CN104452815B - Plastics step-down inspection chamber - Google Patents

Plastics step-down inspection chamber Download PDF

Info

Publication number
CN104452815B
CN104452815B CN201410743330.XA CN201410743330A CN104452815B CN 104452815 B CN104452815 B CN 104452815B CN 201410743330 A CN201410743330 A CN 201410743330A CN 104452815 B CN104452815 B CN 104452815B
Authority
CN
China
Prior art keywords
wellbore
branch pipe
socket
inspection well
plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410743330.XA
Other languages
Chinese (zh)
Other versions
CN104452815A (en
Inventor
周祖明
张双全
郑术友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kangtai Plastic Technology Co ltd
Original Assignee
Kangtai Plastic Science and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kangtai Plastic Science and Technology Group Co Ltd filed Critical Kangtai Plastic Science and Technology Group Co Ltd
Priority to CN201410743330.XA priority Critical patent/CN104452815B/en
Publication of CN104452815A publication Critical patent/CN104452815A/en
Application granted granted Critical
Publication of CN104452815B publication Critical patent/CN104452815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/124Shaft entirely made of synthetic material
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/024Manhole shafts or other inspection chambers; Snow-filling openings; accessories made of plastic material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention discloses a kind of underground water, gas of reducing to the plastics step-down inspection chamber of inspection chamber base pressure. The reinforced wall section that this inspection chamber comprises pit shaft, be positioned at the pit shaft bellmouth on pit shaft top, the tube faucet that is arranged in pit shaft side wall and pit shaft side wall extend wellbore bottom; Described reinforced wall section is provided with at least one relief hole, and described relief hole is through hole. Pressure bottom this inspection chamber can be discharged from the side of inspection chamber by underground water, gas by set relief hole, avoid inspection chamber to be subject to pressure to damage or upwards float and wash away to banket and cause landslide, it is to increase the work-ing life of this plastic inspection well.

Description

塑料降压检查井Plastic decompression inspection well

技术领域technical field

本发明属于给水、排水领域,具体涉及一种塑料降压检查井。The invention belongs to the field of water supply and drainage, and in particular relates to a plastic pressure-reducing inspection well.

背景技术Background technique

检查井是在地下管道每隔一定距离或某一定点位置安装的竖井,检查井一般设在排水管道、线缆管道等的转弯处、交汇处、管径或坡度改变处、直线管段上每隔一定距离处以及排水管道的跌水处。检查井是用以检修管道,清除污泥及连接不同方向、不同高度管道的附属构筑物。具体有污水检查井、街道检查井、沉泥检查井、分水检查井、电力检查井、电信检查井、管道阀门检查井等。塑料检查井具有重量轻、耐腐蚀、耐老化、与塑料管道连接方便、施工效率高、施工成本低等优点,因而塑料检查井替代了传统的检查井得到了广泛的应用。Inspection wells are vertical shafts installed at certain distances or at a certain point in underground pipelines. Inspection wells are generally located at the turns, junctions, pipe diameter or slope changes of drainage pipes, cable pipes, etc., and at intervals on straight pipe sections. A certain distance and the water drop of the drainage pipe. The inspection well is an auxiliary structure used to repair pipelines, remove sludge and connect pipelines in different directions and heights. Specifically, there are sewage inspection wells, street inspection wells, sediment inspection wells, water separation inspection wells, electric power inspection wells, telecommunications inspection wells, pipeline valve inspection wells, etc. Plastic inspection wells have the advantages of light weight, corrosion resistance, aging resistance, convenient connection with plastic pipes, high construction efficiency, and low construction cost. Therefore, plastic inspection wells have replaced traditional inspection wells and have been widely used.

目前,塑料检查井主要包括井筒、位于井筒顶端的井筒承口和设置在井筒侧壁上的支管承口;一般支管承口为一至四个,为了保证塑料检查井的强度井筒侧壁的下端通常会延伸出井筒底部。现有的塑料检查井安装后,检查井的底部受到地下水、气的压力较大;特别是当地下水位升高时,检查井的底部受压尤为严重。当地下水浮力及气压增大到一定程度就会使检查井受压损坏或是使检查井向上浮动冲垮填土造成塌方。At present, the plastic inspection well mainly includes the wellbore, the wellbore socket located at the top of the wellbore, and the branch pipe socket arranged on the side wall of the wellbore; generally, there are one to four branch pipe sockets. In order to ensure the strength of the plastic inspection well, the lower end of the wellbore side wall is usually will extend beyond the bottom of the wellbore. After the existing plastic inspection well is installed, the bottom of the inspection well is under the pressure of groundwater and gas; especially when the groundwater level rises, the pressure at the bottom of the inspection well is particularly serious. When the groundwater buoyancy and air pressure increase to a certain extent, the inspection well will be damaged by pressure or the inspection well will float upwards to wash away the fill and cause landslides.

发明内容Contents of the invention

本发明要解决的技术问题是提供一种减小地下水、气对检查井底部压力的塑料降压检查井。The technical problem to be solved by the present invention is to provide a plastic depressurization inspection well that reduces the pressure of groundwater and gas on the bottom of the inspection well.

为了解决上述技术问题,本发明提供了一种塑料降压检查井,包括井筒、位于井筒顶端的井筒承口、设置在井筒侧壁上的支管承口以及井筒侧壁延伸出井筒底部的加强壁段;所述加强壁段上设有至少一个泄压孔,所述泄压孔为通孔。In order to solve the above technical problems, the present invention provides a plastic depressurization inspection well, which includes a wellbore, a wellbore socket located at the top of the wellbore, a branch pipe socket arranged on the sidewall of the wellbore, and a reinforcement wall extending from the sidewall of the wellbore to the bottom of the wellbore section; the reinforced wall section is provided with at least one pressure relief hole, and the pressure relief hole is a through hole.

进一步的是,所述泄压孔至少为两个,并沿加强壁段的圆周均布。Further, there are at least two pressure relief holes, which are uniformly distributed along the circumference of the reinforced wall section.

进一步的是,所述井筒承口和/或支管承口的外壁上设有至少一根环状加强筋.Further, at least one annular reinforcing rib is provided on the outer wall of the wellbore socket and/or branch pipe socket.

进一步的是,所述井筒承口和支管承口的内表面接口处设有倒角。Further, chamfers are provided at the interface of the inner surface of the wellbore socket and the branch pipe socket.

进一步的是,所述井筒承口的内壁上设有井筒环状平台,所述井筒承口外壁与井筒环状平台相对应处的下侧面上设有三角支撑筋。Further, the inner wall of the wellbore socket is provided with a wellbore annular platform, and the lower side of the outer wall of the wellbore socket corresponding to the wellbore annular platform is provided with triangular support ribs.

进一步的是,所述支管承口的内壁上设有支管环状平台,所述支管承口外壁上与支管环状平台相对应处设有环状加强筋。Further, the inner wall of the branch pipe socket is provided with a branch pipe annular platform, and the outer wall of the branch pipe socket is provided with a ring-shaped reinforcing rib corresponding to the branch pipe annular platform.

进一步的是,所述井筒外壁上设有网状加强筋,所述井筒底部的下侧面上设有辐射状加强筋与环状加强筋相互交错构成的蛛网状加强筋。Further, the outer wall of the wellbore is provided with web-shaped reinforcing ribs, and the lower side of the bottom of the wellbore is provided with cobweb-shaped reinforcing ribs formed by interlacing radial reinforcing ribs and ring-shaped reinforcing ribs.

进一步的是,所述支管承口至少为三个,其中一个支管承口为流出口,其余的支管承口为汇入口;所述井筒底部设有脊梁结构,所述脊梁结构将井筒底部分为至少两个平滑的顺水面结构,所述脊梁结构可将从汇入口流入的水体分隔导向,所述顺水面结构可将从汇入口流入的水体导流至流出口。Further, there are at least three branch pipe sockets, one of which is an outflow port, and the rest of the branch pipe sockets are inlets; the bottom of the shaft is provided with a ridge structure, and the ridge structure divides the bottom of the shaft into At least two smooth structures along the water surface, the ridge structure can separate and guide the water flowing in from the inlet, and the water along the structure can guide the water flowing in from the inlet to the outlet.

进一步的是,所述支管承口为三个,三个支管承口分别设置在井筒侧壁上构成T字形的三通检查井;其中,两个相对应设置的支管承口为汇入口,另一个支管承口为流出口;所述脊梁结构为人字形脊梁,所述人字形脊梁将井筒底部分为三个顺水面结构,三个顺水面结构分别为一个顺流面和两个导流面;所述顺流面为呈扇形的弧面,顺流面的导流方向朝向作为流出口的支管承口;所述导流面为弧形面,两个导流面的导流入口分别朝向两个作为汇入口的支管承口,两个导流面的导流出口均朝向作为流出口的支管承口。Further, there are three branch pipe sockets, and the three branch pipe sockets are respectively arranged on the side wall of the wellbore to form a T-shaped three-way inspection well; wherein, the two correspondingly arranged branch pipe sockets are confluence ports, and the other A branch pipe socket is an outlet; the spine structure is a herringbone spine, and the herringbone spine divides the bottom of the wellbore into three structures along the water surface, and the three structures along the water surface are respectively a downstream surface and two diversion surfaces; The downstream surface is a fan-shaped arc surface, and the diversion direction of the downstream surface faces the branch pipe socket as the outlet; the diversion surface is an arc surface, and the diversion inlets of the two diversion surfaces are respectively directed A branch pipe socket as the inlet, and the diversion outlets of the two diversion surfaces are all facing the branch pipe socket as the outflow port.

进一步的是,所述支管承口与井筒侧壁相连接的相贯线处设有平滑过渡结构,所述平滑过渡结构包括外圆弧倒角和内圆弧倒角。Further, a smooth transition structure is provided at the intersecting line connecting the branch pipe socket and the wellbore side wall, and the smooth transition structure includes an outer circular arc chamfer and an inner circular arc chamfer.

本发明的有益效果是:通过所设置的泄压孔可将地下水、气对该检查井底部的压力从检查井的侧面排出,避免检查井受压损坏或是向上浮动冲垮填土造成塌方,提高了该塑料检查井的使用寿命。沿加强壁段圆周均布的多个泄压孔可将检查井底部的压力从检查井的四周排出,排压效果更好。环状加强筋可以提高检查井的强度,增大井筒承口和支管承口的环刚度,避免检查井侧壁过厚,节约成本。井筒承口上的倒角可以使与井筒承口相连的管道连接方便,支管承口上的倒角可以便于支管承口与其他管道的连接。井筒环状平台提高了井筒的稳定性和密闭性,三角支撑筋加强了井筒的结构。支管环状平台增加了支管承口的稳定性和密闭性。网状加强筋和蛛网状加强筋在增加检查井强度的同时,也增强了检查井抵抗外力挤压变形的能力。所设置的脊梁结构可以在支管承口为三个以上时将从汇入口进入的水体分隔导向,并通过顺水面结构将水体以较低的能耗导流至流出口,使水流更好的汇合,保证了水流的方向和流速,避免了紊流或旋流的产生。人字形脊梁具有更好的分水导向的效果,顺流面还可以对从井筒承口进入的水体进行导流。平滑过渡结构不仅能够提高支管承口与井筒连接之间的强度;而且,便于清淤时清理工具进入检查井疏通。The beneficial effects of the present invention are: the pressure of groundwater and gas on the bottom of the inspection well can be discharged from the side of the inspection well through the set pressure relief hole, so as to avoid the pressure damage of the inspection well or the collapse of the filling soil caused by the upward floating, and improve the quality of the inspection well. The service life of the plastic inspection well has been greatly improved. A plurality of pressure relief holes uniformly distributed along the circumference of the reinforced wall section can discharge the pressure at the bottom of the inspection well from around the inspection well, and the pressure relief effect is better. The annular reinforcing rib can improve the strength of the inspection well, increase the ring stiffness of the wellbore socket and the branch pipe socket, avoid excessive thickness of the side wall of the inspection well, and save costs. The chamfer on the wellbore socket can facilitate the connection of the pipeline connected with the wellbore socket, and the chamfer on the branch pipe socket can facilitate the connection between the branch pipe socket and other pipelines. The annular platform of the wellbore improves the stability and airtightness of the wellbore, and the triangular support ribs strengthen the structure of the wellbore. The annular platform of the branch pipe increases the stability and airtightness of the branch pipe socket. The web-like ribs and spider web-like ribs not only increase the strength of the inspection well, but also enhance the ability of the inspection well to resist extrusion and deformation by external forces. The set spine structure can separate and guide the water body entering from the inlet when there are more than three branch pipe sockets, and guide the water body to the outlet with lower energy consumption through the structure along the water surface, so that the water flow can be better converged , to ensure the direction and velocity of the water flow, to avoid the generation of turbulence or swirl. The herringbone-shaped spine has a better water diversion and guiding effect, and the downstream surface can also guide the water entering from the wellbore socket. The smooth transition structure can not only improve the strength between the branch pipe socket and the wellbore connection; moreover, it is convenient for the cleaning tool to enter the inspection well for dredging during dredging.

附图说明Description of drawings

图1是本发明一种实施方式的半剖结构示意图;Fig. 1 is a schematic diagram of a half-section structure of an embodiment of the present invention;

图2是图1实施方式的俯视结构示意图;Fig. 2 is a schematic top view of the embodiment of Fig. 1;

图3是本发明另一种实施方式的俯视结构示意图;Fig. 3 is a top view structural schematic diagram of another embodiment of the present invention;

图4是图1实施方式的检查井底部结构轴侧视图;Fig. 4 is an axial side view of the bottom structure of the inspection well in the embodiment of Fig. 1;

图中标记为:井筒1、人字形脊梁11、顺流面12、导流面13、导流入口131、导流出口132、井筒承口2、倒角21、井筒环状平台22、三角支撑筋23、支管承口3、倒角31、支管环状平台32、外圆弧倒角33、内圆弧倒角34、加强壁段4、泄压孔41、环状加强筋5、网状加强筋6和蛛网状加强筋7。The marks in the figure are: shaft 1, herringbone ridge 11, downstream surface 12, diversion surface 13, diversion inlet 131, diversion outlet 132, shaft socket 2, chamfer 21, shaft annular platform 22, triangular support Rib 23, branch pipe socket 3, chamfer 31, branch pipe annular platform 32, outer arc chamfer 33, inner arc chamfer 34, reinforced wall section 4, pressure relief hole 41, annular reinforcing rib 5, mesh Reinforcing rib 6 and cobweb-shaped reinforcing rib 7.

具体实施方式detailed description

下面结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.

如图1和图4所示,塑料降压检查井,包括井筒1、位于井筒1顶端的井筒承口2、设置在井筒1侧壁上的支管承口3以及井筒1侧壁延伸出井筒1底部的加强壁段4;所设置的支管承口3通常为一至四个;所述加强壁段4上设有至少一个泄压孔41,所述泄压孔41为通孔。加强壁段4是延伸出井筒1底部的加强结构,用于保证井筒1的整体强度。泄压孔41是设置在加强壁段4上的通孔,用于将地下水、气对检查井底部的压力从检查井的侧面排出。泄压孔41不宜过大,也不宜过多,以免影响加强壁段4的结构强度,导致井筒1的整体强度降低;当然,为了达到最大的降压效果,在保证加强壁段4结构强度的前提下,所设置泄压孔41的尺寸尽可能大,泄压孔41的数量尽可能多。泄压孔41通常设置在加强壁段4的圆周表面上靠近井筒1底部处,这样设置可以提高降压效果。为了避免泄压孔41被泥土、石块等堵塞,一般在会在泄压孔41处的井筒1侧壁上设置过滤网。As shown in Figures 1 and 4, the plastic depressurization inspection well includes a wellbore 1, a wellbore socket 2 located at the top of the wellbore 1, a branch pipe socket 3 arranged on the side wall of the wellbore 1, and the sidewall of the wellbore 1 extending out of the wellbore 1 The reinforced wall section 4 at the bottom; usually one to four branch pipe sockets 3 are provided; at least one pressure relief hole 41 is provided on the reinforced wall section 4, and the pressure relief hole 41 is a through hole. The reinforced wall section 4 is a reinforced structure extending from the bottom of the shaft 1 to ensure the overall strength of the shaft 1 . The pressure relief hole 41 is a through hole provided on the reinforced wall section 4, and is used to discharge the pressure of groundwater and gas on the bottom of the inspection well from the side of the inspection well. The pressure relief hole 41 should not be too large or too many, so as not to affect the structural strength of the reinforced wall section 4, resulting in a decrease in the overall strength of the wellbore 1; On the premise, the size of the pressure relief holes 41 is as large as possible, and the number of pressure relief holes 41 is as large as possible. The pressure relief hole 41 is usually arranged on the circumferential surface of the reinforced wall section 4 near the bottom of the wellbore 1, so that the effect of pressure reduction can be improved. In order to prevent the pressure relief hole 41 from being blocked by soil, stones, etc., generally a filter is provided on the side wall of the shaft 1 at the pressure relief hole 41 .

为了使检查井底部的压力从检查井的四周排出,使检查井向外界排压时所受到的反作用力相互抵消,从而受到较小的反作用力,提高排压效果,所述泄压孔41至少为两个,并沿加强壁段4的圆周均布。In order to discharge the pressure at the bottom of the inspection well from the surroundings of the inspection well, so that the reaction forces received when the inspection well discharges pressure to the outside cancel each other out, thereby receiving a smaller reaction force and improving the pressure discharge effect, the pressure relief hole 41 is at least There are two, and they are evenly distributed along the circumference of the reinforced wall section 4 .

在上述基础上,为了在检查井侧壁厚度一定的情况下,进一步提高检查井的强度,增大井筒承口2和/或支管承口3的环刚度,所述井筒承口2和/或支管承口3的外壁上设有至少一根环状加强筋5。所设置的环状加强筋5的根数在保证强度的情况下适量即可,例如图1方案中,井筒承口2和支管承口3的外壁上均设有三根环状加强筋5。On the basis of the above, in order to further improve the strength of the inspection well under the condition that the side wall thickness of the inspection well is constant, and increase the ring stiffness of the wellbore socket 2 and/or the branch pipe socket 3, the wellbore socket 2 and/or At least one annular reinforcing rib 5 is provided on the outer wall of the branch pipe socket 3 . The number of ring-shaped reinforcing ribs 5 provided should be appropriate under the condition of ensuring the strength. For example, in the scheme of FIG.

为了使与井筒承口2相连的管道连接方便,在井筒承口2的内表面接口处设有倒角21;为了使支管承口3与其他管道的连接方便,在支管承口3的内表面接口处设有倒角31。In order to facilitate the connection of the pipeline connected to the wellbore socket 2, a chamfer 21 is provided at the interface of the inner surface of the wellbore socket 2; A chamfer 31 is provided at the interface.

具体的,再如图1所示,为了提高井筒1的稳定性和密闭性,所述井筒承口2的内壁上设有井筒环状平台22;为了加强井筒环状平台22处井筒1的结构,所述井筒承口2外壁与井筒环状平台22相对应处的下侧面上设有三角支撑筋23。井筒环状平台22为圆环形平台。三角支撑筋23通常为两个以上,并沿井筒1的圆周均布设置。Specifically, as shown in Figure 1, in order to improve the stability and tightness of the shaft 1, the inner wall of the shaft socket 2 is provided with a shaft annular platform 22; in order to strengthen the structure of the shaft 1 at the shaft annular platform 22 , Triangular support ribs 23 are provided on the lower side of the outer wall of the wellbore socket 2 corresponding to the wellbore annular platform 22 . The wellbore annular platform 22 is an annular platform. There are usually more than two triangular support ribs 23 , and they are evenly distributed along the circumference of the shaft 1 .

具体的,再如图1所示,为了提高支管承口3的稳定性和密闭性,所述支管承口3的内壁上设有支管环状平台32,支管环状平台32为圆环平台;为了加强支管环状平台32处支管承口3的结构,所述支管承口3外壁上与支管环状平台32相对应处设有环状加强筋5。Specifically, as shown in Figure 1, in order to improve the stability and airtightness of the branch pipe socket 3, the inner wall of the branch pipe socket 3 is provided with a branch pipe annular platform 32, and the branch pipe annular platform 32 is a circular platform; In order to strengthen the structure of the branch pipe socket 3 at the branch pipe annular platform 32 , an annular reinforcing rib 5 is provided on the outer wall of the branch pipe socket 3 corresponding to the branch pipe annular platform 32 .

为了进一步提高该检查井强度,同时增强检查井抵抗外力挤压变形的能力,如图1和图4所示,所述井筒1外壁上设有网状加强筋6,所述井筒1底部的下侧面上设有辐射状加强筋与环状加强筋相互交错构成的蛛网状加强筋7。In order to further improve the strength of the inspection well and at the same time enhance the ability of the inspection well to resist extrusion and deformation by external force, as shown in Figure 1 and Figure 4, the outer wall of the shaft 1 is provided with a mesh reinforcing rib 6, and the lower part of the bottom of the shaft 1 The side surface is provided with a cobweb-shaped reinforcing rib 7 formed by interlacing radial reinforcing ribs and annular reinforcing ribs.

作为本发明的一种优选方案,具体如图2和图3所示,塑料降压检查井,包括井筒1、位于井筒1顶端的井筒承口2、设置在井筒1侧壁上的支管承口3以及井筒1侧壁延伸出井筒1底部的加强壁段4;所述加强壁段4上设有至少一个泄压孔41,所述泄压孔41为通孔;所述支管承口3至少为三个,其中一个支管承口3为流出口,其余的支管承口3为汇入口;所述井筒1底部设有脊梁结构,所述脊梁结构将井筒1底部分为至少两个平滑的顺水面结构,所述脊梁结构可将从汇入口流入的水体分隔导向,所述顺水面结构可将从汇入口流入的水体导流至流出口。脊梁结构通常为注塑成型。所设置的脊梁结构可以在支管承口为三个以上时将从汇入口进入的水体分隔导向,使水体在井筒1中的流向均朝向流出口,使水流更好的汇合,保证了水流的方向;在脊梁结构对水体进行分隔导向的同时,顺水面结构将水体以较低的能耗导流至流出口,经过平滑的顺水面结构导流后水体的动能消耗较少,水体流速基本不变。该结构的检查井可以避免了支管承口为三个以上时因水体汇流在井筒1中产生紊流或旋流,保证了水体及时排出,而且便于排污和后期的清理。As a preferred solution of the present invention, as specifically shown in Figure 2 and Figure 3, the plastic depressurization inspection well includes a wellbore 1, a wellbore socket 2 located at the top of the wellbore 1, and a branch pipe socket arranged on the side wall of the wellbore 1 3 and the reinforced wall section 4 extending from the side wall of the wellbore 1 to the bottom of the wellbore 1; the reinforced wall section 4 is provided with at least one pressure relief hole 41, and the pressure relief hole 41 is a through hole; the branch pipe socket 3 is at least There are three, wherein one branch pipe socket 3 is an outflow port, and the remaining branch pipe sockets 3 are inlets; the bottom of the wellbore 1 is provided with a ridge structure, and the ridge structure divides the bottom of the wellbore 1 into at least two smooth parallel The water surface structure, the ridge structure can separate and guide the water flowing in from the inlet, and the water surface structure can guide the water flowing in from the inlet to the outlet. The spine structure is usually injection molded. The set spine structure can separate and guide the water body entering from the inlet when there are more than three branch pipe sockets, so that the flow direction of the water body in the wellbore 1 is all towards the outlet, so that the water flow can be better merged and the direction of the water flow is guaranteed. ; While the spine structure separates and guides the water body, the structure along the water surface guides the water body to the outlet with low energy consumption. After the smooth water surface structure diversion, the kinetic energy consumption of the water body is less, and the flow velocity of the water body remains basically unchanged. . The inspection well of this structure can avoid turbulence or swirling flow in the shaft 1 due to the confluence of water bodies when there are more than three branch pipe sockets, ensures timely discharge of water bodies, and is convenient for sewage discharge and later cleaning.

在上述基础上,再如图2所示,所述支管承口3为三个,三个支管承口3分别设置在井筒1侧壁上构成T字形的三通检查井;其中,两个相对应设置的支管承口3为汇入口,另一个支管承口3为流出口;所述脊梁结构为人字形脊梁11,所述人字形脊梁11将井筒1底部分为三个顺水面结构,三个顺水面结构分别为一个顺流面12和两个导流面13;所述顺流面12为呈扇形的弧面,顺流面12的导流方向朝向作为流出口的支管承口3;所述导流面13为弧形面,两个导流面13的导流入口131分别朝向两个作为汇入口的支管承口3,两个导流面13的导流出口132均朝向作为流出口的支管承口3。人字形脊梁11具有更好的分水导向的效果,顺流面12还可以对从井筒承口2进入的水体进行导流。On the basis of the above, as shown in Figure 2, there are three branch pipe sockets 3, and the three branch pipe sockets 3 are respectively arranged on the side wall of the shaft 1 to form a T-shaped three-way inspection well; The branch pipe socket 3 provided correspondingly is the inlet, and the other branch pipe socket 3 is the outflow port; the ridge structure is a herringbone ridge 11, and the chevron ridge 11 divides the bottom of the shaft 1 into three structures along the water surface. The structure of the downstream surface is respectively a downstream surface 12 and two diversion surfaces 13; the downstream surface 12 is a fan-shaped arc surface, and the diversion direction of the downstream surface 12 faces the branch pipe socket 3 as the outlet; The diversion surface 13 is an arc-shaped surface, and the diversion inlets 131 of the two diversion surfaces 13 are respectively facing the two branch pipe sockets 3 as inlets, and the diversion outlets 132 of the two diversion surfaces 13 are all facing as the outlets. The branch pipe socket 3. The herringbone ridge 11 has a better effect of water diversion and guidance, and the downstream surface 12 can also guide the water entering from the shaft socket 2 .

为了提高支管承口3与井筒1连接之间的强度,所述支管承口3与井筒1侧壁相连接的相贯线处设有平滑过渡结构,所述平滑过渡结构包括内圆弧倒角33和外圆弧倒角34,如图1所示。平滑过渡结构还便于清淤时,清理工具进入检查井中进行疏通作业。In order to improve the strength between the connection between the branch pipe socket 3 and the wellbore 1, a smooth transition structure is provided at the intersecting line connecting the branch pipe socket 3 and the side wall of the wellbore 1, and the smooth transition structure includes inner arc chamfering 33 and outer arc chamfering 34, as shown in Figure 1. The smooth transition structure also facilitates dredging when the cleaning tool enters the inspection well.

Claims (8)

1.塑料降压检查井,包括井筒(1)、位于井筒(1)顶端的井筒承口(2)、设置在井筒(1)侧壁上的支管承口(3)以及井筒(1)侧壁延伸出井筒(1)底部的加强壁段(4);其特征在于:所述加强壁段(4)上设有至少一个泄压孔(41),所述泄压孔(41)为通孔;所述支管承口(3)为三个,三个支管承口(3)分别设置在井筒(1)侧壁上构成T字形的三通检查井;其中,两个相对应设置的支管承口(3)为汇入口,另一个支管承口(3)为流出口;1. Plastic depressurization inspection well, including the wellbore (1), the wellbore socket (2) at the top of the wellbore (1), the branch pipe socket (3) arranged on the side wall of the wellbore (1) and the wellbore (1) side The wall extends out of the reinforced wall section (4) at the bottom of the shaft (1); it is characterized in that: the reinforced wall section (4) is provided with at least one pressure relief hole (41), and the pressure relief hole (41) is through holes; there are three branch pipe sockets (3), and the three branch pipe sockets (3) are respectively arranged on the side wall of the shaft (1) to form a T-shaped three-way inspection well; wherein, two correspondingly arranged branch pipes The socket (3) is the inlet, and the other branch socket (3) is the outlet; 所述井筒(1)底部设有脊梁结构,所述脊梁结构为人字形脊梁(11),所述人字形脊梁(11)将井筒(1)底部分为三个平滑的顺水面结构,三个顺水面结构分别为一个顺流面(12)和两个导流面(13);所述顺流面(12)为呈扇形的弧面,顺流面(12)的导流方向朝向作为流出口的支管承口(3);所述导流面(13)为弧形面,两个导流面(13)的导流入口(131)分别朝向两个作为汇入口的支管承口(3),两个导流面(13)的导流出口(132)均朝向作为流出口的支管承口(3);所述脊梁结构可将从汇入口流入的水体分隔导向,所述顺水面结构可将从汇入口流入的水体导流至流出口。The bottom of the wellbore (1) is provided with a spine structure, the spine structure is a herringbone spine (11), and the herringbone spine (11) divides the bottom of the wellbore (1) into three smooth structures along the water surface. The water surface structure is respectively a downstream surface (12) and two diversion surfaces (13); The branch pipe socket (3); the diversion surface (13) is an arc surface, and the diversion inlets (131) of the two diversion surfaces (13) are respectively facing two branch pipe sockets (3) as inlets , the diversion outlets (132) of the two diversion surfaces (13) are all facing the branch pipe socket (3) as the outlet; Divert the water flowing in from the inlet to the outlet. 2.如权利要求1所述的塑料降压检查井,其特征在于:所述泄压孔(41)至少为两个,并沿加强壁段(4)的圆周均布。2. The plastic depressurization inspection well according to claim 1, characterized in that: there are at least two pressure relief holes (41), which are evenly distributed along the circumference of the reinforced wall section (4). 3.如权利要求1所述的塑料降压检查井,其特征在于:所述井筒承口(2)和/或支管承口(3)的外壁上设有至少一根环状加强筋(5)。3. The plastic depressurization inspection well according to claim 1, characterized in that: at least one annular reinforcing rib (5 ). 4.如权利要求1所述的塑料降压检查井,其特征在于:所述井筒承口(2)和支管承口(3)的内表面接口处设有倒角(21,31)。4. The plastic depressurization inspection well according to claim 1, characterized in that chamfers (21, 31) are provided at the interface of the inner surfaces of the wellbore socket (2) and the branch pipe socket (3). 5.如权利要求1所述的塑料降压检查井,其特征在于:所述井筒承口(2)的内壁上设有井筒环状平台(22),所述井筒承口(2)外壁与井筒环状平台(22)相对应处的下侧面上设有三角支撑筋(23)。5. The plastic depressurization inspection well according to claim 1, characterized in that: the inner wall of the wellbore socket (2) is provided with a wellbore annular platform (22), and the outer wall of the wellbore socket (2) is in contact with Triangular support ribs (23) are arranged on the lower side of the shaft annular platform (22) corresponding to it. 6.如权利要求1所述的塑料降压检查井,其特征在于:所述支管承口(3)的内壁上设有支管环状平台(32),所述支管承口(3)外壁上与支管环状平台(32)相对应处设有环状加强筋(5)。6. The plastic depressurization inspection well according to claim 1, characterized in that: the inner wall of the branch pipe socket (3) is provided with a branch pipe annular platform (32), and the outer wall of the branch pipe socket (3) is A ring-shaped reinforcing rib (5) is provided at a position corresponding to the ring-shaped platform (32) of the branch pipe. 7.如权利要求1所述的塑料降压检查井,其特征在于:所述井筒(1)外壁上设有网状加强筋(6),所述井筒(1)底部的下侧面上设有辐射状加强筋与环状加强筋相互交错构成的蛛网状加强筋(7)。7. The plastic depressurization inspection well according to claim 1, characterized in that: the outer wall of the wellbore (1) is provided with mesh reinforcing ribs (6), and the lower side of the bottom of the wellbore (1) is provided with A cobweb-shaped reinforcing rib (7) formed by interlacing radial reinforcing ribs and annular reinforcing ribs. 8.如权利要求1、2、3、4、5、6或7所述的塑料降压检查井,其特征在于:所述支管承口(3)与井筒(1)侧壁相连接的相贯线处设有平滑过渡结构,所述平滑过渡结构包括外圆弧倒角(33)和内圆弧倒角(34)。8. The plastic pressure-relief inspection well according to claim 1, 2, 3, 4, 5, 6 or 7, characterized in that: said branch pipe socket (3) is connected to the side wall of the wellbore (1) A smooth transition structure is provided at the crossing line, and the smooth transition structure includes an outer circular arc chamfer (33) and an inner circular arc chamfer (34).
CN201410743330.XA 2014-12-08 2014-12-08 Plastics step-down inspection chamber Active CN104452815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410743330.XA CN104452815B (en) 2014-12-08 2014-12-08 Plastics step-down inspection chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410743330.XA CN104452815B (en) 2014-12-08 2014-12-08 Plastics step-down inspection chamber

Publications (2)

Publication Number Publication Date
CN104452815A CN104452815A (en) 2015-03-25
CN104452815B true CN104452815B (en) 2016-06-08

Family

ID=52899515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410743330.XA Active CN104452815B (en) 2014-12-08 2014-12-08 Plastics step-down inspection chamber

Country Status (1)

Country Link
CN (1) CN104452815B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912174B (en) * 2015-05-25 2017-02-01 浙江浙牌科技有限公司 Convenient-to-mount high-strength water dropping well
CN107060045B (en) * 2017-04-19 2022-08-23 中国瑞林工程技术股份有限公司东莞分公司 Jet type drainage four-way inspection well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182147A (en) * 1999-12-28 2001-07-03 Aron Kasei Co Ltd With ribs
CN102367685A (en) * 2011-10-26 2012-03-07 江苏通全球工程管业有限公司 Base of inspection well
CN202157341U (en) * 2011-07-25 2012-03-07 四川亚塑新材料有限公司 Enhanced reinforcing rib plastic inspection well
CN203420284U (en) * 2013-07-17 2014-02-05 康泰塑胶科技集团有限公司 Well base of inspection well for community
CN203960903U (en) * 2014-07-22 2014-11-26 山东文远建材科技股份有限公司 A kind of surface is provided with the plastic inspection well of netted reinforcing rib

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182147A (en) * 1999-12-28 2001-07-03 Aron Kasei Co Ltd With ribs
CN202157341U (en) * 2011-07-25 2012-03-07 四川亚塑新材料有限公司 Enhanced reinforcing rib plastic inspection well
CN102367685A (en) * 2011-10-26 2012-03-07 江苏通全球工程管业有限公司 Base of inspection well
CN203420284U (en) * 2013-07-17 2014-02-05 康泰塑胶科技集团有限公司 Well base of inspection well for community
CN203960903U (en) * 2014-07-22 2014-11-26 山东文远建材科技股份有限公司 A kind of surface is provided with the plastic inspection well of netted reinforcing rib

Also Published As

Publication number Publication date
CN104452815A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
KR102061685B1 (en) Prefabricated Pump Station Units and Water Distribution Units
CN205606060U (en) With single riser water -drainage tube part of layer installation
CN104452815B (en) Plastics step-down inspection chamber
CN203886249U (en) Squirrel cage type two-stage swirl solid-liquid separation device
CN106245676A (en) A kind of body and pipe gallery
CN204898831U (en) Novel plastic check well
CN104452816A (en) High-stiffness leakage-proof plastic inspection well and production method thereof
CN205475605U (en) Anti floating plastic sinks mud inspection shaft
CN108130948B (en) Pressure flow water inlet runner system suitable for deep underground drainage lifting pump station
CN204002651U (en) A kind of jumbolter
CN102322075A (en) Enhanced reinforced plastic inspection well
CN106088265B (en) A kind of anticlogging single standpipe cyclone of preventing water leakage
CN205975844U (en) Single riser swirler of jam is prevented to leak protection water
CN205935150U (en) Rain water pipe assembly
CN107740438B (en) Urban comprehensive pipe gallery drainage pipe system
CN203939050U (en) Integral molded plastic manhole well seat
CN201358510Y (en) Rectangular well chamber of plastic integrative inspection well
CN202091662U (en) Clockwise inserting opening structure of plastic steel wound tube
CN100410457C (en) Combined pipe inspection well
CN209873999U (en) City utility tunnel drainage pipe inserts a mouth tube coupling
CN201933604U (en) Rainwater drainage multi-passage inspection well
CN218176069U (en) A repair structure for sewage inspection shaft
CN202577550U (en) Siphon pipeline of closestool
CN205637052U (en) Plastic check well with strengthening rib
CN210395588U (en) Gutter inlet inspection well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 611230 north section of Hongye Road, Chongzhou Economic Development Zone, Chengdu, Sichuan

Patentee after: Kangtai Plastic Technology Co.,Ltd.

Address before: 611230 Kangtai Plastic Technology Group Co., Ltd., North Section of Hongye Avenue, Chongzhou Economic Development Zone, Chengdu City, Sichuan Province

Patentee before: Kangtai Plastic Technology Group Co.,Ltd.

CP03 Change of name, title or address