CN104405417A - Inverted arch construction trolley for self-propelled tunnel - Google Patents

Inverted arch construction trolley for self-propelled tunnel Download PDF

Info

Publication number
CN104405417A
CN104405417A CN201410809532.XA CN201410809532A CN104405417A CN 104405417 A CN104405417 A CN 104405417A CN 201410809532 A CN201410809532 A CN 201410809532A CN 104405417 A CN104405417 A CN 104405417A
Authority
CN
China
Prior art keywords
inverted arch
trolley
formwork
construction
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410809532.XA
Other languages
Chinese (zh)
Inventor
韦伟
朱一国
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201410809532.XA priority Critical patent/CN104405417A/en
Publication of CN104405417A publication Critical patent/CN104405417A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

一种自行式隧道仰拱施工台车,包括台车仰拱圆弧模板,所述台车仰拱圆弧模板通过液压油缸及若干可调节杆件与纵向主梁连接,所述纵向主梁一端连接“L”形行走系统及配重平台,行走系统及配重平台底部设有行走轮,行走系统及配重平台上设有行走控制装置、配重块。解决了隧道仰拱施工慢、整体一次性立模、模板不易安装且安装后容易“跑模”的问题,加快了隧道仰拱施工进度,有效的控制了仰拱与掌子面红线步距,实现了仰拱与小边墙同步浇筑,保证了隧道仰拱的施工质量,具有操作简便、施工快速的特点。

A self-propelled tunnel inverted arch construction trolley, comprising an inverted arc formwork of the trolley, the inverted arch formwork of the trolley is connected to a longitudinal main beam through a hydraulic cylinder and several adjustable rods, and one end of the longitudinal main beam Connect the "L"-shaped walking system and the counterweight platform. The walking system and the counterweight platform are equipped with walking wheels at the bottom, and the walking system and the counterweight platform are equipped with walking control devices and counterweights. It solves the problems of slow construction of the tunnel invert, integral one-time formwork, difficult installation of the formwork and easy "running of the formwork" after installation, speeds up the construction progress of the tunnel invert, and effectively controls the step distance between the invert and the red line of the tunnel face. The simultaneous pouring of the inverted arch and the small side wall is realized, which ensures the construction quality of the tunnel inverted arch, and has the characteristics of easy operation and fast construction.

Description

一种自行式隧道仰拱施工台车A self-propelled tunnel inverted arch construction trolley

技术领域 technical field

本发明涉及一种自行式隧道仰拱施工台车。 The invention relates to a self-propelled tunnel inverted arch construction trolley.

背景技术 Background technique

目前,隧道仰拱施工多采用小块模板组合并现场进行人工安装,再进行仰拱混凝土的浇筑,仰拱每循环周期约4~5天,模板及支撑杆件多,木板固定困难,拆装时间长,施工效率低、质量控制效果差。 At present, the construction of tunnel inverts mostly adopts the combination of small templates and manual installation on site, and then pours the concrete for the inverts. The cycle of the inverts is about 4 to 5 days. There are many formworks and supporting rods, and it is difficult to fix the wooden boards. The time is long, the construction efficiency is low, and the quality control effect is poor.

发明内容 Contents of the invention

    本发明其目的就在于提供一种自行式隧道仰拱施工台车,解决了隧道仰拱施工慢、整体一次性立模、模板不易安装且安装后容易“跑模”的问题,加快了隧道仰拱施工进度,有效的控制了仰拱与掌子面红线步距,实现了仰拱与小边墙同步浇筑,保证了隧道仰拱的施工质量,具有操作简便、施工快速的特点。 The purpose of the present invention is to provide a self-propelled tunnel inverted arch construction trolley, which solves the problems of slow construction of the tunnel inverted arch, integral one-time formwork, difficult installation of the formwork, and easy "running of the formwork" after installation, and speeds up the construction of the tunnel inverted arch. The construction progress of the arch effectively controls the step distance between the inverted arch and the red line of the tunnel face, realizes the simultaneous pouring of the inverted arch and the small side wall, ensures the construction quality of the tunnel inverted arch, and has the characteristics of easy operation and fast construction.

实现上述目的而采取的技术方案,包括台车仰拱圆弧模板,所述台车仰拱圆弧模板通过液压油缸及若干可调节杆件与纵向主梁连接,所述纵向主梁一端连接“L”形行走系统及配重平台,行走系统及配重平台底部设有行走轮,行走系统及配重平台上设有行走控制装置、配重块。 The technical solution adopted to achieve the above purpose includes the trolley inverted arch formwork, the trolley inverted arch formwork is connected to the longitudinal main beam through a hydraulic cylinder and several adjustable rods, and one end of the longitudinal main beam is connected to " L”-shaped walking system and counterweight platform. The bottom of the walking system and counterweight platform is equipped with walking wheels. The walking system and counterweight platform are equipped with walking control devices and counterweights.

与现有技术相比本发明具有以下优点。 Compared with the prior art, the present invention has the following advantages.

1)设计的自行式液压仰拱台车,仰拱施工速度由原来的4天/循环(仰拱无钢筋)提高到2.5天/循环,大大地提高了仰拱施工的效率; 1) The designed self-propelled hydraulic inverted arch trolley increases the construction speed of the inverted arch from the original 4 days/cycle (the inverted arch has no reinforcement) to 2.5 days/cycle, which greatly improves the efficiency of the inverted arch construction;

2)自行式液压仰拱台车设计采用了液压自动调节整体模板,混凝土的外观质量得到了提高,小边墙的“跑模”现象得到了解决。仰拱施工的加快对于隧道的整体施工进度得到了保障,既保证了隧道的施工工期,又利用小的投入节约大的成本。 2) The design of the self-propelled hydraulic inverted arch trolley adopts the hydraulic automatic adjustment of the overall formwork, the appearance quality of the concrete has been improved, and the phenomenon of "running mold" of the small side wall has been solved. The speeding up of the inverted arch construction has ensured the overall construction progress of the tunnel, which not only ensures the construction period of the tunnel, but also saves a large cost with a small investment.

附图说明 Description of drawings

下面结合附图对本发明作进一步详述。 The present invention will be described in further detail below in conjunction with the accompanying drawings.

图1为本装置结构示意主视图; Figure 1 is a schematic front view of the device structure;

图2为本装置结构示意侧视图; Fig. 2 is a schematic side view of the structure of the device;

图3为本装置施工中工作横断面示意图。 Figure 3 is a schematic diagram of the working cross-section of the device during construction.

具体实施方式 Detailed ways

    包括台车仰拱圆弧模板5,如图1、图2所示,所述台车仰拱圆弧模板5通过液压油缸3及若干可调节杆件4与纵向主梁1连接,所述纵向主梁1一端连接“L”形行走系统及配重平台2,行走系统及配重平台2底部设有行走轮9,行走系统及配重平台2上设有行走控制装置、配重块。 Including trolley inverted arc formwork 5, as shown in Figure 1 and Figure 2, said trolley inverted arch formwork 5 is connected with longitudinal main girder 1 through hydraulic cylinder 3 and several adjustable rods 4, and said longitudinal One end of the main girder 1 is connected to an "L" shaped walking system and a counterweight platform 2, and the bottom of the walking system and the counterweight platform 2 is provided with a walking wheel 9, and the walking system and the counterweight platform 2 are provided with a walking control device and a counterweight.

所述纵向主梁1上设有前吊点13、后吊点14,前吊点13经液压油缸3铰接台车仰拱圆弧模板5,后吊点14经可调节杆件4铰接台车仰拱圆弧模板5;所述纵向主梁1下端两侧设有前侧吊点12、后侧吊点11,前侧吊点12经液压油缸3、可调节杆件4铰接台车仰拱圆弧模板5,后侧吊点11经可调节杆件4铰接台车仰拱圆弧模板5。 The longitudinal girder 1 is provided with a front lifting point 13 and a rear lifting point 14, the front lifting point 13 is hinged to the trolley inverted arch formwork 5 through the hydraulic cylinder 3, and the rear lifting point 14 is hinged to the trolley through the adjustable rod 4 Inverted arc formwork 5; both sides of the lower end of the longitudinal main beam 1 are provided with front hanging points 12 and rear hanging points 11, and the front hanging points 12 are hinged to the inverted arch of the trolley through the hydraulic cylinder 3 and the adjustable rod 4 The circular arc formwork 5, the rear hanging point 11 is hinged to the inverted arc formwork 5 of the trolley through the adjustable rod 4.

实施例 Example

本装置包括纵向主梁1,纵向主梁1一端设有行走系统及配重平台2,如图1、图2所示,所述纵向主梁1两端各设有两组液压油缸3及若干可调节杆件4,台车仰拱圆弧模板5通过液压油缸3及若干可调节杆件4与纵向主梁1连接,仰拱衬砌端头模板6在台车前移前安装到位,在安装仰拱衬砌端头模板6下层安装到位后将中埋式止水带7安装后再安装仰拱衬砌端头模板6上层模板,两层模板采用卡具固定,仰拱端头模板安装到位后,通过行走系统及配重平台2推动台车前移,移到设计位置后,通过可调节支撑系统调整标高,确保前后在同一标高,并用锚杆进行锚固。液压油缸3工作,将仰拱圆弧模板5按照设计要求调整到位并用可调节杆件4加固。 The device includes a longitudinal main beam 1, and one end of the longitudinal main beam 1 is provided with a walking system and a counterweight platform 2, as shown in Figures 1 and 2, two sets of hydraulic cylinders 3 and several Adjustable rods 4, trolley inverted arch formwork 5 are connected to longitudinal main beam 1 through hydraulic cylinder 3 and several adjustable rods 4, inverted arch lining end formwork 6 is installed in place before the trolley moves forward, after installation After the lower layer of the inverted arch lining end formwork 6 is installed in place, the buried waterstop 7 is installed, and then the upper formwork of the inverted arch lining end formwork 6 is installed. The two-layer formwork is fixed by clamps. After the inverted arch end formwork is installed in place, Push the trolley forward through the walking system and the counterweight platform 2. After moving to the design position, adjust the elevation through the adjustable support system to ensure that the front and rear are at the same elevation, and anchor with anchor rods. The hydraulic cylinder 3 works to adjust the inverted arc formwork 5 in place according to the design requirements and reinforce it with the adjustable rod 4.

所述自行式液压仰拱台车单侧采用型钢制作纵向主梁1,纵向主梁1按照每板仰拱施工长度加上富余长度,确保端头模板的安装和支撑系统的安装,在纵向主梁1上设置油缸定位卡槽和可调节螺杆定位卡槽,保证油缸和可调节螺杆的拆卸方便;纵向主梁1在浇筑混凝土侧与行走系统及配重平台连接,形成一个整体,另一端安装支撑系统,就位后可以直接支撑在初支上,确保台车的稳定;液压油缸3和可调节杆件4的另一端连接仰拱圆弧模板5,液压油缸3和可调节杆件4根据行程长短设计,单侧仰拱台车两端各有两套液压油缸3,靠小边墙顶面的为短程液压油缸,主要是为了拆模方便及确保模板与混凝土面之间的距离,长程液压油缸,主要是为了将模板提起,确保圆弧模板与仰拱回填顶面的距离,方便后期施工,圆弧模板在短程液压油缸收完后,以短程液压油缸端部的为轴心,通过长程液压油缸将模板提升;行走系统通过四个钢轮在电机的带动下,在已浇筑的仰拱回填顶面行走,配重平台根据要求配置混凝土预制块,确保台车前段不倾覆,安全地到达设计制定位置。 The self-propelled hydraulic invert trolley adopts profiled steel on one side to make the longitudinal main girder 1, and the longitudinal main girder 1 adds a surplus length according to the construction length of each plate invert to ensure the installation of the end formwork and the installation of the support system. The oil cylinder positioning slot and the adjustable screw positioning slot are set on the beam 1 to ensure the easy disassembly of the oil cylinder and the adjustable screw; The support system can be directly supported on the initial support after being in place to ensure the stability of the trolley; the other end of the hydraulic cylinder 3 and the adjustable rod 4 is connected to the inverted arc formwork 5, and the hydraulic cylinder 3 and the adjustable rod 4 are connected according to The length of the stroke is designed. There are two sets of hydraulic cylinders 3 at both ends of the unilateral inverted arch trolley. The hydraulic cylinder is mainly used to lift the formwork to ensure the distance between the arc formwork and the backfill top surface of the inverted arch, which is convenient for later construction. The long-distance hydraulic cylinder lifts the template; the walking system walks on the top surface of the poured inverted arch backfill through four steel wheels driven by the motor. Arrive at the design formulation position.

台车前移至设计位置后,前段的支撑系统落下,根据设计标高位置顶升,调整台车的标高位置,调整到位置后,在仰拱衬砌端头模板安装到位后,通过四组液压油缸的同步行走,将仰拱圆弧模板顶推到设计位置上,再通过可调节杆件对模板进行加固,并对台车前后进行锚固,安装小边墙上的纵向止水带,进行混凝土的浇筑,此工装的圆弧模板为整体模板,通过液压系统调整,不用在人工进行散模板的安装,从这一方面就节约了人员和提高了施工效率,整个仰拱施工中减少了人工劳作,加快了施工进行,还能确保整体的施工质量。 After the trolley moves forward to the design position, the support system of the front section falls, and it is lifted according to the design elevation position, and the elevation position of the trolley is adjusted. The synchronous walking of the inverted arch arc formwork is pushed to the design position, and then the formwork is reinforced through adjustable rods, and the front and rear of the trolley are anchored, and the vertical waterstop on the small side wall is installed to carry out the concrete For pouring, the arc formwork of this tooling is an integral formwork, which is adjusted by the hydraulic system, and there is no need to manually install the loose formwork. From this aspect, it saves personnel and improves construction efficiency. The entire inverted arch construction reduces manual labor. Speed up the construction, but also ensure the overall construction quality.

(1)自行式液压仰拱台车分为左右幅,如图3所示,各位独立的台车,仰拱两侧同步施工,台车各自前移到设计位置,再进行精确定位。台车行走主要靠后侧的行走系统和配重平台(根据设计要求在配重平台上安放混凝土预制块)。 (1) The self-propelled hydraulic invert trolley is divided into left and right sections, as shown in Figure 3, each independent trolley, the two sides of the invert are constructed simultaneously, and the trolleys move forward to the design position, and then carry out precise positioning. The trolley travels mainly on the rear walking system and counterweight platform (prefabricated concrete blocks are placed on the counterweight platform according to design requirements).

(2)纵向主梁由型钢焊接而成,前端截面小,后端截面大(减小前端的重量,减少后面的配重,方便行走),后端与行走系统及配重平台销接在一起,纵向主梁全长为12.5m,行走系统及配重平台长度为6m,仰拱圆弧模板纵向长度为11.9m(与衬砌台车施工长度对应),仰拱圆弧模板按照大模板加工,每段长度为2.975m,共计4段,由现场进行拼装成整体,仰拱圆弧模板圆弧长为1.915m; (2) The longitudinal main girder is welded by section steel, the front section is small, and the rear section is large (to reduce the weight of the front end, reduce the counterweight at the back, and facilitate walking), and the rear end is pinned together with the walking system and the counterweight platform , the total length of the longitudinal main girder is 12.5m, the length of the walking system and the counterweight platform is 6m, the longitudinal length of the inverted arch formwork is 11.9m (corresponding to the construction length of the lining trolley), the inverted arch formwork is processed according to the large formwork, each section The length is 2.975m, with a total of 4 sections, which are assembled into a whole on site. The arc length of the inverted arch arc formwork is 1.915m;

(3)纵向主梁与行走系统及配重平台销接完成后,安装液压系统并调试完毕,在进行仰拱圆弧模板的安装,在洞外拼装调试完毕后在行走时施工段落; (3) After the pin connection between the longitudinal main girder and the walking system and the counterweight platform is completed, the hydraulic system is installed and debugged, and the inverted arch arc formwork is installed, and the construction section is constructed during walking after the assembly and debugging outside the cave;

(4)自行式液压仰拱台车行走前必须定好中线位置、仰拱端头位置及小边墙顶面标高位置,方便台车行走过程中进行位置的调整;端头模板及仰拱中埋式止水带在台车走形前安装到位 (4) Before the self-propelled hydraulic inverted arch trolley moves, the position of the center line, the position of the end of the inverted arch and the elevation of the top surface of the small side wall must be determined, so as to facilitate the adjustment of the position during the movement of the trolley; The type waterstop is installed in place before the trolley goes out of shape

(5)自行式液压仰拱台车行走到设计位置后,进行复核,确认无误后进行台车前后的锚固,锚固后再通过液压系统调整仰拱圆弧模板至设计位置,并通过可调节杆件与纵向主梁进行加固。 (5) After the self-propelled hydraulic inverted arch trolley walks to the design position, conduct a review. After confirming that it is correct, anchor the front and rear of the trolley. parts and longitudinal girders are reinforced.

(6)台车就位并加固完成后,安装小边墙的纵向止水带,检查无误后再进行混凝土的浇筑; (6) After the trolley is in place and the reinforcement is completed, install the longitudinal waterstop of the small side wall, and then pour the concrete after checking that it is correct;

(7)浇筑完混凝土待初凝后,混凝土标高覆盖湿润的土工布进行养护,待混凝土强度达到2.5Mpa后,拆除提升仰拱圆弧模板,再安装仰拱回填端头模板进行仰拱回填的施工。 (7) After pouring the concrete and waiting for the initial setting, the concrete level is covered with wet geotextiles for maintenance. After the concrete strength reaches 2.5Mpa, remove and lift the inverted arch arc formwork, and then install the inverted arch backfill end formwork for inverted arch backfill construction.

Claims (2)

1.一种自行式隧道仰拱施工台车,包括台车仰拱圆弧模板(5),其特征在于,所述台车仰拱圆弧模板(5)通过液压油缸(3)及若干可调节杆件(4)与纵向主梁(1)连接,所述纵向主梁(1)一端连接“L”形行走系统及配重平台(2),行走系统及配重平台(2)底部设有行走轮(9),行走系统及配重平台(2)上设有行走控制装置、配重块。 1. A self-propelled tunnel inverted arch construction trolley, comprising a trolley inverted arch formwork (5), characterized in that the trolley inverted arch formwork (5) passes through a hydraulic cylinder (3) and several movable The adjusting rod (4) is connected to the longitudinal main beam (1), and one end of the longitudinal main beam (1) is connected to the "L" shaped walking system and the counterweight platform (2), and the bottom of the walking system and the counterweight platform (2) is set Walking wheels (9) are arranged, and a walking control device and a counterweight are arranged on the walking system and the counterweight platform (2). 2.根据权利要求1所述的一种自行式隧道仰拱施工台车,其特征在于,所述纵向主梁(1)上设有前吊点(13)、后吊点(14),前吊点(13)经液压油缸(3)铰接台车仰拱圆弧模板(5),后吊点(14)经可调节杆件(4)铰接台车仰拱圆弧模板(5);所述纵向主梁(1)下端两侧设有前侧吊点(12)、后侧吊点(11),前侧吊点(12)经液压油缸(3)、可调节杆件(4)铰接台车仰拱圆弧模板(5),后侧吊点(11)经可调节杆件(4)铰接台车仰拱圆弧模板(5)。 2. A self-propelled tunnel inverted arch construction trolley according to claim 1, characterized in that, the longitudinal main girder (1) is provided with a front lifting point (13) and a rear lifting point (14), and the front The lifting point (13) is hinged to the trolley inverted arch formwork (5) through the hydraulic cylinder (3), and the rear lifting point (14) is hinged to the trolley inverted arch formwork (5) through the adjustable rod (4); There are front hanging points (12) and rear hanging points (11) on both sides of the lower end of the longitudinal main beam (1), and the front hanging points (12) are hinged by hydraulic cylinders (3) and adjustable rods (4) The trolley inverted arc formwork (5), the rear hanging point (11) is hinged to the trolley inverted arch formwork (5) through the adjustable bar (4).
CN201410809532.XA 2014-12-24 2014-12-24 Inverted arch construction trolley for self-propelled tunnel Pending CN104405417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410809532.XA CN104405417A (en) 2014-12-24 2014-12-24 Inverted arch construction trolley for self-propelled tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410809532.XA CN104405417A (en) 2014-12-24 2014-12-24 Inverted arch construction trolley for self-propelled tunnel

Publications (1)

Publication Number Publication Date
CN104405417A true CN104405417A (en) 2015-03-11

Family

ID=52643073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410809532.XA Pending CN104405417A (en) 2014-12-24 2014-12-24 Inverted arch construction trolley for self-propelled tunnel

Country Status (1)

Country Link
CN (1) CN104405417A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111779506A (en) * 2020-07-08 2020-10-16 中铁二十局集团有限公司 Rotatable inverted arch template
CN111997651A (en) * 2019-05-27 2020-11-27 湖南五新模板有限公司 A kind of tunnel double-layer inverted arch construction template, trestle and construction method
CN113586087A (en) * 2021-08-12 2021-11-02 中铁十九局集团有限公司勘察设计院分公司 Tunnel construction auxiliary trolley
CN116146240A (en) * 2022-12-29 2023-05-23 中国水利水电第十四工程局有限公司 A construction method of composite needle-beam steel formwork trolley with arch-circular sliding form at the bottom of a flat tunnel

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4080300B2 (en) * 2002-10-30 2008-04-23 岐阜工業株式会社 Method and apparatus for placing concrete for tunnel
CN101215970A (en) * 2008-01-02 2008-07-09 中铁五局(集团)有限公司 Tunnel invert operation trolley
CN202970732U (en) * 2012-12-17 2013-06-05 山东铁鹰建设工程有限公司 Subway tunnel inverted arch concrete lining trolley
CN203066990U (en) * 2013-02-05 2013-07-17 重庆铁科轨道交通工程有限公司 Fully-hydraulic and self-walking inverted arch formworking trolley for tunnel
CN103352710A (en) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN203296781U (en) * 2013-06-08 2013-11-20 中铁十七局集团第四工程有限公司 Tunnel self-propelled inverted arch formwork trolley
CN203531925U (en) * 2013-11-25 2014-04-09 中铁十局集团有限公司 Self-propelled integral template of tunnel inverted arch
CN204386615U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A self-propelled tunnel inverted arch construction trolley

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4080300B2 (en) * 2002-10-30 2008-04-23 岐阜工業株式会社 Method and apparatus for placing concrete for tunnel
CN101215970A (en) * 2008-01-02 2008-07-09 中铁五局(集团)有限公司 Tunnel invert operation trolley
CN202970732U (en) * 2012-12-17 2013-06-05 山东铁鹰建设工程有限公司 Subway tunnel inverted arch concrete lining trolley
CN203066990U (en) * 2013-02-05 2013-07-17 重庆铁科轨道交通工程有限公司 Fully-hydraulic and self-walking inverted arch formworking trolley for tunnel
CN203296781U (en) * 2013-06-08 2013-11-20 中铁十七局集团第四工程有限公司 Tunnel self-propelled inverted arch formwork trolley
CN103352710A (en) * 2013-07-25 2013-10-16 成都锐龙机械制造有限公司 Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN203531925U (en) * 2013-11-25 2014-04-09 中铁十局集团有限公司 Self-propelled integral template of tunnel inverted arch
CN204386615U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A self-propelled tunnel inverted arch construction trolley

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997651A (en) * 2019-05-27 2020-11-27 湖南五新模板有限公司 A kind of tunnel double-layer inverted arch construction template, trestle and construction method
CN111779506A (en) * 2020-07-08 2020-10-16 中铁二十局集团有限公司 Rotatable inverted arch template
CN113586087A (en) * 2021-08-12 2021-11-02 中铁十九局集团有限公司勘察设计院分公司 Tunnel construction auxiliary trolley
CN116146240A (en) * 2022-12-29 2023-05-23 中国水利水电第十四工程局有限公司 A construction method of composite needle-beam steel formwork trolley with arch-circular sliding form at the bottom of a flat tunnel

Similar Documents

Publication Publication Date Title
CN113235472B (en) A trolley for pouring concrete for slab culvert
CN104631333B (en) Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method
CN105386778A (en) Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method
CN102587295B (en) Under-supported basket form fine-adjustment system and under-supported basket form adjustment method
CN102493362A (en) Construction method for midspan closure segment of longspan continuous rigid frame bridge
CN204386615U (en) A self-propelled tunnel inverted arch construction trolley
CN205805577U (en) A kind of arch wall type open cut tunnel chassis
CN108035741A (en) A kind of backform trolley
CN204476416U (en) The simple and easy sliding form apparatus of a kind of vertical shaft concrete lining
CN204851287U (en) Big section moving as a whole formula formwork support
CN107268455B (en) Concrete girder gooseneck composite structure beam cradle construction method
CN214993219U (en) Concrete placement platform truck is contained to apron
CN101492907B (en) A construction method of cast-in-place construction method for flange plate of T-shaped bridge
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN205521918U (en) Prefabricated formwork system of T roof beam batch production
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN101476288B (en) Cast-in-place moving die carrier of T type bridge flange board
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN205295849U (en) Mechanized ditch template
CN204997809U (en) Prefabricated little case beam side device
CN217378638U (en) Splicing seam adjusting device for mounting prefabricated box channel and box culvert
CN104894943A (en) Integral formwork for road and bridge drainage ditch construction concrete pouring
CN103266572A (en) Multifunctional construction platform for constructing cross beams between twin-deck bridges through cast-in-place
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN205711780U (en) Wave forms steel web SCC engineering method movable hanging basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150311

RJ01 Rejection of invention patent application after publication