CN104376766B - Bus duct installation technology practical training device - Google Patents

Bus duct installation technology practical training device Download PDF

Info

Publication number
CN104376766B
CN104376766B CN201410667481.1A CN201410667481A CN104376766B CN 104376766 B CN104376766 B CN 104376766B CN 201410667481 A CN201410667481 A CN 201410667481A CN 104376766 B CN104376766 B CN 104376766B
Authority
CN
China
Prior art keywords
bus duct
training device
busway
installation technology
mounting technique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201410667481.1A
Other languages
Chinese (zh)
Other versions
CN104376766A (en
Inventor
杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sina Aituo Equipment Jiangsu Co ltd
Original Assignee
Zhejiang College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang College of Construction filed Critical Zhejiang College of Construction
Priority to CN201410667481.1A priority Critical patent/CN104376766B/en
Publication of CN104376766A publication Critical patent/CN104376766A/en
Application granted granted Critical
Publication of CN104376766B publication Critical patent/CN104376766B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/06Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
    • G09B23/18Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Business, Economics & Management (AREA)
  • Mathematical Physics (AREA)
  • Algebra (AREA)
  • Computational Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Pure & Applied Mathematics (AREA)
  • Installation Of Bus-Bars (AREA)

Abstract

本发明涉及一种母线槽安装技术实训装置,包括全开放式的由终端封头、直线段、三通、水平弯、垂直弯、始端接头连接而成的母线槽,所述母线槽通过始端接头与配电柜相连接,母线槽上连有插接箱用于取电。发明有益的效果是:本发明是一套反映了工程实际的母线槽安装技术实训装置,促进实践教学。通过这套实训装置,可以开展母线槽连接安装工艺、与配电柜连接安装、与桥架连接工艺、竖井安装工艺等多个实训项目,填补了建筑电气专业群教学中母线槽安装工艺技术实训的不足。

The invention relates to a training device for busway installation technology, which includes a fully open busway formed by connecting a terminal head, a straight line, a tee, a horizontal bend, a vertical bend, and a starting joint. The busway passes through the starting end The connector is connected with the power distribution cabinet, and the bus duct is connected with a plug box for taking power. The beneficial effects of the invention are: the invention is a set of practical training devices for busway installation technology reflecting engineering practice, and promotes practical teaching. Through this training device, it is possible to carry out multiple training projects such as bus duct connection installation technology, connection installation with power distribution cabinet, bridge connection technology, shaft installation technology, etc., which fills the bus duct installation technology in the teaching of building electrical professional groups Insufficient training.

Description

一种母线槽安装技术实训装置A training device for busway installation technology

技术领域technical field

本发明涉及一种实训教学装置,尤其是一种母线槽安装技术实训装置。The invention relates to a practical training and teaching device, in particular to a practical training device for busway installation technology.

背景技术Background technique

随着现代化工程设施和装备的涌现,各行各业的用电量迅增,尤其是众多的高层建筑和大型厂房车间的出现,作为输电导线的传统电缆在大电流输送系统中已不能满足要求,多路电缆的并联使用给现场安装施工连接带来了诸多不便。插接式母线槽作为一种新型配电导线应运而生,母线槽与传统的电缆相比,在大电流输送时充分体现出它的优越性,同时由于采用了新技术、新工艺,大大降低的母线槽两端部连接处及分线口插接处的接触电阻和温升,并在母线槽中使用了高质量的绝缘材料,从而提高了母线槽的安全可靠性,使整个系统更加完善。母线槽安装是建筑电气专业群中一项基础而重要的内容,而对母线槽安装技术实训一直没有很好的实训装置,更多的主要是到施工现场去学习,而且现场许多安装技术都是隐蔽工程,很难看到,具有危险性。With the emergence of modern engineering facilities and equipment, the power consumption of all walks of life is increasing rapidly, especially the emergence of many high-rise buildings and large workshops. The traditional cables used as power transmission wires can no longer meet the requirements in large current transmission systems. The parallel use of multiple cables brings a lot of inconvenience to the site installation and construction connection. As a new type of power distribution wire, the plug-in bus duct has emerged at the historic moment. Compared with the traditional cable, the bus duct fully demonstrates its superiority in the transmission of large currents. The contact resistance and temperature rise of the joints at both ends of the bus duct and the plug-in of the distribution port, and high-quality insulating materials are used in the bus duct, thereby improving the safety and reliability of the bus duct and making the whole system more perfect . Busway installation is a basic and important content in the building electrical professional group, but there has been no good training device for the training of busway installation technology, and more is mainly to learn at the construction site, and many installation techniques on site They are all hidden projects, difficult to see, and dangerous.

发明内容Contents of the invention

本发明要解决上述现有技术的缺点,提供一种反映工程实际情况、促进实践教学的母线槽安装技术实训装置。The present invention aims to solve the above-mentioned shortcomings of the prior art, and provides a busway installation technology training device that reflects the actual engineering situation and promotes practical teaching.

本发明解决其技术问题采用的技术方案:这种母线槽安装技术实训装置,包括全开放式的由终端封头、直线段、三通、水平弯、垂直弯、始端接头连接而成的母线槽,所述母线槽通过始端接头与配电柜相连接,母线槽上连有插接箱用于取电。The technical solution adopted by the present invention to solve its technical problems: this busway installation technology training device includes a fully open busbar connected by a terminal head, a straight line, a tee, a horizontal bend, a vertical bend, and a beginning joint The bus duct is connected to the power distribution cabinet through the head joint, and the bus duct is connected with a plug box for power taking.

作为优选,所述母线槽穿过墙壁的防火封堵设置,母线槽穿过楼板的弹簧支架。Preferably, the bus duct passes through the fireproof sealing of the wall, and the bus duct passes through the spring support of the floor.

作为优选,母线槽沿墙走线设有固定支架。Preferably, the bus duct is provided with a fixed bracket along the wall.

作为优选,所述配电柜的空气开关通过电缆与始端接头相连接,连接处位于始端箱内。Preferably, the air switch of the power distribution cabinet is connected to the head joint through a cable, and the connection is located in the head box.

作为优选,所述插接箱通过母线槽上的插接孔处取电,插接箱内设有空气开关。Preferably, the plug-in box takes power through the plug-in hole on the bus duct, and an air switch is arranged in the plug-in box.

作为优选,各段母线槽金属外壳采用铜编织线连接并保护接地。Preferably, the metal casings of each section of the bus duct are connected with copper braided wires and grounded for protection.

作为优选,母线槽各段的连接:展示各段母线槽三相五线铜排之间的连接工艺。As a preference, the connection of each section of the bus duct: the connection process between the three-phase five-wire copper bars of each section of the bus duct is shown.

发明有益的效果是:本发明是一套反映了工程实际的母线槽安装技术实训装置,促进实践教学。通过这套实训装置,可以开展母线槽连接安装工艺、与配电柜连接安装、与桥架连接工艺、竖井安装工艺等多个实训项目,填补了建筑电气专业群教学中母线槽安装工艺技术实训的不足。The beneficial effects of the invention are: the invention is a set of practical training devices for busway installation technology reflecting engineering practice, and promotes practical teaching. Through this training device, it is possible to carry out multiple training projects such as bus duct connection installation technology, connection installation with power distribution cabinet, bridge connection technology, shaft installation technology, etc., which fills the bus duct installation technology in the teaching of building electrical professional groups Insufficient training.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

附图标记说明:终端封头1,三通2,水平弯3,垂直弯4,始端接头5,始端箱6,配电柜7,插接箱8,弹簧支架9,防火封堵设置10,固定支架11,直线段12。Explanation of reference signs: terminal head 1, tee 2, horizontal bend 3, vertical bend 4, start joint 5, start box 6, power distribution cabinet 7, plug box 8, spring bracket 9, fireproof sealing device 10, Fixed bracket 11, straight section 12.

具体实施方式detailed description

下面结合附图对本发明作进一步说明:The present invention will be further described below in conjunction with accompanying drawing:

实施例:Example:

实训装置设计既能展示工程现场实际的工艺技术和构件,又要合理占用实训场所,所以本装置采用容量较小的200A空气型母线槽安装工艺技术实训装置,占地2平方左右。The design of the training device can not only display the actual process technology and components on the project site, but also occupy the training place reasonably. Therefore, this device adopts a 200A air-type busway installation process technology training device with a small capacity, covering an area of about 2 square meters.

如图1所述,母线槽系统及各连接环节主要设计:母线槽安装技术实训装置,包括全开放式的由终端封头1、直线段12、三通2、水平弯3、垂直弯4、始端接头5连接而成的母线槽,所述母线槽一端为始端接头5,始端接头5与配电柜7相连接。母线槽上连有插接箱8。所述母线槽穿过防火封堵设置10,母线槽的穿过楼板的弹簧支架9安装设置。母线槽沿墙走线设有固定支架11。As shown in Figure 1, the main design of the busway system and each connection link: the busway installation technology training device, including a fully open terminal head 1, straight section 12, tee 2, horizontal bend 3, vertical bend 4 1. A bus duct formed by connecting the starting joint 5, one end of the bus duct is the starting joint 5, and the starting joint 5 is connected with the power distribution cabinet 7. The busway is connected with a plug box 8. The bus duct passes through the fireproof sealing arrangement 10, and the spring support 9 of the bus duct passing through the floor is installed and arranged. The bus duct is provided with a fixed bracket 11 along the wall.

该实训装置包含展示工程实际母线槽系统及各连接环节以及以下安装工艺:The training device includes the actual busway system and various connection links of the demonstration project, as well as the following installation processes:

母线槽与配电柜7连接:包括配电柜7的空气开关通过电缆与母线槽始端接头5的连接工艺,连接处位于始端箱6内,始端箱6可打开方便观察其连接结构。Connection between the busway and the distribution cabinet 7: including the connection process between the air switch of the power distribution cabinet 7 and the busway head end connector 5 through cables.

母线槽竖井的安装工艺:母线槽穿楼板的弹簧支架9安装工艺,弹簧支架9起到缓冲作用,防止发生沉降导致各楼层之间的母线槽发生断裂;母线槽穿过墙壁的防火封堵设置10的安装封堵工艺,防火封堵设置10起到隔离作用,防止楼层起火顺着母线槽蔓延。The installation process of the busway shaft: the installation process of the spring bracket 9 that the busway passes through the floor, and the spring bracket 9 acts as a buffer to prevent the busway between floors from being broken due to settlement; the fireproof sealing setting for the busway passing through the wall 10's installation and sealing process, the fireproofing and sealing arrangement 10 plays an isolation role, preventing the fire from spreading along the busway on the floor.

母线槽插接箱8取电工艺:所述插接箱8设于母线槽上的插接孔处插接箱8负责从母线槽中取点,插接箱8内设有空气开关,同时插接箱8一头插在母线槽内,一头连接的是电缆。Power-taking process of busway plug-in box 8: the plug-in box 8 is set at the plug-in hole on the busway. The plug-in box 8 is responsible for taking points from the busway. One end of connection box 8 is inserted in the bus duct, and what one end connects is the cable.

母线槽接地:各段母线槽外壳的铜编织线的连接工艺。Bus duct grounding: the connection process of the copper braided wires of the bus duct shell of each section.

母线槽各环节的连接:展示各环节母线槽三相五线铜排之间的连接工艺。The connection of each link of the busway: show the connection process between the three-phase five-wire copper bars of the busway in each link.

除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。In addition to the above-mentioned embodiments, the present invention can also have other implementations. All technical solutions formed by equivalent replacement or equivalent transformation fall within the scope of protection required by the present invention.

Claims (6)

1. a kind of bus duct mounting technique actual training device, is characterized in that: include full open model by terminal end socket (1), straightway (12), threeway (2), horizontal curved (3), bus duct that vertically curved (4), top joint (5) is formed by connecting, described bus duct passes through to begin End connector (5) is connected with power distribution cabinet (7), bus duct is connected with jack box (8) for power taking.
2. bus duct mounting technique actual training device according to claim 1, is characterized in that: described bus duct passes through wall Fireproof blocking arranges (10), and bus duct passes through the spring support (9) of floor.
3. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: bus duct sets along wall cabling There is fixed support (11).
4. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: the sky of described power distribution cabinet (7) Air cock is connected with top joint (5) by cable, and junction is located in top case (6).
5. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: described jack box (8) is passed through Power taking at spliced eye on bus duct, jack box is provided with air switch in (8).
6. bus duct mounting technique actual training device according to claim 1 and 2, is characterized in that: outside each section of bus duct metal Shell adopts copper litz wire to connect and protective grounding.
CN201410667481.1A 2014-11-20 2014-11-20 Bus duct installation technology practical training device Withdrawn - After Issue CN104376766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410667481.1A CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410667481.1A CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Publications (2)

Publication Number Publication Date
CN104376766A CN104376766A (en) 2015-02-25
CN104376766B true CN104376766B (en) 2017-01-25

Family

ID=52555649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410667481.1A Withdrawn - After Issue CN104376766B (en) 2014-11-20 2014-11-20 Bus duct installation technology practical training device

Country Status (1)

Country Link
CN (1) CN104376766B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110544407B (en) * 2019-09-16 2021-04-16 驻马店职业技术学院 Training device for vocational skill training

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248410Y (en) * 1994-09-21 1997-02-26 钱霆 Fireproof busbar casing
CN101354852A (en) * 2008-09-05 2009-01-28 吴方国 Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
CN201311737Y (en) * 2008-11-13 2009-09-16 浙江天煌科技实业有限公司 Intelligent district practical training module
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN204215634U (en) * 2014-11-20 2015-03-18 浙江建设职业技术学院 Bus duct field engineering actual training device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2879964B2 (en) * 1990-10-29 1999-04-05 積水ハウス株式会社 Kitchen design assistant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248410Y (en) * 1994-09-21 1997-02-26 钱霆 Fireproof busbar casing
CN101354852A (en) * 2008-09-05 2009-01-28 吴方国 Emulation experiment platform of buildings integrative wire laying system and emulation method thereof
CN201311737Y (en) * 2008-11-13 2009-09-16 浙江天煌科技实业有限公司 Intelligent district practical training module
CN103680239A (en) * 2013-12-04 2014-03-26 国家电网公司 Three-dimensional simulation system of 500kV transformer substation
CN204215634U (en) * 2014-11-20 2015-03-18 浙江建设职业技术学院 Bus duct field engineering actual training device

Also Published As

Publication number Publication date
CN104376766A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN105298201B (en) Transmission line cable termination solid draws lower device
CN105071335A (en) Rapid plugging/pulling cable branching box
CN103872589B (en) Emergency power supply access case
CN205116866U (en) Device is down drawn to transmission line cable termination solid
CN203352080U (en) Cable splitter
CN104376766B (en) Bus duct installation technology practical training device
CN204215634U (en) Bus duct field engineering actual training device
CN204167694U (en) Switch cubicle secondary line routing device
CN203895633U (en) Short circuit grounding wire suitable for box transformer substation and electricity distribution room
CN205335810U (en) Cable distribution box
CN105161878A (en) Power distribution fast acousto-optic electricity testing grounding wire
CN203951151U (en) The European front connector of 10kV
CN203056530U (en) High-voltage cable branch box
CN204992266U (en) 220 kilovolt main transformer's inlet wire draws and connects device
CN203839911U (en) 12kV European front connector
CN203589662U (en) Sectional ground wire connection structure
CN206820255U (en) A power transformer distribution system
CN204615167U (en) GIS combined electrical appliance front lying wall bushing
CN106207530A (en) The complete thread guide devices in a kind of 10KV transformer platform area
CN206697907U (en) A kind of regularization cable protection box
CN201430007Y (en) Low-smoke, halogen-free, flame-retardant and fire-resistant prefabricated branch cables
CN204577755U (en) A kind of multidirectional two-wire RJ45 network switch head
CN203787782U (en) Special grounding wire for ring main unit
CN201974908U (en) Remote split-type multi-channel electrical fire monitoring detector
CN206225817U (en) Ring main unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191212

Address after: 225600 Baqiao Industrial Park, XIAJIA Town, Gaoyou City, Yangzhou City, Jiangsu Province

Patentee after: Sina aituo equipment (Jiangsu) Co.,Ltd.

Address before: 311231 Xiaoshan higher education zone, Hangzhou, Zhejiang

Patentee before: Zhejiang College of Construction

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20170125

Effective date of abandoning: 20251204

AV01 Patent right actively abandoned

Granted publication date: 20170125

Effective date of abandoning: 20251204

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned