CN104535886A CN201510005082.3A CN201510005082A CN104535886A CN 104535886 A CN104535886 A CN 104535886A CN 201510005082 A CN201510005082 A CN 201510005082A CN 104535886 A CN104535886 A CN 104535886A
Authority
CN
China
Prior art keywords
iron core
transformer
current
grounding
diagnosis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510005082.3A
Other languages
Chinese (zh)
Inventor
王楠
魏菊芳
李松原
曹梦
李旭
张黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510005082.3A priority Critical patent/CN104535886A/en
Publication of CN104535886A publication Critical patent/CN104535886A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a transformer iron core multipoint grounding diagnosis and processing method. The transformer iron core multipoint grounding diagnosis and processing method is technically characterized by comprising the steps of measuring grounding current of a transformer iron core, checking whether a measuring method is correct or not and performing re-measurement if the grounding current exceeds standard, making a definite diagnosis on failure cause through oil chromatography testing and grounding current change, taking a series resistance or large current impact treatment measure if re-measurement is abnormal, and timely arranging major repair according to a transformer operation state under the necessary situation. The transformer iron core multipoint grounding diagnosis and processing method is reasonable in design, and the problems of accurate judgment and quick processing after multiple-point grounding of a transformer occurs are solved. The analysis time of technicians is remarkably reduced, the accuracy of an analysis conclusion and timeliness of problem handling are improved, safe and stable operation of the transformer and a power grid is ensured, and operation reliability of the power grid is ensured.

Description

Multipoint earthing of iron core of transformer diagnosis and management method
Technical field
The invention belongs to transformer technology field, especially a kind of multipoint earthing of iron core of transformer diagnosis and management method.
Background technology
The transformer core of normal operation should one point earth, but, if fall into metallic foreign body in fuel tank, can make to be communicated with between core lamination stack with casing; In addition, if core lamination stack is because touching the reasons such as folder after the tilting of certain reason, in Transformer iron core grounding line, the situation of circulation is had to happen occasionally.According to statistics, iron core grounding fault comes the 3rd in transformer fault, accounts for more than 30% of transformer total failare.For these reasons, the State Grid Corporation of China 18 of latest edition is counter arrange in the ANOMALOUS VARIATIONS situation that Transformer should note circulation is proposed.Therefore, how carrying out treatment and analysis when transformer generation multipoint earthing of iron core, is the problem needing solution at present badly.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of multipoint earthing of iron core of transformer diagnosis and management method is provided, solve timely detection and the process problem of multipoint earthing of iron core of transformer.
The present invention solves existing technical matters and takes following technical scheme to realize:
A kind of multipoint earthing of iron core of transformer diagnosis and management method, comprises the following steps:
Step 1, measuring transformer iron core grounding current, if ground current exceeds standard, then whether check measurement method is correct, and carries out repetition measurement;
Step 2, to be tested by oil chromatography and ground current change, make a definite diagnosis failure cause;
If step 3 repetition measurement is abnormal, take the treatment measures of resistance in series or heavy current impact;
Step 4, in the case of necessary, arrange overhaul in time in conjunction with running state of transformer.
And the method whether described step 1 check measurement method is correct is: when measuring transformer iron core grounding current, clamp on amperemeter should be close to the impact that iron core grounding downlead measures leakage flux; Then clamp on amperemeter is clamped into iron core grounding downlead, measure iron core grounding current; Finally, the actual value of iron core grounding current should get rid of the influence value of leakage flux; In addition, iron core grounding downlead structure should be checked, and measure on first earth point of iron core grounding downlead.
And the treatment measures of described step 3 are: if insulation resistance changes greatly in measuring process, or inside transformer has intermittent discharging sound, then transformer core and folder exist unstable ground connection, now adopt heavy current impact, are punctured by foreign matter or hit down; When iron core grounding current is greater than 300mA, in iron core grounding downlead place resistance in series, with restricted grounding current value in critical field.
Advantage of the present invention and good effect are:
The invention provides one to detect and disposal route multipoint earthing of iron core of transformer comprehensively, reliably, quickly, solve the accurate judgement after transformer generation multipoint earthing and fast processing problem, the present invention not only considerably reduces the analysis time of technician, and improve the timely row of accuracy and the process problem analyzing conclusion, ensure that the safety of transformer and electrical network, stable operation, ensure that operation of power networks reliability.
Accompanying drawing explanation
Fig. 1 is treatment scheme schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the embodiment of the present invention is further described.
A kind of multipoint earthing of iron core of transformer diagnosis and management method, as shown in Figure 1, comprises the following steps:
Step 1, measuring transformer iron core grounding current, if ground current exceeds standard, then whether check measurement method is correct, and carries out repetition measurement.
When measuring transformer iron core grounding current, clamp on amperemeter should be close to the impact that iron core grounding downlead measures leakage flux; Then clamp on amperemeter is clamped into iron core grounding downlead, measure iron core grounding current; The actual value of iron core grounding current should get rid of the influence value of leakage flux.
During measurement, iron core grounding downlead structure should be checked, and measure on first earth point (comprising and casing tie point) of iron core grounding downlead.
Step 2, to be tested by oil chromatography and ground current change, make a definite diagnosis failure cause.
Multipoint earthing of iron core of transformer fault is usually along with oil chromatography data exception, analyze the change of the characteristic gas such as total hydrocarbon, acetylene, determine multipoint earthing of iron core fault, be generally reflected as total hydrocarbon and exceed standard and methane, ethene accounting are larger, as found, acetylene content increases, and may be dynamic earth fault.
In addition, as transformer generation multipoint earth faults, iron core grounding current changes along with transformer load level, and general load level is high, and core current level is also high.
If step 3 repetition measurement is normal, normally run; If repetition measurement is abnormal, take the treatment measures that resistance in series or heavy current impact etc. are necessary.
As repetition measurement is abnormal, transformer should arrange to have a power failure in time, measures core insulation resistance.As insulation resistance changes greatly in measuring process, or inside transformer has intermittent discharging sound, and transformer core and folder may exist unstable ground connection, now, can attempt utilizing heavy current impact, is punctured by foreign matter or hit down; If insulation resistance is zero, then there is real ground connection in inside transformer, also can attempt utilizing capacitor charge and discharge to puncture foreign matter, but success ratio is lower.
As repetition measurement is abnormal; after transformer power failure process, problem is still unresolved; also or transformer cannot arrange in the recent period have a power failure; when iron core grounding current is greater than 300mA, should consider in iron core grounding downlead place resistance in series, with restricted grounding current value in critical field; but the safeguard measure of resistance in series in rainproof etc. should be noted; and regularly arrange iron core grounding current test, prevent multipoint earthing of iron core from disappearing, cause transformer core current potential too high and damage.In addition, this treating method only has some iron core groundings effective to inside transformer, and when inside transformer has 2 iron core grounding faults, the method is inoperative.
Step 4, in conjunction with running state of transformer, arrange overhaul in time.
Run the time limit, defect situation, live detection and state evaluation result in conjunction with transformer, arrange transformer overhaul in time.
It is emphasized that; embodiment of the present invention is illustrative; instead of it is determinate; therefore the present invention includes the embodiment be not limited to described in embodiment; every other embodiments drawn by those skilled in the art's technical scheme according to the present invention, belong to the scope of protection of the invention equally.

Claims (3)

1. a multipoint earthing of iron core of transformer diagnosis and management method, is characterized in that comprising the following steps:
Step 1, measuring transformer iron core grounding current, if ground current exceeds standard, then whether check measurement method is correct, and carries out repetition measurement;
Step 2, to be tested by oil chromatography and ground current change, make a definite diagnosis failure cause;
If step 3 repetition measurement is abnormal, take the treatment measures of resistance in series or heavy current impact;
Step 4, in the case of necessary, arrange overhaul in time in conjunction with running state of transformer.
2. multipoint earthing of iron core of transformer diagnosis and management method according to claim 1, it is characterized in that: the method whether described step 1 check measurement method is correct is: when measuring transformer iron core grounding current, clamp on amperemeter should be close to the impact that iron core grounding downlead measures leakage flux; Then clamp on amperemeter is clamped into iron core grounding downlead, measure iron core grounding current; Finally, the actual value of iron core grounding current should get rid of the influence value of leakage flux; In addition, iron core grounding downlead structure should be checked, and measure on first earth point of iron core grounding downlead.
3. multipoint earthing of iron core of transformer diagnosis and management method according to claim 1, it is characterized in that: the treatment measures of described step 3 are: if insulation resistance changes greatly in measuring process, or inside transformer has intermittent discharging sound, then there is unstable ground connection in transformer core and folder, now adopt heavy current impact, foreign matter is punctured or hits down; When iron core grounding current is greater than 300mA, in iron core grounding downlead place resistance in series, with restricted grounding current value in critical field.
CN201510005082.3A 2015-01-06 2015-01-06 Transformer iron core multipoint grounding diagnosis and processing method Pending CN104535886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510005082.3A CN104535886A (en) 2015-01-06 2015-01-06 Transformer iron core multipoint grounding diagnosis and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510005082.3A CN104535886A (en) 2015-01-06 2015-01-06 Transformer iron core multipoint grounding diagnosis and processing method

Publications (1)

Publication Number Publication Date
CN104535886A true CN104535886A (en) 2015-04-22

Family

ID=52851448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510005082.3A Pending CN104535886A (en) 2015-01-06 2015-01-06 Transformer iron core multipoint grounding diagnosis and processing method

Country Status (1)

Country Link
CN (1) CN104535886A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106199164A (en) * 2016-06-28 2016-12-07 国网河南桐柏县供电公司 A kind of measuring method of transformer iron core grounding current
CN109085451A (en) * 2018-08-30 2018-12-25 国网北京市电力公司 The detection method and device of iron core grounding in transformer, storage medium
CN109541364A (en) * 2018-09-25 2019-03-29 广西电网有限责任公司电力科学研究院 High-power transformer multipoint earthing of clamping piece breakdown judge and method of disposal
CN111289728A (en) * 2020-03-26 2020-06-16 云南电网有限责任公司电力科学研究院 Device and method for monitoring dissolved gas in insulating oil
CN112198461A (en) * 2020-09-28 2021-01-08 芜湖金牛电气股份有限公司 Dry-type transformer fault processing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101572181A (en) * 2009-03-16 2009-11-04 华北电网有限公司北京超高压公司 Transformer core earth resistance live line measurement installing device and method therefor
CN102998521A (en) * 2012-10-11 2013-03-27 苏州爱知电机有限公司 Ground-current remote monitor for transformer cores
CN103076526A (en) * 2013-01-16 2013-05-01 国网电力科学研究院 Fault diagnosis method based on transformer panoramic state information
CN103513125A (en) * 2012-06-29 2014-01-15 上海翔骋电气设备有限公司 Integrated intelligent diagnosis system and method of above-220KV transformers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101572181A (en) * 2009-03-16 2009-11-04 华北电网有限公司北京超高压公司 Transformer core earth resistance live line measurement installing device and method therefor
CN103513125A (en) * 2012-06-29 2014-01-15 上海翔骋电气设备有限公司 Integrated intelligent diagnosis system and method of above-220KV transformers
CN102998521A (en) * 2012-10-11 2013-03-27 苏州爱知电机有限公司 Ground-current remote monitor for transformer cores
CN103076526A (en) * 2013-01-16 2013-05-01 国网电力科学研究院 Fault diagnosis method based on transformer panoramic state information

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
华盘勇: "变压器铁芯多点接地故障的检测与分析", 《华中电力》 *
李兴斌 等: "变压器铁心多点接地及油道短路故障分析", 《黑龙江电力技术》 *
陈卫中 等: "大型变压器铁芯接地在线监测技术的研究", 《广东输电与变电技术》 *
陈涵林: "变压器铁芯多点接地故障的诊断及处理", 《电气试验》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106199164A (en) * 2016-06-28 2016-12-07 国网河南桐柏县供电公司 A kind of measuring method of transformer iron core grounding current
CN106199164B (en) * 2016-06-28 2019-07-12 国网河南桐柏县供电公司 A kind of measurement method of transformer iron core grounding current
CN109085451A (en) * 2018-08-30 2018-12-25 国网北京市电力公司 The detection method and device of iron core grounding in transformer, storage medium
CN109085451B (en) * 2018-08-30 2021-07-20 国网北京市电力公司 Method and device for detecting iron core grounding in transformer and storage medium
CN109541364A (en) * 2018-09-25 2019-03-29 广西电网有限责任公司电力科学研究院 High-power transformer multipoint earthing of clamping piece breakdown judge and method of disposal
CN111289728A (en) * 2020-03-26 2020-06-16 云南电网有限责任公司电力科学研究院 Device and method for monitoring dissolved gas in insulating oil
CN112198461A (en) * 2020-09-28 2021-01-08 芜湖金牛电气股份有限公司 Dry-type transformer fault processing method

Similar Documents

Publication Publication Date Title
CN100580464C (en) Large-scale grounding network detection technology and detection system for power plant and transformer substation
CN104535886A (en) Transformer iron core multipoint grounding diagnosis and processing method
CN104569481B (en) Buchholz relay oil stream flow velocity acquisition system and grave gas setting valve method of calibration
CN104569724A (en) Transformer short-circuit fault comprehensive diagnosis method
CN105699840A (en) Method for judging inter-turn short-circuit fault of reactor
CN101975911B (en) Earth fault judging method for overhead line fault indicator
CN104133155A (en) Cable local-defect diagnosis method
CN109142963B (en) Interturn short circuit fault positioning system and method
CN103499777B (en) A kind of appraisal procedure based on ultralow frequency Partial Discharge Detection and system
CN102507816B (en) Method for detecting effectiveness of oil chromatogram online monitoring data
CN101865817B (en) Sensor and detection method for detecting corrosion of buried metal
CN105371742A (en) Bushing tap pulse signal injection method-based transformer winding deformation detection device and method
CN203249968U (en) A real-time detecting circuit for detecting the earth insulation impedance of a photovoltaic grid-connected inverter
CN102221652A (en) Method and device for testing 500kV metal oxide arrester
CN205139307U (en) 500kV high pressure parallel reactor interturn insulation capability test device
CN116794436A (en) Lightning arrester degradation alarm method, device, electronic equipment, system and medium
CN103558450B (en) Three mutual inductor on-Line Monitor Device of apparatus for fixing transformer ground current
CN205003237U (en) Device that screening of guide body line defect detected on ground net
CN204945268U (en) Lightning arrester on-line monitoring circuit
CN203630207U (en) Double-transformer on-line monitoring device of transformer clamping piece grounding current
CN204613388U (en) A kind of capacitive current transformer on-line fault diagnosis device
CN108152659B (en) Method for judging turn-to-turn insulation short circuit of electromagnetic voltage transformer
CN206876812U (en) Supporting insulator local discharge detection device in gas-insulated switch
CN105182169A (en) Defect screening detection method and apparatus of grounding network upper guide body wire
CN111796159A (en) Method for detecting whether composite type drainage device is damaged or not on site

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150422

RJ01 Rejection of invention patent application after publication