CN104572884B - Apparatus control method, apparatus and system - Google Patents
Apparatus control method, apparatus and system Download PDFInfo
- Publication number
- CN104572884B CN104572884B CN201410811571.3A CN201410811571A CN104572884B CN 104572884 B CN104572884 B CN 104572884B CN 201410811571 A CN201410811571 A CN 201410811571A CN 104572884 B CN104572884 B CN 104572884B
- Authority
- CN
- China
- Prior art keywords
- control information
- control
- controlled device
- information
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 29
- 230000008859 change Effects 0.000 claims abstract description 49
- 238000004321 preservation Methods 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000008569 process Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000005764 inhibitory process Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The present invention is suitable for information technology field, provides apparatus control method, apparatus and system.The method includes:Control information aggregate is obtained from server;The device attribute information and status information of equipment for obtaining controlled device are chosen and the relevant control information subset of the controlled device according to the device attribute information of acquisition from the control information aggregate;When the status information of equipment is mismatched with the control information subset chosen, Status Change is carried out to the controlled device.The present invention is by the way that controlled device is connect with plant control unit, make the direct management and control controlled device of plant control unit, when controlled device needs to safeguard, shift or replace, only need to Status Change be carried out according to the control information aggregate in plant control unit, the degree of automation of equipment control is substantially increased, reduces the complexity of apparatus management/control cost and apparatus management/control.
Description
Technical field
The invention belongs to information technology field more particularly to apparatus control method, apparatus and systems.
Background technology
In existing equipment management system, when equipment needs change (such as repair, displacement are replaced), manually weight is needed
Newly device parameter is downloaded, and data maintenance and debugging are carried out to equipment.When needing equipment to be changed more, to all
Equipment, which changes, to be needed to expend a large amount of manpower and time.System is managed especially for security device, when need peace to be changed
When anti-equipment is more, change that time-consuming to security device due to one by one, security device is waiting process to be changed
In the corresponding place of the security device can not be monitored, lead to security protection loophole.
Invention content
In consideration of it, an embodiment of the present invention provides a kind of apparatus control method, apparatus and system, to solve existing equipment
Control mode ease for use is low, the problem of needing to expend a large amount of manpowers and time.
On the one hand, an embodiment of the present invention provides a kind of apparatus control method, including:
From server obtain control information aggregate, it is described control information aggregate include N number of control information subset, N be more than
Or the integer equal to 1;
Obtain the device attribute information and status information of equipment of controlled device;
According to the device attribute information of acquisition, selection is related to the controlled device from the control information aggregate
Control information subset;
When the status information of equipment is mismatched with the control information subset chosen, according to control information
Controlled device described in set pair carries out Status Change.
Second aspect, an embodiment of the present invention provides a kind of plant control unit, including:
Information aggregate acquiring unit is controlled, for obtaining control information aggregate, the control information aggregate packet from server
N number of control information subset is included, N is the integer more than or equal to 1;
Apparatus information acquiring unit, for obtaining the device attribute information of controlled device and status information of equipment;
Information subset selection unit is controlled, for the device attribute information according to acquisition from the control information aggregate
Middle selection and the relevant control information subset of the controlled device;
Status Change control unit, for being mismatched in the status information of equipment with the control information subset chosen
When, Status Change is carried out to the controlled device according to the control information subset.
The third aspect, an embodiment of the present invention provides a kind of apparatus control system, including:
Server, controlled device and plant control unit;
The server controls for sending with relevant control information aggregate to the equipment of the plant control unit
Device, the control information aggregate include N number of control information subset, and N is the integer more than or equal to 1;
The controlled device, for carrying out Status Change according to the control information subset.
Existing advantageous effect is the embodiment of the present invention compared with prior art:The embodiment of the present invention is by by controlled device
It is connect with plant control unit, makes the direct management and control controlled device of plant control unit (even if server passes through plant control unit
Indirect control controlled device), make server need not be according to the concrete type of controlled device, model and equipment state to controlled device
Management and control one by one is carried out, and unified management and control is carried out by controlling the controlled device that information aggregate pair is connect with plant control unit, when
When controlled device needs to safeguard, shift or replace, only need to state be carried out according to the control information aggregate in plant control unit
Change, without manually to controlled device arrange parameter one by one, substantially increasing the degree of automation of equipment control, reducing equipment
The complexity of management and control cost and apparatus management/control.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some
Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the realization flow chart of apparatus control method provided in an embodiment of the present invention;
Fig. 2 is the specific implementation flow chart of apparatus control method step S101 provided in an embodiment of the present invention;
Fig. 3 is the specific implementation flow chart of apparatus control method step S104 provided in an embodiment of the present invention;
Fig. 4 is the structure diagram of equipment plant control unit provided in an embodiment of the present invention;
Fig. 5 is the structure diagram of apparatus control system provided in an embodiment of the present invention.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Fig. 1 shows the realization flow chart of apparatus control method provided in an embodiment of the present invention, and details are as follows:
In step S101, control information aggregate is obtained from server, the control information aggregate includes N number of control information
Subset, N are the integer more than or equal to 1.
In embodiments of the present invention, plant control unit is obtained from server and is believed with the relevant control of the plant control unit
Breath set.Control information aggregate is used for the controlled device that management and control is connected with plant control unit.Information aggregate is controlled to include N number of control
Information subset processed, N number of control information subset are respectively used to the different controlled device of management and control devices attribute information.It controls and fills with equipment
It puts connected controlled device and is up to N kind device attributes.
The embodiment of the present invention passes through plant control unit by the direct management and control controlled device of plant control unit, i.e. server
Indirect management and control controlled device makes server need not be according to the concrete type of controlled device, model and equipment state to controlled device
Management and control one by one is carried out, and by the way that the controlled device that information aggregate pair is connect with plant control unit is controlled to carry out unified management and control.
Preferably, the control information subset includes at least one of following:Controlled device number, controlled device title, quilt
Control device type, controlled device position, management and control mode or passage mode.
For example, controlled device number is GYY-DM001, controlled device title is industry park gate, and controlled device type is
Entrance, controlled device position are plum forests roads 17, and management and control mode is that discrepancy is controlled, and passage mode is opposing traffic.
In step s 102, the device attribute information and status information of equipment of controlled device are obtained.
In embodiments of the present invention, each plant control unit can be connected with multiple controlled devices, each controlled device
Device attribute information may be different.For example, certain plant control unit is connected with 4 controlled devices, wherein, a controlled device
Device attribute be forward to gate inhibition, the device attribute of a controlled device is to gate inhibition, the device attribute of a controlled device
To be to camera forward to the device attribute of camera, another controlled device.
In step s 103, according to the device attribute information of acquisition from it is described control information aggregate in choose with it is described
The relevant control information subset of controlled device.
Plant control unit can be chosen controlled with this according to the device attribute information of controlled device from control information aggregate
The matched control information subset of equipment.For example, the device attribute of controlled device is forward to gate inhibition, then plant control unit is according to this
The device attribute information of controlled device chosen from control information aggregate with forward to the matched control information subset of gate inhibition.
In step S104, when the status information of equipment is mismatched with the control information subset chosen, according to
The control information subset carries out Status Change to the controlled device.
As one embodiment of the present of invention, when plant control unit is detected in the status information of equipment of controlled device
A certain parameter to the controlled device with during corresponding parameter difference, state is carried out according to control information subset in control information subset
Change makes the parameter of the controlled device after change be consistent with corresponding parameter in control information subset.
It should be noted that the Status Change in the embodiment of the present invention include but not limited to equipment installation, parameter initialization,
Parameter adjustment, data maintenance, data debugging or equipment unloading.
Fig. 2 shows the specific implementation flow chart of apparatus control method step S101 provided in an embodiment of the present invention, references
Fig. 2:
In step s 201, the control information aggregate that server is sent is received;
In step S202, the plant control unit preserves the control information aggregate received, with according to preservation
The control information aggregate controlled device is controlled.
As one embodiment of the present of invention, plant control unit passively receives the control information aggregate of server transmission.
Server by control information aggregate push to each plant control unit, without according to controlled device type, model or
Person's equipment state carries out parameter setting, data maintenance or debugging etc. to controlled device one by one, and passes through plant control unit pair
Controlled device carries out management and control, substantially increases the intelligence of apparatus management/control.Plant control unit is receiving server transmission
After controlling information aggregate, control information aggregate is preserved, it, can be according to the control information aggregate pair of preservation with when controlled device is replaced
New controlled device carries out parameter initialization, data maintenance and debugging.
Fig. 3 shows the specific implementation flow chart of apparatus control method step S104 provided in an embodiment of the present invention, reference
Fig. 3:
In step S301, the newest change time of the controlled device is obtained according to the status information of equipment;
In step s 302, control information acquisition times are determined according to the control information aggregate;
In step S303, when the control information acquisition times are later than the newest change time, set described in judgement
Standby status information is mismatched with the control information subset chosen, and according to the control information subset to the controlled device
Carry out Status Change.
As one embodiment of the present of invention, plant control unit is believed according to the newest change time of controlled device with control
The control information acquisition times of set are ceased to judge whether status information of equipment matches with the control information subset chosen.When newest
When the change time is later than control information acquisition times, show that controlled device carries out Status Change according to control information subset;
When it is newest change the time earlier than control information acquisition times when, show controlled device not yet according to it is newest control information subset into
Row Status Change, at this point, control information subset corresponding with controlled device is pushed to controlled device by plant control unit, so that
Controlled device carries out Status Change according to control information subset.
It should be understood that in embodiments of the present invention, the size of the serial number of above-mentioned each process is not meant to the elder generation of execution sequence
Afterwards, the execution sequence of each process should be determined with its function and internal logic, the implementation process structure without coping with the embodiment of the present invention
Into any restriction.
The embodiment of the present invention makes the direct management and control quilt of plant control unit by the way that controlled device is connect with plant control unit
Equipment (even if server passes through plant control unit indirect control controlled device) is controlled, makes server without according to controlled device
Concrete type, model and equipment state carry out controlled device management and control one by one, and by the way that information aggregate pair is controlled to be controlled with equipment
The controlled device of device connection carries out unified management and control, only need to be according to equipment when controlled device needs to safeguard, shift or replace
Control information aggregate in control device carries out Status Change, without manually to controlled device arrange parameter one by one, greatly improving
The degree of automation of equipment control reduces the complexity of apparatus management/control cost and apparatus management/control.
Fig. 4 shows the structure diagram of equipment plant control unit provided in an embodiment of the present invention, equipment equipment control
Device can be used for service chart 1 to the apparatus control method described in Fig. 3.For convenience of description, it illustrates only and the present embodiment phase
The part of pass.
With reference to Fig. 4, described device includes:
Information aggregate acquiring unit 41 is controlled, for obtaining control information aggregate, the control information aggregate from server
Including N number of control information subset, N is the integer more than or equal to 1;
Apparatus information acquiring unit 42, for obtaining the device attribute information of controlled device and status information of equipment;
Information subset selection unit 43 is controlled, information collection is controlled from described for the device attribute information according to acquisition
It is chosen and the relevant control information subset of the controlled device in conjunction;
Status Change control unit 44, for the status information of equipment with the control information subset chosen not
Timing carries out Status Change according to the control information subset to the controlled device.
Preferably, the control information aggregate acquiring unit 41 includes:
Passive receiving subelement 411, for receiving the control information aggregate of server transmission;
Subelement 412 is preserved, for preserving the control information aggregate received, to believe according to the control of preservation
Breath set controls controlled device.
Preferably, the Status Change control unit 44 includes:
The newest change time obtains subelement 441, for obtaining the controlled device according to the status information of equipment
The newest change time;
Information acquisition times determination subelement 442 is controlled, for determining that control information obtains according to the control information aggregate
Take the time;
Status Change controls subelement 443, for being later than the newest change time in the control information acquisition times
When, judge that the status information of equipment mismatches, and with the control information subset chosen according to the control information subset
Status Change is carried out to the controlled device.
Preferably, the control information subset includes at least one of following:Controlled device number, controlled device title, quilt
Control device type, controlled device position, management and control mode or passage mode.
The embodiment of the present invention makes equipment plant control unit straight by the way that controlled device is connect with equipment plant control unit
Control controlled device (even if server passes through equipment plant control unit indirect control controlled device) is taken over, makes server without root
Management and control one by one is carried out to controlled device according to the concrete type of controlled device, model and equipment state, and by controlling information aggregate
Pair controlled device being connect with equipment plant control unit carries out unified management and control, when controlled device needs to safeguard, shifts or more
When changing, only need to Status Change be carried out according to the control information aggregate in equipment plant control unit, without manually to controlled device
Arrange parameter one by one substantially increases the degree of automation of equipment control, reduces apparatus management/control cost and apparatus management/control
Complexity.
Fig. 5 shows the structure diagram of apparatus control system provided in an embodiment of the present invention, the system include server 51,
Controlled device 52 and plant control unit 53.The plant control unit 53 can be the plant control unit in Fig. 4.The equipment control
Device 53 processed can be used for service chart 1 to the apparatus control method described in Fig. 3.For convenience of description, it illustrates only and this implementation
The relevant part of example.
The server 51, for sending and the relevant control information aggregate of the plant control unit 53 to the equipment
Control device 53, the control information aggregate include N number of control information subset, and N is the integer more than or equal to 1;
The controlled device 52, for carrying out Status Change according to the control information subset.
Preferably, the server 51 is specifically used for:
It actively sends and the relevant control information aggregate of the plant control unit 53 to the plant control unit 53.
The embodiment of the present invention makes the direct management and control quilt of plant control unit by the way that controlled device is connect with plant control unit
Equipment (even if server passes through plant control unit indirect control controlled device) is controlled, makes server without according to controlled device
Concrete type, model and equipment state carry out controlled device management and control one by one, and by the way that information aggregate pair is controlled to be controlled with equipment
The controlled device of device connection carries out unified management and control, only need to be according to equipment when controlled device needs to safeguard, shift or replace
Control information aggregate in control device carries out Status Change, without manually to controlled device arrange parameter one by one, greatly improving
The degree of automation of equipment control reduces the complexity of apparatus management/control cost and apparatus management/control.
Those of ordinary skill in the art may realize that each exemplary lists described with reference to the embodiments described herein
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is performed with hardware or software mode, specific application and design constraint depending on technical solution.Professional technician
Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed
The scope of the present invention.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit can refer to the corresponding process in preceding method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, it can be with
It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit
It divides, only a kind of division of logic function can have other dividing mode, such as multiple units or component in actual implementation
It may be combined or can be integrated into another system or some features can be ignored or does not perform.Another point, it is shown or
The mutual coupling, direct-coupling or communication connection discussed can be the indirect coupling by some interfaces, device or unit
It closes or communicates to connect, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit
The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple
In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme
's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
That each unit is individually physically present, can also two or more units integrate in a unit.
If the function is realized in the form of SFU software functional unit and is independent product sale or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially in other words
The part contribute to the prior art or the part of the technical solution can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, is used including some instructions so that a computer equipment (can be
People's computer, server or network equipment etc.) perform all or part of the steps of the method according to each embodiment of the present invention.
And aforementioned storage medium includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in change or replacement, should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention described should be subject to the protection scope in claims.
Claims (10)
1. a kind of apparatus control method, which is characterized in that including:
Control information aggregate is obtained from server, the control information aggregate includes N number of control information subset, and N is is more than or waits
In 1 integer, the control information aggregate is used for management and control controlled device;
Obtain the device attribute information and status information of equipment of controlled device;
It is chosen and the relevant control of the controlled device from the control information aggregate according to the device attribute information of acquisition
Information subset processed;
When the status information of equipment is mismatched with the control information subset chosen, according to the control information subset pair
The controlled device carries out Status Change.
2. the method as described in claim 1, which is characterized in that described obtained from server controls information aggregate to include:
Receive the control information aggregate that server is sent;
The control information aggregate received is preserved, controlled device is controlled with the control information aggregate according to preservation
System.
3. the method as described in claim 1, which is characterized in that described in the status information of equipment and the control of selection
When information subset mismatches, Status Change is carried out to the controlled device according to the control information subset and is included:
The newest change time of the controlled device is obtained according to the status information of equipment;
Control information acquisition times are determined according to the control information aggregate;
When the control information acquisition times are later than the newest change time, the status information of equipment and selection are judged
The control information subset mismatches, and carries out Status Change to the controlled device according to the control information subset.
4. method as described in any one of claims 1 to 3, which is characterized in that it is described control information subset include it is following at least
One:Controlled device number, controlled device title, controlled device type, controlled device position, management and control mode or current mould
Formula.
5. a kind of plant control unit, which is characterized in that including:
Information aggregate acquiring unit is controlled, for obtaining control information aggregate from server, the control information aggregate includes N number of
Information subset is controlled, N is the integer more than or equal to 1, and the control information aggregate is used for management and control controlled device;
Apparatus information acquiring unit, for obtaining the device attribute information of controlled device and status information of equipment;
Information subset selection unit is controlled, is selected from the control information aggregate for the device attribute information according to acquisition
It takes and the relevant control information subset of the controlled device;
Status Change control unit, for the status information of equipment with choose the control information subset mismatch when,
Status Change is carried out to the controlled device according to the control information subset.
6. device as claimed in claim 5, which is characterized in that the control information aggregate acquiring unit includes:
Passive receiving subelement, for receiving the control information aggregate of server transmission;
Subelement is preserved, for preserving the control information aggregate received, with the control information aggregate according to preservation
Controlled device is controlled.
7. device as claimed in claim 5, which is characterized in that the Status Change control unit includes:
The newest change time obtains subelement, for obtaining the newest change of the controlled device according to the status information of equipment
Time;
Information acquisition times determination subelement is controlled, for determining control information acquisition times according to the control information aggregate;
Status Change controls subelement, for when the control information acquisition times are later than the newest change time, judging
The status information of equipment is mismatched with the control information subset chosen, and according to the control information subset to the quilt
It controls equipment and carries out Status Change.
8. such as claim 5 to 7 any one of them device, which is characterized in that the control information subset include it is following at least
One:Controlled device number, controlled device title, controlled device type, controlled device position, management and control mode or current mould
Formula.
9. a kind of apparatus control system, which is characterized in that including:
Server, controlled device and such as claim 5 to 8 any one of them plant control unit;
The server fills for sending to control to the equipment with the relevant control information aggregate of the plant control unit
It puts, the control information aggregate includes N number of control information subset, and N is integer more than or equal to 1, the control information aggregate
For management and control controlled device;
The controlled device, for carrying out Status Change according to the control information subset.
10. system as claimed in claim 9, which is characterized in that the server is specifically used for:
It actively sends and the relevant control information aggregate of the plant control unit to the plant control unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811571.3A CN104572884B (en) | 2014-12-22 | 2014-12-22 | Apparatus control method, apparatus and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811571.3A CN104572884B (en) | 2014-12-22 | 2014-12-22 | Apparatus control method, apparatus and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104572884A CN104572884A (en) | 2015-04-29 |
CN104572884B true CN104572884B (en) | 2018-06-19 |
Family
ID=53088946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410811571.3A Expired - Fee Related CN104572884B (en) | 2014-12-22 | 2014-12-22 | Apparatus control method, apparatus and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104572884B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110320831A (en) * | 2019-04-28 | 2019-10-11 | 安百拓(南京)建筑矿山设备有限公司 | A kind of method and apparatus of maintenance control system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101162393A (en) * | 2007-11-13 | 2008-04-16 | 南京邮电大学 | Self-adapting universal control point system structure based on universal plug and play and control method thereof |
CN101266483A (en) * | 2007-03-15 | 2008-09-17 | 海尔集团公司 | Associated control system |
CN101287001A (en) * | 2008-04-14 | 2008-10-15 | 中山大学 | System and method for remote managing digital household electrical appliance based on mobile device |
JP2011194388A (en) * | 2010-03-24 | 2011-10-06 | Research Institute Of Innovative Technology For The Earth | Aqueous solution which effectively absorbs and recovers carbon dioxide contained in gas |
CN102684905A (en) * | 2011-02-01 | 2012-09-19 | 株式会社理光 | Device interaction tree and technique |
-
2014
- 2014-12-22 CN CN201410811571.3A patent/CN104572884B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101266483A (en) * | 2007-03-15 | 2008-09-17 | 海尔集团公司 | Associated control system |
CN101162393A (en) * | 2007-11-13 | 2008-04-16 | 南京邮电大学 | Self-adapting universal control point system structure based on universal plug and play and control method thereof |
CN101287001A (en) * | 2008-04-14 | 2008-10-15 | 中山大学 | System and method for remote managing digital household electrical appliance based on mobile device |
JP2011194388A (en) * | 2010-03-24 | 2011-10-06 | Research Institute Of Innovative Technology For The Earth | Aqueous solution which effectively absorbs and recovers carbon dioxide contained in gas |
CN102684905A (en) * | 2011-02-01 | 2012-09-19 | 株式会社理光 | Device interaction tree and technique |
Also Published As
Publication number | Publication date |
---|---|
CN104572884A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104866366B (en) | Application program method for cleaning and device | |
CN108055144A (en) | The monitoring method and system of a kind of network equipment | |
CN103347259B (en) | A kind of flow prompt method and system | |
CN109495896A (en) | Channel plan determines | |
WO2014197741A3 (en) | System and method for managing behavior change applications for mobile users | |
WO2015041741A3 (en) | Systems and methods for utility usage monitoring and management | |
DE102014103353A1 (en) | Collecting and Providing Data to a Big Data Machine in a Process Control System | |
CN106130972B (en) | resource access control method and device | |
CN105049290B (en) | Page access monitoring method and device | |
CN106210129B (en) | A kind of current-limiting method and system based on Web server configuration | |
CN106897196B (en) | The determination method and device of access path between Website page | |
CN105590216A (en) | Method and system of real-time monitoring of transaction risk | |
CN106775936A (en) | The management method and device of a kind of virtual machine | |
WO2011082826A1 (en) | Network optimisation | |
CN106484591A (en) | A kind of collecting method based on distributed system and acquisition system | |
CN104572884B (en) | Apparatus control method, apparatus and system | |
CN106095843B (en) | Social account method for digging and device | |
CN104268293B (en) | The index treating method and apparatus that can not add up in database | |
JP2015109493A5 (en) | ||
EP2804342A2 (en) | Method and device for clearing configuration command in communication equipment | |
CN106570029A (en) | Data processing method and data processing system of distributed relation type database | |
CN105939218B (en) | The statistical method and device of network flow | |
CN103577933A (en) | Data monitoring method and device based on cigarette manufacturing data integration environment | |
CN106603722A (en) | Management device determining method and device | |
CN110138892A (en) | Determine the method and device of equipment regional information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180619 |
|
CF01 | Termination of patent right due to non-payment of annual fee |