CN104563162A - Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction - Google Patents

Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction Download PDF

Info

Publication number
CN104563162A
CN104563162A CN201310466492.9A CN201310466492A CN104563162A CN 104563162 A CN104563162 A CN 104563162A CN 201310466492 A CN201310466492 A CN 201310466492A CN 104563162 A CN104563162 A CN 104563162A
Authority
CN
China
Prior art keywords
air bag
special
shaped air
irregularly
shaped gasbag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310466492.9A
Other languages
Chinese (zh)
Inventor
张立新
段青英
张立华
段青灵
李勇
于海洋
牛景涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Resources Research Institute of Shandong Province
Original Assignee
Water Resources Research Institute of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Water Resources Research Institute of Shandong Province filed Critical Water Resources Research Institute of Shandong Province
Priority to CN201310466492.9A priority Critical patent/CN104563162A/en
Publication of CN104563162A publication Critical patent/CN104563162A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to an irregularly-shaped gasbag and a rapid construction method using the irregularly-shaped gasbag as an underground continuous wall junction. The irregularly-shaped gasbag 1 comprises an air faucet 2; resistant nails 3, which are solid and hemispherical, are arranged on the outer wall of the irregularly-shaped gasbag 1 in the form of a quincunx. The rapid construction method comprises the following steps: (1) utilizing the irregularly-shaped gasbag 1 to divide a groove 4 into a plurality of groove sections 5 during construction; (2) putting counterweight balls 7 onto the inner bottom of the irregularly-shaped gasbag 1; (3) inflating the irregularly-shaped gasbag 1 through the air faucet 2 till the irregularly-shaped gasbag 1 is expanded enough; (4) pouring an impermeable material into the groove sections 5 which are positioned on both sides of the irregularly-shaped gasbag 1, deflating the irregularly-shaped gasbag 1 when the strength of the impermeable material reaches a certain degree, and taking out the irregularly-shaped gasbag 1; (5) sufficiently flushing a cavity where the irregularly-shaped gasbag 1 is positioned, and pouring a second-phase impermeable material into the cavity to integrate all the groove sections 5; (6) after the process is finished, carrying out subsequent wall construction in the same manner.

Description

A kind of special-shaped air bag and the underground continuous wall connector speedy construction method with special-shaped air bag
Technical field
The present invention relates to a kind of construction method of underground continuous wall connector, particularly a kind of special-shaped air bag and with the speedy construction method of special-shaped air bag as underground continuous wall connector.
Background technology
At present, in hydraulic engineering, the subterranean continuous imperviousing wall application of low water head widely.During construction, by special equipment, build the groove of one fixed width and the degree of depth according to designing requirement, its length is determined according to designing requirement, and because length is longer, when building impervious material in the trench, groove must be divided into several groove sections, leakage proof wall is built in segmentation.Groove section separates common methods to be had: method 1: point sequence excavation section by section, build body of wall, namely multiple groove section is divided into according to impervious wall design axis by planning to build the impervious wall made, first the impervious wall alternation excavation made will be planned to build, build this groove section impervious wall again, non-box cut section is as spacer body, when having built after the impervious material in groove section reaches some strength, excavate the groove section body of wall as interval again, namely first excavate and build 1,3,5 ... section, excavate again and build 2,4,6 ... section, namely the body of wall of having built can be used as spacer body, and a point sequence completes wall construction like this.Method 2: the continuous channel first building certain length, then locking notch pipe (junction block) is inserted in the trench, and be fixed, impervious material is under water built respectively in the groove section on locking notch pipe both sides, after the impervious material of locking notch pipe both sides groove section reaches some strength, extract locking notch pipe, the body of wall of clear hole after-pouring locking notch pipe part, completes two sections of wall connectings.The segregation method of above groove section all exist complex procedures, speed of application slow, can not work continuously, quality is not easy the shortcomings such as guarantees, especially the connection of continuous wall connector is difficult to process; In addition, easily there is problems such as can not pulling out out or pull off, thus cause quality accident in the locking notch pipe in method 2.
Summary of the invention
The present invention, in order to make up the shortcoming of above construction of diaphragm wall, provides a kind of special-shaped air bag and with the speedy construction method of special-shaped air bag as underground continuous wall connector spacer body.The present invention is achieved through the following technical solutions: a kind of special-shaped air bag for underground continuous wall connector, this special-shaped air bag includes valve, the outer wall of described special-shaped air bag is provided with resistance nail, and described resistance nail is in solid hemispherical, and plum blossom-shaped is arranged in different in nature gasbag ektexine.
A kind of underground continuous wall connector speedy construction method utilizing special-shaped air bag:
One, during construction, special-shaped air bag is placed in respectively the groove of construction plant according to certain distance, utilizes special-shaped air bag to be some groove sections by trench separation;
Two, weighted spherical ball is fallen into the bottom of special-shaped air bag, weighted spherical ball plays counterweight, guiding and positioning action;
Three, make it expand through valve inflation in special-shaped air bag, the special-shaped air bag after expansion embeds in the cell wall in groove by resistance nail;
Four, then respectively impervious material is built to the groove section on special-shaped air bag both sides, after impervious material reaches some strength, to special-shaped air bag deflation, propose special-shaped air bag; Special-shaped air bag cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag place, build the second stage of impervious material, make each groove section be linked to be as a whole, good fusion is played to two phase impervious materials in the cavity that resistance nail place is stayed.
Six, this operation terminates, and completes follow-up wall construction by that analogy.
In above process, weighted spherical ball has constant weight, and has a certain amount of powdered lubricant to coordinate.
In above process special-shaped air bag arrangement and take out can not be damaged.
Described special-shaped air bag is high-pressure gasbag, resistance to wears, and its diameter is slightly wider than groove width.
The present invention has efficiently construction of underground continuous wall jointing, feature fast, can substantially increase programming.
Accompanying drawing explanation
Fig. 1 is the front view of special-shaped airbag structure schematic diagram in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is special-shaped air bag layout plan in the trench in the present invention;
Fig. 4 be in the present invention special-shaped air bag in the trench schematic diagram is set.
In figure: 1, special-shaped air bag, 2, valve, 3, resistance nail, 4, groove, 5, groove section, 6, cell wall, 7, weighted spherical ball, 8, powdered lubricant.
Detailed description of the invention
With reference to accompanying drawing, for a special-shaped air bag for underground continuous wall connector, this special-shaped air bag 1 includes valve 2, it is characterized in that: the outer wall of described special-shaped air bag 1 is provided with resistance nail 3, described resistance nail 3 is in solid hemispherical, and plum blossom-shaped is arranged in different in nature gasbag ektexine.
A kind of underground continuous wall connector speedy construction method utilizing special-shaped air bag:
One, during construction, special-shaped air bag 1 is placed in respectively the groove 4 of construction plant according to certain distance, utilizes special-shaped air bag 1 that groove 4 is divided into some groove sections 5;
Two, weighted spherical ball 7 is fallen into the bottom of special-shaped air bag 1, weighted spherical ball 7 plays counterweight, guiding and positioning action;
Three, make it expand through valve 2 inflation in special-shaped air bag 1, the special-shaped air bag 1 after expansion embeds in the cell wall 6 in groove 4 by resistance nail 3;
Four, then respectively impervious material is built to the groove section 5 on special-shaped air bag 1 both sides, after impervious material reaches some strength, special-shaped air bag 1 is exitted, propose special-shaped air bag 1; Special-shaped air bag 1 cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag 1 place, build the second stage of impervious material, make each groove section 5 be linked to be as a whole, resistance is followed closely the cavity stayed at 3 places and is played good fusion to two phase impervious materials.
Six, this operation terminates, and completes follow-up wall construction by that analogy.
Described special-shaped air bag 1 can be set to 3 ~ 5, utilizes special-shaped air bag 1 that the groove 4 of construction plant is divided into 2 ~ 4 groove sections, circulation construction, more convenient.
In above process, weighted spherical ball 7 has constant weight, weighted spherical ball 7 and have a certain amount of powdered lubricant 8 with the use of, powdered lubricant 8 plays the lubrication between weighted spherical ball 7.
In above process, the lifting of special-shaped air bag 1 can not damage air bag.
Described special-shaped air bag 1 is high-pressure gasbag, and resistance to wear, its diameter is slightly wider than slotted eye width.

Claims (4)

1. the special-shaped air bag for underground continuous wall connector, this special-shaped air bag (1) includes valve (2), it is characterized in that: the outer wall of special-shaped air bag (1) is provided with resistance nail (3), described resistance nail (3) is in solid hemispherical, and plum blossom-shaped is arranged on the outer wall of different in nature air bag (1).
2. one kind utilizes the underground continuous wall connector speedy construction method of the special-shaped air bag described in claim 1; It is characterized in that:
One, during construction, special-shaped air bag (1) is placed in respectively the groove (4) of construction plant according to certain distance, utilizes special-shaped air bag (1) that groove (4) is divided into some groove sections (5);
Two, weighted spherical ball (7) is fallen into the bottom of special-shaped air bag (1), weighted spherical ball (7) plays counterweight, guiding and positioning action;
Three, make it expand through valve (2) inflation in special-shaped air bag (1), the special-shaped air bag (1) after expansion embeds in the cell wall (6) in groove (4) by resistance nail (3);
Four, then respectively impervious material is built to the groove section (5) on special-shaped air bag (1) both sides, after impervious material reaches some strength, to special-shaped air bag (1) venting, propose special-shaped air bag (1); Special-shaped air bag (1) cycle applications is constructed in next groove section;
Five, fully rinse the cavity at special-shaped air bag (1) place, build the second stage of impervious material, make each groove section (5) be linked to be as a whole, good fusion is played to two phase impervious materials in the cavity that resistance nail (3) place is stayed;
Six, this operation terminates, and completes follow-up wall construction by that analogy.
3. according to the underground continuous wall connector speedy construction method of the special-shaped air bag utilized described in claim 2; It is characterized in that: described special-shaped air bag (1) can be set to 3 ~ 5, utilize special-shaped air bag (1) that the groove (4) of construction plant is divided into 2 ~ 4 groove sections, circulation construction.
4. according to the underground continuous wall connector speedy construction method of the special-shaped air bag utilized described in claim 2 or 3; It is characterized in that: described weighted spherical ball (7) and have powdered lubricant (8) with the use of.
CN201310466492.9A 2013-10-09 2013-10-09 Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction Pending CN104563162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310466492.9A CN104563162A (en) 2013-10-09 2013-10-09 Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310466492.9A CN104563162A (en) 2013-10-09 2013-10-09 Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction

Publications (1)

Publication Number Publication Date
CN104563162A true CN104563162A (en) 2015-04-29

Family

ID=53080174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310466492.9A Pending CN104563162A (en) 2013-10-09 2013-10-09 Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction

Country Status (1)

Country Link
CN (1) CN104563162A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802971A (en) * 2024-01-03 2024-04-02 广州地铁设计研究院股份有限公司 Anti-winding structure for underground wall joint and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06294142A (en) * 1991-05-27 1994-10-21 Kajima Corp Underground wall construction method and concrete from therefor
CN101806067A (en) * 2009-02-16 2010-08-18 上海市机械施工有限公司 Construction method of underground continuous wall joints by using air bag
CN102116035A (en) * 2009-12-30 2011-07-06 上海市机械施工有限公司 Process for constructing underground structural walls without linings
CN103195070A (en) * 2013-04-03 2013-07-10 北京四方如钢混凝土制品有限公司 Prefabricated block for backfill and backfill method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06294142A (en) * 1991-05-27 1994-10-21 Kajima Corp Underground wall construction method and concrete from therefor
CN101806067A (en) * 2009-02-16 2010-08-18 上海市机械施工有限公司 Construction method of underground continuous wall joints by using air bag
CN102116035A (en) * 2009-12-30 2011-07-06 上海市机械施工有限公司 Process for constructing underground structural walls without linings
CN103195070A (en) * 2013-04-03 2013-07-10 北京四方如钢混凝土制品有限公司 Prefabricated block for backfill and backfill method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117802971A (en) * 2024-01-03 2024-04-02 广州地铁设计研究院股份有限公司 Anti-winding structure for underground wall joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN102221712B (en) Automatic testing method of wire line coring drilling hoisting-free pressurized water test
CN109162703B (en) Super-long soft coal seam drilling multi-stage pressure sealing pressure measuring device and method
CN107939333B (en) Multistage pressure-bearing type permeable hole sealing method and device
CN211824858U (en) Shield constructs around originating/arrival section tunnel stratum water and soil pressure monitoring devices
CN108180035B (en) Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam
CN102660966A (en) Chamber excavation device with geomechanical model
CN104405434A (en) Hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering method and hypotonic coal seam region mineshaft gas phase fracturing and rapid coal uncovering device
CN104563162A (en) Irregularly-shaped gasbag and rapid construction method using irregularly-shaped gasbag as underground continuous wall junction
CN111931372A (en) Multi-factor-considered prediction method for soil deformation caused by saturated soil small-curvature shield construction
CN203487559U (en) Special-shaped air bag for underground diaphragm wall joint
CN108397207A (en) The device that the shield tail of shield prototype is sealed
CN104805830B (en) Non-shot rock uplift pile construction method
CN207989031U (en) The device that the shield tail of shield prototype is sealed
CN110725660B (en) Multistage releasable water-swelling packer and method
CN107542420A (en) Salvaging type expandable casing patching exempts to bore plug device
CN206410616U (en) The static medicament pressure pipe of city shallow embedding rock stratum tunnel static blasting construction intermediate hole
CN113550331A (en) Milling joint based on cross steel plate and limiting air bag core mold and construction method
CN208565659U (en) A kind of waterway conversion valve for the interior test that drills
CN206530310U (en) Deng the skeleton anchor mechanism of hole diameter expansion sleeve
RU2644959C1 (en) Device for restoration of defects of operating columns of oil and gas wells
CN103901167A (en) High-pressure inflatable raft mat testing device and method for simulating coal seam mining
CN216043717U (en) Subway communication channel freezing method construction interface simulation test system for traversing methane-containing stratum
CN110438947B (en) Polyurethane curtain forming method for preventing hole die from shrinking
CN204282383U (en) Flow-plastic-shaped mud sand surrounding rock advanced vacuum dewatering device
CN212454243U (en) Ultra-shallow horizontal well surface layer pre-inclined casing string structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429