CN104372845A - Urban road early runoff rainwater pollutant interception treatment device - Google Patents

Urban road early runoff rainwater pollutant interception treatment device Download PDF

Info

Publication number
CN104372845A
CN104372845A CN201410607238.0A CN201410607238A CN104372845A CN 104372845 A CN104372845 A CN 104372845A CN 201410607238 A CN201410607238 A CN 201410607238A CN 104372845 A CN104372845 A CN 104372845A
Authority
CN
China
Prior art keywords
water
module
rainwater
water inlet
aqueduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410607238.0A
Other languages
Chinese (zh)
Other versions
CN104372845B (en
Inventor
朱泽
顾雯
蔡庆拟
罗晓丽
郝梦茹
胡涛
陈喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201410607238.0A priority Critical patent/CN104372845B/en
Publication of CN104372845A publication Critical patent/CN104372845A/en
Application granted granted Critical
Publication of CN104372845B publication Critical patent/CN104372845B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F2201/00Details, devices or methods not otherwise provided for
    • E03F2201/20Measuring flow in sewer systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/30Wastewater or sewage treatment systems using renewable energies
    • Y02W10/33Wastewater or sewage treatment systems using renewable energies using wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/30Wastewater or sewage treatment systems using renewable energies
    • Y02W10/37Wastewater or sewage treatment systems using renewable energies using solar energy

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Sewage (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)

Abstract

本发明公开了一种城市路面初期径流雨水截污处理装置,其特征在于:包括:进水口截污分流模块(1),沉淀池模块(2),净水池模块(3)以及自控提水模块(4);所述进水口截污分流模块(1)的出水口与所述沉淀池模块(2)的进水口相连,所述沉淀池模块(2)的出水口与所述自控提水模块(4)的进水口相连,所述自控提水模块(4)的出水口分别与所述净水池模块(3)的进水口和绿地地表(5)的灌溉喷口相连,所述净水池模块(3)的出水口与所述自控提水模块(4)相连通。本发明提供的一种城市路面初期径流雨水截污处理装置,实现雨水资源的循环利用,环保高效,符合生态用水要求,同时装置结构简单紧凑、成本低廉、经济适用、简易可行。

The invention discloses a sewage interception and treatment device for initial runoff rainwater on urban pavement, which is characterized in that it comprises: a water inlet sewage interception and diversion module (1), a sedimentation tank module (2), a water purification pool module (3) and self-controlled water lifting module (4); the water outlet of the water inlet interception and diversion module (1) is connected to the water inlet of the sedimentation tank module (2), and the water outlet of the sedimentation tank module (2) is connected to the self-controlled water extraction The water inlet of the module (4) is connected, the water outlet of the self-controlled water lifting module (4) is respectively connected with the water inlet of the water purification pool module (3) and the irrigation nozzle of the green land surface (5), and the water purification The water outlet of the pool module (3) communicates with the self-controlled water lifting module (4). The device provided by the present invention provides an initial runoff rainwater interception treatment device for urban pavement, realizes the recycling of rainwater resources, is environmentally friendly and efficient, and meets the requirements of ecological water use. At the same time, the device has a simple and compact structure, low cost, is economical and applicable, and is simple and feasible.

Description

一种城市路面初期径流雨水截污处理装置A treatment device for initial runoff rainwater interception on urban pavement

技术领域 technical field

本发明涉及一种城市路面初期径流雨水截污处理装置,尤其涉及一种用于城市蓄存降雨、净化初期径流雨水的截污处理装置,属于水利工程技术领域。 The invention relates to a sewage interception and treatment device for initial runoff rainwater on urban pavement, in particular to a sewage interception treatment device for storing rainfall and purifying initial runoff rainwater in cities, and belongs to the technical field of water conservancy engineering.

背景技术 Background technique

随着城市化进程的发展,不可渗透地面的面积高速增长,导致污染物堆积,使得路面雨水中持有大量的污染物,德国的Sansalone .J.J 在路面径流的研究表明,初期20%雨水径流中的污染负荷占整场降雨污染的80%,因此,初期雨水的截留与处理可有效控制径流带来的水体污染。目前,国内外对于雨水污染处理也有着不同的措施,国外大多是将雨水直接收集起来再利用,国内是将初期雨水直接引入污水处理厂,忽略了污水处理厂除污容量有限,多余污水未经处理直接排入自然水体。因此,有必要研制能够弥补这些方面不足的初期径流雨水截污处理装置,收集并净化城市道路雨水,并用净化后的雨水灌溉绿地,提高水资源利用率。 With the development of urbanization, the area of impermeable ground increases at a high speed, leading to the accumulation of pollutants, which makes the road rainwater hold a large amount of pollutants. Sansalone .J.J of Germany showed in the research of road runoff that the initial 20% rainwater runoff The pollution load of rainwater accounts for 80% of the total rainfall pollution. Therefore, the interception and treatment of initial rainwater can effectively control the water pollution caused by runoff. At present, there are different measures for rainwater pollution treatment at home and abroad. Most of the foreign countries directly collect rainwater for reuse. Domestically, the initial rainwater is directly introduced into the sewage treatment plant, ignoring the limited decontamination capacity of the sewage treatment plant. Disposal Discharge directly into natural water bodies. Therefore, it is necessary to develop an initial runoff rainwater interception treatment device that can make up for these deficiencies, collect and purify urban road rainwater, and use the purified rainwater to irrigate green spaces to improve water resource utilization.

发明内容 Contents of the invention

本发明所要解决的技术问题是,提供一种能够控制20%的初期雨水收集量,充分考虑了截污净水能力以及雨水污染源的分布问题;进一步地,本发明实现了集雨、截污、净水以及灌溉功能一体化;更进一步地,本发明实现了集雨、截污、净水以及灌溉的自动控制,还实现了水泵的一泵两用,使本发明的整体结构紧凑,适于实用;更进一步地,本发明实现了能源的绿色可持续利用,利用风车和太阳能电池板将风能和太阳能储存起来,并转化为电能储存在蓄电装置中,为整个装置提供绿色能源;更进一步地,本发明的沉淀池采用至少95%的镂空空间的土工防水布,具有超强的承压能力,可以实现更有效率的蓄水,经济适用,施工简单。 The technical problem to be solved by the present invention is to provide an initial rainwater collection that can control 20%, fully considering the interception and purification capacity and the distribution of rainwater pollution sources; further, the present invention realizes rain collection, sewage interception, Water purification and irrigation functions are integrated; further, the present invention realizes the automatic control of rain collection, sewage interception, water purification and irrigation, and also realizes the dual-purpose of one pump, which makes the overall structure of the present invention compact and suitable for Practical; further, the present invention realizes the green and sustainable utilization of energy, uses windmills and solar panels to store wind energy and solar energy, and converts them into electrical energy and stores them in the power storage device to provide green energy for the entire device; further Specifically, the sedimentation tank of the present invention adopts a geotechnical tarpaulin with at least 95% hollow space, which has super pressure bearing capacity, can realize more efficient water storage, is economical and applicable, and is easy to construct.

为解决上述技术问题,本发明采用的技术方案为: In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:

一种城市路面初期径流雨水截污处理装置,其特征在于:包括:进水口截污分流模块,沉淀池模块,净水池模块以及自控提水模块;所述进水口截污分流模块的出水口与所述沉淀池模块的进水口相连,所述沉淀池模块的出水口与所述自控提水模块的进水口相连,所述自控提水模块的出水口分别与所述净水池模块的进水口和绿地地表的灌溉喷口相连; A treatment device for initial runoff rainwater interception on urban pavement, characterized in that it includes: a water inlet sewage interception and diversion module, a sedimentation tank module, a water purification tank module and a self-control water lifting module; the water outlet of the water inlet sewage diversion module It is connected with the water inlet of the sedimentation tank module, the water outlet of the sedimentation tank module is connected with the water inlet of the self-control water lifting module, and the water outlet of the self-control water lifting module is respectively connected with the inlet of the water purification tank module. The water outlet is connected with the irrigation spout on the surface of the green space;

所述进水口截污分流模块包括用于收集雨水的水沟、进水口截污挂篮、装置截污挂篮、用于控制收集初期雨水的浮阀球、第一导水管以及第一检修井;所述水沟位于道路旁的地下,所述进水口截污挂篮连通所述道路地表和所述水沟,所述水沟底端有一开口且连接所述第一导水管的进水口,所述第一导水管的进水口处放置所述装置截污挂篮,所述装置截污挂篮底端呈喇叭型且开口,所述第一导水管内放置所述浮阀球,所述第一导水管的出水口与所述沉淀池模块的进水口相连,所述第一检修井设于所述第一导水管的正上方的所述道路上。 The sewage interception and diversion module of the water inlet includes a ditch for collecting rainwater, a sewage interception hanging basket at the water inlet, a sewage interception hanging basket for the device, a float valve ball for controlling the collection of initial rainwater, a first aqueduct, and a first maintenance well The ditch is located underground next to the road, the water inlet sewage intercepting hanging basket is connected to the surface of the road and the ditch, the bottom end of the ditch has an opening and is connected to the water inlet of the first aqueduct, The sewage intercepting hanging basket of the device is placed at the water inlet of the first aqueduct, and the bottom end of the sewage intercepting hanging basket of the device is trumpet-shaped and open, and the floating valve ball is placed in the first aqueduct. The water outlet of the first water conduit is connected to the water inlet of the sedimentation tank module, and the first maintenance well is arranged on the road directly above the first water conduit.

所述沉淀池模块包括沉淀池、泥沙沉淀区以及排泥孔,所述第一导水管的出水口与所述沉淀池的进水口相连,所述沉淀池位于所述绿地地表的下方,所述沉淀池的下方设置有所述泥沙沉淀区,所述泥沙沉淀区设置有所述排泥孔。 The sedimentation tank module includes a sedimentation tank, a sedimentation area and a mud discharge hole, the water outlet of the first aqueduct is connected to the water inlet of the sedimentation tank, and the sedimentation tank is located below the surface of the green land, so The sedimentation area is provided below the sedimentation tank, and the mud discharge hole is provided in the sedimentation area.

所述自控提水模块包括风车、太阳能电池板、电路连接线、蓄电装置、控制阀、水位监测器、第二检修井、水泵、第二导水管以及第三导水管,所述风车设置于地面上,所述风车上安装有所述太阳能电池板,所述电路连接线连接所述风车、太阳能电池板和蓄电装置,所述第二检修井位于所述沉淀池模块和净水池模块之间并连通所述沉淀池模块和净水池模块,所述第二检修井内设置有所述水泵,所述水泵通过所述第二导水管与所述绿地地表的灌溉喷口相连,所述水泵还通过所述第三导水管与所述净水池模块的进水口相连,所述水位监测器设有2个,分别位于所述沉淀池和净水池模块内,所述水位监测器通过所述控制阀与所述蓄电装置电相连。 The self-controlled water lifting module includes a windmill, a solar panel, a circuit connection line, an electric storage device, a control valve, a water level monitor, a second maintenance well, a water pump, a second aqueduct and a third aqueduct, and the windmill is arranged on On the ground, the solar panel is installed on the windmill, the circuit connection line connects the windmill, the solar panel and the power storage device, and the second maintenance shaft is located at the sedimentation tank module and the water purification tank module The sedimentation tank module and the water purification tank module are connected between them, the water pump is arranged in the second maintenance well, and the water pump is connected with the irrigation spout on the surface of the green land through the second aqueduct, and the water pump It is also connected to the water inlet of the water purification tank module through the third water guide pipe, and the water level monitor is provided with two, which are respectively located in the sedimentation tank and the water purification tank module, and the water level monitor passes through the The control valve is electrically connected to the power storage device.

所述风车、太阳能电池板、蓄电装置、控制阀以及水位监测器之间通过电路连接线相连接,构成一个蓄电供电一体化的供能装置。 The windmill, the solar panel, the power storage device, the control valve and the water level monitor are connected through a circuit connection line to form an energy supply device integrating power storage and power supply.

所述净水池模块包括净水池、浮床床体以及浮床框体,所述第三导水管与所述净水池的进水口相连,所述净水池由所述浮床框体划分为若干区,所述浮床框体上架设所述浮床床体,所述浮床床体上培植有用于净水水质的浮床植物。 The water purification pool module includes a water purification pool, a floating bed body and a floating bed frame, the third aqueduct is connected to the water inlet of the water purification pool, and the water purification pool is divided into several by the floating bed frame In the area, the floating bed body is erected on the floating bed frame, and the floating bed plants used for water purification are planted on the floating bed body.

所述进水口截污分流模块位于本发明的上方,所述沉淀池模块和净水池模块水平布置于绿地地表下,所述自控提水模块为本发明提供电能,使本发明成为一个自控结构。 The water inlet sewage interception and diversion module is located above the invention, the sedimentation tank module and the water purification tank module are horizontally arranged under the surface of the green space, and the self-control water lifting module provides electric energy for the invention, making the invention a self-control structure .

所述的第一导水管、第二导水管以及第三导水管均为PP-R管材。 The first aqueduct, the second aqueduct and the third aqueduct are all PP-R pipes.

所述浮阀球的直径大于所述装置截污挂篮的最小管径,且大于所述装置截污挂篮底端的直。 The diameter of the floating valve ball is greater than the minimum pipe diameter of the device's sewage intercepting hanging basket, and is greater than the diameter of the bottom end of the device's sewage intercepting hanging basket.

所述浮阀球直径略大于装置截污挂篮的最小管径,可收集20%的初期雨水。 The diameter of the floating valve ball is slightly larger than the minimum pipe diameter of the sewage intercepting hanging basket of the device, which can collect 20% of the initial rainwater.

所述沉淀池的容量为至少盛装占整个降雨量20%的初期雨水,所述沉淀池的上表面与所述水沟的下表面相平齐,所述沉淀池模块的材料为选用至少具有95%的镂空空间的土工防水布。 The capacity of the sedimentation tank is at least containing the initial rainwater accounting for 20% of the total rainfall, the upper surface of the sedimentation tank is flush with the lower surface of the ditch, and the material of the sedimentation tank module is selected to have at least 95 % hollow space geotechnical tarpaulins.

所述沉淀池采用95%的镂空空间的土工防水布制成。 The sedimentation tank is made of geotechnical waterproof cloth with 95% of the hollow space.

所述沉淀池的容量的计算方法为极限强度法。 The calculation method of the capacity of the sedimentation tank is the ultimate strength method.

极限强度法:当全流域雨水参与汇流时,产生的流量最大; Ultimate strength method: When the rainwater in the whole basin participates in the confluence, the flow generated is the largest;

1、当汇水面积上最远点的雨水流达集流点时,全面积产生汇流,雨水管道的设计流量最大; 1. When the rainwater flow at the farthest point on the catchment area reaches the catchment point, confluence will occur in the entire area, and the design flow rate of the rainwater pipeline will be the largest;

2、当降雨历时等于汇水面积上最远点的雨水流达集流点的集流时间时,雨水管道需要排除的雨水量最大。 2. When the rainfall duration is equal to the gathering time for the rainwater at the farthest point on the catchment area to reach the gathering point, the rainwater pipeline needs to discharge the largest amount of rainwater.

所述泥沙沉淀区的底面呈坡度,所述排泥孔设置于大坡度端的侧面上。 The bottom surface of the sediment deposition area has a slope, and the mud discharge hole is arranged on the side of the steep slope end.

所述控制阀包括第一控制阀、第二控制阀、第三控制阀和第四控制阀,所述第一控制阀设置于所述沉淀池的出水口处,所述第二控制阀设置于所述第二导水管上,所述第三控制阀设置于所述第三导水管上,所述第四控制阀设置于所述净水池的出水口处。 The control valve includes a first control valve, a second control valve, a third control valve and a fourth control valve, the first control valve is set at the water outlet of the sedimentation tank, and the second control valve is set at On the second water guide pipe, the third control valve is arranged on the third water guide pipe, and the fourth control valve is arranged at the water outlet of the water purification tank.

不同控制阀的开关组合实现本发明的储水、净水、灌溉等多功能的一体化。 The combination of switches of different control valves realizes the multifunctional integration of water storage, water purification, irrigation and the like in the present invention.

所述水位监测器上至少设置3个用于检测不同水位的探针。 At least three probes for detecting different water levels are arranged on the water level monitor.

本发明的工作原理如下: The working principle of the present invention is as follows:

集雨净雨:城市降雨时,路面雨水通过水沟,通过进水口截污挂篮初步将路面雨水的污物拦截,再通过装置截污挂篮达到二次拦污的效果,雨水通过第一导水管注入沉淀池模块,当初期雨水收集量达到20%时,在第一导水管中设置的浮阀球上移,将进水口截污分流模块的进水口堵住,完成此次降雨雨水的收集。注入沉淀池中的雨水,经沉淀后泥沙通过泥沙沉淀区,由排泥孔排出,此时,自控提水模块打开第一控制阀和第三控制阀,关闭第二控制阀和第四控制阀,经沉淀后的水由水泵提取,通过第三导水管注入净水池中,净水池中的浮床植物净化效果好并能美化环境,浮床植物如美人蕉。 Rain collection and purification: When the city is raining, the rainwater on the road passes through the ditch, and the sewage on the road is initially intercepted by the sewage intercepting hanging basket at the water inlet, and then the sewage intercepting hanging basket is installed to achieve the second pollution interception effect. The rainwater passes through the first The aqueduct is injected into the sedimentation tank module. When the initial rainwater collection reaches 20%, the floating valve ball set in the first aqueduct moves up to block the water inlet of the water inlet interception and diversion module to complete the rainwater collection of this rainfall. collect. The rainwater injected into the sedimentation tank, after sedimentation, the sediment passes through the sediment sedimentation area and is discharged from the mud discharge hole. At this time, the self-controlled water lifting module opens the first control valve and the third control valve, and closes the second control valve and the fourth control valve. Control valve, the water after sedimentation is extracted by the water pump, and injected into the water purification tank through the third aqueduct. The floating bed plants in the water purification tank have good purification effect and can beautify the environment. The floating bed plants are such as canna.

灌溉取水:本发明的电能通过太阳能电池板以及风车提供,储存在蓄电装置中,当绿地地表需要提水进行灌溉时,自控提水模块打开第二控制阀和第四控制阀,关闭第一控制阀和第三控制阀,通过蓄电装置为水泵供电,水泵将净水池中被净化后的水通过第三导水管提取出,并经由灌溉喷口实现对绿地的灌溉。 Water intake for irrigation: The electric energy of the present invention is provided by solar panels and windmills, and stored in the power storage device. When the surface of the green land needs to lift water for irrigation, the self-control water lift module opens the second control valve and the fourth control valve, and closes the first control valve. The control valve and the third control valve supply power to the water pump through the power storage device, and the water pump extracts the purified water in the water purification tank through the third aqueduct, and realizes irrigating the green space through the irrigation spout.

污染物冲刷规律为初期20%雨水径流中的污染负荷占整场降雨污染的80%,故初期雨水的截留与处理可有效控制径流带来的水体污染 。 The law of pollutant erosion is that the pollution load in the initial 20% of rainwater runoff accounts for 80% of the total rainfall pollution, so the interception and treatment of initial rainwater can effectively control the water pollution caused by runoff.

我国目前是将初期雨水直接引入到污水处理厂,忽略了污水处理厂除污容量有限,多余污水未经处理直接排入自然水体。  At present, our country directly introduces the initial rainwater into the sewage treatment plant, ignoring the limited decontamination capacity of the sewage treatment plant, and the excess sewage is directly discharged into the natural water body without treatment. the

雨水中包含各种污染物(悬浮颗粒(SS)、N、P等营养元素、金属元素、有机化合物等),而初期20%雨水中的各种污染物占整场降雨污染的80%;本发明先利用进水口截污挂篮进行物理净化,即初步去除大颗粒泥沙,碎垃圾,漂浮物,树叶等;然后利用浮阀球截留20%的初期雨水至沉淀池,其余80%的后期雨水经水沟排放至湖泊河流;20%的初期雨水经沉淀池沉淀去除泥沙后排出净化池,经净化池的植物吸收、土壤渗透去除大量植物营养元素及有机物,净化后的水为有机物量较低的水体,用于灌溉草坪、树木等植被。 Rainwater contains various pollutants (suspended particles (SS), N, P and other nutrient elements, metal elements, organic compounds, etc.), and various pollutants in the initial 20% of rainwater account for 80% of the entire rainfall pollution; The invention first uses the sewage intercepting hanging basket at the water inlet to carry out physical purification, that is, initially removes large particles of sediment, broken garbage, floating objects, leaves, etc.; then uses the floating valve ball to intercept 20% of the initial rainwater to the sedimentation tank, and the remaining 80% of the later stage Rainwater is discharged to lakes and rivers through ditches; 20% of the initial rainwater is deposited in the sedimentation tank to remove sediment and then discharged to the purification tank. Plants absorb and soil infiltration in the purification tank removes a large number of plant nutrients and organic matter. The purified water is the amount of organic matter The lower water body is used to irrigate vegetation such as lawns and trees.

本发明提供的一种城市路面初期径流雨水截污处理装置,在收集城市道路雨水的同时,将受污染的雨水净化,并用于绿地灌溉,实现雨水资源的循环利用;本发明利用浮阀球控制20%的初期雨水收集量,充分考虑了截污净水能力以及雨水污染源的分布情况,即浮阀球为雨水分流器,能收集20%的初期降雨;本发明结构紧凑,利用水沟集雨、挂篮截污、沉淀池过滤、净水池净水、再通过水泵提水实现灌溉,使集雨、截污、净水以及灌溉功能一体化;本发明利用水位监测器实现装置的自动控制以及水泵的一泵两用,一是将经沉淀池沉淀后的雨水注入净化池,二是将净化后的水从净化池中提出用于绿地灌溉;本发明还.利用绿色能源为装置提供电能,利用风车和太阳能电池板将风能和太阳能储存起来,并转化为电能储存在蓄电装置中,为本发明提供绿色能源;还有,本发明的沉淀池采用95%的镂空空间的土工防水布,具有超强的承压能力,可以实现更有效率的蓄水,经济适用,施工简单。 The present invention provides an urban road initial runoff rainwater interception treatment device, which can purify the polluted rainwater while collecting urban road rainwater, and use it for green space irrigation to realize the recycling of rainwater resources; the present invention utilizes floating valve balls to control 20% of the initial rainwater collection, fully considering the sewage interception and water purification capacity and the distribution of rainwater pollution sources, that is, the floating valve ball is a rainwater diverter, which can collect 20% of the initial rainfall; the invention has a compact structure and utilizes gutters to collect rain , hanging basket to intercept sewage, filter in sedimentation tank, purify water in water purification pool, and then pump water to realize irrigation, so that rain collection, sewage interception, water purification and irrigation functions are integrated; the invention uses a water level monitor to realize automatic control of the device As well as the dual-purpose of the water pump, the first is to inject the rainwater deposited in the sedimentation tank into the purification tank, and the second is to extract the purified water from the purification tank for green land irrigation; the present invention also uses green energy to provide electric energy for the device , Utilize windmills and solar panels to store wind energy and solar energy, and convert them into electric energy and store them in the storage device, so as to provide green energy for the present invention; in addition, the sedimentation tank of the present invention adopts a geotechnical tarpaulin with 95% hollow space , has super pressure bearing capacity, can realize more efficient water storage, is economical and applicable, and is easy to construct.

本发明提供的一种城市路面初期径流雨水截污处理装置,以雨水为处理载体,通过集雨、截污净化、自动化提水灌溉等环节实现雨水资源的循环利用,环保高效,符合生态用水要求;同时装置结构简单紧凑、成本低廉、经济适用、简易可行。综上所述,该装置具有良好的推广价值和应用前景。 The invention provides an urban pavement initial runoff rainwater interception and sewage treatment device, which uses rainwater as a treatment carrier to realize the recycling of rainwater resources through rain collection, sewage interception and purification, automatic water lifting and irrigation, which is environmentally friendly and efficient, and meets the requirements of ecological water use ; Simultaneously, the structure of the device is simple and compact, low in cost, economical and applicable, simple and feasible. In summary, the device has good promotion value and application prospect.

附图说明 Description of drawings

图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;

图2为本发明的俯视图; Fig. 2 is the top view of the present invention;

图3为本发明中水位监测器的结构示意图; Fig. 3 is the structural representation of water level monitor among the present invention;

图4为本发明中降雨时间-雨水量的趋势图。 Fig. 4 is a trend diagram of rainfall time-rainwater amount in the present invention.

具体实施方式 Detailed ways

下面结合附图对本发明作更进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings.

如图1~3所示,一种城市路面初期径流雨水截污处理装置,其特征在于:包括:进水口截污分流模块1,沉淀池模块2,净水池模块3以及自控提水模块4;所述进水口截污分流模块1的出水口与所述沉淀池模块2的进水口相连,所述沉淀池模块2的出水口与所述自控提水模块4的进水口相连,所述自控提水模块4的出水口分别与所述净水池模块3的进水口和绿地地表5的灌溉喷口相连,所述净水池模块3的出水口与所述自控提水模块4相连通; As shown in Figures 1 to 3, an urban pavement initial runoff rainwater interception treatment device is characterized in that it includes: a water inlet sewage interception and diversion module 1, a sedimentation tank module 2, a water purification tank module 3 and a self-controlled water lifting module 4 ; The water outlet of the water inlet interception and diversion module 1 is connected with the water inlet of the sedimentation tank module 2, the water outlet of the sedimentation tank module 2 is connected with the water inlet of the automatic control water lifting module 4, and the automatic control The water outlet of the water-lifting module 4 is connected with the water inlet of the water purification pool module 3 and the irrigation spout of the green space surface 5 respectively, and the water outlet of the water purification pool module 3 is connected with the self-control water lifting module 4;

所述进水口截污分流模块1包括用于收集雨水的水沟11、进水口截污挂篮12、装置截污挂篮13、用于控制收集初期雨水的浮阀球14、第一导水管15以及第一检修井16;所述水沟11位于道路6旁的地下,所述进水口截污挂篮12连通所述道路6地表和所述水沟11,所述水沟11底端有一开口且连接所述第一导水管15的进水口,所述第一导水管15的进水口处放置所述装置截污挂篮13,所述装置截污挂篮13底端呈喇叭型且开口,所述第一导水管15内放置所述浮阀球14,所述第一导水管15的出水口与所述沉淀池模块2的进水口相连,所述第一检修井16设于所述第一导水管15的正上方的所述道路6上。 The water inlet sewage interception and diversion module 1 includes a ditch 11 for collecting rainwater, a water inlet sewage interception hanging basket 12, a device sewage interception hanging basket 13, a floating valve ball 14 for controlling the collection of initial rainwater, and a first aqueduct 15 and the first maintenance well 16; the ditch 11 is located underground next to the road 6, the water inlet sewage interception hanging basket 12 communicates with the surface of the road 6 and the ditch 11, and the bottom end of the ditch 11 has a Open and connected to the water inlet of the first water guide pipe 15, the water inlet of the first water guide pipe 15 is placed with the device intercepting the sewage hanging basket 13, and the bottom end of the device intercepting the sewage hanging basket 13 is trumpet-shaped and has an opening. , the float valve ball 14 is placed in the first aqueduct 15, the water outlet of the first aqueduct 15 is connected to the water inlet of the sedimentation tank module 2, and the first maintenance well 16 is located in the On the road 6 directly above the first water conduit 15 .

所述沉淀池模块2包括沉淀池21、泥沙沉淀区22以及排泥孔23,所述第一导水管15的出水口与所述沉淀池21的进水口相连,所述沉淀池21位于所述绿地地表5的下方,所述沉淀池21的下方设置有所述泥沙沉淀区22,所述泥沙沉淀区22设置有所述排泥孔23。 The sedimentation tank module 2 includes a sedimentation tank 21, a sedimentation area 22, and a mud discharge hole 23. The water outlet of the first aqueduct 15 is connected to the water inlet of the sedimentation tank 21, and the sedimentation tank 21 is located at the Below the green land surface 5, the sedimentation area 22 is provided below the sedimentation tank 21, and the sedimentation area 22 is provided with the mud discharge hole 23.

所述自控提水模块4包括风车41、太阳能电池板42、电路连接线43、蓄电装置44、控制阀45、水位监测器46、第二检修井47、水泵48、第二导水管49以及第三导水管410,所述风车41设置于地面上,所述风车41上安装有所述太阳能电池板42,所述电路连接线43连接所述风车41、太阳能电池板42和蓄电装置44,所述第二检修井47位于所述沉淀池模块2和净水池模块3之间并连通所述沉淀池模块2和净水池模块3,所述第二检修井47内设置有所述水泵48,所述水泵48通过所述第二导水管49与所述绿地地表5的灌溉喷口相连,所述水泵48还通过所述第三导水管410与所述净水池模块3的进水口相连,所述水位监测器46设有2个,分别位于所述沉淀池21和净水池模块3内,所述水位监测器46通过所述控制阀45与所述蓄电装置44电相连。 The self-controlled water lifting module 4 includes a windmill 41, a solar panel 42, a circuit connection line 43, an electrical storage device 44, a control valve 45, a water level monitor 46, a second maintenance well 47, a water pump 48, a second water guide pipe 49 and The third water pipe 410, the windmill 41 is arranged on the ground, the solar battery panel 42 is installed on the windmill 41, and the circuit connection line 43 is connected to the windmill 41, the solar battery panel 42 and the power storage device 44 , the second maintenance well 47 is located between the sedimentation tank module 2 and the water purification tank module 3 and communicates with the sedimentation tank module 2 and the water purification tank module 3, and the second maintenance well 47 is provided with the A water pump 48, the water pump 48 is connected to the irrigation spout of the green land surface 5 through the second water guide pipe 49, and the water pump 48 is also connected to the water inlet of the water purification pool module 3 through the third water guide pipe 410 There are two water level monitors 46 located in the sedimentation tank 21 and the water purification tank module 3 respectively. The water level monitor 46 is electrically connected to the power storage device 44 through the control valve 45 .

所述净水池模块3包括净水池31、浮床床体32以及浮床框体33,所述第三导水管410与所述净水池31的进水口相连,所述净水池31由所述浮床框体33划分为若干区,所述浮床框体33上架设所述浮床床体32,所述浮床床体32上培植有用于净水水质的浮床植物7。 The water purification tank module 3 includes a water purification tank 31, a floating bed body 32 and a floating bed frame 33, the third water guide pipe 410 is connected to the water inlet of the water purification tank 31, and the water purification tank 31 is formed by the The floating bed frame 33 is divided into several areas, the floating bed body 32 is erected on the floating bed frame body 33, and the floating bed plants 7 for water purification and water quality are cultivated on the floating bed body 32.

所述浮阀球14的直径大于所述装置截污挂篮13的最小管径,且大于所述装置截污挂篮13底端的直。 The diameter of the floating valve ball 14 is greater than the minimum pipe diameter of the device intercepting the dirt hanging basket 13, and greater than the diameter of the device intercepting the dirt hanging basket 13 bottom.

所述沉淀池21的容量为至少盛装占整个降雨量20%的初期雨水,所述沉淀池21的上表面与所述水沟11的下表面相平齐,所述沉淀池模块2的材料为选用至少具有95%的镂空空间的土工防水布。 The capacity of the sedimentation tank 21 is at least containing the initial rainwater accounting for 20% of the total rainfall, the upper surface of the sedimentation tank 21 is flush with the lower surface of the ditch 11, and the material of the sedimentation tank module 2 is Choose a geotechnical tarpaulin with at least 95% hollow space.

所述沉淀池21的容量的计算方法为极限强度法。 The calculation method of the capacity of the sedimentation tank 21 is the ultimate strength method.

所述泥沙沉淀区22的底面呈坡度,所述排泥孔23设置于大坡度端的侧面上。 The bottom surface of the sediment sedimentation area 22 has a slope, and the mud discharge hole 23 is arranged on the side of the steep slope end.

所述控制阀45包括第一控制阀451、第二控制阀452、第三控制阀453和第四控制阀454,所述第一控制阀451设置于所述沉淀池21的出水口处,所述第二控制阀452设置于所述第二导水管49上,所述第三控制阀453设置于所述第三导水管410上,所述第四控制阀454设置于所述净水池31的出水口处。 The control valve 45 includes a first control valve 451, a second control valve 452, a third control valve 453 and a fourth control valve 454. The first control valve 451 is arranged at the water outlet of the sedimentation tank 21, so The second control valve 452 is set on the second water pipe 49, the third control valve 453 is set on the third water pipe 410, and the fourth control valve 454 is set on the water purification tank 31. at the water outlet.

所述水位监测器46上至少设置3个用于检测不同水位的探针。 The water level monitor 46 is provided with at least three probes for detecting different water levels.

如图4所示,举例说明沉淀池容积的计算方法:在一次特定降雨中,选定一个特定地点,测量W1和W2的降雨量随降雨时间t的变化并绘制曲线,当W1=W2(初期雨水与后期雨水各占50%),此时T=7.5 min;当t>T时,洁净降雨将明显增多,而初期雨水量增速缓慢。因此,初期雨量为沉淀池的容积计算量的依据,此时,W1=9.8m3,故初期雨水取为10m3,即沉淀池的容积确定为10m3As shown in Figure 4, an example is given to illustrate the calculation method of the volume of the sedimentation tank: in a specific rainfall, select a specific location, measure the rainfall of W1 and W2 with the rainfall time t and draw the curve, when W1=W2 (initial At this time, T=7.5 min; when t>T, the clean rainfall will increase significantly, while the growth rate of initial rainfall is slow. Therefore, the initial rainfall is the basis for calculating the volume of the sedimentation tank. At this time, W1=9.8m 3 , so the initial rainwater is taken as 10m 3 , that is, the volume of the sedimentation tank is determined to be 10m 3 .

W1代表初期雨水,W2代表后期雨水,t代表降雨时间,T代表W1=W2时的降雨时间。 W1 represents the initial rain, W2 represents the late rain, t represents the rainfall time, and T represents the rainfall time when W1=W2.

以上所述仅是本发明的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.

Claims (10)

1. a urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus, is characterized in that: comprising: water inlet cuts dirty diverter module (1), sedimentation basin module (2), clear water reservoir module (3) and automatic control water lift module (4); The delivery port that described water inlet cuts dirty diverter module (1) is connected with the water inlet of described sedimentation basin module (2), the delivery port of described sedimentation basin module (2) is connected with the water inlet of described automatic control water lift module (4), the delivery port of described automatic control water lift module (4) is connected with the irrigation spout of earth's surface, greenery patches (5) with the water inlet of described clear water reservoir module (3) respectively, and the delivery port of described clear water reservoir module (3) is connected with described automatic control water lift module (4);
Described water inlet cut dirty diverter module (1) comprise ditch (11) for collecting rainwater, water inlet Prefabricated combined septic tank (12), device Prefabricated combined septic tank (13), for controlling to collect the float valve ball (14) of early-stage rainwater, the first aqueduct (15) and the first inspection-pit (16), described ditch (11) is positioned at the other underground of road (6), described water inlet Prefabricated combined septic tank (12) is communicated with described road (6) earth's surface and described ditch (11), there is an opening described ditch (11) bottom and connects the water inlet of described first aqueduct (15), described device Prefabricated combined septic tank (13) is placed in the water inlet of described first aqueduct (15), described device Prefabricated combined septic tank (13) bottom is trumpet type and opening, described float valve ball (14) is placed in described first aqueduct (15), the delivery port of described first aqueduct (15) is connected with the water inlet of described sedimentation basin module (2), described first inspection-pit (16) is located on the described road (6) directly over described first aqueduct (15).
2. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 1, it is characterized in that: described sedimentation basin module (2) comprises sedimentation basin (21), sediment deposition district (22) and mudhole (23), the delivery port of described first aqueduct (15) is connected with the water inlet of described sedimentation basin (21), described sedimentation basin (21) is positioned at the below on earth's surface, described greenery patches (5), the below of described sedimentation basin (21) is provided with described sediment deposition district (22), and described sediment deposition district (22) is provided with described mudhole (23).
3. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 2, it is characterized in that: described automatic control water lift module (4) comprises windmill (41), solar panel (42), circuit connecting wire (43), electrical storage device (44), control valve (45), water level monitor (46), second inspection-pit (47), water pump (48), second aqueduct (49) and the 3rd aqueduct (410), described windmill (41) is arranged on ground, described windmill (41) is provided with described solar panel (42), described circuit connecting wire (43) connects described windmill (41), solar panel (42) and electrical storage device (44), described second inspection-pit (47) to be positioned between described sedimentation basin module (2) and clear water reservoir module (3) and to be communicated with described sedimentation basin module (2) and clear water reservoir module (3), described water pump (48) is provided with in described second inspection-pit (47), described water pump (48) is connected with the irrigation spout on earth's surface, described greenery patches (5) by described second aqueduct (49), described water pump (48) is also connected with the water inlet of described clear water reservoir module (3) by described 3rd aqueduct (410), described water level monitor (46) is provided with 2, lay respectively in described sedimentation basin (21) and clear water reservoir module (3), described water level monitor (46) is connected with described electrical storage device (44) electricity by described control valve (45).
4. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 3, it is characterized in that: described clear water reservoir module (3) comprises clear water reservoir (31), floating bed bed body (32) and floating bed framework (33), described 3rd aqueduct (410) is connected with the water inlet of described clear water reservoir (31), described clear water reservoir (31) is divided into some districts by described floating bed framework (33), the described floating bed bed body (32) of the upper erection of described floating bed framework (33), described floating bed bed body (32) is upper cultivates the floating bed plant (7) had for water purification water quality.
5. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 1, it is characterized in that: the diameter of described float valve ball (14) is greater than the minimum pipe of described device Prefabricated combined septic tank (13), and be greater than the straight of described device Prefabricated combined septic tank (13) bottom.
6. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 2, it is characterized in that: the capacity of described sedimentation basin (21) is that at least splendid attire accounts for the early-stage rainwater of whole amount of precipitation 20%, the upper surface of described sedimentation basin (21) is mutually concordant with the soffit of described ditch (11), and the material of described sedimentation basin module (2) is the geotechnological canvas cloth selecting the hollow space at least with 95%.
7. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 6, is characterized in that: the computational methods of the capacity of described sedimentation basin (21) are ultimate strenght method.
8. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 1, is characterized in that: the bottom surface of described sediment deposition district (22) is the gradient, and described mudhole (23) is arranged on the side of heavy grade end.
9. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 4, it is characterized in that: described control valve (45) comprises the first control valve (451), second control valve (452), 3rd control valve (453) and the 4th control valve (454), described first control valve (451) is arranged at the water outlet of described sedimentation basin (21), described second control valve (452) is arranged on described second aqueduct (49), described 3rd control valve (453) is arranged on described 3rd aqueduct (410), described 4th control valve (454) is arranged at the water outlet of described clear water reservoir (31).
10. a kind of urban pavement Initial Runoff intercepting pollution for rainwater treating apparatus according to claim 3, is characterized in that: described water level monitor (46) is at least arranged 3 for detecting the probe of different water level.
CN201410607238.0A 2014-10-31 2014-10-31 A treatment device for initial runoff rainwater interception on urban pavement Expired - Fee Related CN104372845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410607238.0A CN104372845B (en) 2014-10-31 2014-10-31 A treatment device for initial runoff rainwater interception on urban pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410607238.0A CN104372845B (en) 2014-10-31 2014-10-31 A treatment device for initial runoff rainwater interception on urban pavement

Publications (2)

Publication Number Publication Date
CN104372845A true CN104372845A (en) 2015-02-25
CN104372845B CN104372845B (en) 2016-01-13

Family

ID=52552012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410607238.0A Expired - Fee Related CN104372845B (en) 2014-10-31 2014-10-31 A treatment device for initial runoff rainwater interception on urban pavement

Country Status (1)

Country Link
CN (1) CN104372845B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104829051A (en) * 2015-04-27 2015-08-12 桂林市广泽科技开发有限公司 Intelligent rainwater/waste water purification treatment system and application and treatment method thereof
CN105672440A (en) * 2015-12-23 2016-06-15 河南科技学院 Intelligent urban green land rainwater collection and utilization apparatus
CN106440597A (en) * 2016-09-30 2017-02-22 东莞市联洲知识产权运营管理有限公司 Stacking type water source storage equipment
CN108517737A (en) * 2018-04-13 2018-09-11 河海大学 A kind of subsurface stormwater processing collection reuse means
CN109322374A (en) * 2017-10-30 2019-02-12 湖南雨创环保工程有限公司 A kind of non-sunk type greenery patches processing unit and method
CN110679435A (en) * 2019-10-28 2020-01-14 淮安信息职业技术学院 Wisdom is irrigation equipment for agricultural
CN111995166A (en) * 2020-06-05 2020-11-27 南京信息工程大学 Intelligent mountain initial rain storage and decontamination system and in-situ self-driven utilization method thereof
CN114751602A (en) * 2022-05-23 2022-07-15 珠江水利委员会珠江水利科学研究院 Water collection and recycling system for living community

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028788A (en) * 2004-07-13 2006-02-02 Ooike Co Ltd Lid for underground structure
CN101844852A (en) * 2009-03-23 2010-09-29 甘肃金桥给水排水设计与工程(集团)有限公司 Small sewage biological treatment and reuse device and control method
CN102531282A (en) * 2011-12-28 2012-07-04 华北水利水电学院 Device and method for quality-based rainwater collection, treatment and utilization
CN203768984U (en) * 2014-01-16 2014-08-13 安徽锋亚环境技术有限公司 Environment-friendly energy-saving type yard type rainwater collecting, processing and recycling system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006028788A (en) * 2004-07-13 2006-02-02 Ooike Co Ltd Lid for underground structure
CN101844852A (en) * 2009-03-23 2010-09-29 甘肃金桥给水排水设计与工程(集团)有限公司 Small sewage biological treatment and reuse device and control method
CN102531282A (en) * 2011-12-28 2012-07-04 华北水利水电学院 Device and method for quality-based rainwater collection, treatment and utilization
CN203768984U (en) * 2014-01-16 2014-08-13 安徽锋亚环境技术有限公司 Environment-friendly energy-saving type yard type rainwater collecting, processing and recycling system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104829051A (en) * 2015-04-27 2015-08-12 桂林市广泽科技开发有限公司 Intelligent rainwater/waste water purification treatment system and application and treatment method thereof
CN105672440A (en) * 2015-12-23 2016-06-15 河南科技学院 Intelligent urban green land rainwater collection and utilization apparatus
CN106440597A (en) * 2016-09-30 2017-02-22 东莞市联洲知识产权运营管理有限公司 Stacking type water source storage equipment
CN106440597B (en) * 2016-09-30 2018-11-30 绍兴柯桥耀沃针纺有限公司 A kind of stack type water source storage facilities
CN109322374A (en) * 2017-10-30 2019-02-12 湖南雨创环保工程有限公司 A kind of non-sunk type greenery patches processing unit and method
CN108517737A (en) * 2018-04-13 2018-09-11 河海大学 A kind of subsurface stormwater processing collection reuse means
CN108517737B (en) * 2018-04-13 2020-02-21 河海大学 An underground rainwater treatment, collection and reuse device
CN110679435A (en) * 2019-10-28 2020-01-14 淮安信息职业技术学院 Wisdom is irrigation equipment for agricultural
CN110679435B (en) * 2019-10-28 2021-07-06 淮安信息职业技术学院 Wisdom is irrigation equipment for agricultural
CN111995166A (en) * 2020-06-05 2020-11-27 南京信息工程大学 Intelligent mountain initial rain storage and decontamination system and in-situ self-driven utilization method thereof
CN111995166B (en) * 2020-06-05 2022-04-08 南京信息工程大学 A smart mountain first rain regulation, storage and decontamination system and its in-situ self-driving utilization method
CN114751602A (en) * 2022-05-23 2022-07-15 珠江水利委员会珠江水利科学研究院 Water collection and recycling system for living community

Also Published As

Publication number Publication date
CN104372845B (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN104372845B (en) A treatment device for initial runoff rainwater interception on urban pavement
CN201976543U (en) Green belt rain collecting automatic micro-sprinkling irrigation device
CN202374807U (en) Solar rainwater irrigation device for green belts
CN209686564U (en) A kind of small sponge urban ecology rainwater storage cell system
CN104213599B (en) Zero energy consumption roof rain water reclaims Waste water utilization system
CN105735405B (en) A kind of rainwater collecting and treating system on building roof
CN206408676U (en) A kind of cell environment landscape planting rain collector
CN209907525U (en) Urban road rainwater collection, purification and utilization system
CN104196179B (en) A kind of rainwater utilization system and using method thereof
CN205204913U (en) A stealthy ecological filtering pond system that is used for initial stage rainwater to collect retrieval and utilization
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN209509056U (en) A kind of water storage reclamation set of rain water on roof disconnecting
CN205153075U (en) Grange rain water collecting device
CN109937747A (en) Rainwater collection and automatic irrigation system in the green belt of the viaduct
CN202148222U (en) Processing device for denitrification and phosphorous removal of high-load reciprocating type undercurrent artificial wetland
CN201520997U (en) Side ditch rainwater collection device
CN104264773B (en) A kind of for the treatment of parking lot rainwater and the storage stream wet land system regulating miniclimate
CN111285503A (en) Outdoor courtyard rainwater resource recycling integrated system and rainwater purification method
CN202380515U (en) Multi-purpose rainwater utilization system
CN211897679U (en) Novel sponge urban road system
CN204540225U (en) The express highway intelligent irrigation system that a kind of water collection section is water integrated
CN204163295U (en) A kind of rainwater utilization system
CN203514479U (en) Artificial underground river rainwater accumulation and drainage device
CN207714472U (en) Cell rainwater-collecting and irrigation system
CN206110232U (en) Community landscaping rainwater utilization device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20181031

CF01 Termination of patent right due to non-payment of annual fee