, the height of the skeleton body 21 is less than half of the height of the floor body 1, which facilitates the cutting of the floor body 1 to meet the needs of engineering wiring.
实施例3,如图8所示,骨架支撑构件2包括两个相背设置的呈L型的骨架本体21,两个骨架本体21的上端连接为一体,骨架本体21的高度大于中心槽11的底部与楼板本体1的底面之间的距离,骨架本体21的高度小于楼板本体1高度的一半,便于实现楼板本体1的切割,以满足工程布线需要。Embodiment 3, as shown in FIG. 8 , the skeleton support member 2 includes two L-shaped skeleton bodies 21 arranged opposite to each other. The distance between the bottom and the bottom surface of the floor body 1, the height of the skeleton body 21 is less than half of the height of the floor body 1, which facilitates the cutting of the floor body 1 to meet the needs of engineering wiring.
以上所述为本发明最佳实施方式的举例,其中未详细述及的部分均为本领域普通技术人员的公知常识。本发明的保护范围以权利要求的内容为准,任何基于本发明的技术启示而进行的等效变换,也在本发明的保护范围之内。The above descriptions are examples of the best implementation modes of the present invention, and the parts not mentioned in detail are common knowledge of those skilled in the art. The protection scope of the present invention is based on the content of the claims, and any equivalent transformation based on the technical inspiration of the present invention is also within the protection scope of the present invention.
Claims (6)
- A kind of 1. disassembly-free heat-insulation floor modules unit, it is characterised in that:The modular unit includes the floor sheet connected as one Body(1)And skeletal support member(2);The floor body(1)For cuboid EPS benzene plates;The skeletal support member(2)For galvanized steel plain sheet;The skeletal support member(2)Above running through has several through holes(24);The floor body(1)It is provided with Steel bar rack(3), Steel bar rack(3)Including base(31)And rack body(32), bottom Seat(31)Provided with two, rack body(32)Positioned at two bases(31)Overcentre, base(31)And rack body(32) Between be connected with support frame(35), rack body(32)Middle part be provided with and be used to accommodate the groove of reinforcing bar(33), base(31)'s Lower section, which is provided with, to be used for and floor body(1)The fixed part being fixedly connected(34), fixed part(34)Type knot is carved using tip is directed downwardly Structure;The floor body(1)It is provided with wallsten stent(4), wallsten stent(4)It is arranged on floor body(1)Top surface On;The wallsten stent(4)Including base(41)And rack body(42), base(41)Provided with four, rack body(42) Positioned at four bases(41)Overcentre, base(41)And rack body(42)Between be connected with support frame(45), support sheet Body(42)Middle part be provided with and be used to accommodate the cruciform groove of steel wire(43), base(41)Lower section be provided be used for and module sheet The fixed part that body is fixedly connected(44), fixed part(44)Type structure is carved using tip is directed downwardly;The skeletal support member(2)Including L-shaped frame body(21), frame body(21)It is connected with supporting part(22), Supporting part(22)It is arranged on frame body(21)Outside, supporting part(22)Lower end and frame body(21)Bottom between have There is gap;The supporting part(22)It is fitted in frame body(21)Outside, supporting part(22)Upper end and frame body(21)It is upper End connects as one;Or, supporting part(22)Upper end and frame body(21)Upper end between be provided with connecting portion(23), supporting part (22), connecting portion(23)And frame body(21)Three connects as one;Or, the skeletal support member(2)Including two L-shaped frame bodies being disposed opposite to each other(21), two frame bodies (21)Upper end connect as one.
- A kind of 2. disassembly-free heat-insulation floor modules unit as claimed in claim 1, it is characterised in that:The floor body(1)On Surface is provided with floor heating pipeline groove(17), floor heating pipeline groove(17)It is interior to be used to accommodate floor heating pipeline.
- A kind of 3. disassembly-free heat-insulation floor modules unit as claimed in claim 1 or 2, it is characterised in that:The floor body(1) Middle part be provided with central channel along its length(11), central channel(11)Bottom and floor body(1)Bottom surface between have one Set a distance;The central channel(11)Including bottom(110)And openend(112), bottom(110)And openend(112)Between be provided with Between portion(111), central channel(11)Bottom(110)For dovetail groove, central channel(11)Openend(112)Side wall and floor body (1)Top surface using arc transition connect, pars intermedia(111)Rectangular cross-section.
- A kind of 4. disassembly-free heat-insulation floor modules unit as claimed in claim 1, it is characterised in that:The frame body(21)'s Highly it is more than central channel(11)Bottom and floor body(1)The distance between bottom surface, frame body(21)Height be less than Floor body(1)The half of height.
- A kind of 5. disassembly-free heat-insulation floor modules unit as claimed in claim 3, it is characterised in that:The Steel bar rack(3)If Put in central channel(11)Bottom.
- A kind of 6. disassembly-free heat-insulation floor modules unit as claimed in claim 1, it is characterised in that:The floor body(1)On Through there is several through holes, direction and the floor body of through hole(1)Length direction it is consistent, through hole is used to realize the friendship of natural wind Change or accommodate hydroelectric line.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510007652.2A CN104612303B (en) | 2015-01-08 | 2015-01-08 | A kind of disassembly-free heat-insulation floor modules unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510007652.2A CN104612303B (en) | 2015-01-08 | 2015-01-08 | A kind of disassembly-free heat-insulation floor modules unit |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104612303A CN104612303A (en) | 2015-05-13 |
| CN104612303B true CN104612303B (en) | 2018-01-19 |
Family
ID=53146931
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510007652.2A Active CN104612303B (en) | 2015-01-08 | 2015-01-08 | A kind of disassembly-free heat-insulation floor modules unit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104612303B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105178603A (en) * | 2015-06-17 | 2015-12-23 | 深圳建业工程集团股份有限公司 | EPS polyphenyl dismantling-exempt template concrete building cover plate construction technology method |
| ES2718806B2 (en) * | 2018-01-04 | 2020-03-12 | Dinatec Tecnica S L | MODULAR BASE OF CONSTRUCTION |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003074142A (en) * | 2001-08-30 | 2003-03-12 | Ohbayashi Corp | Floor and ceiling construction |
| CN2509265Y (en) * | 2001-09-29 | 2002-09-04 | 陈国君 | Reinfored bar support for concrete slab |
| CN2568735Y (en) * | 2002-09-05 | 2003-08-27 | 张伟 | Steel bar support positioning fastener |
| CN2732900Y (en) * | 2004-11-05 | 2005-10-12 | 朱秦江 | 300 mm polystyrene insulating formwork |
| CN200968043Y (en) * | 2006-08-01 | 2007-10-31 | 王里 | Heating floor |
| CN201310141Y (en) * | 2008-12-01 | 2009-09-16 | 王春山 | Heat-insulating shed module casing |
| CN203857517U (en) * | 2014-06-09 | 2014-10-01 | 王翠侠 | Novel cushion structure for ground heating paving |
| CN204510572U (en) * | 2015-01-08 | 2015-07-29 | 张景云 | A kind of disassembly-free heat-insulation floor modules unit |
-
2015
- 2015-01-08 CN CN201510007652.2A patent/CN104612303B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN104612303A (en) | 2015-05-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201292573Y (en) | Local sleeve steel tube reinforced concrete prefabricated column for IMS system | |
| CN102433955B (en) | Assembling prefabricated light steel composite load-bearing wall panel | |
| WO2007134517A1 (en) | Composite concrete shear wall for heat insulation | |
| CN205954921U (en) | Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area | |
| CN105544801A (en) | Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method | |
| CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
| CN103696514A (en) | T-frame component and lightweight concrete body fabricated shear wall and connection structure thereof | |
| CN206091045U (en) | Antinode core precast concrete assembled composite wall | |
| CN104763078A (en) | Shock-absorption type frame-shear wall combination structure system and construction method thereof | |
| CN217975039U (en) | Interlayer connecting system for prefabricated sandwich heat-insulation load-bearing wall boards | |
| CN103711232B (en) | L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method | |
| CN201962844U (en) | Hollow composition board internally provided with steel pipes and steel plates | |
| CN105040853A (en) | Composite heat-insulation plate cast-in-place concrete sandwiched wall structure | |
| CN104612291B (en) | Non-dismantling heat preservation wall module unit | |
| CN204940581U (en) | A kind of complex heat-preservation plate cast-in-place concrete sandwich wall structure | |
| CN103696512A (en) | Z-frame component and lightweight concrete body fabricated shear wall and connection structure thereof | |
| CN203347203U (en) | Multi-functional super-thick bulked concrete steel tube support system | |
| CN104612303A (en) | Non-dismantling heat preservation floor slab module unit | |
| CN204510572U (en) | A kind of disassembly-free heat-insulation floor modules unit | |
| CN106760059B (en) | Assembled building structure system | |
| CN204510538U (en) | A kind of disassembly-free heat-insulation wall body module unit | |
| CN106065676A (en) | Novel external wallboard joint and construction method | |
| CN207794307U (en) | Modular prefabricated steel-concrete combined frame structure | |
| CN207959688U (en) | A kind of assembled architecture load bearing heat preserving wallboard | |
| CN206581456U (en) | Steel construction wall component with reinforced pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20190304 Address after: 261061 No. 2677 Dongfeng East Street, Weifang High-tech Zone, Shandong Province (in the courtyard of Shandong Linchao New Materials Company) Patentee after: Weifang Chaozhou Investment Co.,Ltd. Address before: 261061 No. 2677 Dongfeng East Street, Weifang High-tech Zone, Shandong Province (in the courtyard of Shandong Linchao New Materials Company) Patentee before: Zhang Jingyun |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20210716 Address after: 250000 room f8-2-201-51, No. 2016, Feiyue Avenue, high tech Zone, Jinan City, Shandong Province Patentee after: Greenberg Green Construction Technology Co.,Ltd. Address before: 261061 No. 2677 Dongfeng East Street, Weifang High-tech Zone, Shandong Province (in the courtyard of Shandong Linchao New Materials Company) Patentee before: Weifang Chaozhou Investment Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20220214 Address after: 261000 No. 2677, Dongfeng East Street, high tech Zone, Weifang City, Shandong Province (in the courtyard of Shandong LingChao new materials Co., Ltd.) Patentee after: Weifang Chaozhou Investment Co.,Ltd. Address before: 250000 room f8-2-201-51, No. 2016, Feiyue Avenue, high tech Zone, Jinan City, Shandong Province Patentee before: Greenberg Green Construction Technology Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250905 Address after: 250100Shandong ProvinceJinan CityHigh-tech Development ZoneFeiyue Avenue2016 Innovation ParkF4-2-201-22 Patentee after: Shandong Research Institute of Ultra Low Energy Consumption Green Construction in Europe America and Asia Country or region after: China Address before: 261000 No. 2677, Dongfeng East Street, high tech Zone, Weifang City, Shandong Province (in the courtyard of Shandong LingChao new materials Co., Ltd.) Patentee before: Weifang Chaozhou Investment Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |