CN104452595A - Tensioning device for stay cable which is provided with single-lug or double-lug sleeve and can be adjusted in one direction or two directions and construction method of device - Google Patents

Tensioning device for stay cable which is provided with single-lug or double-lug sleeve and can be adjusted in one direction or two directions and construction method of device Download PDF

Info

Publication number
CN104452595A
CN104452595A CN201410636757.XA CN201410636757A CN104452595A CN 104452595 A CN104452595 A CN 104452595A CN 201410636757 A CN201410636757 A CN 201410636757A CN 104452595 A CN104452595 A CN 104452595A
Authority
CN
China
Prior art keywords
cable
prefabricated
deck
steel
stay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410636757.XA
Other languages
Chinese (zh)
Other versions
CN104452595B (en
Inventor
袁爱民
何雨
吴闻秀
程宏斌
钱守龙
董华能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University
Original Assignee
Hohai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University filed Critical Hohai University
Priority to CN201410636757.XA priority Critical patent/CN104452595B/en
Publication of CN104452595A publication Critical patent/CN104452595A/en
Application granted granted Critical
Publication of CN104452595B publication Critical patent/CN104452595B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明为一种斜拉索张拉技术,它涉及单、双耳套筒单、双向调节斜拉索的一种张拉装置及施工方法。本发明的张拉装置由预制下卡座、紧固螺栓、一端带挤压锚固端头的张拉钢绞线、预制上卡座、前卡式油压千斤顶、穿心式荷载传感器及传感器数据采集系统组成。本发明所述的一种斜拉索张拉装置及施工方法能够有效完成拉索张拉工作,两台前卡式油压千斤顶对称张拉可使装置受力均匀,千斤顶油压表读数和穿心式荷载传感器同时对油压千斤顶进行控制,可减小误差。整套装置制作简单,操作方便,具有较强的实用和推广价值。

The invention relates to a cable tensioning technology, which relates to a tensioning device and a construction method for single and double ear sleeves to adjust the cable stays. The tensioning device of the present invention consists of a prefabricated lower deck, a fastening bolt, a tensioning steel strand with an extruded anchor end at one end, a prefabricated upper deck, a front clamping hydraulic jack, a through-core load sensor and sensor data. The composition of the acquisition system. A cable tensioning device and construction method described in the present invention can effectively complete the tensioning work of the cables, and the symmetrical tensioning of two front clamping hydraulic jacks can make the device evenly stressed, and the reading and wear of the hydraulic pressure gauge of the jacks The core load sensor controls the hydraulic jack at the same time, which can reduce the error. The whole set of device is simple to manufacture, convenient to operate, and has strong practical and popularization value.

Description

单、双耳套筒单、双向调节斜拉索的张拉装置及施工方法Tensioning device and construction method for single and double-direction adjustable stay cables with single and double lug sleeves

技术领域 technical field

本发明为一种斜拉索张拉技术,它涉及土木工程领域一种单、双耳套筒单、双向调节斜拉索的张拉装置及施工方法。 The invention relates to a cable tensioning technology, which relates to a tensioning device and a construction method for single and double ear sleeve single and two-way adjustable cable stays in the field of civil engineering.

背景技术 Background technique

随着桥梁事业的迅猛发展,各式各样的斜拉桥也不断在工程领域中涌现。传统的斜拉索采用成品索,锚具一般采用冷铸式锚或夹片式群锚体系,斜拉索的张拉端在斜拉索的梁段,张拉施工技术已经较为成熟。 With the rapid development of the bridge industry, various cable-stayed bridges are constantly emerging in the engineering field. The traditional stay cables use finished cables, and the anchorage generally adopts cold-cast anchors or clip-type group anchor systems. The tension end of the stay cables is at the beam section of the stay cables, and the tension construction technology is relatively mature.

然而,随着斜拉桥的服役年限逐渐增加,越来越多的斜拉索面临着更换,传统斜拉索面临着更换困难、操作复杂、对原结构损伤大等难题,这使得很多设计师在选择斜拉桥的斜拉索时,越来越多的采用单、双耳套筒单、双向调节斜拉索,它具有安装及更换方便、对原结构损伤少等优点。 However, as the service life of cable-stayed bridges gradually increases, more and more cable-stayed cables are facing replacement. Traditional cable-stayed cables face problems such as difficult replacement, complicated operation, and great damage to the original structure. This makes many designers When choosing the stay cables of cable-stayed bridges, more and more single and double-ear sleeve single and two-way adjustable stay cables are used, which have the advantages of convenient installation and replacement and less damage to the original structure.

对于这种斜拉索的张拉与安装,存在着既有张拉施工设备陈旧,产品设备没有配套设计张拉设备,张拉控制力难控制等不足和缺点。现有的千斤顶张拉,仅通过油压表读数来控制张拉力,误差大,且不宜控制(千斤顶油压大时,油表指针会不停的摆动)。同时,拉索张拉的反力一般由拉索端部附近的梁体提供,故需在梁体预留反力装置。而对于单、双耳套筒单、双向调节斜拉索,它是通过拧紧斜拉索自带的索体正反丝套筒对斜拉索施加张拉力。当这种斜拉索的索力较大时,索体正反丝套筒很难扭动,斜拉索施加张拉力比较困难,需要额外施加力减小套筒承担的力。另外,这种索体张拉时,反力装置的着力点必须和斜拉索在一条直线上,否则张拉时,张拉力的分力无法保证斜拉索正确安装。通过在梁端张拉方法,很难让反力装置的着力点位于斜拉索连接的塔端和梁端的直线上。如果桥梁的主梁是弯梁,则变得更加困难了。因为随着主梁的弯曲变化,每根斜拉索的受力方向也会发生改变,每个位置的预留反力装置的位置和方向都需要分别计算和设置,十分繁琐。 For the tensioning and installation of this cable-stayed cable, there are deficiencies and shortcomings such as existing tensioning construction equipment is obsolete, product equipment does not have supporting design tensioning equipment, and tensioning control force is difficult to control. In the existing jack tensioning, the tension force is only controlled by the reading of the oil pressure gauge, which has a large error and is not suitable for control (when the jack oil pressure is high, the pointer of the oil gauge will swing continuously). At the same time, the tensioning reaction force of the cable is generally provided by the beam body near the end of the cable, so it is necessary to reserve a reaction force device on the beam body. And for the single and two-way adjustable stay cables of the single and double-ear sleeves, it applies tension to the stay cables by tightening the positive and negative wire sleeves of the cable body that the stay cables carry. When the cable force of the stay cable is large, it is difficult to twist the positive and negative wire sleeve of the cable body, and it is difficult to apply tension to the stay cable, and it is necessary to apply additional force to reduce the force borne by the sleeve. In addition, when the cable body is stretched, the force point of the counter force device must be on a straight line with the stay cable, otherwise, the component force of the tension force cannot ensure the correct installation of the stay cable during tension. By tensioning at the beam end, it is difficult to allow the force point of the reaction force device to be located on the straight line between the tower end and the beam end connected by the stay cable. It becomes more difficult if the main girders of the bridge are curved. As the bending of the main girder changes, the force direction of each stay cable will also change. The position and direction of the reserved reaction force device at each position need to be calculated and set separately, which is very cumbersome.

可见,对于斜拉桥中采用的单、双耳套筒单、双向调节斜拉索,有必要设计一种与之相适合的张拉装置和施工方法,对这种斜拉索张拉具有良好的普适性。 It can be seen that it is necessary to design a suitable tensioning device and construction method for the single- and double-ear sleeve single- and two-way adjustable cable-stayed cables used in cable-stayed bridges, which have a good effect on the tension of such cable-stayed cables. universality.

发明内容 Contents of the invention

为了解决上述技术问题,本发明的目的在于提供一种单、双耳套筒单、双向调节斜拉索的张拉装置及施工方法,主要解决的技术问题:一是张拉时反力装置如何设置才能保证拉索与张拉力在一直线的问题。二是解决如何张拉控制力准确度问题。为了实现上述技术目的,本发明采用的技术方案是: In order to solve the above-mentioned technical problems, the object of the present invention is to provide a tensioning device and a construction method for single- and double-eared sleeve single- and two-way adjustable stay cables. Setting can ensure that the cable and the tension force are in a straight line. The second is to solve the problem of how to stretch the accuracy of the control force. In order to realize the above-mentioned technical purpose, the technical scheme that the present invention adopts is:

一种单、双耳套筒单、双向调节斜拉索的张拉装置,包括:预制下卡座、两根钢绞线、预制上卡座、索体正反丝套筒、前卡式油压千斤顶、穿心式荷载传感器、传感器数据采集系统及油压表;其中:所述预制下卡座包括左、右对称的两片下卡座钢板,每片下卡座钢板的内侧焊有半圆形钢扣耳,所述半圆形钢扣耳扣住斜拉索的索头吊耳,并将力依次传递给销栓和耳板;两片下卡座钢板上分别开设螺栓孔并通过紧固螺栓将两片下卡座钢板夹紧; A tensioning device for single- and double-eared sleeves and single- and two-way adjustable cable stays, including: a prefabricated lower deck, two steel strands, a prefabricated upper deck, a positive and negative wire sleeve for the cable body, and a front clamping oil Pressure jack, through-core load sensor, sensor data acquisition system and oil pressure gauge; wherein: the prefabricated lower deck includes two lower deck steel plates with left and right symmetry, each lower deck steel plate is welded with half Circular steel buckle ears, the semi-circular steel buckle ears buckle the cable head lugs of the stay cables, and transmit the force to the pin bolts and ear plates in turn; Bolt holes are respectively set on the two lower deck steel plates and passed through The fastening bolts clamp the two lower deck steel plates;

所述预制上卡座由两块带三个半圆凹槽的上卡座钢板拼成,拼成后形成的中间圆孔直径略大于斜拉索直径且小于斜拉索索体锚头直径,边上两个圆孔的直径略大于两根所述钢绞线直径;两块上卡座钢板上均开设螺栓孔,通过紧固螺栓将所述两块上卡座钢板夹紧、固定; The prefabricated upper deck is composed of two upper deck steel plates with three semicircular grooves. The diameter of the middle hole formed after the assembly is slightly larger than the diameter of the stay cable and smaller than the diameter of the anchor head of the stay cable body. The diameters of the two round holes are slightly larger than the diameters of the two steel strands; bolt holes are provided on the two upper deck steel plates, and the two upper deck steel plates are clamped and fixed by fastening bolts;

所述预制下卡座和预制上卡座上分别设有用于所述两根钢绞线穿过的圆孔,所述两根钢绞线分别穿过预制下卡座及预制上卡座的圆孔,与穿心式荷载传感器及两台前卡式油压千斤顶相连;穿心式荷载传感器安装在预制上卡座和两台前卡式油压千斤顶之间,传感器数据采集系统与穿心式荷载传感器连接,油压表与前卡式油压千斤顶连接。 The prefabricated lower deck and the prefabricated upper deck are respectively provided with round holes for the passage of the two steel strands, and the two steel strands pass through the circles of the prefabricated lower deck and the prefabricated upper deck respectively. The hole is connected with the through-type load sensor and two front clamping hydraulic jacks; the through-type load sensor is installed between the prefabricated upper deck and the two front clamping hydraulic jacks, and the sensor data acquisition system is connected with the through-type hydraulic jack. The load sensor is connected, and the oil pressure gauge is connected with the front snap-in hydraulic jack.

所述一种单、双耳套筒单、双向调节斜拉索的张拉装置,所述每片下卡座钢板的外侧设有纵向加劲肋和横向带孔肋板。 The tensioning device for single and double-direction adjustable stay cables with single and double lug sleeves, each of the lower deck steel plates is provided with longitudinal stiffeners and transverse perforated ribs on the outer side.

所述一种单、双耳套筒单、双向调节斜拉索的张拉装置及施工方法,包括以下几个步骤: The tensioning device and construction method of the single- and double-ear sleeve single- and two-way adjustable stay cables include the following steps:

第一步、预制下卡座安装:将预制下卡座的两钢板安放在斜拉索端部,半圆形扣耳扣住斜拉索索头吊耳,并用紧固螺栓将两片预制下卡座尾部夹紧;  The first step, the installation of the prefabricated lower card seat: place the two steel plates of the prefabricated lower card seat on the end of the stay cable, buckle the semicircular buckle ear to the lifting ear of the cable head, and use the fastening bolts to fasten the two prefabricated lower cards The tail of the seat is clamped;

第二步、预制上卡座安装:将两块所述上卡座钢板的中间凹槽正对斜拉索安放,并拧紧螺栓,使得两块上卡座钢板正好卡在斜拉索索体锚头上;  The second step, prefabricated upper deck installation: place the middle groove of the two upper deck steel plates facing the stay cable, and tighten the bolts so that the two upper deck steel plates are just stuck on the anchor head of the stay cable body superior;

第三步、千斤顶安装:将两根端部带有挤压锚头的钢绞线分别穿过预制下卡座及预制上卡座的左右预留圆孔,与穿心式荷载传感器及两台前卡式油压千斤顶相连; The third step, jack installation: pass the two steel strands with extruded anchor heads at the ends respectively through the left and right reserved round holes of the prefabricated lower deck and the prefabricated upper deck, and connect with the through-core load sensor and two The front card type hydraulic jack is connected;

第四步、钢绞线张拉:钢绞线,此时力的向下传递路径是:千斤顶→钢绞线→预制下卡座→销栓→梁体吊耳;力的向上传递路径是:千斤顶→上卡座→斜拉索; The fourth step, steel strand tensioning: steel strand, the downward transmission path of force at this time is: jack → steel strand → prefabricated lower bracket → pin bolt → beam body lifting lug; the upward transmission path of force is: Jack→upper deck→stay cable;

第五步:斜拉索张拉:钢绞线一旦张拉受力以后,斜拉索的索体正反比套筒受力减小,迅速拧紧斜拉索上的索体正反丝套筒,使钢绞线所承担的力减小; Step 5: Cable tensioning: Once the steel strand is tensioned, the positive and negative force of the cable body of the cable-stayed cable is reduced compared with the sleeve, and the positive and negative wire sleeve of the cable body on the cable-stayed cable is quickly tightened. , so that the force borne by the steel strand is reduced;

第六步:重复第四步、第五步,如此循环,不断往复。 Step 6: Repeat steps 4 and 5, and so on, and keep going back and forth.

所述穿心式荷载传感器布置在两台所述前卡式油压千斤顶和预制上卡座之间。 The through-hole load sensor is arranged between the two front clamping hydraulic jacks and the prefabricated upper clamping seat.

所述前卡式油压千斤顶布置在斜拉索两侧,对称进行张拉,张拉力采用穿心式荷载传感器、油压表进行力的双控,使斜拉索的索力既不超张拉,也不欠张拉。 The front snap-in hydraulic jacks are arranged on both sides of the stay cable, and the tension is carried out symmetrically. The tension force is double-controlled by a through-hole load sensor and an oil pressure gauge, so that the cable force of the stay cable is neither overstretched. La, also does not owe Zhang La.

综上,本发明提供的一种单、双耳套筒单、双向调节斜拉索的张拉装置及施工方法具有以下的优点: To sum up, the tensioning device and construction method of a single- and double-ear sleeve single- and two-way adjustable stay cables provided by the present invention have the following advantages:

第一、装置简单实用,制作成本低,安装和拆卸操作方便,可提高张拉效率; First, the device is simple and practical, the production cost is low, the installation and disassembly are convenient, and the tensioning efficiency can be improved;

第二、各零部件设计精巧,自重轻,搬运安装都比较方便,节省了人力,仅需几名工人就能完成张拉工作; Second, the design of each part is exquisite, the weight is light, and the handling and installation are more convenient, which saves manpower, and only a few workers can complete the tensioning work;

第三、采用两台前卡式油压千斤顶对称进行张拉,装置受力均匀,不产生偏心作用; Third, two sets of front clamp hydraulic jacks are used for symmetrical tensioning, and the device is evenly stressed without eccentricity;

第四、通过千斤顶油压表读数和穿心式荷载传感器对千斤顶张拉力进行力的双控,使张拉力控制更为准确; Fourth, the double control of the tension force of the jack is carried out through the reading of the jack oil pressure gauge and the through-hole load sensor, so that the tension control is more accurate;

第五、预制下卡座固定在拉索的吊耳处,张拉过程仅对拉索的端部施力,梁体无须预留反力装置,保证了张拉时反力作用点与斜拉索在一条直线上,使斜拉索的张拉能够顺利实现。 Fifth, the prefabricated lower bracket is fixed at the lifting lug of the cable. During the tensioning process, only the end of the cable is exerted force, and the beam body does not need to reserve a reaction device, which ensures that the reaction point and the cable-stayed force during tensioning are consistent with each other. The cables are in a straight line, so that the tensioning of the stay cables can be realized smoothly.

附图说明 Description of drawings

图1是本发明斜拉索张拉装置图; Fig. 1 is the diagram of the stay cable tensioning device of the present invention;

图2是预制下卡座主视图; Fig. 2 is the front view of the prefabricated lower deck;

图3是预制下卡座侧视图; Fig. 3 is a side view of the prefabricated lower deck;

图4是预制下卡座俯视图; Figure 4 is a top view of the prefabricated lower deck;

图5是图1的A-A剖面图; Fig. 5 is the A-A sectional view of Fig. 1;

图6是图1的B-B剖面图; Fig. 6 is the B-B sectional view of Fig. 1;

其中,1、预制下卡座;2、紧固螺栓;3、钢绞线;4、预制上卡座;5、前卡式油压千斤顶;6、穿心式荷载传感器;7、耳板;8、销栓;9、索头吊耳;10、索体正反丝套筒;11、索体锚头;12、斜拉索;13、半圆形钢扣耳;14、纵向加劲肋;15、横向带孔肋板;16、半圆形凹槽;17、传感器数据采集系统;18、油压表;19、螺栓孔。 Among them, 1. Prefabricated lower deck; 2. Fastening bolts; 3. Steel strand; 4. Prefabricated upper deck; 5. Front clamping hydraulic jack; 6. Through-core load sensor; 7. Ear plate; 8. Pin bolt; 9. Cable head lifting lug; 10. Cable body positive and negative wire sleeve; 11. Cable body anchor head; 12. Stay cable; 13. Semicircular steel buckle ear; 14. Longitudinal stiffener; 15. Horizontal ribs with holes; 16. Semicircular groove; 17. Sensor data acquisition system; 18. Oil pressure gauge; 19. Bolt holes.

具体实施方式 Detailed ways

以下结合图示,对本发明装置及施工方法作进一步说明。 The device and construction method of the present invention will be further described below in conjunction with the drawings.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。 In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and Simplified descriptions, rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and thus should not be construed as limiting the invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接 ;可以是机械连接,也可以是电连接 ;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。 In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

一种单、双耳套筒单、双向调节斜拉索的张拉装置,如图1所示,包括:预制下卡座1、两根钢绞线3、预制上卡座4、索体正反丝套筒10、前卡式油压千斤顶5、穿心式荷载传感器6、传感器数据采集系统17及油压表18; A tensioning device for a single- and two-way adjustable stay cable with a single- and double-ear sleeve, as shown in Figure 1, comprising: a prefabricated lower deck 1, two steel strands 3, a prefabricated upper deck 4, a cable body positive Anti-wire sleeve 10, front clamping hydraulic jack 5, through-hole load sensor 6, sensor data acquisition system 17 and hydraulic gauge 18;

如图2、图3、图4及图5所示,其中:所述预制下卡座1包括左、右对称的两片下卡座钢板,每片下卡座钢板的内侧焊有半圆形钢扣耳13,所述半圆形钢扣耳13扣住斜拉索12的索头吊耳9,并将力依次传递给销栓8和耳板7;两片下卡座钢板上分别开设螺栓孔并通过紧固螺栓2将两片下卡座钢板夹紧; As shown in Fig. 2, Fig. 3, Fig. 4 and Fig. 5, wherein: the prefabricated lower deck 1 comprises two lower deck steel plates with left and right symmetry, and the inner side of each lower deck steel plate is welded with a semicircular Steel buckle ear 13, the semicircular steel buckle ear 13 fastens the cable head lug 9 of the stay cable 12, and transmits the force to the pin bolt 8 and the ear plate 7 in sequence; Bolt holes and the two lower deck steel plates are clamped by fastening bolts 2;

如图6所示,所述预制上卡座4由两块带三个半圆凹槽的上卡座钢板拼成,拼成后形成的中间圆孔直径略大于斜拉索12直径且小于斜拉索索体锚头11直径,边上两个圆孔的直径略大于两根所述钢绞线3直径;两块上卡座钢板上均开设螺栓孔,通过紧固螺栓2将所述两块上卡座钢板夹紧、固定; As shown in Figure 6, the prefabricated upper deck 4 is assembled by two upper deck steel plates with three semicircular grooves, and the diameter of the middle hole formed after the assembly is slightly larger than the diameter of the stay cable 12 and smaller than that of the stay cable 12. The diameter of the anchor head 11 of the cable body, the diameter of the two round holes on the side is slightly larger than the diameter of the two steel strands 3; bolt holes are provided on the two upper deck steel plates, and the two upper plates are fastened by fastening bolts 2. Clamping and fixing of deck steel plates;

所述预制下卡座1和预制上卡座4上分别设有用于所述两根钢绞线3穿过的圆孔,所述两根钢绞线3分别穿过预制下卡座1及预制上卡座4的圆孔,与穿心式荷载传感器6及两台前卡式油压千斤顶5相连;穿心式荷载传感器6安装在预制上卡座4和两台前卡式油压千斤顶5之间,传感器数据采集系统17与穿心式荷载传感器6连接,油压表18与前卡式油压千斤顶5连接。 The prefabricated lower deck 1 and the prefabricated upper deck 4 are respectively provided with circular holes for the passage of the two steel strands 3, and the two steel strands 3 pass through the prefabricated lower deck 1 and the prefabricated The round hole of the upper deck 4 is connected with the through-type load sensor 6 and the two front clamping hydraulic jacks 5; the through-type load sensor 6 is installed on the prefabricated upper deck 4 and the two front clamping hydraulic jacks 5 Between them, the sensor data acquisition system 17 is connected to the through-hole load sensor 6, and the oil pressure gauge 18 is connected to the front clamping hydraulic jack 5.

所述一种单、双耳套筒单、双向调节斜拉索的张拉装置,所述每片下卡座钢板的外侧设有纵向加劲肋14和横向带孔肋板15。 The tensioning device for the single- and double-eared sleeve single- and bi-directionally adjustable stay cables, the outer side of each lower deck steel plate is provided with a longitudinal stiffener 14 and a transverse perforated rib 15 .

一种利用本发明所述一种单、双套筒单、双向调节斜拉索的张拉装置的施工方法,包括以下几个步骤: A kind of construction method utilizing the tensioning device of a kind of single-, double-sleeve single-, two-way adjustable stay cable of the present invention, comprises the following several steps:

第一步、预制下卡座安装:将预制下卡座的两钢板安放在斜拉索12端部,半圆形扣耳13扣住斜拉索索头吊耳9,并用紧固螺栓2将两片预制下卡座(1)尾部夹紧;  The first step, the installation of the prefabricated lower deck: place the two steel plates of the prefabricated lower deck on the end of the stay cable 12, the semicircular buckle ear 13 buckles the hanger 9 of the cable head of the stay cable, and fasten the two steel plates with the fastening bolt 2 The end of the prefabricated lower deck (1) is clamped;

第二步、预制上卡座安装:将两块所述上卡座钢板的中间凹槽正对斜拉索12安放,并拧紧螺栓,使得两块上卡座钢板正好卡在斜拉索索体锚头11上;  The second step, prefabricated upper deck installation: place the middle grooves of the two upper deck steel plates facing the stay cable 12, and tighten the bolts so that the two upper deck steel plates are just stuck in the anchor of the stay cable head 11;

第三步、千斤顶安装:将两根端部带有挤压锚头的钢绞线3分别穿过预制下卡座1及预制上卡座4的左右预留圆孔,与穿心式荷载传感器及两台前卡式油压千斤顶相连; The third step, jack installation: pass the two steel strands 3 with extruded anchor heads at the ends respectively through the left and right reserved round holes of the prefabricated lower deck 1 and the prefabricated upper deck 4, and connect with the through-core load sensor And two front card type hydraulic jacks are connected;

第四步、钢绞线张拉:钢绞线3,此时力的向下传递路径是:千斤顶→钢绞线3→预制下卡座1→销栓8→梁体吊耳7;力的向上传递路径是:千斤顶→上卡座4→斜拉索12。 The fourth step, steel strand tensioning: steel strand 3, the downward transmission path of the force at this time is: jack→steel strand 3→prefabricated lower deck 1→pin bolt 8→beam lifting lug 7; The upward transmission path is: jack→upper deck 4→stay cable 12.

第五步:斜拉索张拉:钢绞线3一旦张拉受力以后,斜拉索的索体正反比套筒受力减小,迅速拧紧斜拉索12上的索体正反丝套筒10,使钢绞线3所承担的力减小。 Step 5: cable tensioning: once the steel strand 3 is tensioned, the positive and negative force of the cable body of the cable stay is smaller than that of the sleeve, and the positive and negative wires of the cable body on the cable stay 12 are quickly tightened. The sleeve 10 reduces the force borne by the steel strand 3 .

第六步:重复第四步、第五步,如此循环,不断往复; Step 6: Repeat step 4 and step 5, so that the cycle continues;

综上,所述的一种单、双耳套筒单、双向调节斜拉索的张拉装置制作简单,施工方法方便可行,具有较强的实用和推广价值。 To sum up, the tensioning device of the single- and double-ear sleeve single- and two-way adjustable stay cables described above is simple to manufacture, the construction method is convenient and feasible, and has strong practical and popularization value.

Claims (5)

1.一种单、双耳套筒单、双向调节斜拉索的张拉装置,其特征在于,包括:预制下卡座(1)、两根钢绞线(3)、预制上卡座(4)、索体正反丝套筒(10)、前卡式油压千斤顶(5)、穿心式荷载传感器(6)、传感器数据采集系统(17)及油压表(18);其中:所述预制下卡座(1)包括左、右对称的两片下卡座钢板,每片下卡座钢板的内侧焊有半圆形钢扣耳(13),所述半圆形钢扣耳(13)扣住斜拉索(12)的索头吊耳(9),并将力依次传递给销栓(8)和耳板(7);两片下卡座钢板上分别开设螺栓孔并通过紧固螺栓(2)将两片下卡座钢板夹紧; 1. A single- and double-eared sleeve single- and two-way adjustable cable tensioning device, characterized in that it includes: a prefabricated lower deck (1), two steel strands (3), a prefabricated upper deck ( 4), positive and negative cable sleeves (10), front clamping hydraulic jacks (5), through-hole load sensors (6), sensor data acquisition systems (17) and hydraulic gauges (18); among them: The prefabricated lower deck (1) includes two symmetrical lower deck steel plates, the inner side of each lower deck steel plate is welded with a semicircular steel buckle ear (13), the semicircular steel buckle ear (13) Buckle the cable head lug (9) of the stay cable (12), and transmit the force to the pin (8) and ear plate (7) in sequence; respectively set bolt holes on the two lower deck steel plates and Clamp the two lower deck steel plates through the fastening bolts (2); 所述预制上卡座(4)由两块带三个半圆凹槽的上卡座钢板拼成,拼成后形成三个圆心在同一直线上的圆孔,中间圆孔直径略大于斜拉索(12)直径且小于斜拉索索体锚头(11)直径,边上两个圆孔的直径略大于两根所述钢绞线(3)直径;两块上卡座钢板上均开设螺栓孔,通过紧固螺栓(2)将所述两块上卡座钢板夹紧、固定; The prefabricated upper deck (4) is composed of two upper deck steel plates with three semi-circular grooves. After being assembled, three round holes with centers on the same line are formed. The diameter of the middle round hole is slightly larger than that of the stay cable. (12) The diameter is smaller than the diameter of the anchor head (11) of the stay cable body, and the diameter of the two round holes on the side is slightly larger than the diameter of the two steel strands (3); Bolt holes are provided on the two upper deck steel plates , the two upper deck steel plates are clamped and fixed by fastening bolts (2); 所述预制下卡座(1)和预制上卡座(4)上分别设有供所述两根钢绞线(3)穿过的圆孔,所述两根钢绞线(3)分别穿过预制下卡座(1)及预制上卡座(4)的圆孔,与穿心式荷载传感器(6)及两台前卡式油压千斤顶(5)相连;穿心式荷载传感器(6)安装在预制上卡座(4)和两台前卡式油压千斤顶(5)之间,传感器数据采集系统(17)与穿心式荷载传感器(6)连接,油压表(18)与前卡式油压千斤顶(5)连接。 The prefabricated lower deck (1) and the prefabricated upper deck (4) are respectively provided with round holes for the two steel strands (3) to pass through, and the two steel strands (3) are respectively threaded Through the round holes of the prefabricated lower deck (1) and the prefabricated upper deck (4), it is connected with the through-hole load sensor (6) and two front clamping hydraulic jacks (5); the through-hole load sensor (6) ) is installed between the prefabricated upper deck (4) and two front deck hydraulic jacks (5), the sensor data acquisition system (17) is connected with the through-hole load sensor (6), the oil pressure gauge (18) is connected with The front card type hydraulic jack (5) is connected. 2.根据权利要求1所述一种单、双耳套筒单、双向调节斜拉索的张拉装置,其特征在于,所述每片下卡座钢板的外侧设有纵向加劲肋(14)和横向带孔肋板(15)。 2. According to claim 1, a single- and double-ear sleeve single- and two-way adjustable cable tensioning device is characterized in that, the outer side of each lower deck steel plate is provided with longitudinal stiffeners (14) And transverse perforated ribs (15). 3.如权利要求1所述一种单、双套筒单、双向调节斜拉索的张拉装置的施工方法,其特征在于:包括以下几个步骤: 3. the construction method of the tensioning device of a kind of single, double sleeve single, two-way adjustment stay cable as claimed in claim 1, it is characterized in that: comprise the following steps: 第一步、预制下卡座安装:将预制下卡座的两钢板安放在斜拉索(12)端部,半圆形扣耳(13)扣住斜拉索索头吊耳(9),并用紧固螺栓(2)将两片预制下卡座(1)尾部夹紧;  Step 1. Installation of the prefabricated lower deck: place the two steel plates of the prefabricated lower deck on the end of the stay cable (12), buckle the semicircular buckle ear (13) on the hanger (9) of the cable head of the stay cable, and use the Tighten the bolts (2) to clamp the tails of the two prefabricated lower decks (1); 第二步、预制上卡座安装:将两块所述上卡座钢板的中间凹槽正对斜拉索(12)安放,并拧紧螺栓,使得两块上卡座钢板正好卡在斜拉索索体锚头(11)上;  The second step, prefabricated upper deck installation: place the middle grooves of the two upper deck steel plates facing the stay cables (12), and tighten the bolts so that the two upper deck steel plates are just stuck on the stay cables body anchor head (11); 第三步、千斤顶安装:将两根端部带有挤压锚头的钢绞线(3)分别穿过预制下卡座(1)及预制上卡座(4)的左右预留圆孔,与穿心式荷载传感器及两台前卡式油压千斤顶相连; The third step, jack installation: pass the two steel strands (3) with extruded anchor heads at the ends respectively through the left and right reserved round holes of the prefabricated lower deck (1) and the prefabricated upper deck (4), It is connected with the through-hole load cell and two front clamp hydraulic jacks; 第四步、钢绞线张拉:钢绞线(3),此时力的向下传递路径是:千斤顶→钢绞线(3)→预制下卡座(1)→销栓(8)→梁体吊耳(7);力的向上传递路径是:千斤顶→上卡座(4)→斜拉索(12); The fourth step, steel strand tension: steel strand (3), the downward transmission path of the force at this time is: jack → steel strand (3) → prefabricated lower deck (1) → pin (8) → Beam lug (7); the upward transmission path of force is: jack → upper deck (4) → stay cable (12); 第五步:斜拉索张拉:钢绞线(3)一旦张拉受力以后,斜拉索的索体正反比套筒受力减小,迅速拧紧斜拉索(12)上的索体正反丝套筒(10),使钢绞线(3)所承担的力减小; Step 5: Cable tensioning: Once the steel strand (3) is tensioned, the tension on the cable body of the cable body decreases in positive and negative ratio compared to the sleeve, and the cable on the cable (12) is quickly tightened. body positive and negative wire sleeve (10), so that the force borne by the steel strand (3) is reduced; 第六步:重复第四步、第五步,如此循环,不断往复。 Step 6: Repeat steps 4 and 5, and so on, and keep going back and forth. 4.根据权利要求3所述一种单、双套筒单、双向调节斜拉索的张拉装置的施工方法,其特征在于:所述穿心式荷载传感器(6)布置在两台所述前卡式油压千斤顶(5)和预制上卡座(4)之间。 4. According to claim 3, a construction method for tensioning devices with single and double sleeves and single and two-way adjustable stay cables, characterized in that: the through-core load sensor (6) is arranged in two said Between the front clamping hydraulic jack (5) and the prefabricated upper clamping seat (4). 5.根据权利要求4所述一种单、双套筒单、双向调节斜拉索的张拉装置的施工方法,其特征在于:所述前卡式油压千斤顶(5)布置在斜拉索(12)两侧,对称进行张拉,张拉力采用穿心式荷载传感器(6)、油压表(18)进行力的双控,使斜拉索的索力既不超张拉,也不欠张拉。 5. According to claim 4, the construction method of a single-, double-sleeve, single-, two-way adjustable cable-stayed tensioning device is characterized in that: the front clamping hydraulic jack (5) is arranged on the cable-stayed (12) Both sides are tensioned symmetrically, and the tension force is double-controlled by a through-hole load sensor (6) and an oil pressure gauge (18), so that the cable force of the cable stay is neither overstretched nor Under tension.
CN201410636757.XA 2014-11-12 2014-11-12 The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder Expired - Fee Related CN104452595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410636757.XA CN104452595B (en) 2014-11-12 2014-11-12 The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410636757.XA CN104452595B (en) 2014-11-12 2014-11-12 The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder

Publications (2)

Publication Number Publication Date
CN104452595A true CN104452595A (en) 2015-03-25
CN104452595B CN104452595B (en) 2016-05-25

Family

ID=52899296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410636757.XA Expired - Fee Related CN104452595B (en) 2014-11-12 2014-11-12 The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder

Country Status (1)

Country Link
CN (1) CN104452595B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284073A (en) * 2016-08-25 2017-01-04 中铁大桥局集团有限公司 A kind of suspension cable beam-ends hanging cable equipment
CN106939556A (en) * 2017-05-05 2017-07-11 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment
CN108867868A (en) * 2018-08-13 2018-11-23 青岛华斯壮能源科技有限公司 Steel strand prestress flexible draw bar connection structure
CN109775628A (en) * 2019-01-29 2019-05-21 北京城建集团有限责任公司 A kind of double rope lifting devices and its construction method
CN111089715A (en) * 2020-01-10 2020-05-01 河海大学 Bridge inhaul cable force detection device and detection method
CN111175068A (en) * 2020-02-24 2020-05-19 长沙理工大学 A device and method for typical damage simulation of cable-stayed bridges
CN112065061A (en) * 2020-08-26 2020-12-11 中冶建筑研究总院有限公司 Prestress intelligent regulation and control device and cable force regulation and control method thereof
CN115506598A (en) * 2022-10-31 2022-12-23 中冶(上海)钢结构科技有限公司 Computer-controlled multi-beam chord beam synchronous tensioning method
CN117052834A (en) * 2023-09-01 2023-11-14 海南大学 An intelligent suspension connection component with stress sensing and compression deformation functions
CN121407728A (en) * 2025-11-18 2026-01-27 中建八局第三建设有限公司 A tensioning device for monitoring the stress of carbon fiber cables

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1215347A2 (en) * 2000-12-13 2002-06-19 Walter Bau-Aktiengesellschaft Method for installing and tensioning a free tendon, and anchoring device for carrying out the method
JP2007315035A (en) * 2006-05-25 2007-12-06 Se Corp Cable laying method
CN200992685Y (en) * 2006-12-31 2007-12-19 巨力集团有限公司 Sleeve-regulating hot-cast anchor cable
CN201183930Y (en) * 2008-04-28 2009-01-21 张国志 Cable length regulating apparatus
CN101831871A (en) * 2010-03-16 2010-09-15 中交二航局第二工程有限公司 Adjustable wind cable and installing method thereof
CN203782575U (en) * 2014-01-20 2014-08-20 中交一公局厦门工程有限公司 Stay cable hanging and tension construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1215347A2 (en) * 2000-12-13 2002-06-19 Walter Bau-Aktiengesellschaft Method for installing and tensioning a free tendon, and anchoring device for carrying out the method
JP2007315035A (en) * 2006-05-25 2007-12-06 Se Corp Cable laying method
CN200992685Y (en) * 2006-12-31 2007-12-19 巨力集团有限公司 Sleeve-regulating hot-cast anchor cable
CN201183930Y (en) * 2008-04-28 2009-01-21 张国志 Cable length regulating apparatus
CN101831871A (en) * 2010-03-16 2010-09-15 中交二航局第二工程有限公司 Adjustable wind cable and installing method thereof
CN203782575U (en) * 2014-01-20 2014-08-20 中交一公局厦门工程有限公司 Stay cable hanging and tension construction device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284073A (en) * 2016-08-25 2017-01-04 中铁大桥局集团有限公司 A kind of suspension cable beam-ends hanging cable equipment
CN106939556A (en) * 2017-05-05 2017-07-11 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment
CN106939556B (en) * 2017-05-05 2019-01-18 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment
CN108867868A (en) * 2018-08-13 2018-11-23 青岛华斯壮能源科技有限公司 Steel strand prestress flexible draw bar connection structure
CN109775628B (en) * 2019-01-29 2024-04-30 北京城建集团有限责任公司 Double-cable lifting device and construction method thereof
CN109775628A (en) * 2019-01-29 2019-05-21 北京城建集团有限责任公司 A kind of double rope lifting devices and its construction method
CN111089715A (en) * 2020-01-10 2020-05-01 河海大学 Bridge inhaul cable force detection device and detection method
CN111175068A (en) * 2020-02-24 2020-05-19 长沙理工大学 A device and method for typical damage simulation of cable-stayed bridges
CN112065061B (en) * 2020-08-26 2021-06-04 中冶建筑研究总院有限公司 Prestress intelligent regulation and control device and cable force regulation and control method thereof
CN112065061A (en) * 2020-08-26 2020-12-11 中冶建筑研究总院有限公司 Prestress intelligent regulation and control device and cable force regulation and control method thereof
CN115506598A (en) * 2022-10-31 2022-12-23 中冶(上海)钢结构科技有限公司 Computer-controlled multi-beam chord beam synchronous tensioning method
CN117052834A (en) * 2023-09-01 2023-11-14 海南大学 An intelligent suspension connection component with stress sensing and compression deformation functions
CN121407728A (en) * 2025-11-18 2026-01-27 中建八局第三建设有限公司 A tensioning device for monitoring the stress of carbon fiber cables

Also Published As

Publication number Publication date
CN104452595B (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN104452595B (en) The construction method of the single, double tensioning equipment to adjusting suspension cable of single, double ear muff cylinder
CN101831871B (en) Adjustable wind cable and installing method thereof
CN114941288B (en) Construction method for suspension bridge loose cable sleeve
CN104847122B (en) Device assembly for tensioning fork ear type stay rope or steel pull rod and tensioning construction method of device assembly
CN101265727A (en) Prestressed Steel Structure Rolling Tension Cable Nodes
CN106758767A (en) A kind of suspension bridge segmented cat road and its construction method
CN112376916A (en) Prestressed steel cable tensioning and tightening device and construction method
CN116497701A (en) Connected anti-slip structure and installation method suitable for cable clamps of suspension bridges
CN111924720A (en) Wind cable anchoring system of cable crane tower and construction method
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN103526688A (en) Pipe bridge hanging system
CN111719407B (en) Stay cable and concrete bridge tower anchoring structure of pre-buried steel plate
CN202215040U (en) Telescopic adjustable temporary wire drawing device for transmission line pole/tower
CN201679149U (en) A device for tensioning the middle connection of steel strands
CN202347525U (en) Prestress bow-shaped steel circuit purlin
CN116599428A (en) Photovoltaic Cable Structure Adaptive Tensioning Device and Photovoltaic Flexible Support System
CN209760863U (en) An externally prestressed steel strand connector and supporting tensioning device
CN216891997U (en) Traction offset system of large-span bridge beam section
CN210395101U (en) Stay cable steering device
CN116463967A (en) A method for removing tension in the middle of a steel strand stay cable
CN204475874U (en) A kind of novel pre-stressed steel strand draw-gear
CN211947975U (en) A kind of cable-stayed beam end winch fast traction equipment
CN211312198U (en) Stay cable anchoring traction device of large-span cable-stayed bridge
CN101392599B (en) Cable Tensioning Diagonal Force Transmitting Beam
CN207330173U (en) A kind of cable crane tower frame self-balance system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20181112