CN104577885B - A kind of cable laying anchoring - Google Patents

A kind of cable laying anchoring Download PDF

Info

Publication number
CN104577885B
CN104577885B CN201410823950.4A CN201410823950A CN104577885B CN 104577885 B CN104577885 B CN 104577885B CN 201410823950 A CN201410823950 A CN 201410823950A CN 104577885 B CN104577885 B CN 104577885B
Authority
CN
China
Prior art keywords
cable
base
shaft
spring
sliding sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410823950.4A
Other languages
Chinese (zh)
Other versions
CN104577885A (en
Inventor
张思
陈颖
杨东方
施勇
刘新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ELECTRIC POWER Co
XUZHOU POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
JIANGSU ELECTRIC POWER Co
XUZHOU POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ELECTRIC POWER Co, XUZHOU POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co, State Grid Corp of China SGCC filed Critical JIANGSU ELECTRIC POWER Co
Priority to CN201410823950.4A priority Critical patent/CN104577885B/en
Publication of CN104577885A publication Critical patent/CN104577885A/en
Application granted granted Critical
Publication of CN104577885B publication Critical patent/CN104577885B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of cable laying anchoring, including cable, shaft, mounting base, guiding trestle and bearing;Mounting hole is equipped with four corners of the mounting base, mounting base is fixedly arranged on the top of base by four bolts, in addition, electronic guider includes gear, shaft, roller, fixed supported slab, mounting base and motor, electronic guider is interval with above base, guiding trestle is equipped with above the left side of base, the upper end of guiding trestle is equipped with crossbeam, and the bottom surface of crossbeam is fixedly arranged in the middle of resilient guiding device;Elastic guide base, the first directive wheel and spring are equipped with the resilient guiding device, the lower end of elastic guide base is equipped with sliding sleeve vertically.The present invention can significantly reduce the labor intensity of worker, reduce construction cost, improve speed of application, shorten construction period;Cable can be avoided to be damaged caused by artificial construction, and construction quality is higher.

Description

A kind of cable laying anchoring
Technical field
The present invention relates to field of electricity construction, is specifically a kind of cable laying anchoring.
Background technology
Existing cable laying is more to be carried out using manpower, the cabling in cable duct of substation, when being particularly long cable, often Substantial amounts of interim recruitment is often needed, it is big for the demand of personnel, spend the time more, while interim recruitment is mostly non-electricity The pressure of professional, safety and monitoring is big, while cost is also higher.In cabling, personnel are by lower cable duct, easily Cause the security risk trampling, increase cable system of the construction personnel to cable.
The content of the invention
It is an object of the invention to provide a kind of cable laying drawing simple in structure, easy to use and can improving speed of application Line apparatus, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical solution:
A kind of cable laying anchoring, including cable, shaft, mounting base, electronic guider, tooth belt, lead To stent and bearing;Roller is installed with the middle part of the shaft, the centre of roller is equipped with wider groove, is laid with groove Several protective blocks, one end of shaft are installed with gear, and gear connects motor by tooth belt, in addition, one end of shaft leads to The centre that bearing is installed on fixed supported slab is crossed, gear is installed in the outside of fixed supported slab, the other end of shaft also by bearing The centre of fixed supported slab, two fixed supported slabs are vertical at the middle of mounting base both sides;In the mounting base Mounting hole is equipped with four corners, mounting base is fixedly arranged on the top of base by four bolts, in addition, electronic guider Including gear, shaft, roller, fixed supported slab, mounting base and motor, electronic guider, bottom are interval with above base Guiding trestle is equipped with above the left side of seat, the upper end of guiding trestle is equipped with crossbeam, and the bottom surface of crossbeam is fixedly arranged in the middle of elastic guide Device;The cable is set around on cable reel, and cable reel is arranged on the top of cable reel stent, and the right end of cable is equipped with cable system Set, cable grip connect dragger by steel wire messenger, and dragger is on the right side of base;Bullet is equipped with the resilient guiding device Property guide seats, the first directive wheel and spring, elastic guide base are bolted on the lower end of crossbeam, elastic guide base Lower end be equipped with sliding sleeve vertically, the cunning chamber of cylinder is equipped with sliding sleeve, the upper end of sliding sleeve is equipped with the upper spring blocking plate of annular;Wherein, Shaft is equipped with the axle center of first directive wheel, the centre of the first directive wheel is equipped with annular groove, and the both ends of shaft rotate admittedly It is scheduled on guide frame, the both ends of guide frame upper surface have been fixedly connected with lower spring blocking plate, and the upper end of spring blocking plate is consolidated under two groups Equipped with slide-bar, slide-bar is arranged in sliding sleeve, and the top of slide-bar is circular anti-off board equipped with section, is slided between anti-off board and sliding sleeve Connection.
Further:The spring is set on slide-bar, and spring is arranged between lower spring blocking plate and upper spring blocking plate.
Further:The diameter of the anti-off board is bigger than the diameter of bore of upper spring blocking plate.
Compared with prior art, the configuration of the present invention is simple, easy to use, can significantly reduce the labor intensity of worker, Construction cost is reduced, speed of application is improved, shortens construction period;Cable can be avoided to be damaged caused by artificial construction, and Construction quality is higher.
Brief description of the drawings
Fig. 1 is a kind of structure diagram of cable laying anchoring.
Fig. 2 is a kind of partial top view of cable laying anchoring.
Fig. 3 is a kind of structure chart of guiding mechanism in cable laying anchoring.
Fig. 4 is a kind of structure diagram of resilient guiding device in cable laying anchoring.
Fig. 5 is resilient guiding device left view in a kind of cable laying anchoring.
In figure:1- cable reels, 2- cable reel stents, 3- cables, 4- guiding trestles, 41- crossbeams, 5- fixed supported slabs, 6- teeth Wheel, 7- shafts, 8- mounting bases, 9- cable grips, 10- steel wires messenger, 11- draggers, 12- bases, 14- motors, 15- gears Belt, 16- bolts, 17- protective blocks, 18- rollers, 19- resilient guiding devices, 191- elastic guides base, 192- sliding sleeves, 193- Spring blocking plate under sliding chamber, 194- anti-off boards, 195- slide-bars, the upper spring blocking plates of 196-, 197- springs, 198-, 199- guide frames, 1910- elastic rotation shafts, the first directive wheels of 1911-.
Embodiment
The technical solution of this patent is described in more detail with reference to embodiment.
- 5 are please referred to Fig.1, a kind of cable laying anchoring, including cable 3, shaft 7, mounting base 8, electronic guiding fill Put, tooth belt 15, guiding trestle 4 and bearing;The middle part of the shaft 7 is installed with roller 18, the centre of roller 18 be equipped with compared with Wide groove, is laid with several protective blocks 17 on groove, protective block 17 can increase the friction between roller 18 and cable 3 Power, one end of shaft 7 are installed with gear 6, and gear 6 connects motor 14 by tooth belt 15, when opening motor 14,6 quilt of gear Motor 14 drives, while gear 6 drives shaft 7 and roller 18 to rotate together, in addition, one end of shaft 7 is installed on by bearing The centre of fixed supported slab 5, gear 6 are installed on fixed supported slab 5 in the outside of fixed supported slab 5, the other end of shaft 7 also by bearing Centre, two fixed supported slabs 5 are vertical at the middle of 8 both sides of mounting base;On four sides of the mounting base 8 Mounting hole is equipped with angle, mounting base 8 is fixedly arranged on the top of base 12 by four bolts 16, in addition, electronic guider Including gear 6, shaft 7, roller 18, fixed supported slab 5, mounting base 8 and motor 14, the top of base 12 is interval with electronic lead To device, it is more time saving and energy saving that electronic guider transmits the traction of cable, and guiding trestle 4 is equipped with above the left side of base 12, The upper end of guiding trestle 4 is equipped with crossbeam 41, and the bottom surface of crossbeam 41 is fixedly arranged in the middle of resilient guiding device 19, and cable 3 passes through elasticity The lower section of guider 19 and the top for being located at roller 18, the lower end of resilient guiding device 19 and the upper end of roller 18 are in same Horizontal level, can so reduce friction of the cable 3 in moving process;The cable 3 is set around on cable reel 1, cable reel 1 Arranged on the top of cable reel stent 2, the right end of cable 3 is equipped with cable grip 9, and cable grip 9 is led by the connection of steel wire messenger 10 Draw machine 11, dragger 11 is on the right side of base 12;During work, the right end connection dragger 11 of cable 3, starts dragger 11 and electricity Machine 14, makes cable 3 first pass through the lower section of resilient guiding device 19, then passes sequentially through the roller on two groups of electronic guiders again 18, the protective block 17 set on roller 18 increases the frictional force between cable 3 and roller 18, when roller 18 rotates, roller 18 are also applied with a part of kinetic energy to cable 3, so that the traction time of delivery of cable 3 is shorter, improve the effect of cable laying Rate, reduces the amount of labour of construction personnel;Elastic guide base 191, the first directive wheel are equipped with the resilient guiding device 19 1911 and spring 197, elastic guide base 191 be bolted on the lower end of crossbeam 41, the lower end of elastic guide base 191 It is vertical to be equipped with sliding sleeve 192, the cunning chamber 193 of cylinder is equipped with sliding sleeve 192, the upper end of sliding sleeve 192 is equipped with the upper spring blocking plate of annular 196;Wherein, elastic rotation shaft 1910 is equipped with the axle center of first directive wheel 1911, the centre of the first directive wheel 1911 is equipped with Annular groove, cable 3 can be rotated by the both ends of, elastic rotation shaft 1910 from annular groove and be fixed on guide frame 199, The both ends of 199 upper surface of guide frame have been fixedly connected with lower spring blocking plate 198, and the upper end of spring blocking plate 198 is installed with cunning under two groups Axis 195, slide-bar 195 are arranged in sliding sleeve 192, and the top of slide-bar 195 is circular anti-off board 194 equipped with section, anti-off board 194 Diameter is bigger than the diameter of bore of upper spring blocking plate 196, is slidably connected between anti-off board 194 and sliding sleeve 192, and slide-bar 195 can be The interior axle center along sliding sleeve of sliding sleeve 192 is upward, moves down, and spring 197 is set on slide-bar 195, and spring 197 is arranged on lower catch spring Between plate 198 and upper spring blocking plate 196.

Claims (3)

1. a kind of cable laying anchoring, including cable(3), shaft(7), mounting base(8), electronic guider, gear Belt(15), guiding trestle(4)And bearing;It is characterized in that, the shaft(7)Middle part be installed with roller(18), roller (18)Centre be equipped with wider groove, be laid with several protective blocks on groove(17), shaft(7)One end it is fixed with teeth Wheel(6), gear(6)Pass through tooth belt(15)Connect motor(14), in addition, shaft(7)One end be installed on by bearing it is solid Determine support plate(5)Centre, gear(6)In fixed supported slab(5)Outside, shaft(7)The other end be installed on also by bearing it is solid Determine support plate(5)Centre, two fixed supported slabs(5)It is vertical at mounting base(8)The middle of both sides;In the installation Bottom plate(8)Four corners on be equipped with mounting hole, mounting base(8)Pass through four bolts(16)It is fixedly arranged on base(12)It is upper Side, in addition, electronic guider includes gear(6), shaft(7), roller(18), fixed supported slab(5), mounting base(8)And electricity Machine(14), base(12)Top be interval with electronic guider, base(12)Left side above be equipped with guiding trestle(4), Guiding trestle(4)Upper end be equipped with crossbeam(41), crossbeam(41)Bottom surface be fixedly arranged in the middle of resilient guiding device(19);The electricity Cable(3)It is set around cable reel(1)On, cable reel(1)Arranged on cable reel stent(2)Top, cable(3)Right end be equipped with cable Net cover(9), cable grip(9)Pass through steel wire messenger(10)Connect dragger(11);The resilient guiding device(19)Inside it is equipped with Elastic guide base(191), the first directive wheel(1911)And spring(197), elastic guide base(191)It is bolted on Crossbeam(41)Lower end, elastic guide base(191)Lower end be equipped with sliding sleeve vertically(192), sliding sleeve(192)It is interior to be equipped with cylinder Cunning chamber(193), sliding sleeve(192)Upper end be equipped with annular upper spring blocking plate(196);Wherein, first directive wheel(1911) Axle center at be equipped with elastic rotation shaft(1910), the first directive wheel(1911)Centre be equipped with annular groove, elastic rotation shaft(1910) Both ends rotate be fixed on guide frame(199)On, guide frame(199)The both ends of upper surface have been fixedly connected with lower spring blocking plate (198), spring blocking plate under two groups(198)Upper end be installed with slide-bar(195), slide-bar(195)Arranged on sliding sleeve(192)It is interior, slide-bar (195)Top equipped with section be circular anti-off board(194), anti-off board(194)With sliding sleeve(192)Between be slidably connected.
A kind of 2. cable laying anchoring according to claim 1, it is characterised in that the spring(197)It is set in Slide-bar(195)On, and spring(197)Arranged on lower spring blocking plate(198)With upper spring blocking plate(196)Between.
A kind of 3. cable laying anchoring according to claim 1, it is characterised in that the anti-off board(194)It is straight Footpath is than upper spring blocking plate(196)Diameter of bore it is big.
CN201410823950.4A 2014-12-26 2014-12-26 A kind of cable laying anchoring Active CN104577885B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410823950.4A CN104577885B (en) 2014-12-26 2014-12-26 A kind of cable laying anchoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410823950.4A CN104577885B (en) 2014-12-26 2014-12-26 A kind of cable laying anchoring

Publications (2)

Publication Number Publication Date
CN104577885A CN104577885A (en) 2015-04-29
CN104577885B true CN104577885B (en) 2018-04-24

Family

ID=53093367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410823950.4A Active CN104577885B (en) 2014-12-26 2014-12-26 A kind of cable laying anchoring

Country Status (1)

Country Link
CN (1) CN104577885B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105923466A (en) * 2016-06-15 2016-09-07 成都新大洋焊接材料有限责任公司 Combined welding wire feeding system
CN107147044B (en) * 2017-05-30 2018-05-29 江苏金卓能建设工程技术有限公司 A kind of multifunctional intellectual cable laying engineering truck
CN109270650B (en) * 2018-11-19 2020-05-22 长沙昭讯通信科技有限公司 Laying device for optical communication test optical cable for communication
CN110497736B (en) * 2019-08-30 2020-08-28 国网山东省电力公司平阴县供电公司 Auxiliary walking device for measuring electromagnetic parameters of transformer substation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1921253A (en) * 2005-08-25 2007-02-28 清华同方威视技术股份有限公司 Inverting directional folding and unfolding cable reeling device for moving system commercial power supply
CN202594543U (en) * 2012-06-01 2012-12-12 岳阳科力电磁科技有限公司 Automatic wire arrangement cable drum for mobile engineering machinery
CN203714981U (en) * 2014-01-24 2014-07-16 浙江伟成塑胶有限公司 Electric wire pre-storing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006033898A (en) * 2004-07-12 2006-02-02 Showa Electric Wire & Cable Co Ltd Cable laying method and apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1921253A (en) * 2005-08-25 2007-02-28 清华同方威视技术股份有限公司 Inverting directional folding and unfolding cable reeling device for moving system commercial power supply
CN202594543U (en) * 2012-06-01 2012-12-12 岳阳科力电磁科技有限公司 Automatic wire arrangement cable drum for mobile engineering machinery
CN203714981U (en) * 2014-01-24 2014-07-16 浙江伟成塑胶有限公司 Electric wire pre-storing device

Also Published As

Publication number Publication date
CN104577885A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN203879092U (en) Telegraph pole lifting device
CN106212131B (en) A kind of automatic rope winding device of trees
CN104681211B (en) Power line cables insulation automatic wrapping device
CN105186385B (en) Intelligent cable lays dolly
CN102040173B (en) Wire rope pretightening device
CN203781484U (en) Pay-off devices for power transmission cables
CN202785064U (en) Steel wire rope winding device
CN105759381B (en) A kind of communication optical fiber coiling device
CN106451242A (en) Pipe cable conveying device and method
CN204396275U (en) A kind of crawler crane maintaining steel wire rope device
CN204538633U (en) A kind of cable pulling frock
CN205151361U (en) Horizontal and vertical equal large -scale cable of adjustable dish cable laying device
KR101579660B1 (en) Method for horizontally winding and unwinding a parallel wire strand
CN106271923A (en) A kind of sheet material sanding apparatus
CN207149313U (en) A kind of cable cabling machine for being convenient for changing a number
CN104986613A (en) Old wire recovery device
KR101663458B1 (en) Apparatus for and Method of Making Cable Raid Grommet
CN106927302A (en) A kind of safety type power cable can wind access device
CN104143782B (en) The electrification replacing tool of one ± 800kV line tension insulator chain and method
CN205722995U (en) A kind of multi-functional cabling device
CN206692129U (en) A kind of cable actinobacillus device with tension regulating function
CN204474025U (en) A kind of drawing-off wire feeder
CN205464746U (en) Wind power tower cylinder outer wall welding seam welding platform truck
CN202282579U (en) Track cable drum carriage
KR101261458B1 (en) many cable pulling equipment of underground cable

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant