隧道施工钢筋绑扎所用自走式模架 Download PDFInfo
- Publication number
- CN104564099A CN104564099A CN201410810809.0A CN201410810809A CN104564099A CN 104564099 A CN104564099 A CN 104564099A CN 201410810809 A CN201410810809 A CN 201410810809A CN 104564099 A CN104564099 A CN 104564099A
- Authority
- CN
- China
- Prior art keywords
- door frame
- arch ring
- walking
- fixing
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title abstract description 21
- 229910000831 Steel Inorganic materials 0.000 title abstract description 7
- 239000010959 steel Substances 0.000 title abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 22
- 239000003638 chemical reducing agent Substances 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开的隧道施工钢筋绑扎所用自走式模架,是将门架底梁与固定门架相互连接,门架底梁两端安装行走轮,减速机输出端连接驱动链轮、行走链轮与行走轮,在两端固定门架上设置调中支架与调中油缸,两侧设置滑动轮与升降油缸,其上端与活动门架固定,在固定门架与活动门架外铰连拱圈,全部拱圈相互连接,在固定门架与拱圈之间铰连脱模油缸。本发明行走自由方便,可随时确定调整施工的位置,自动定模脱模,升降装置灵活,在拱圈连杆上刻有的尺寸标记使绑扎的钢筋整齐规范,有效的保障了钢筋的绑扎质量,无效工作时间短,所用辅助人员少,劳动强度低,工作效率高,不需要辅助设备,是一种理想的隧道施工中钢筋绑扎所用模架。
Description
技术领域
本发明涉及一种隧道钢筋架设及绑扎所用工作模架,具体是一种隧道施工钢筋绑扎扎所用自走式模架,属于路桥施工领域。
背景技术
随着铁路及公路建设的快速发展,隧道及涵洞施工的技术规范要求越来越高,即要保证高效率高质量的完成施工任务,同时又提倡节能环保,绿色低碳的施工理念,要求施工即节约成本、减轻施工人员的劳动强度,又要保护生态环境少受破坏,所以快速高效的完成隧道施工中钢筋的架设及绑扎成为重要的施工环节。目前隧道施工中钢筋的架设及绑扎主要采用以下两种方法:一种是用钢管搭设支架和施工平台,施工人员站在施工平台上实施钢筋的架设及绑扎,完成一段施工后再拆除前移重新组装施工平台,这种方法无效工作时间长,施工进度慢,劳动强度大,又制约其它的施工环节;还有一种方法是用型钢焊接的施工支架与施工平台,用多根丝杆来调节钢筋的高度和宽度,完成一段施工后再用装载机推动前移到指定位置,再进行下一段施工,由于施工支架笨重,加之有的隧道空间较小无法用装载机推动,所以只能依靠人工推拉,效率低又不安全。上述两种方法的共同缺陷是绑扎后的钢筋间距层差不齐,对后续施工质量制成影响。目前还没有一种较好的隧道钢筋架设及绑扎施工设备。
发明内容
本发明的目地是克服目前隧道施工中钢筋架设及绑扎所用设备存在的缺陷,而公开一种隧道施工钢筋绑扎所用自走式模架。
本发明的技术方案如下:
在两根门架底梁上固定若干个固定门架连接成一个整体,在每根门架底梁两端内侧分别安装减速机,每根门架底梁两端下面分别安装行走轮,减速机输出端连接驱动链轮,驱动链轮通过链条连接行走链轮,行走链轮同轴连接行走轮,行走轮放置在轨道上,在两端固定门架上分别设置调中支架,调中油缸一端与调中支架固定,其另一端与固定门架铰连,在调中支架两端的固定门架上设置滑动轮,滑动轮上分别设置升降油缸,升降油缸上端分别与活动门架固定,在其余固定门架与活动门架之间铰连加固丝杠,在所有固定门架与活动门架的外周通过若干个加固丝杠铰连拱圈,通过若干个拱圈连杆纵向将全部拱圈相互连接,在所有拱圈连杆上均刻有尺寸标记,在两端固定门架外侧与拱圈之间铰连脱模油缸,在全部固定门架之间设有多组施工平台,在一侧的门架底梁与固定门架之间设有控制箱。
本发明行走自由方便,可随时确定调整施工的位置,并可自动定模脱模,升降装置灵活,在拱圈连杆上所刻尺寸标记使架设及绑扎的钢筋整齐规范,还可根据设计要求随时灵活调节,有效的保障了钢筋的架设及绑扎质量。本发明无效工作时间短,所用辅助人员少,劳动强度低,工作效率高,不需要辅助设备,是一种理想的隧道施工中钢筋绑扎所用模架。
附图说明
附图1为本发明的主视结构示意图。
附图2为本发明附图1A-A向断面示意图。
附图标记说明如下:
固定门架1,门架底梁2,调中支架3,调中油缸4,滑动轮5,升降油缸6,活动门架7,拱圈8,拱圈连杆9,脱模油缸10,加固丝杠11,施工平台12,减速机13,驱动链轮14,链条15,行走链轮16,行走轮17,轨道18,控制箱19。
具体实施方式
以下结合附图对本发明的技术方案做具体描述如下:
在两根门架底梁(2)上固定5个固定门架(1)连接成一个整体,在每根门架底梁(2)两端内侧分别安装减速机(13),每根门架底梁(2)两端下面分别安装行走轮(17),减速机(13)输出端连接驱动链轮(14),驱动链轮(14)通过链条(15)连接行走链轮(16),行走链轮(16)同轴连接行走轮(17),行走轮(17)放置在轨道(18)上,在两端固定门架(1)上分别设置调中支架(3),调中油缸(4)一端与调中支架(3)固定,其另一端与固定门架(1)铰连,在调中支架(3)两端的固定门架(1)上设置滑动轮(5),滑动轮(5)上分别设置升降油缸(6),升降油缸(6)上端分别与活动门架(7)固定,在其余固定门架(1)与活动门架(7)之间铰连加固丝杠(11),在所有固定门架(1)与活动门架(7)的外周通过6个加固丝杠(11)铰连拱圈(8),通过10个拱圈连杆(9)纵向将全部拱圈(8)相互连接,在所有拱圈连杆(9)上均刻有尺寸标记,在两端固定门架(1)外侧与拱圈(8)之间铰连脱模油缸(10),在全部固定门架(1)之间设有多组施工平台(12),在一侧的门架底梁(2)与固定门架(1)之间设有控制箱(19)。
本发明施工时,先开启控制箱电源启动减速机,驱动链轮带动行走链轮使行走轮沿着轨道行走到指定位置,开启控制箱升降油缸使其上升或下降,迫使活动门架同步上升或下降到指定的位置,再开启调中油缸使门架向左或向右推移到指定位置,再开启脱模油缸伸长或收缩,带动拱圈向外或向内推移到指定位置,拧紧拱圈与固定门架及活动门架之间的加固丝杠,最后再拧紧固定门架与活动门架之间的加固丝杠,参照拱圈连杆上的尺寸标记,调整好钢筋的间距尺寸,然后进行钢筋绑扎。
Claims (3)
1.一种隧道施工中钢筋绑扎所用自走式模架,其特征在于:在两根门架底梁(2)上固定若干个固定门架(1)连接成一个整体,在每根门架底梁(2)两端内侧分别安装减速机(13),每根门架底梁(2)两端下面分别安装行走轮(17),减速机(13)输出端连接驱动链轮(14),驱动链轮(14)通过链条(15)连接行走链轮(16),行走链轮(16)同轴连接行走轮(17),行走轮(17)放置在轨道(18)上,在两端固定门架(1)上分别设置调中支架(3),调中油缸(4)一端与调中支架(3)固定,其另一端与固定门架(1)铰连,在调中支架(3)两端的固定门架(1)上设置滑动轮(5),滑动轮(5)上分别设置升降油缸(6),升降油缸(6)上端分别与活动门架(7)固定,在其余固定门架(1)与活动门架(7)之间铰连加固丝杠(11),在所有固定门架(1)与活动门架(7)的外周通过若干个加固丝杠(11)铰连拱圈(8),通过若干个拱圈连杆(9)纵向将全部拱圈(8)相互连接,在两端固定门架(1)外侧与拱圈(8)之间铰连脱模油缸(10),在全部固定门架(1)之间设有多组施工平台(12),在一侧的门架底梁(2)与固定门架(1)之间设有控制箱(19)。
2.根据权利要求1所述的一种隧道施工中钢筋绑扎所用自走式模架,其特征在于:在两根门架底梁(2)上固定5个固定门架(1)连接成一个整体;在所有固定门架(1)与活动门架(7)的外周通过6个加固丝杠(11)铰连拱圈(8),通过10个拱圈连杆(9)纵向将全部拱圈(8)相互连接。
3.根据权利要求1所述的一种隧道施工中钢筋绑扎所用自走式模架,其特征在于:在所有拱圈连杆(9)上均刻有尺寸标记。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410810809.0A CN104564099A (zh) | 2014-12-22 | 2014-12-22 | 隧道施工钢筋绑扎所用自走式模架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410810809.0A CN104564099A (zh) | 2014-12-22 | 2014-12-22 | 隧道施工钢筋绑扎所用自走式模架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104564099A true CN104564099A (zh) | 2015-04-29 |
Family
ID=53081079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410810809.0A Pending CN104564099A (zh) | 2014-12-22 | 2014-12-22 | 隧道施工钢筋绑扎所用自走式模架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104564099A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105736016A (zh) * | 2016-04-27 | 2016-07-06 | 中铁四局集团第一工程有限公司 | 隧道二衬钢筋骨架施工装备及其应用 |
CN105863682A (zh) * | 2016-04-26 | 2016-08-17 | 重庆工商职业学院 | 隧道衬砌钢筋骨架绑扎装置 |
CN110593136A (zh) * | 2019-10-23 | 2019-12-20 | 中铁七局集团有限公司 | 上承式板拱桥拱圈走行式模板台车及施工方法 |
CN116104312A (zh) * | 2023-04-07 | 2023-05-12 | 中铁九局集团有限公司 | 一种适用于立面钢筋网的绑扎机器人及其绑扎方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2869322Y (zh) * | 2005-12-23 | 2007-02-14 | 于海滨 | 新型门架式隧道衬砌模板台车 |
JP2009209527A (ja) * | 2008-02-29 | 2009-09-17 | Taisei Corp | セグメント組立装置及びセグメント組立方法 |
CN101586464A (zh) * | 2008-05-22 | 2009-11-25 | 中铁十一局集团第一工程有限公司 | 一种铁路隧道衬砌边墙混凝土施工方法 |
CN201486572U (zh) * | 2009-08-05 | 2010-05-26 | 中交隧道工程局有限公司 | 一种多变径衬砌模板台车 |
CN201526325U (zh) * | 2009-10-21 | 2010-07-14 | 北京中铁天瑞机械设备有限公司 | 隧道衬砌模板台车 |
CN202768019U (zh) * | 2012-09-04 | 2013-03-06 | 湖南五新重型装备有限公司 | 一种用于小城门断面的隧道衬砌台车 |
CN202991062U (zh) * | 2012-12-06 | 2013-06-12 | 中铁十二局集团有限公司 | 多断面衬砌台车 |
CN204511453U (zh) * | 2014-12-22 | 2015-07-29 | 中铁二十一局集团路桥工程有限公司 | 隧道施工钢筋绑扎所用自走式模架 |
-
2014
- 2014-12-22 CN CN201410810809.0A patent/CN104564099A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2869322Y (zh) * | 2005-12-23 | 2007-02-14 | 于海滨 | 新型门架式隧道衬砌模板台车 |
JP2009209527A (ja) * | 2008-02-29 | 2009-09-17 | Taisei Corp | セグメント組立装置及びセグメント組立方法 |
CN101586464A (zh) * | 2008-05-22 | 2009-11-25 | 中铁十一局集团第一工程有限公司 | 一种铁路隧道衬砌边墙混凝土施工方法 |
CN201486572U (zh) * | 2009-08-05 | 2010-05-26 | 中交隧道工程局有限公司 | 一种多变径衬砌模板台车 |
CN201526325U (zh) * | 2009-10-21 | 2010-07-14 | 北京中铁天瑞机械设备有限公司 | 隧道衬砌模板台车 |
CN202768019U (zh) * | 2012-09-04 | 2013-03-06 | 湖南五新重型装备有限公司 | 一种用于小城门断面的隧道衬砌台车 |
CN202991062U (zh) * | 2012-12-06 | 2013-06-12 | 中铁十二局集团有限公司 | 多断面衬砌台车 |
CN204511453U (zh) * | 2014-12-22 | 2015-07-29 | 中铁二十一局集团路桥工程有限公司 | 隧道施工钢筋绑扎所用自走式模架 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863682A (zh) * | 2016-04-26 | 2016-08-17 | 重庆工商职业学院 | 隧道衬砌钢筋骨架绑扎装置 |
CN105736016A (zh) * | 2016-04-27 | 2016-07-06 | 中铁四局集团第一工程有限公司 | 隧道二衬钢筋骨架施工装备及其应用 |
CN105736016B (zh) * | 2016-04-27 | 2018-01-19 | 中铁四局集团第一工程有限公司 | 隧道二衬钢筋骨架施工装备及其应用 |
CN110593136A (zh) * | 2019-10-23 | 2019-12-20 | 中铁七局集团有限公司 | 上承式板拱桥拱圈走行式模板台车及施工方法 |
CN116104312A (zh) * | 2023-04-07 | 2023-05-12 | 中铁九局集团有限公司 | 一种适用于立面钢筋网的绑扎机器人及其绑扎方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105952482B (zh) | 自行式隧道仰拱衬砌台车 | |
CN104594918B (zh) | 分体整合式地下通道钢模板台车及其施工方法 | |
CN101319613B (zh) | 双梁双柱步进超前液压支架 | |
CN110499708B (zh) | 一种预制装配式桥梁多跨同步安装架桥机及其安装方法 | |
CN104564099A (zh) | 隧道施工钢筋绑扎所用自走式模架 | |
CN107060823B (zh) | 隧道锚段二衬混凝土施工无拆卸台车 | |
CN104533460B (zh) | 换撑式模板台车和地下通道混凝土浇筑的施工方法 | |
CN203783592U (zh) | 扩展式多平台铁路隧道作业台车 | |
CN102587918B (zh) | 煤矿冻结立井井筒施工用高强度变径模板 | |
CN204511453U (zh) | 隧道施工钢筋绑扎所用自走式模架 | |
CN107059511B (zh) | 一种可自行移动钢轨的铺设装置 | |
CN104695335A (zh) | 上行式移动模架钢筋整体绑扎吊装施工工法及施工装置 | |
CN202132052U (zh) | 全液压隧道仰拱栈桥式移动模架 | |
CN203959729U (zh) | 钢拱架安装台架 | |
CN204849595U (zh) | 适用于在大坡度情况下架设预制梁的架桥机支腿 | |
CN104018869B (zh) | 超前支架支护装置 | |
CN104060860B (zh) | 一种用于预制混凝土t梁的分节伸缩式防雨棚及使用方法 | |
CN111733872B (zh) | 一种管廊施工方法 | |
CN104948203A (zh) | 一种斜井隧道衬砌与不对称中隔墙衬砌整体施工方法 | |
CN104372746B (zh) | 铁路桥梁预制后张法简支t梁注砼模板支架及其安装工艺 | |
CN202073570U (zh) | 带有跨越行走装置的仰拱移动模架 | |
CN105881734B (zh) | 一种混凝土预应力桩张紧装置 | |
CN108798714A (zh) | 一种通道墙身施工用的轻便式移模台车及其施工方法 | |
CN206607460U (zh) | 一种可自行移动钢轨的铺设装置 | |
CN102808632A (zh) | 一种全圆式模板台车组件及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |
|
WD01 | Invention patent application deemed withdrawn after publication |