CN104563162A - Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction - Google Patents
Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction Download PDFInfo
- Publication number
- CN104563162A CN104563162A CN201310466492.9A CN201310466492A CN104563162A CN 104563162 A CN104563162 A CN 104563162A CN 201310466492 A CN201310466492 A CN 201310466492A CN 104563162 A CN104563162 A CN 104563162A
- Authority
- CN
- China
- Prior art keywords
- air bag
- special
- shaped air
- irregularly
- shaped gasbag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention relates to an irregularly-shaped gasbag and a rapid construction method using the irregularly-shaped gasbag as an underground continuous wall junction. The irregularly-shaped gasbag 1 comprises an air faucet 2; resistant nails 3, which are solid and hemispherical, are arranged on the outer wall of the irregularly-shaped gasbag 1 in the form of a quincunx. The rapid construction method comprises the following steps: (1) utilizing the irregularly-shaped gasbag 1 to divide a groove 4 into a plurality of groove sections 5 during construction; (2) putting counterweight balls 7 onto the inner bottom of the irregularly-shaped gasbag 1; (3) inflating the irregularly-shaped gasbag 1 through the air faucet 2 till the irregularly-shaped gasbag 1 is expanded enough; (4) pouring an impermeable material into the groove sections 5 which are positioned on both sides of the irregularly-shaped gasbag 1, deflating the irregularly-shaped gasbag 1 when the strength of the impermeable material reaches a certain degree, and taking out the irregularly-shaped gasbag 1; (5) sufficiently flushing a cavity where the irregularly-shaped gasbag 1 is positioned, and pouring a second-phase impermeable material into the cavity to integrate all the groove sections 5; (6) after the process is finished, carrying out subsequent wall construction in the same manner.
Description
Technical field
The present invention relates to a kind of construction method of underground continuous wall connector, particularly a kind of special-shaped air bag and with the speedy construction method of special-shaped air bag as underground continuous wall connector.
Background technology
At present, in hydraulic engineering, the subterranean continuous imperviousing wall application of low water head widely.During construction, by special equipment, build the groove of one fixed width and the degree of depth according to designing requirement, its length is determined according to designing requirement, and because length is longer, when building impervious material in the trench, groove must be divided into several groove sections, leakage proof wall is built in segmentation.Groove section separates common methods to be had: method 1: point sequence excavation section by section, build body of wall, namely multiple groove section is divided into according to impervious wall design axis by planning to build the impervious wall made, first the impervious wall alternation excavation made will be planned to build, build this groove section impervious wall again, non-box cut section is as spacer body, when having built after the impervious material in groove section reaches some strength, excavate the groove section body of wall as interval again, namely first excavate and build 1,3,5 ... section, excavate again and build 2,4,6 ... section, namely the body of wall of having built can be used as spacer body, and a point sequence completes wall construction like this.Method 2: the continuous channel first building certain length, then locking notch pipe (junction block) is inserted in the trench, and be fixed, impervious material is under water built respectively in the groove section on locking notch pipe both sides, after the impervious material of locking notch pipe both sides groove section reaches some strength, extract locking notch pipe, the body of wall of clear hole after-pouring locking notch pipe part, completes two sections of wall connectings.The segregation method of above groove section all exist complex procedures, speed of application slow, can not work continuously, quality is not easy the shortcomings such as guarantees, especially the connection of continuous wall connector is difficult to process; In addition, easily there is problems such as can not pulling out out or pull off, thus cause quality accident in the locking notch pipe in method 2.
Summary of the invention
The present invention, in order to make up the shortcoming of above construction of diaphragm wall, provides a kind of special-shaped air bag and with the speedy construction method of special-shaped air bag as underground continuous wall connector spacer body.The present invention is achieved through the following technical solutions: a kind of special-shaped air bag for underground continuous wall connector, this special-shaped air bag includes valve, the outer wall of described special-shaped air bag is provided with resistance nail, and described resistance nail is in solid hemispherical, and plum blossom-shaped is arranged in different in nature gasbag ektexine.
A kind of underground continuous wall connector speedy construction method utilizing special-shaped air bag:
One, during construction, special-shaped air bag is placed in respectively the groove of construction plant according to certain distance, utilizes special-shaped air bag to be some groove sections by trench separation;
Two, weighted spherical ball is fallen into the bottom of special-shaped air bag, weighted spherical ball plays counterweight, guiding and positioning action;
Three, make it expand through valve inflation in special-shaped air bag, the special-shaped air bag after expansion embeds in the cell wall in groove by resistance nail;
Four, then respectively impervious material is built to the groove section on special-shaped air bag both sides, after impervious material reaches some strength, to special-shaped air bag deflation, propose special-shaped air bag; Special-shaped air bag cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag place, build the second stage of impervious material, make each groove section be linked to be as a whole, good fusion is played to two phase impervious materials in the cavity that resistance nail place is stayed.
Six, this operation terminates, and completes follow-up wall construction by that analogy.
In above process, weighted spherical ball has constant weight, and has a certain amount of powdered lubricant to coordinate.
In above process special-shaped air bag arrangement and take out can not be damaged.
Described special-shaped air bag is high-pressure gasbag, resistance to wears, and its diameter is slightly wider than groove width.
The present invention has efficiently construction of underground continuous wall jointing, feature fast, can substantially increase programming.
Accompanying drawing explanation
Fig. 1 is the front view of special-shaped airbag structure schematic diagram in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is special-shaped air bag layout plan in the trench in the present invention;
Fig. 4 be in the present invention special-shaped air bag in the trench schematic diagram is set.
In figure: 1, special-shaped air bag, 2, valve, 3, resistance nail, 4, groove, 5, groove section, 6, cell wall, 7, weighted spherical ball, 8, powdered lubricant.
Detailed description of the invention
With reference to accompanying drawing, for a special-shaped air bag for underground continuous wall connector, this special-shaped air bag 1 includes valve 2, it is characterized in that: the outer wall of described special-shaped air bag 1 is provided with resistance nail 3, described resistance nail 3 is in solid hemispherical, and plum blossom-shaped is arranged in different in nature gasbag ektexine.
A kind of underground continuous wall connector speedy construction method utilizing special-shaped air bag:
One, during construction, special-shaped air bag 1 is placed in respectively the groove 4 of construction plant according to certain distance, utilizes special-shaped air bag 1 that groove 4 is divided into some groove sections 5;
Two, weighted spherical ball 7 is fallen into the bottom of special-shaped air bag 1, weighted spherical ball 7 plays counterweight, guiding and positioning action;
Three, make it expand through valve 2 inflation in special-shaped air bag 1, the special-shaped air bag 1 after expansion embeds in the cell wall 6 in groove 4 by resistance nail 3;
Four, then respectively impervious material is built to the groove section 5 on special-shaped air bag 1 both sides, after impervious material reaches some strength, special-shaped air bag 1 is exitted, propose special-shaped air bag 1; Special-shaped air bag 1 cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag 1 place, build the second stage of impervious material, make each groove section 5 be linked to be as a whole, resistance is followed closely the cavity stayed at 3 places and is played good fusion to two phase impervious materials.
Six, this operation terminates, and completes follow-up wall construction by that analogy.
Described special-shaped air bag 1 can be set to 3 ~ 5, utilizes special-shaped air bag 1 that the groove 4 of construction plant is divided into 2 ~ 4 groove sections, circulation construction, more convenient.
In above process, weighted spherical ball 7 has constant weight, weighted spherical ball 7 and have a certain amount of powdered lubricant 8 with the use of, powdered lubricant 8 plays the lubrication between weighted spherical ball 7.
In above process, the lifting of special-shaped air bag 1 can not damage air bag.
Described special-shaped air bag 1 is high-pressure gasbag, and resistance to wear, its diameter is slightly wider than slotted eye width.
Claims (4)
1. the special-shaped air bag for underground continuous wall connector, this special-shaped air bag (1) includes valve (2), it is characterized in that: the outer wall of special-shaped air bag (1) is provided with resistance nail (3), described resistance nail (3) is in solid hemispherical, and plum blossom-shaped is arranged on the outer wall of different in nature air bag (1).
2. one kind utilizes the underground continuous wall connector speedy construction method of the special-shaped air bag described in claim 1; It is characterized in that:
One, during construction, special-shaped air bag (1) is placed in respectively the groove (4) of construction plant according to certain distance, utilizes special-shaped air bag (1) that groove (4) is divided into some groove sections (5);
Two, weighted spherical ball (7) is fallen into the bottom of special-shaped air bag (1), weighted spherical ball (7) plays counterweight, guiding and positioning action;
Three, make it expand through valve (2) inflation in special-shaped air bag (1), the special-shaped air bag (1) after expansion embeds in the cell wall (6) in groove (4) by resistance nail (3);
Four, then respectively impervious material is built to the groove section (5) on special-shaped air bag (1) both sides, after impervious material reaches some strength, to special-shaped air bag (1) venting, propose special-shaped air bag (1); Special-shaped air bag (1) cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag (1) place, build the second stage of impervious material, make each groove section (5) be linked to be as a whole, good fusion is played to two phase impervious materials in the cavity that resistance nail (3) place is stayed;
Six, this operation terminates, and completes follow-up wall construction by that analogy.
3. according to the underground continuous wall connector speedy construction method of the special-shaped air bag utilized described in claim 2; It is characterized in that: described special-shaped air bag (1) can be set to 3 ~ 5, utilize special-shaped air bag (1) that the groove (4) of construction plant is divided into 2 ~ 4 groove sections, circulation construction.
4. according to the underground continuous wall connector speedy construction method of the special-shaped air bag utilized described in claim 2 or 3; It is characterized in that: described weighted spherical ball (7) and have powdered lubricant (8) with the use of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310466492.9A CN104563162A (en) | 2013-10-09 | 2013-10-09 | Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310466492.9A CN104563162A (en) | 2013-10-09 | 2013-10-09 | Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104563162A true CN104563162A (en) | 2015-04-29 |
Family
ID=53080174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310466492.9A Pending CN104563162A (en) | 2013-10-09 | 2013-10-09 | Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104563162A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117802971A (en) * | 2024-01-03 | 2024-04-02 | 广州地铁设计研究院股份有限公司 | Anti-winding structure for underground wall joint and construction method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06294142A (en) * | 1991-05-27 | 1994-10-21 | Kajima Corp | Underground wall construction method and concrete from therefor |
CN101806067A (en) * | 2009-02-16 | 2010-08-18 | 上海市机械施工有限公司 | Construction method of underground continuous wall joints by using air bag |
CN102116035A (en) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | Process for constructing underground structural walls without linings |
CN103195070A (en) * | 2013-04-03 | 2013-07-10 | 北京四方如钢混凝土制品有限公司 | Prefabricated block for backfill and backfill method |
-
2013
- 2013-10-09 CN CN201310466492.9A patent/CN104563162A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06294142A (en) * | 1991-05-27 | 1994-10-21 | Kajima Corp | Underground wall construction method and concrete from therefor |
CN101806067A (en) * | 2009-02-16 | 2010-08-18 | 上海市机械施工有限公司 | Construction method of underground continuous wall joints by using air bag |
CN102116035A (en) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | Process for constructing underground structural walls without linings |
CN103195070A (en) * | 2013-04-03 | 2013-07-10 | 北京四方如钢混凝土制品有限公司 | Prefabricated block for backfill and backfill method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117802971A (en) * | 2024-01-03 | 2024-04-02 | 广州地铁设计研究院股份有限公司 | Anti-winding structure for underground wall joint and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102221712B (en) | Automatic testing method of wire line coring drilling hoisting-free pressurized water test | |
CN109162703B (en) | Super-long soft coal seam drilling multi-stage pressure sealing pressure measuring device and method | |
CN107939333B (en) | Multistage pressure-bearing type permeable hole sealing method and device | |
CN211824858U (en) | Shield constructs around originating/arrival section tunnel stratum water and soil pressure monitoring devices | |
CN108180035B (en) | Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam | |
CN102660966A (en) | Chamber excavation device with geomechanical model | |
CN104405434A (en) | Hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering method and hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering device | |
CN104563162A (en) | Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction | |
CN111931372A (en) | Multi-factor-considered prediction method for soil deformation caused by saturated soil small-curvature shield construction | |
CN203487559U (en) | Special-shaped air bag for underground diaphragm wall joint | |
CN108397207A (en) | The device that the shield tail of shield prototype is sealed | |
CN104805830B (en) | Non-shot rock uplift pile construction method | |
CN207989031U (en) | The device that the shield tail of shield prototype is sealed | |
CN110725660B (en) | Multistage releasable water-swelling packer and method | |
CN107542420A (en) | Salvaging type expandable casing patching exempts to bore plug device | |
CN206410616U (en) | The static medicament pressure pipe of city shallow embedding rock stratum tunnel static blasting construction intermediate hole | |
CN113550331A (en) | Milling joint based on cross steel plate and limiting air bag core mold and construction method | |
CN208565659U (en) | A kind of waterway conversion valve for the interior test that drills | |
CN206530310U (en) | Deng the skeleton anchor mechanism of hole diameter expansion sleeve | |
RU2644959C1 (en) | Device for restoration of defects of operating columns of oil and gas wells | |
CN103901167A (en) | High-pressure inflatable raft mat testing device and method for simulating coal seam mining | |
CN216043717U (en) | Subway communication channel freezing method construction interface simulation test system for traversing methane-containing stratum | |
CN110438947B (en) | Polyurethane curtain forming method for preventing hole die from shrinking | |
CN204282383U (en) | Flow-plastic-shaped mud sand surrounding rock advanced vacuum dewatering device | |
CN212454243U (en) | Ultra-shallow horizontal well surface layer pre-inclined casing string structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |