CN104481426A - Operation well anti-top and anti-channeling device - Google Patents
Operation well anti-top and anti-channeling device Download PDFInfo
- Publication number
- CN104481426A CN104481426A CN201410720858.5A CN201410720858A CN104481426A CN 104481426 A CN104481426 A CN 104481426A CN 201410720858 A CN201410720858 A CN 201410720858A CN 104481426 A CN104481426 A CN 104481426A
- Authority
- CN
- China
- Prior art keywords
- slip
- lifting hydraulic
- channeling device
- lifting
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/10—Slips; Spiders ; Catching devices
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
本发明涉及一种作业井防顶防窜装置。主要解决现有的小修施工中出现管柱上顶上窜无法处理的问题。其特征在于:所述的安全卡瓦包括安全卡瓦壳体(1),安全卡瓦壳体(1)内部置有两个卡瓦(2),两个卡瓦(2)的两侧分别连接有丝杠(5);所述的防窜装置主体包括举升液压缸(16),举升液压缸(16)底部通过连接座(18)连接有固定液压卡管器(17)、顶部通过连接座(18)连接有举升液压卡管器(15)。该作业井防顶防窜装置解除了钢丝绳对井口上部空间的限制,同时对起、下管柱全程控制,实现防顶防窜、限速上提的目的。
The invention relates to an anti-roof and anti-channeling device for an operation well. The utility model mainly solves the problem that the pipe column jumps up and down in the existing minor repair construction and cannot be handled. It is characterized in that: the safety slip includes a safety slip shell (1), and two slips (2) are built inside the safety slip shell (1), and the two sides of the two slips (2) are respectively A lead screw (5) is connected; the main body of the anti-channeling device includes a lifting hydraulic cylinder (16), and the bottom of the lifting hydraulic cylinder (16) is connected to a fixed hydraulic pipe clamp (17) through a connecting seat (18), and the top A lifting hydraulic pipe clamp (15) is connected through the connecting seat (18). The anti-roofing and anti-channeling device of the operation well removes the restriction of the steel wire rope on the upper space of the wellhead, and at the same time controls the whole process of lifting and lowering the pipe string, so as to realize the purpose of anti-topping and anti-channeling, and speed-limited lifting.
Description
技术领域 technical field
本发明涉及油田领域,具体的说是一种作业井防顶防窜装置。 The invention relates to the field of oil fields, in particular to an anti-roofing and anti-channeling device for operating wells.
背景技术 Background technique
目前,油田在小修作业过程中出现管柱上顶上窜现象后,施工队伍普遍采用防喷器或钢丝绳反勒的方法控制管柱,使用罐车拉运泄压,待压力降低后进行下步施工的方式进行处理。但在处理过程中存在以下几方面问题:一是罐车拉运泄压时间不定,无效躺井时间延长,同时作业队伍无法搬家,影响施工效率;二是部分非高危区异常高压井需抢装防喷器,存在安全隐患;三是目前小修作业普遍应用的单闸板手动防喷器主要功能为防止井喷,虽能对管柱上窜起到一定程度的控制,但存在安全隐患;四是钢丝绳反勒井口的控制方式存在安全隐患,同时限制了井口上部空间,无法安装其它设备。因此,目前现有技术难以从根本上解决施工过程中出现的管柱上顶上窜问题。 At present, in the oil field, after the phenomenon of pipe strings running up and down during minor repair operations, the construction team generally uses blowout preventers or steel wire ropes to control the pipe strings, and uses tank trucks to pull and release the pressure. After the pressure is reduced, the next step of construction is carried out way of processing. However, there are the following problems in the process of processing: first, the time for tank trucks to transport and release pressure is uncertain, and the time for invalid lying in the well is prolonged, and the operation team cannot move, which affects the construction efficiency; second, some abnormal high-pressure wells in non-high-risk areas need to rush to install anti The third is that the main function of the single ram manual blowout preventer commonly used in minor repair operations is to prevent blowout. Although it can control the pipe string to a certain extent, it has potential safety hazards; the fourth is the wire rope The control method of the reverse wellhead has potential safety hazards, and at the same time, the upper space of the wellhead is limited, and other equipment cannot be installed. Therefore, it is difficult for the current prior art to fundamentally solve the problem of running up and down the top of the pipe string that occurs during the construction process.
发明内容 Contents of the invention
为了克服现有的小修施工中出现管柱上顶上窜现象无法处理的不足,本发明提供一种作业井防顶防窜装置,该作业井防顶防窜装置可以解除钢丝绳对井口上部空间的限制,同时对起、下管柱全程控制,实现防顶防窜、限速上提的目的。 In order to overcome the inadequacy of the existing minor maintenance construction, which cannot be dealt with when the pipe string goes up and down, the invention provides an operation well anti-roof and anti-channel device. At the same time, it controls the whole process of lifting and lowering the pipe string, so as to realize the purpose of preventing jacking and channeling, and speed-limited lifting.
本发明的技术方案是:一种作业井防顶防窜装置,包括安全卡瓦和防窜装置主体,所述的安全卡瓦包括安全卡瓦壳体,安全卡瓦壳体内部置有两个卡瓦,两个卡瓦的两侧分别连接有丝杠;所述的防窜装置主体包括举升液压缸,举升液压缸底部通过连接座连接有固定液压卡管器、顶部通过连接座连接有举升液压卡管器。 The technical solution of the present invention is: an anti-roofing and anti-channeling device for an operation well, including a safety slip and a main body of the anti-channeling device, the safety slip includes a safety slip shell, and two Slips, the two sides of the two slips are respectively connected with lead screws; the main body of the anti-channeling device includes a lifting hydraulic cylinder, the bottom of the lifting hydraulic cylinder is connected to a fixed hydraulic pipe clamp through a connecting seat, and the top is connected to There is a lifting hydraulic card tube.
所述的固定液压卡管器包括卡瓦壳体,所述的卡瓦壳体内部连接有卡瓦座,卡瓦座内部置有卡瓦;所述的举升液压缸包括缸筒、活塞杆,所述的缸筒固定在连接座上,缸筒内部置有活塞杆,活塞杆上部连接有油缸盖,油缸盖上部通过上缸帽连接举升液压卡管器。 The fixed hydraulic pipe clamp includes a slip housing, the slip housing is connected with a slip seat, and the slip seat is equipped with a slip; the lifting hydraulic cylinder includes a cylinder barrel, a piston rod , the cylinder is fixed on the connecting seat, the cylinder is equipped with a piston rod, the upper part of the piston rod is connected with the oil cylinder head, and the upper part of the oil cylinder head is connected with the lifting hydraulic pipe clamp through the upper cylinder cap.
本发明具有如下有益效果:由于采取上述方案,由安全卡瓦代替钢丝绳对管柱进行控制,解除了紧急控制钢丝对井口上部空间的限制,方便采用其它设备控制管柱。同时,可以由防顶防窜装置主体带动管柱上下运行,从而实现举升或下放管柱。该装置起、下管柱全过程由液压控制,安全可靠,解决了施工过程中出现的管柱上顶上窜问题。 The present invention has the following beneficial effects: due to the adoption of the above scheme, the pipe string is controlled by the safety slip instead of the steel wire rope, the restriction of the emergency control wire on the upper space of the wellhead is removed, and it is convenient to use other equipment to control the pipe string. At the same time, the main body of the anti-top and anti-channeling device can drive the pipe string to run up and down, so as to realize the lifting or lowering of the pipe string. The whole process of lifting and lowering the pipe string of the device is controlled by hydraulic pressure, which is safe and reliable, and solves the problem of pipe string running up and down during the construction process.
附图说明 Description of drawings
图1是本发明中安全卡瓦的结构示意图; Fig. 1 is the structural representation of safety slip in the present invention;
图2是本发明中防窜装置主体的结构示意图。 Fig. 2 is a schematic structural view of the main body of the anti-channeling device in the present invention.
图中1-安全卡瓦壳体,2-安全卡瓦,3-螺钉,4-挡板,5-丝杠,6-螺栓,7-卡瓦壳体,8-卡瓦,9-卡瓦座,10-滑块,11-缸筒,12-活塞杆,13-油缸盖,14-上缸帽,15-举升液压卡管器,16-举升液压缸,17-固定液压卡管器,18-连接座。 In the figure 1-safety slip shell, 2-safety slip, 3-screw, 4-baffle, 5-lead screw, 6-bolt, 7-slip shell, 8-slip, 9-slip Seat, 10-slider, 11-cylinder barrel, 12-piston rod, 13-oil cylinder head, 14-upper cylinder cap, 15-lifting hydraulic clamp, 16-lifting hydraulic cylinder, 17-fixed hydraulic clamping tube device, 18-connector.
具体实施方式 Detailed ways
下面结合附图对本发明作进一步说明: The present invention will be further described below in conjunction with accompanying drawing:
由图1、图2所示,一种作业井防顶防窜装置,包括安全卡瓦和防窜装置主体,防窜装置主体通过螺栓连接于安全卡瓦上部,安全卡瓦固定在井口上。所述的安全卡瓦包括两个安全卡瓦壳体1,两个安全卡瓦壳体1合成为圆环形,壳体上竖直方向开有若干个圆孔,螺栓穿过圆孔与上部的防窜装置主体及下部的井口连接。安全卡瓦壳体1内部置有两个卡瓦2,两个卡瓦2的内侧有卡牙,通过卡牙卡紧管柱,两个卡瓦2的两侧分别连接有丝杠5,通过转动丝杠5可以使卡瓦2向内或向外移动,从而将管柱卡紧或松开。 As shown in Fig. 1 and Fig. 2, an anti-roof and anti-channeling device for an operation well includes safety slips and a main body of the anti-channeling device. The main body of the anti-channeling device is connected to the upper part of the safety slips by bolts, and the safety slips are fixed on the wellhead. The safety slip includes two safety slip shells 1, and the two safety slip shells 1 are combined into a circular ring. There are several round holes in the vertical direction on the shell, and the bolts pass through the round holes and the upper part. The main body of the anti-channeling device and the lower wellhead are connected. There are two slips 2 inside the safety slip shell 1, and the inner sides of the two slips 2 have clamping teeth, and the pipe column is clamped by the clamping teeth, and the two sides of the two slips 2 are respectively connected with lead screws 5, through Turning the lead screw 5 can make the slips 2 move inward or outward, thereby clamping or loosening the pipe string.
所述的防窜装置主体包括举升液压缸16,举升液压缸16底部通过连接座18连接有固定液压卡管器17、顶部通过连接座18连接有举升液压卡管器15。所述的固定液压卡管器17包括卡瓦壳体7,所述的卡瓦壳体7内部连接有卡瓦座9,卡瓦座8内部置有卡瓦8,卡瓦座8连接有油缸,通过油缸活塞的伸缩可以控制卡瓦座8移动,从而带动卡瓦8移动。所述的举升液压缸16包括缸筒11、活塞杆12,所述的缸筒11固定在连接座18上,从而将举升液压缸16与固定液压卡管器17连接在一起。缸筒11内部置有活塞杆12,活塞杆12下部外侧置有滑块10,活塞杆12上部连接有油缸盖13,油缸盖13上部通过上缸帽14连接举升液压卡管器15,从而将活塞杆12与举升液压卡管器15连接。 The main body of the anti-channeling device includes a lifting hydraulic cylinder 16, the bottom of the lifting hydraulic cylinder 16 is connected to a fixed hydraulic pipe clamp 17 through a connecting seat 18, and the top is connected to a lifting hydraulic pipe clamping device 15 through a connecting seat 18. The fixed hydraulic pipe clamp 17 includes a slip housing 7, the slip housing 7 is internally connected with a slip seat 9, the slip seat 8 is internally provided with a slip 8, and the slip seat 8 is connected with an oil cylinder , the movement of the slip seat 8 can be controlled through the expansion and contraction of the oil cylinder piston, thereby driving the slip 8 to move. The lifting hydraulic cylinder 16 includes a cylinder barrel 11 and a piston rod 12 , and the cylinder barrel 11 is fixed on a connecting seat 18 so as to connect the lifting hydraulic cylinder 16 and the fixed hydraulic pipe clamp 17 together. A piston rod 12 is arranged inside the cylinder barrel 11, a slide block 10 is arranged outside the lower part of the piston rod 12, and an oil cylinder cover 13 is connected to the upper part of the piston rod 12, and the upper part of the oil cylinder cover 13 is connected to the lifting hydraulic pipe clamp 15 through the upper cylinder cap 14, thereby Connect the piston rod 12 with the lifting hydraulic pipe clamp 15.
在进行上顶上窜井处理时,首先将安全卡瓦在两条上窜管柱固定钢丝之间穿过,并与井口法兰连接,接替钢丝绳对管柱进行控制,为下步处理提供条件。其次,将防顶防窜主体吊装于安全卡瓦之上,通过螺栓连接,井内管柱穿过举升液压卡管器15及固定液压卡管器17,关闭举升液压卡管器15抱紧管柱,固定液压卡管器17处于打开状态,此时井内管柱可随举升液压缸16的活塞杆12上下运行。当活塞杆12运行到行程终点时,关闭固定液压卡管器17,打开举升液压卡管器15,活塞杆12可空行程运行到另一端,关闭举升液压卡管器15,打开固定液压卡管器17,即可进行下一个循环的举升或下放管柱的动作,从而实现起、下管柱全过程液压受控操作。 When carrying out the upper and upper channeling treatment, first pass the safety slip between the two fixed steel wires of the upper channeling string, and connect it to the wellhead flange, and take over the steel wire rope to control the string, providing conditions for the next step of processing . Secondly, hoist the anti-top and anti-channeling main body on the safety slips, and connect them through bolts. The pipe string in the well passes through the lifting hydraulic pipe clamp 15 and the fixed hydraulic pipe clamp 17, and closes the lifting hydraulic pipe clamp 15 to hold it tightly. The pipe string, the fixed hydraulic pipe clamp 17 is in the open state, and now the pipe string in the well can run up and down with the piston rod 12 of the lifting hydraulic cylinder 16. When the piston rod 12 runs to the end of the stroke, close the fixed hydraulic clamp 17, open the lifting hydraulic clamp 15, the piston rod 12 can run to the other end with no stroke, close the lifting hydraulic clamp 15, and open the fixed hydraulic clamp 15. The pipe clamp 17 can carry out the action of lifting or lowering the pipe string in the next cycle, so as to realize the hydraulic control operation of the whole process of lifting and lowering the pipe string.
该作业井防顶防窜装置的安全卡瓦与防窜装置主体也可以单独使用。例如,利用安全卡瓦解除紧急控制钢丝对井口上部空间的限制后,若井下压力过高,可采用带压作业工艺进行下步处理;防窜装置主体还可以单独用于机械堵水拔堵、长关井拔封等高危作业,进行全程液压受控操作。 The safety slips and the main body of the anti-channeling device of the working well anti-roofing device can also be used separately. For example, after the emergency control steel wire is used to release the restriction on the upper space of the wellhead by using the safety slip, if the downhole pressure is too high, the pressure operation process can be used for the next step; the main body of the anti-channeling device can also be used alone for mechanical water plugging, For high-risk operations such as long shut-in and unsealing of wells, the whole hydraulic control operation is carried out.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410720858.5A CN104481426A (en) | 2014-12-02 | 2014-12-02 | Operation well anti-top and anti-channeling device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410720858.5A CN104481426A (en) | 2014-12-02 | 2014-12-02 | Operation well anti-top and anti-channeling device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104481426A true CN104481426A (en) | 2015-04-01 |
Family
ID=52756018
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410720858.5A Pending CN104481426A (en) | 2014-12-02 | 2014-12-02 | Operation well anti-top and anti-channeling device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104481426A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109458154A (en) * | 2018-10-08 | 2019-03-12 | 东北石油大学 | The anti-top leap-preventing device of abnormal high pressure operation well and method |
| CN110630207A (en) * | 2018-06-25 | 2019-12-31 | 中国石油天然气股份有限公司 | Anti-pipe string up channeling device |
| CN118008170A (en) * | 2024-04-10 | 2024-05-10 | 西安宇星石油机械新技术开发有限公司 | A composite hydraulic gear transmission anti-top and anti-fall chuck |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5243702A (en) * | 1975-10-01 | 1977-04-06 | Acf Ind Inc | Pipe retainer for well structure |
| US4646827A (en) * | 1983-10-26 | 1987-03-03 | Cobb William O | Tubing anchor assembly |
| CN2083190U (en) * | 1990-08-16 | 1991-08-21 | 河南石油勘探局采油工艺研究所 | Underground blowout preventer |
| CN201574715U (en) * | 2009-09-24 | 2010-09-08 | 中国石化股份胜利油田分公司孤岛采油厂 | Oil pipe anti-scurrying device |
| CN101984213A (en) * | 2010-09-06 | 2011-03-09 | 阜新驰宇石油机械有限公司 | Multifunctional hydraulic workover rig |
-
2014
- 2014-12-02 CN CN201410720858.5A patent/CN104481426A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5243702A (en) * | 1975-10-01 | 1977-04-06 | Acf Ind Inc | Pipe retainer for well structure |
| US4646827A (en) * | 1983-10-26 | 1987-03-03 | Cobb William O | Tubing anchor assembly |
| CN2083190U (en) * | 1990-08-16 | 1991-08-21 | 河南石油勘探局采油工艺研究所 | Underground blowout preventer |
| CN201574715U (en) * | 2009-09-24 | 2010-09-08 | 中国石化股份胜利油田分公司孤岛采油厂 | Oil pipe anti-scurrying device |
| CN101984213A (en) * | 2010-09-06 | 2011-03-09 | 阜新驰宇石油机械有限公司 | Multifunctional hydraulic workover rig |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110630207A (en) * | 2018-06-25 | 2019-12-31 | 中国石油天然气股份有限公司 | Anti-pipe string up channeling device |
| CN109458154A (en) * | 2018-10-08 | 2019-03-12 | 东北石油大学 | The anti-top leap-preventing device of abnormal high pressure operation well and method |
| CN118008170A (en) * | 2024-04-10 | 2024-05-10 | 西安宇星石油机械新技术开发有限公司 | A composite hydraulic gear transmission anti-top and anti-fall chuck |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201778687U (en) | Workover rig under pressure for wellhead | |
| CN110630204B (en) | Under-pressure operation equipment for gas drive injection well completion and under-pressure operation method thereof | |
| CN103993852A (en) | Gas well snubbing fluid sealing gas wellhead blowout prevention system | |
| CN104314486A (en) | Hydraulic power slip of removable oil string | |
| CN204342334U (en) | That a kind of oil-well rig is changed the large rope of drilling well leads large rope device | |
| CN102061899B (en) | Hydraulic pressure balance work over rig | |
| CN104481426A (en) | Operation well anti-top and anti-channeling device | |
| CN204899832U (en) | Hawser sealing device | |
| CN105239953A (en) | Blowout-preventive operation device for lifting and lowering rod pipe under pressure | |
| CN203925394U (en) | Gas well snubbing fluid sealing gas wellhead blowout prevention system | |
| CN204646137U (en) | A kind of low-pressure gas well operation device under pressure | |
| CN204552639U (en) | A kind of Novel wellhead automation equipment | |
| CN204225800U (en) | A kind of hydraulic power slip of dismantled and assembled petroleum pipe column | |
| CN204827284U (en) | Pincers of breaking out on workover rig are pressed in oil field area | |
| CN206158656U (en) | A pressure working device | |
| CN114673461A (en) | A device suitable for pressurized operation of shallow low-pressure oil wells | |
| CN202745769U (en) | Under-pressure tripping-in device of continuous tube overlong drilling tool | |
| CN206600155U (en) | A kind of Continuous Circulation Drilling System | |
| CN205297374U (en) | Centralizing plate | |
| CN202417348U (en) | Anti-dropping device of drilling tool | |
| CN104165032B (en) | An open coiled tubing injector and method of use thereof | |
| CN209100004U (en) | A kind of sucker rod annular blowout preventer | |
| CN203420652U (en) | Pressure-balanced and controllable workover treatment device | |
| CN105370235B (en) | A kind of well top sealing device | |
| CN205063886U (en) | Area has been pressed lower beam pipe and has been prevented spouting operation device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150401 |