CN104407604A - D5000调试中规约测试装置及方法 - Google Patents
D5000调试中规约测试装置及方法 Download PDFInfo
- Publication number
- CN104407604A CN104407604A CN201410674075.8A CN201410674075A CN104407604A CN 104407604 A CN104407604 A CN 104407604A CN 201410674075 A CN201410674075 A CN 201410674075A CN 104407604 A CN104407604 A CN 104407604A
- Authority
- CN
- China
- Prior art keywords
- debugging
- substation
- supervising device
- sub
- protocol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/18—Protocol analysers
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Selective Calling Equipment (AREA)
Abstract
本发明公开了一种D5000调试中规约测试装置及方法,包括控制器、输出设备、输入设备、子站监控装置,所述控制器与输出设备、输入设备连接,所述控制器通过网络接口与子站监控装置连接,所述控制器与外围电路、存储器连接,所述输出设备包括显示器和扩音器,助先进的计算机、通讯、软件技术,模拟主站,按照设定的规约与被测子站进行通信,实现104规约跨路由提前预知规约调试、发现信息核对工作中可能会遇到的问题,并提前处理,实现在通道不具备的情况下提前进行远动调试的功能。
Description
技术领域:
本发明涉及一种规约测试设备,特别是涉及一种D5000调试中规约测试装置及方法。
背景技术:
今年来新建变电站数量逐年增加,由于工期、人员等条件的限制,造成了一个变电站内多家调试单位同时施工的现象,如果远动与调度端的信息核对工作还按原有的阶梯型作业流程已不能再适合现场的需求。
实际新建变电站需要一次、二次设备都安装完毕后,远动、通讯、自动化等专业才能进入施工现场进行相关的调试工作,按原有的工作流程只有通讯专业调试完成,变电站段与调度端信息通道建立后,远动专业才能和调度端进行规约调试、信息核对等工作,但施工进度只能满足一家专业的调试时间,如果远动与调度端的信息核对工作还按原有的阶梯型作业流程已不能再适合现场的需求,这样就造成了新建变电站无法按时投运的结果,因此需要找到一种新的方法来满足远动调试的工作。
发明内容:
本发明所要解决的技术问题是:克服现有技术的不足,提供一种计算机、通讯、软件技术,实现104规约跨路由提前预知规约调试、发现信息核对工作中可能会遇到的问题,并实现提前处理,具有在通道不具备的情况下提前进行远动调试功能的D5000调试中规约测试装置及方法。
本发明的技术方案是:一种D5000调试中规约测试装置,包括控制器、输出设备、输入设备、子站监控装置,所述控制器与输出设备、输入设备连接,所述控制器通过网络接口与子站监控装置连接,所述控制器与外围电路、存储器连接,所述输出设备包括显示器和扩音器。
所述网络接口为至少两个,所述输入设备包括键盘、鼠标、语音输入设备、摄像机。所述外围电路包括算术逻辑单元电路、触发器单元电路、寄存器单元电路、总线结构模块。
所述子站监控装置与灯光智能控制子监控装置、门禁子监控装置、环境监测子监控装置、视频监控子监控装置、智能接口设备监控子监控装置、消防子监控装置、工作状态检测子监控装置、仪器仪表监控子监控装置连接。
一种D5000调试中规约测试方法,控制器内的模拟104规约调试软件对主站系统进行模拟,并通过网络接口与子站监控系统连接,模拟104规约调试软件对主站网络地址进行设置,且与子站网络地址在同一网段内,按照设定的规约与被测子站进行通信,
通过对主站远动参数的配置进行修改,保证主站网络地址和子站网络地址在同一网段内,并设置模拟主站相应的波特率及RTU站址实现数字通道调试。
通过输入设备对多种规约的参数进行设置,实现:模拟产生遥控和遥调操作:可人工发送自定义的命令报文并对报文进行跟踪分析;历史数据记录:对接收到的子站实时数据进行间隔为2S的历史数据记录并可绘制遥测量的历史数据曲线;通信内容的监视与记录:可以对子站的遥信、遥测响应时间、遥测精度、遥控响应时间和SOE准确度等进行测试,并可为子站的调试提供便利条件;规约分析功能:能够对多种规约的参数进行灵活设置并进行报文分析。
本发明的有益效果是:
1、本发明借助先进的计算机、通讯、软件技术,模拟主站,按照设定的规约与被测子站进行通信,实现104规约跨路由提前预知规约调试、发现信息核对工作中可能会遇到的问题,并提前处理,实现在通道不具备的情况下提前进行远动调试的功能。
2、本发明实时数据接收及命令下发,模拟产生遥控和遥调操作、历史数据记录,可以对子站的遥信、遥测响应时间、遥测精度、遥控响应时间和SOE准确度等进行测试,并可为子站的调试提供便利条件,同时能够对多种规约的参数进行灵活设置并进行报文分析。
3、本发明对改造后的子站系统进行了确认测试和性能指标测试,既避免了调试过程中对主站系统的影响,也确保了远动信息准确无误地接入主站系统。
4、本发明在日常维护工作中可以利用报文监控功能进行远动通道的故障诊断及规约错误分析,提高工作效率,为有利于大量运行远动信息顺利接入地调D5000系统。
附图说明:
图1为D5000调试中规约测试装置连接框图。
具体实施方式:
实施例:参见图1。
D5000调试中规约测试装置,包括控制器、输出设备、输入设备、子站监控装置,控制器与输出设备、输入设备连接,控制器通过网络接口与子站监控装置连接,控制器与外围电路、存储器连接,输出设备包括显示器和扩音器。
网络接口为至少两个,所述输入设备包括键盘、鼠标、语音输入设备、摄像机。外围电路包括算术逻辑单元电路、触发器单元电路、寄存器单元电路、总线结构模块。
子站监控装置与灯光智能控制子监控装置、门禁子监控装置、环境监测子监控装置、视频监控子监控装置、智能接口设备监控子监控装置、消防子监控装置、工作状态检测子监控装置、仪器仪表监控子监控装置连接。
D5000调试中规约测试方法,控制器内的模拟104规约调试软件对主站系统进行模拟,并通过网络接口与子站监控系统连接,模拟104规约调试软件对主站网络地址进行设置,且与子站网络地址在同一网段内,按照设定的规约与被测子站进行通信,
通过对主站远动参数的配置进行修改,保证主站网络地址和子站网络地址在同一网段内,并设置模拟主站相应的波特率及RTU站址实现数字通道调试。
通过输入设备对多种规约的参数进行设置,实现:模拟产生遥控和遥调操作:可人工发送自定义的命令报文并对报文进行跟踪分析;历史数据记录:对接收到的子站实时数据进行间隔为2S的历史数据记录并可绘制遥测量的历史数据曲线;通信内容的监视与记录:可以对子站的遥信、遥测响应时间、遥测精度、遥控响应时间和SOE准确度等进行测试,并可为子站的调试提供便利条件;规约分析功能:能够对多种规约的参数进行灵活设置并进行报文分析。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (7)
1.一种D5000调试中规约测试装置,包括控制器、输出设备、输入设备、子站监控装置,其特征是:所述控制器与输出设备、输入设备连接,所述控制器通过网络接口与子站监控装置连接,所述控制器与外围电路、存储器连接,所述输出设备包括显示器和扩音器。
2.根据权利要求1所述的D5000调试中规约测试装置,其特征是:所述网络接口为至少两个,所述输入设备包括键盘、鼠标、语音输入设备、摄像机。
3.根据权利要求1所述的D5000调试中规约测试装置,其特征是:所述子站监控装置与灯光智能控制子监控装置、门禁子监控装置、环境监测子监控装置、视频监控子监控装置、智能接口设备监控子监控装置、消防子监控装置、工作状态检测子监控装置、仪器仪表监控子监控装置连接。
4.根据权利要求1所述的D5000调试中规约测试装置,其特征是:所述外围电路包括算术逻辑单元电路、触发器单元电路、寄存器单元电路、总线结构模块。
5.一种D5000调试中规约测试方法,其特征是:利用控制器内的模拟104规约调试软件对主站系统进行模拟,并通过网络接口与子站监控系统连接,模拟104规约调试软件对主站网络地址进行设置,且与子站网络地址在同一网段内,按照设定的规约与被测子站进行通信。
6.根据权利要求5所述的D5000调试中规约测试方法,其特征是:通过对主站远动参数的配置进行修改,保证主站网络地址和子站网络地址在同一网段内,并设置模拟主站相应的波特率及RTU站址实现数字通道调试。
7.根据权利要求5述的D5000调试中规约测试方法,其特征是:通过输入设备对多种规约的参数进行设置,实现:模拟产生遥控和遥调操作:人工发送自定义的命令报文并对报文进行跟踪分析;历史数据记录:对接收到的子站实时数据进行间隔为2S的历史数据记录并可绘制遥测量的历史数据曲线;通信内容的监视与记录:对子站的遥信、遥测响应时间、遥测精度、遥控响应时间和SOE准确度等进行测试,并为子站的调试提供便利条件;规约分析功能:能够对多种规约的参数进行灵活设置并进行报文分析。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410674075.8A CN104407604A (zh) | 2014-11-22 | 2014-11-22 | D5000调试中规约测试装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410674075.8A CN104407604A (zh) | 2014-11-22 | 2014-11-22 | D5000调试中规约测试装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104407604A true CN104407604A (zh) | 2015-03-11 |
Family
ID=52645242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410674075.8A Pending CN104407604A (zh) | 2014-11-22 | 2014-11-22 | D5000调试中规约测试装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104407604A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105262230A (zh) * | 2015-11-26 | 2016-01-20 | 国网辽宁省电力有限公司大连供电公司 | 新建变电站调试用便携式调度主站系统的组建方法 |
CN105334777A (zh) * | 2015-11-26 | 2016-02-17 | 国网辽宁省电力有限公司大连供电公司 | 串口规约报文信号试验端子排 |
CN109547584A (zh) * | 2018-12-12 | 2019-03-29 | 武汉虹识技术有限公司 | Ip地址管理方法、装置及电子设备 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201750226U (zh) * | 2010-08-12 | 2011-02-16 | 广东电网公司佛山供电局 | 一种变电站远程检测系统 |
US20120004876A1 (en) * | 2010-06-30 | 2012-01-05 | Hart James E | Portable System for Auto Var Testing |
CN202218067U (zh) * | 2011-08-22 | 2012-05-09 | 浙江省电力公司 | 一种电力系统自动化信息智能对点系统 |
CN103227735A (zh) * | 2008-12-30 | 2013-07-31 | 国家电网公司 | 一种基于iec61850的故障信息子站建模方法 |
CN104052151A (zh) * | 2014-05-14 | 2014-09-17 | 国家电网公司 | 变电站智能辅助综合监控与d5000综合联动平台 |
CN204287954U (zh) * | 2014-11-22 | 2015-04-22 | 国家电网公司 | D5000调试中规约测试装置 |
-
2014
- 2014-11-22 CN CN201410674075.8A patent/CN104407604A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103227735A (zh) * | 2008-12-30 | 2013-07-31 | 国家电网公司 | 一种基于iec61850的故障信息子站建模方法 |
US20120004876A1 (en) * | 2010-06-30 | 2012-01-05 | Hart James E | Portable System for Auto Var Testing |
CN201750226U (zh) * | 2010-08-12 | 2011-02-16 | 广东电网公司佛山供电局 | 一种变电站远程检测系统 |
CN202218067U (zh) * | 2011-08-22 | 2012-05-09 | 浙江省电力公司 | 一种电力系统自动化信息智能对点系统 |
CN104052151A (zh) * | 2014-05-14 | 2014-09-17 | 国家电网公司 | 变电站智能辅助综合监控与d5000综合联动平台 |
CN204287954U (zh) * | 2014-11-22 | 2015-04-22 | 国家电网公司 | D5000调试中规约测试装置 |
Non-Patent Citations (1)
Title |
---|
周伊琳: "电网调度自动化模拟测试系统", 《中国电力》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105262230A (zh) * | 2015-11-26 | 2016-01-20 | 国网辽宁省电力有限公司大连供电公司 | 新建变电站调试用便携式调度主站系统的组建方法 |
CN105334777A (zh) * | 2015-11-26 | 2016-02-17 | 国网辽宁省电力有限公司大连供电公司 | 串口规约报文信号试验端子排 |
CN109547584A (zh) * | 2018-12-12 | 2019-03-29 | 武汉虹识技术有限公司 | Ip地址管理方法、装置及电子设备 |
CN109547584B (zh) * | 2018-12-12 | 2021-12-14 | 武汉虹识技术有限公司 | Ip地址管理方法、装置及电子设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109541353B (zh) | 配电自动化检测系统 | |
CN108009097B (zh) | 面向轨道交通信号系统的云计算仿真测试方法与装置 | |
CN103176084B (zh) | 全景取代模式的智能变电站模拟系统及其集成测试方法 | |
CN201721467U (zh) | 一种新型列车调度便携式综合测试仪 | |
CN112366818B (zh) | 一种智能变电站监控信息自动验收方法及系统 | |
CN107257304B (zh) | 远动免对点配置测试系统 | |
CN107819647B (zh) | 智能变电站站控层网络测试仪 | |
CN106787199A (zh) | 一种便携式子站模拟测试系统及方法 | |
CN104299042A (zh) | 核电站事故风险预测方法和系统 | |
WO2015149595A1 (zh) | 基于iec61850的绝缘在线监测设备通信仿真方法 | |
CN104246521A (zh) | 智能变电站继电保护功能自动测试的方法及装置 | |
CN110717736A (zh) | 一种建筑用施工进度智能追踪方法及系统 | |
CN103545917A (zh) | 一种调度自动化子站仿真系统 | |
CN102521087A (zh) | 一种远程获取内核模块实时分级调试信息的系统及方法 | |
CN103984335A (zh) | 配电自动化系统的测试方法及系统 | |
WO2015149597A1 (zh) | 基于iec61850的sf6气体在线监测设备通信仿真方法 | |
CN104407604A (zh) | D5000调试中规约测试装置及方法 | |
CN110611312B (zh) | 一种变电站间隔层全景数据在线模拟系统及方法 | |
CN106569165A (zh) | 一种电子式电能表计量性能远程在线检测系统 | |
CN104392603B (zh) | 一种现场用电信息采集设备智能诊断系统 | |
CN204989367U (zh) | 低压用户输电线路串户检测系统 | |
CN109765451A (zh) | 一种智能配电网终端仿真测试平台、系统及方法 | |
CN204287954U (zh) | D5000调试中规约测试装置 | |
CN101414737A (zh) | 一种轨道交通电力数据采集与监视控制方法及系统 | |
CN102734896A (zh) | 一种多联机空调系统运行环境监控方法和装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150311 |