CN104466815A - Installing tool for bare conductor insulated protection sleeve - Google Patents
Installing tool for bare conductor insulated protection sleeve Download PDFInfo
- Publication number
- CN104466815A CN104466815A CN201410641383.0A CN201410641383A CN104466815A CN 104466815 A CN104466815 A CN 104466815A CN 201410641383 A CN201410641383 A CN 201410641383A CN 104466815 A CN104466815 A CN 104466815A
- Authority
- CN
- China
- Prior art keywords
- pulley
- connecting rod
- insulating sleeve
- supporting shaft
- bolster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Insulating Bodies (AREA)
Abstract
Description
技术领域 technical field
本发明属于电力线路故障监测技术领域,尤其涉及一种裸导线绝缘护套安装工具。 The invention belongs to the technical field of power line fault monitoring, and in particular relates to a bare conductor insulation sheath installation tool.
背景技术 Background technique
在配网线路中,有许多户外的线路为裸漏导线,飞禽走兽等小动物或异物搭接在裸漏导线上容易造成短路事故;而且裸漏导线受凝露闪烁、污秽闪烁、冰柱粘雪影响容易造成电气事故,这些裸导线通常采取的防护措施是安装绝缘护套,但是安装前需要将进行停电操作,严重影响了居民生活用电。 In the distribution network lines, there are many outdoor lines with bare drain wires. Small animals such as birds and animals or foreign objects lapped on the bare drain wires are likely to cause short-circuit accidents; The impact of snow is likely to cause electrical accidents. The protective measure usually taken for these bare wires is to install insulating sheaths, but a power outage operation is required before installation, which seriously affects the electricity consumption of residents.
发明内容 Contents of the invention
为了解决现有技术中存在的问题,本发明的目的是提供一种裸导线绝缘护套安装工具,该安装工具能够在导线带电状态下,能够方便快捷的在导线上安装绝缘护套。 In order to solve the problems existing in the prior art, the object of the present invention is to provide a bare wire insulation sheath installation tool, which can conveniently and quickly install the insulation sheath on the wire when the wire is charged.
为了实现上述发明目的,本发明采用如下所述的技术方案: In order to realize the above-mentioned purpose of the invention, the present invention adopts the technical scheme as follows:
一种裸导线绝缘护套安装工具,其包括绝缘护套箱、滑轮A、滑轮B、滑轮C和压装工具,所述绝缘护套箱由箱体、设置在箱体内的转轴以及缠绕在转轴上呈卷状的绝缘护套,绝缘护套的一端部从箱体上开设的出口伸出;滑轮A、滑轮B和滑轮C的中心处分别穿设有支承轴A、支承轴B和支承轴C,支撑轴A的一端与绝缘护套箱通过连杆A连接,支承轴B的一端分别与轴承轴A的一端、支承轴C的一端通过连杆B和连杆C连接,绝缘护套箱位于滑轮A的正下方,滑轮B位于滑轮A的右侧,滑轮C位于滑轮B的正下方;在滑轮B的一端面上连接有压装工具,压装工具包括支撑杆和压板,支撑杆的一端连接在支承轴B的端面上,另一端连接压板;所述连杆C的下端设置有弹簧,在连杆的中部开设有滑槽,支承轴C的一端位于滑槽内,且弹簧的上端顶贴于支承轴C的一端,弹簧处于压缩状态,滑轮B和滑轮C紧贴。 A bare wire insulation sheath installation tool, which includes an insulation sheath box, a pulley A, a pulley B, a pulley C and a pressing tool, the insulation sheath box is composed of a box body, a rotating shaft arranged in the box body, and a rotating shaft wound on the rotating shaft Roll-shaped insulating sheath on the top, one end of the insulating sheath protrudes from the outlet opened on the box body; the centers of pulley A, pulley B and pulley C are respectively pierced with supporting shaft A, supporting shaft B and supporting shaft C, one end of the support shaft A is connected to the insulating sheath box through the connecting rod A, one end of the supporting shaft B is respectively connected to one end of the bearing shaft A and one end of the supporting shaft C through the connecting rod B and the connecting rod C, and the insulating sheath box It is located directly below pulley A, pulley B is located on the right side of pulley A, and pulley C is located directly below pulley B; a pressing tool is connected to one end of pulley B, and the pressing tool includes a support rod and a pressure plate. One end is connected to the end surface of the supporting shaft B, and the other end is connected to the pressure plate; the lower end of the connecting rod C is provided with a spring, and a chute is opened in the middle of the connecting rod, and one end of the supporting shaft C is located in the chute, and the upper end of the spring The top sticks to one end of the supporting shaft C, the spring is in a compressed state, and the pulley B and the pulley C are close to each other.
进一步地,所述连杆C上还设置有导向杆,导向杆的设置方向与绝缘护套箱的出口相对应。 Further, the connecting rod C is also provided with a guide rod, and the direction of the guide rod is corresponding to the outlet of the insulating sheath box.
进一步地,所述绝缘护套箱上还设置有牵引绳。 Further, a traction rope is also provided on the insulating sheath box.
由于采用上述技术方案,本发明具有以下优越性: Owing to adopting above-mentioned technical scheme, the present invention has the following advantages:
本发明能够实现操作人员站在地面上对裸漏导线进线绝缘护套的安装,操作简单、安全,提高了工作效率,避免了工作人员登高及在导线上操作,同时,不用停电即可进行绝缘护套的安装。 The invention enables the operator to stand on the ground to install the insulation sheath of the incoming wire of the bare leakage wire, which is simple and safe to operate, improves the work efficiency, avoids the staff from climbing a height and operating on the wire, and at the same time, it can be carried out without power failure Installation of insulating sheath.
附图说明 Description of drawings
图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;
图中:1-绝缘护套箱;2-出口;3-连杆C;4-弹簧;5-导向杆;6-滑轮C;7-压板;8-支撑杆;9-滑轮B;10-连杆B;11-滑轮A;12-连杆A;13-裸漏导线;14-牵引绳。 In the figure: 1-insulation sheath box; 2-exit; 3-connecting rod C; 4-spring; 5-guide rod; 6-pulley C; Connecting rod B; 11-pulley A; 12-connecting rod A; 13-bare drain wire; 14-traction rope.
具体实施方式 Detailed ways
下面结合附图及实施例对本发明的技术方案做进一步详细的说明。 The technical solutions of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
如图1所示,一种裸导线绝缘护套安装工具,其包括绝缘护套箱1、滑轮A11、滑轮B9、滑轮C6和压装工具,所述绝缘护套箱1由箱体、设置在箱体内的转轴以及缠绕在转轴上呈卷状的绝缘护套,绝缘护套的一端部从箱体上开设的出口2伸出;滑轮A11、滑轮B9和滑轮C6的中心处分别穿设有支承轴A、支承轴B和支承轴C,支撑轴A的一端与绝缘护套箱通过连杆A12连接,支承轴B的一端分别与支承轴A的一端、支承轴C的一端通过连杆B10和连杆C3连接,绝缘护套箱1位于滑轮A11的正下方,滑轮B9位于滑轮A11的右侧,滑轮C6位于滑轮B9的正下方;在滑轮B的一端面上连接有压装工具,压装工具包括支撑杆8和压板7,支撑杆8的一端连接在支承轴B的端面上,另一端连接压板7;所述连杆C3的下端设置有弹簧4,在连杆的中部开设有滑槽,支承轴C的一端位于滑槽内,且弹簧的上端顶贴于支承轴C的一端,弹簧处于压缩状态,滑轮B和滑轮C紧贴。 As shown in Figure 1, a kind of bare conductor insulation sheath installation tool, it comprises insulation sheath box 1, pulley A11, pulley B9, pulley C6 and pressing tool, and described insulation sheath box 1 is arranged on box body, The rotating shaft in the box and the insulating sheath wound on the rotating shaft in a roll shape, one end of the insulating sheath protrudes from the outlet 2 opened on the box body; the centers of pulley A11, pulley B9 and pulley C6 are respectively pierced with supports Axis A, supporting shaft B and supporting shaft C, one end of supporting shaft A is connected with insulating sheath box through connecting rod A12, one end of supporting shaft B is connected with one end of supporting shaft A and one end of supporting shaft C through connecting rod B10 and The connecting rod C3 is connected, the insulating sheath box 1 is located directly below the pulley A11, the pulley B9 is located on the right side of the pulley A11, and the pulley C6 is located directly below the pulley B9; a press-fitting tool is connected to one end of the pulley B, press-fit The tool includes a support rod 8 and a pressure plate 7, one end of the support rod 8 is connected to the end surface of the support shaft B, and the other end is connected to the pressure plate 7; the lower end of the connecting rod C3 is provided with a spring 4, and a chute is opened in the middle of the connecting rod One end of the supporting shaft C is located in the chute, and the upper end of the spring is attached to one end of the supporting shaft C, the spring is in a compressed state, and the pulley B and the pulley C are in close contact.
所述连杆C3上还设置有导向杆5,导向杆5的设置方向与绝缘护套箱的出口2相对应;由于从绝缘护套箱出来的绝缘护套是处于卷曲状态,导向杆用于对绝缘护套进行抻展,便于压板将绝缘护套压装在裸漏导线上。 Also be provided with guide rod 5 on described connecting rod C3, the setting direction of guide rod 5 is corresponding to the outlet 2 of insulation sheath box; Stretch the insulating sheath so that the pressing plate can press the insulating sheath on the bare drain wire.
所述绝缘护套箱上还设置有牵引绳14,用于牵引整个安装工具的移动。 The insulating sheath box is also provided with a traction rope 14 for pulling the movement of the entire installation tool.
所述压板7可以制成与绝缘护套外表面相似的曲面结构,便于绝缘护套的压装。 The pressing plate 7 can be made into a curved structure similar to the outer surface of the insulating sheath, which facilitates the pressing of the insulating sheath.
在具体应用时,将滑轮C6下拉,将滑轮A11和滑轮B9挂在裸漏导线13上,然后松开滑轮C6,在弹簧4的作用下滑轮C6和滑轮B9紧密接触后将裸漏导线13夹在滑轮B9和滑轮C6 的轮槽内,然后将绝缘护套的一端从绝缘护套箱1拉出,经过导向杆5后将其压装到压板7下方的裸漏导线13上,然后通过拉动牵引绳14,滑轮A、滑轮B和滑轮C在裸漏导线上移动,由于绝缘护套的一端已被压装到裸导线上,因此绝缘护套会不断从绝缘护套箱内被拉出并被压装到裸漏导线上。 In the specific application, pull down the pulley C6, hang the pulley A11 and the pulley B9 on the bare drain wire 13, then loosen the pulley C6, and clamp the bare drain wire 13 after the pulley C6 and the pulley B9 are in close contact under the action of the spring 4 In the wheel groove of the pulley B9 and the pulley C6, then pull out one end of the insulating sheath from the insulating sheath box 1, press it onto the bare drain wire 13 below the pressing plate 7 after passing through the guide rod 5, and then pull it Traction rope 14, pulley A, pulley B and pulley C move on the bare drain wire, because one end of the insulation sheath has been pressed onto the bare wire, so the insulation sheath can constantly be pulled out from the insulation sheath box and Press-fitted onto bare drain wires.
所述压板是位于裸漏导线的正上方,而且绝缘护套从绝缘护套箱内伸出后,可以从滑轮B和滑轮C的一侧面经过然后进入到压板内,或者也可以将绝缘护套绕经滑轮B轮槽的上部再进入到压板内。 The pressure plate is located directly above the bare drain wire, and after the insulation sheath protrudes from the insulation sheath box, it can pass through one side of the pulley B and pulley C and then enter the pressure plate, or the insulation sheath can also be inserted into the pressure plate. Go around the upper part of the pulley B wheel groove and then enter into the pressure plate.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410641383.0A CN104466815A (en) | 2014-11-14 | 2014-11-14 | Installing tool for bare conductor insulated protection sleeve |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410641383.0A CN104466815A (en) | 2014-11-14 | 2014-11-14 | Installing tool for bare conductor insulated protection sleeve |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104466815A true CN104466815A (en) | 2015-03-25 |
Family
ID=52912421
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410641383.0A Pending CN104466815A (en) | 2014-11-14 | 2014-11-14 | Installing tool for bare conductor insulated protection sleeve |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104466815A (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105406391A (en) * | 2015-11-25 | 2016-03-16 | 国网河南洛宁县供电公司 | Reset device of anti-vibration hammer |
| CN105932605A (en) * | 2016-06-13 | 2016-09-07 | 国家电网公司 | Electrified cross line insulating packaged sheath and construction method therefor |
| CN106410682A (en) * | 2016-06-21 | 2017-02-15 | 银川汤姆森电气有限公司 | Transmission conductor insulation sheath installation tool |
| CN107123946A (en) * | 2017-06-02 | 2017-09-01 | 广东电网有限责任公司清远供电局 | A kind of clamp structure of Fast Installation from volume insulating sheath |
| CN107154598A (en) * | 2017-06-02 | 2017-09-12 | 广东电网有限责任公司清远供电局 | It is a kind of that equipment is installed from volume insulating sheath |
| CN107230959A (en) * | 2017-06-29 | 2017-10-03 | 国网河南省电力公司济源供电公司 | A kind of bus insulation sheath auxiliary installation device |
| CN107394674A (en) * | 2017-09-08 | 2017-11-24 | 武汉华大鄂电电气设备有限公司 | A kind of robot for power transmission line parcel insulating barrier |
| CN108418148A (en) * | 2018-05-11 | 2018-08-17 | 国网安徽省电力有限公司凤台县供电公司 | A kind of distribution line insulation Wrap device |
| CN108747966A (en) * | 2018-08-24 | 2018-11-06 | 安徽安凯汽车股份有限公司 | One kind being convenient for warm wind water pipe sheath mounting tool |
| CN111884128A (en) * | 2020-08-21 | 2020-11-03 | 广州德晟电力科技有限公司 | 10kV distribution line uninterrupted repair wire device and repair method thereof |
-
2014
- 2014-11-14 CN CN201410641383.0A patent/CN104466815A/en active Pending
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105406391A (en) * | 2015-11-25 | 2016-03-16 | 国网河南洛宁县供电公司 | Reset device of anti-vibration hammer |
| CN105932605B (en) * | 2016-06-13 | 2018-06-29 | 国家电网公司 | One kind lives across line insulation wrap jacket and construction method |
| CN105932605A (en) * | 2016-06-13 | 2016-09-07 | 国家电网公司 | Electrified cross line insulating packaged sheath and construction method therefor |
| CN106410682A (en) * | 2016-06-21 | 2017-02-15 | 银川汤姆森电气有限公司 | Transmission conductor insulation sheath installation tool |
| CN106410682B (en) * | 2016-06-21 | 2017-12-12 | 银川汤姆森电气有限公司 | A kind of transmission pressure insulating sheath installation tool |
| CN107123946A (en) * | 2017-06-02 | 2017-09-01 | 广东电网有限责任公司清远供电局 | A kind of clamp structure of Fast Installation from volume insulating sheath |
| CN107154598A (en) * | 2017-06-02 | 2017-09-12 | 广东电网有限责任公司清远供电局 | It is a kind of that equipment is installed from volume insulating sheath |
| CN107230959A (en) * | 2017-06-29 | 2017-10-03 | 国网河南省电力公司济源供电公司 | A kind of bus insulation sheath auxiliary installation device |
| CN107394674A (en) * | 2017-09-08 | 2017-11-24 | 武汉华大鄂电电气设备有限公司 | A kind of robot for power transmission line parcel insulating barrier |
| CN107394674B (en) * | 2017-09-08 | 2019-06-25 | 武汉华大鄂电电气设备有限公司 | A kind of robot for power transmission line package insulating layer |
| CN108418148A (en) * | 2018-05-11 | 2018-08-17 | 国网安徽省电力有限公司凤台县供电公司 | A kind of distribution line insulation Wrap device |
| CN108418148B (en) * | 2018-05-11 | 2023-11-14 | 国网安徽省电力有限公司凤台县供电公司 | A kind of insulation wrapping device for distribution lines |
| CN108747966A (en) * | 2018-08-24 | 2018-11-06 | 安徽安凯汽车股份有限公司 | One kind being convenient for warm wind water pipe sheath mounting tool |
| CN108747966B (en) * | 2018-08-24 | 2023-08-08 | 安徽安凯汽车股份有限公司 | Installation tool for sheath of warm air water pipe |
| CN111884128A (en) * | 2020-08-21 | 2020-11-03 | 广州德晟电力科技有限公司 | 10kV distribution line uninterrupted repair wire device and repair method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104466815A (en) | Installing tool for bare conductor insulated protection sleeve | |
| CN201274324Y (en) | Operation apparatus of ultra-high-voltage grounding wire | |
| CN205646216U (en) | Insulation is tested denso and is established earth connection auxiliary rod | |
| CN203415716U (en) | Power system electrified operation wiring clamp | |
| CN102290743B (en) | Electrified linkage pin-pulling device for replacing 220kV linear insulator string | |
| CN204258181U (en) | A kind of plain conductor insulating sleeve erecting tools | |
| CN202094327U (en) | Portable ground wire power used in transmission line | |
| CN204886018U (en) | Intraductal area silk device of wearing of building electrical engineering | |
| CN205407146U (en) | Ware is repaired to wire | |
| CN203672919U (en) | Wiring clamp for breaker insulation resistance testing | |
| CN202075335U (en) | Electricity examining device | |
| CN102969671A (en) | Equipotential outlet trolley for double bundle conductor | |
| CN205846661U (en) | A kind of high-tension bus-bar conductor spacer | |
| CN206022675U (en) | Universal shaped cable clamp earth lead | |
| CN204696553U (en) | A kind of automobile-used insulator crossarm | |
| CN203787698U (en) | Conductive telescoping device | |
| CN203883381U (en) | Wire-tensioning device for wire tower line overhaul | |
| CN202190028U (en) | A live-replacing 220kV linear insulator series movable pin remover | |
| CN207021045U (en) | One kind exempts from binding-type indicating fault porcelain vase | |
| CN206673134U (en) | A kind of portable plum blossom fingertip earthing or grounding means | |
| CN203721474U (en) | Transformer high-voltage bushing lead coupling device | |
| CN205791271U (en) | Fixing sleeve for wire stripper | |
| CN206302059U (en) | A kind of switch cubicle of the quick secondary connection of energy | |
| CN203760876U (en) | Simple grounding grid overhaul device | |
| CN204205505U (en) | A kind of pre-hinged strain clamp |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150325 |