CN104528542A - Double load-bearing trolley of tower crane - Google Patents

Double load-bearing trolley of tower crane Download PDF

Info

Publication number
CN104528542A
CN104528542A CN201410838973.2A CN201410838973A CN104528542A CN 104528542 A CN104528542 A CN 104528542A CN 201410838973 A CN201410838973 A CN 201410838973A CN 104528542 A CN104528542 A CN 104528542A
Authority
CN
China
Prior art keywords
trolley
hook
dolly
tower crane
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410838973.2A
Other languages
Chinese (zh)
Inventor
王建军
刘尊正
王科伟
郭崇嵩
李海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd
Original Assignee
Xuzhou Construction Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd filed Critical Xuzhou Construction Machinery Group Co Ltd
Priority to CN201410838973.2A priority Critical patent/CN104528542A/en
Publication of CN104528542A publication Critical patent/CN104528542A/en
Pending legal-status Critical Current

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62—Constructional features or details
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00—Trolleys or crabs, e.g. operating above runways
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00—Cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

本发明公开了一种塔式起重机双载重小车,包括后小车、前小车、副吊钩和主吊钩;所述后小车包括后小车架、导轮以及滑轮组;所述前小车包括前小车架、导轮以及滑轮组;所述后小车与所述前小车通过导轮在起重臂轨道上运行,并通过小车连接轴固定或分离;所述副吊钩通过钢丝绳与后小车的滑轮组连接;所述主吊钩通过钢丝绳与前小车的滑轮组连接;所述副吊钩和所述主吊钩之间通过吊钩连接板固定或分离。将载重小车设计成双小车,小车之间互相连接,当使用4倍率吊重时使用双小车,双小车整体宽度较大,有效避免钢丝绳打搅现象。当使用2倍率吊重时使用单小车,另外一个小车固定在起重臂臂根,载重小车整体重量减轻,大大增加了整机的起重性能。

The invention discloses a double-carrying trolley for a tower crane, which includes a rear trolley, a front trolley, an auxiliary hook and a main hook; the rear trolley includes a rear trolley frame, guide wheels and a block of pulleys; Frame, guide wheel and pulley block; the rear trolley and the front trolley run on the boom rail through the guide wheel, and are fixed or separated by the trolley connecting shaft; the auxiliary hook is connected to the pulley block of the rear trolley through a wire rope ; The main hook is connected with the pulley block of the front trolley through a wire rope; the auxiliary hook and the main hook are fixed or separated by a hook connecting plate. The load-carrying trolley is designed as double trolleys, and the trolleys are connected to each other. When using 4-fold hoisting, double trolleys are used. The overall width of the double trolleys is large, which can effectively avoid the disturbance of wire ropes. When using the 2-fold lifting ratio, a single trolley is used, and the other trolley is fixed at the root of the boom arm, the overall weight of the trolley is reduced, and the lifting performance of the whole machine is greatly increased.

Description

一种塔式起重机双载重小车A kind of double-carrying trolley of tower crane

技术领域 technical field

本发明涉及一种塔式起重机,具体是一种塔式起重机双载重小车。 The invention relates to a tower crane, in particular to a double-carrying trolley of the tower crane.

背景技术 Background technique

如图1所示,目前我国的塔式起重机通常设计有单载重小车,载重小车2为塔式起重机起升重物的主要载体,载重小车2转配在起重臂1上,可以再起重臂1上移动,载重小车2与起升吊钩3用钢丝绳相连,起到变换起升幅度的作用。一般可以变换2倍率、4倍率钢丝绳使用,有的可以做到变换6倍率。倍率即载重小车与吊钩之间钢丝绳的股数,2倍率及载重小车与吊钩之间由2股钢丝绳连接。 As shown in Figure 1, the current tower cranes in my country are usually designed with a single load trolley, and the load trolley 2 is the main carrier for the tower crane to lift heavy objects. 1 moves up, and the trolley 2 is connected with the hoisting hook 3 with a wire rope, which plays the role of changing the lifting range. Generally, wire ropes with 2x and 4x ratios can be used, and some can be used with 6x ratios. The magnification is the number of strands of the steel wire rope between the trolley and the hook, and the magnification is 2 and the trolley and the hook are connected by 2 strands of wire rope.

在现有的设计中,载重小车2为单小车,在使用4倍率吊载时由于4条钢丝绳几乎平行,很容易出现钢丝绳打搅现象,且2、4倍率载重小车、吊钩3都不发生变化,2倍率载重性能被大大削弱。其缺点如下: In the existing design, the trolley 2 is a single trolley. When the 4-magnification ratio is used for hoisting, since the 4 wire ropes are almost parallel, it is easy to cause the wire ropes to disturb the phenomenon, and the 2- and 4-magnification trolley and the hook 3 do not change. , 2 times load performance is greatly weakened. Its disadvantages are as follows:

1.单载重小车滑轮宽度有限,在使用时易出现钢丝绳打搅现象,增加小车滑轮宽度又面临着增加小车的重量而导致整机的起重性能下降; 1. The width of the single-load trolley pulley is limited, and it is easy to cause wire rope disturbance during use. Increasing the width of the trolley pulley will also increase the weight of the trolley, which will lead to a decrease in the lifting performance of the whole machine;

2.吊钩2倍率变换为4倍率时,副钩仍保留在载重小车下方,占用塔机的起重能力。 2. When the hook 2 ratio is converted to 4 ratio, the auxiliary hook remains under the trolley, occupying the lifting capacity of the tower crane.

发明内容 Contents of the invention

针对上述现有技术存在的问题,本发明提供一种塔式起重机双载重小车,防止钢丝绳打搅现象,同时不降低起重机的起重性能。 Aiming at the above-mentioned problems in the prior art, the present invention provides a double-carrying trolley for a tower crane, which prevents the wire rope from disturbing the phenomenon, and at the same time does not reduce the lifting performance of the crane.

为了实现上述目的,本发明一种塔式起重机双载重小车,包括后小车、前小车、副吊钩和主吊钩;所述后小车包括后小车架、导轮以及滑轮组;所述前小车包括前小车架、导轮以及滑轮组;所述后小车与所述前小车通过导轮在起重臂轨道上运行,并通过小车连接轴固定或分离;所述副吊钩通过钢丝绳与后小车的滑轮组连接;所述主吊钩通过钢丝绳与前小车的滑轮组连接;所述副吊钩和所述主吊钩之间通过吊钩连接板固定或分离。 In order to achieve the above object, a double-carrying trolley of a tower crane of the present invention includes a rear trolley, a front trolley, an auxiliary hook and a main hook; the rear trolley includes a rear trolley frame, a guide wheel and a pulley block; the front trolley It includes the front trolley frame, guide wheels and pulley blocks; the rear trolley and the front trolley run on the boom track through the guide wheels, and are fixed or separated by the trolley connecting shaft; the auxiliary hook is connected to the rear trolley through a wire rope The pulley block is connected; the main hook is connected with the pulley block of the front trolley through a wire rope; the auxiliary hook and the main hook are fixed or separated by a hook connecting plate.

进一步的,使用2倍率吊钩时,所述后小车架与起重臂臂根通过固定销轴连接。使用2倍率吊钩时,使载重小车整体重量减轻,大大增加了整机的起重性能。 Further, when using a 2-magnification hook, the rear trolley frame is connected to the root of the boom through a fixed pin. When the 2-fold hook is used, the overall weight of the trolley is reduced, and the lifting performance of the whole machine is greatly increased.

进一步的,所述后小车架后部连接有维修吊篮。在后小车架上设置维修吊篮,便于作业人员对其进行维护。 Further, a maintenance basket is connected to the rear of the rear trolley frame. The maintenance hanging basket is set on the rear trolley frame, which is convenient for the operator to maintain it.

进一步的,所述前小车架侧部设有断绳保护器和紧绳装置。断绳保护器能够防止钢丝绳断裂造成的危害,紧绳装置能够调节钢丝绳的张紧程度。 Further, a broken rope protector and a rope tightening device are provided on the side of the front trolley frame. The broken rope protector can prevent the damage caused by the broken wire rope, and the rope tightening device can adjust the tension degree of the steel wire rope.

进一步的,所述后小车与所述前小车之间设置有防撞装置。可以起到缓冲作用,防止前后辆小车相互碰撞,产生损坏。 Further, an anti-collision device is provided between the rear trolley and the front trolley. It can act as a buffer to prevent the front and rear cars from colliding with each other and causing damage.

将载重小车设计成双小车,小车之间互相连接,当使用4倍率吊重时使用双小车,双小车整体宽度较大,有效避免钢丝绳打搅现象。当使用2倍率吊重时使用单小车,另外一个小车固定在起重臂臂根,载重小车整体重量减轻,大大增加了整机的起重性能。因此本发明具有以下优点:有效防止4倍率吊钩起升钢丝绳打搅;提升吊钩2倍率的起重性能。 The load-carrying trolleys are designed as double trolleys, and the trolleys are connected to each other. When using 4-fold hoisting, double trolleys are used. The overall width of the double trolleys is large, which can effectively avoid the disturbance of wire ropes. When using the 2-fold lifting ratio, a single trolley is used, and the other trolley is fixed at the root of the boom arm, the overall weight of the trolley is reduced, and the lifting performance of the whole machine is greatly increased. Therefore, the present invention has the following advantages: effectively preventing the wire rope from being disturbed by lifting the hook with a 4-fold ratio; and improving the lifting performance of the hook with a 2-fold ratio.

附图说明 Description of drawings

图1为现有技术单载重小车结构示意图; Fig. 1 is the structural representation of prior art single-carrying trolley;

图2为本发明结构示意图; Fig. 2 is a structural representation of the present invention;

图3为本发明双载重小车主视图; Fig. 3 is the front view of the double load trolley of the present invention;

图4为本发明双载重小车俯视图; Fig. 4 is the top view of the double-carrying trolley of the present invention;

图5为本发明双吊钩示意图; Fig. 5 is a schematic diagram of double hooks of the present invention;

图6为本发明使用2倍率吊钩状态图; Fig. 6 is a state diagram of using a 2-magnification hook in the present invention;

图中:1、起重臂,2、载重小车,3、吊钩,4、后小车,41、后小车架,42、滑轮组,43、导轮,44、固定销轴,45、维修吊篮,5、前小车,51、前小车架,52、断绳保护器,53、紧绳装置,6、副吊钩,7、主吊钩,8、防撞装置,9、小车连接轴,10、吊钩连接板,11、钩头。 Among the figure: 1, lifting arm, 2, trolley, 3, suspension hook, 4, rear trolley, 41, rear trolley frame, 42, block pulley, 43, guide wheel, 44, fixed pin shaft, 45, maintenance crane Basket, 5, front trolley, 51, front trolley frame, 52, broken rope protector, 53, rope tightening device, 6, auxiliary hook, 7, main hook, 8, anti-collision device, 9, trolley connecting shaft , 10, hook connecting plate, 11, hook head.

具体实施方式 Detailed ways

下面结合附图对本发明作进一步说明。 The present invention will be further described below in conjunction with accompanying drawing.

如图2所示,本发明塔式起重机双载重小车,包括后小车4、前小车5、副吊钩6和主吊钩7;如图3所示,后小车4包括后小车架41、导轮43以及滑轮组42前小车5包括前小车架51、导轮43以及滑轮组42;后小车4与所述前小车5通过导轮43在起重臂1轨道上运行,并通过小车连接轴9固定或分离;如图5所示,副吊钩6通过钢丝绳与后小车4的滑轮组42连接;主吊钩7通过钢丝绳与前小车5的滑轮组42连接;副吊钩6和所述主吊钩7之间通过吊钩连接板10固定或分离; As shown in Figure 2, the double load dolly of tower crane of the present invention comprises rear dolly 4, front dolly 5, secondary suspension hook 6 and main suspension hook 7; As shown in Figure 3, rear dolly 4 comprises rear trolley frame 41, The guide wheel 43 and the pulley block 42. The front trolley 5 includes the front trolley frame 51, the guide wheel 43 and the pulley block 42; the rear trolley 4 and the front trolley 5 run on the boom 1 track through the guide wheel 43, and connect the shaft through the trolley 9 is fixed or separated; as shown in Figure 5, the auxiliary hook 6 is connected with the pulley block 42 of the rear trolley 4 through a wire rope; the main hook 7 is connected with the pulley block 42 of the front trolley 5 through a wire rope; the auxiliary hook 6 and the main suspension The hooks 7 are fixed or separated by the hook connecting plate 10;

此外上述结构基础上,本实用型性还可以具有如下改进,如图3和图6所示,使用2倍率吊钩时,后小车架41与起重臂臂根通过固定销轴44连接。使用2倍率吊钩时,使载重小车整体重量减轻,大大增加了整机的起重性能。如图4所示,在后小车架41后部连接有维修吊篮45,便于作业人员对其进行维护。前小车架51侧部设有断绳保护器52和紧绳装置53,断绳保护器能够防止钢丝绳断裂造成的危害,紧绳装置能够调节钢丝绳的张紧程度。如图3所述,在后小车4与所述前小车5之间设置有防撞装置8,可以起到缓冲作用,防止前后辆小车相互碰撞,产生损坏。 In addition, on the basis of the above structure, the utility model can also have the following improvements. As shown in FIG. 3 and FIG. When the 2-fold hook is used, the overall weight of the trolley is reduced, and the lifting performance of the whole machine is greatly increased. As shown in Figure 4, a maintenance hanging basket 45 is connected to the rear part of the rear trolley frame 41, which is convenient for operating personnel to maintain it. Front trolley frame 51 sides are provided with broken rope protector 52 and tight rope device 53, and broken rope protector can prevent the harm that wire rope fracture causes, and tight rope device can adjust the tension degree of steel rope. As shown in Figure 3, an anti-collision device 8 is arranged between the rear trolley 4 and the front trolley 5, which can play a buffering role and prevent the front and rear trolleys from colliding with each other and causing damage.

本发明双小车使用方法如下:在使用4倍率钢丝绳起吊重物时,后小车架41与前小车架51使用固定销轴44连接,两小车连接后一同在起重臂1轨道上运行。主吊钩7与副吊钩6连接在一体使用,用勾头11吊装重物,小车最外侧滑轮宽度大,有效防止乱绳现象。 The method of using the double trolleys of the present invention is as follows: when using the 4-magnification steel wire rope to lift heavy objects, the rear trolley frame 41 and the front trolley frame 51 are connected by the fixed pin 44, and the two trolleys run together on the boom 1 track after being connected. The main suspension hook 7 is connected with the secondary suspension hook 6 and used in one body, and the heavy object is hoisted with the hook head 11, and the outermost pulley width of the trolley is large, which effectively prevents the rope disorder phenomenon.

在使用2倍率吊钩时,后小车架41与起重臂臂根连接,副吊钩6与后小车架41连接,使用前小车架51与主吊钩7起吊重物,以达到减轻重量的目的。 When using a 2-fold hook, the rear trolley frame 41 is connected to the root of the boom arm, the auxiliary hook 6 is connected to the rear trolley frame 41, and the front trolley frame 51 and the main hook 7 are used to lift heavy objects to achieve purpose of weight reduction.

Claims (5)

1. the two loading trolley of tower crane, is characterized in that, comprise rear dolly (4), front dolly (5), secondary suspension hook (6) and main suspension hook (7);
Described rear dolly (4) comprises rear trolley frame (41), guide wheel (43) and assembly pulley (42);
Described front dolly (5) comprises front trolley frame (51), guide wheel (43) and assembly pulley (42);
Described rear dolly (4) and described front dolly (5) are run on crane arm (1) track by guide wheel (43), and the fixing or separation by dolly adapter shaft (9);
Described secondary suspension hook (6) is connected with the assembly pulley (42) of rear dolly (4) by steel rope;
Described main suspension hook (7) is connected with the assembly pulley (42) of front dolly (5) by steel rope;
Fixing or the separation by suspension hook connecting panel (10) between described secondary suspension hook (6) and described main suspension hook (7).
2. the two loading trolley of a kind of tower crane according to claim 1, is characterized in that, when using 2 multiplying power suspension hook, described rear trolley frame (41) is connected by fixed pin shaft (44) with cargo boom root.
3. the two loading trolley of a kind of tower crane according to claim 1 and 2, it is characterized in that, described rear trolley frame (41) rear portion is connected with maintenance hanging basket (45).
4. the two loading trolley of a kind of tower crane according to claim 1 and 2, it is characterized in that, described front trolley frame (51) sidepiece is provided with broken rope protector (52) and rope tightening device (53).
5. the two loading trolley of a kind of tower crane according to claim 1 and 2, is characterized in that, be provided with anticollision device (8) between described rear dolly (4) and described front dolly (5).
CN201410838973.2A 2014-12-30 2014-12-30 Double load-bearing trolley of tower crane Pending CN104528542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410838973.2A CN104528542A (en) 2014-12-30 2014-12-30 Double load-bearing trolley of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410838973.2A CN104528542A (en) 2014-12-30 2014-12-30 Double load-bearing trolley of tower crane

Publications (1)

Publication Number Publication Date
CN104528542A true CN104528542A (en) 2015-04-22

Family

ID=52844241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410838973.2A Pending CN104528542A (en) 2014-12-30 2014-12-30 Double load-bearing trolley of tower crane

Country Status (1)

Country Link
CN (1) CN104528542A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113753761A (en) * 2021-08-09 2021-12-07 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems
WO2023088474A1 (en) * 2021-11-22 2023-05-25 徐州建机工程机械有限公司 Two-stage tolerance type lifting hook having four pulley sets
CN119612345A (en) * 2025-02-13 2025-03-14 四川省特种设备检验研究院 Hoisting machine with separable auxiliary hook trolley and hoisting method
DE102025111544B3 (en) 2025-03-25 2026-07-09 Wolffkran Holding Ag Tower crane with two trolleys for optional load capacity increase and coupling arrangement for the automatic coupling of two trolleys

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3402824A (en) * 1966-07-25 1968-09-24 Pacific Coast Eng Co Convertible cargo handling system
FR2293394A1 (en) * 1974-12-06 1976-07-02 Tax Hans HOIST TROLLEY CRANE
DE2222591B2 (en) * 1971-05-12 1976-11-04 Potain S.A., Chevilly Larue, VaI de Marne (Frankreich) CABLE TROLLEY FOR A JIB CRANE OR OVERLAY CRANE
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Variable magnification conversion rope winding system based on trolley
CN202131018U (en) * 2011-06-17 2012-02-01 常州常矿起重机械有限公司 Trolley of crane
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable magnification conversion rope winding system based on trolley
CN203767887U (en) * 2014-04-10 2014-08-13 浙江德清华杨科技有限公司 Detachable rope warding-off device for load trolley
CN204434122U (en) * 2014-12-30 2015-07-01 徐州建机工程机械有限公司 The two loading trolley of tower crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3402824A (en) * 1966-07-25 1968-09-24 Pacific Coast Eng Co Convertible cargo handling system
DE2222591B2 (en) * 1971-05-12 1976-11-04 Potain S.A., Chevilly Larue, VaI de Marne (Frankreich) CABLE TROLLEY FOR A JIB CRANE OR OVERLAY CRANE
FR2293394A1 (en) * 1974-12-06 1976-07-02 Tax Hans HOIST TROLLEY CRANE
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Variable magnification conversion rope winding system based on trolley
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable magnification conversion rope winding system based on trolley
CN202131018U (en) * 2011-06-17 2012-02-01 常州常矿起重机械有限公司 Trolley of crane
CN203767887U (en) * 2014-04-10 2014-08-13 浙江德清华杨科技有限公司 Detachable rope warding-off device for load trolley
CN204434122U (en) * 2014-12-30 2015-07-01 徐州建机工程机械有限公司 The two loading trolley of tower crane

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《水利水电工程施工安全技术规程标准应用指南》编写组: "《水利水电工程施工安全技术规程标准应用指南》", 31 January 2009, 中国水利水电出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113753761A (en) * 2021-08-09 2021-12-07 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems
CN113753761B (en) * 2021-08-09 2024-02-13 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems
WO2023088474A1 (en) * 2021-11-22 2023-05-25 徐州建机工程机械有限公司 Two-stage tolerance type lifting hook having four pulley sets
CN119612345A (en) * 2025-02-13 2025-03-14 四川省特种设备检验研究院 Hoisting machine with separable auxiliary hook trolley and hoisting method
DE102025111544B3 (en) 2025-03-25 2026-07-09 Wolffkran Holding Ag Tower crane with two trolleys for optional load capacity increase and coupling arrangement for the automatic coupling of two trolleys

Similar Documents

Publication Publication Date Title
CN201236103Y (en) Winding mechanism of trestle crane hoisting mechanism steel wire rope
CN103754778B (en) Counterweight balance equipment of crane
CN103964316A (en) Multifunctional and multipurpose portal crane
CN103058056A (en) Container lifting mechanism with balance anti-swinging function and eight-rope lifting three-point balancing method using container lifting mechanism
CN107651553A (en) A kind of crane
CN202148155U (en) Novel variable-amplitude mast and crane with same
CN206645749U (en) Electric block type multi-lay winding hoist engine
CN204434122U (en) The two loading trolley of tower crane
CN107055340A (en) It is a kind of to detect the gantry crane that support frame bears weight
CN102910541B (en) Ocean platform crane with buggy luffing mechanism
CN204778474U (en) Hoist is with having surpassed device
CN102795545A (en) Stabilizing device of tire-type crane lift
CN205328482U (en) Multi -purpose gantry container crane of two hoisting points
CN103803432B (en) A kind of carriage amplitude varying formula tower crane two multiplying power luffing device
CN203529821U (en) Variable amplitude trolley for tower crane
CN205772882U (en) An electric hoist partial suspension trolley
CN205132933U (en) Two load trolley structure of tower crane
CN106006434B (en) A kind of single drum four-point lifting lifting mechanism
CN102627228B (en) Tower crane and its hook assembly
CN205114875U (en) Hoist anti -swing system
CN204057762U (en) Lifting device for a bulk carrier
CN102963821B (en) Gantry crane
CN203889948U (en) Multifunctional multipurpose portal crane
CN204607419U (en) Small-sized steel-wire rope type electric block
CN204752021U (en) Symmetrical train of two jib loading boom towers machine

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150422