CN104362745B - A kind of important sensitivity load Power supply system of factory - Google Patents

A kind of important sensitivity load Power supply system of factory Download PDF

Info

Publication number
CN104362745B
CN104362745B CN201410592919.4A CN201410592919A CN104362745B CN 104362745 B CN104362745 B CN 104362745B CN 201410592919 A CN201410592919 A CN 201410592919A CN 104362745 B CN104362745 B CN 104362745B
Authority
CN
China
Prior art keywords
load
chopper
wireless
executor
important sensitivity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410592919.4A
Other languages
Chinese (zh)
Other versions
CN104362745A (en
Inventor
倪明
汤奕
谭敏刚
申振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nandian Smart Energy Service Co., Ltd
Original Assignee
CHANGZHOU SPREAD POWER TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU SPREAD POWER TECH Co Ltd filed Critical CHANGZHOU SPREAD POWER TECH Co Ltd
Priority to CN201410592919.4A priority Critical patent/CN104362745B/en
Publication of CN104362745A publication Critical patent/CN104362745A/en
Application granted granted Critical
Publication of CN104362745B publication Critical patent/CN104362745B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of important sensitivity load Power supply system of factory, including impact load and important sensitivity load, impact load is connected in supply line by chopper, and chopper is connected with the wireless executor of impact load by auxiliary reclay;Important sensitivity load first line in parallel, the second connection are in supply line, chopper and ups power is in series with first line, chopper is provided with second circuit, and the chopper on first line, the second circuit is connected with the wireless executor of important sensitivity load by auxiliary reclay;Load is wireless, and executor is communicated with wireless transceiver;Wireless transceiver is connected with electricity consumption Automatic Centering Control of factory, before impact load is started, send the important sensitivity load of control signal switching to be powered by UPS, after impact load stable operation, control signal is sent by important sensitivity load switching electrical network normal power supply, so as to ensure the power supply reliability of important sensitivity load.

Description

A kind of important sensitivity load Power supply system of factory
Technical field
The present invention relates to a kind of Power supply system, the important sensitivity load Power supply system of specifically a kind of factory.
Background technology
Due to the restriction of plant configuration and important in some of the consideration of convenience and economy, factory is connected up Sensitivity load is often connected on some impact loads in same time supply line.
But when starting these impact loads, the high capacity motor of generally existing in such as factory, inevitably Cause a series of asking for power quality indexs declines such as the voltage cataclysm of electrical network supply line, harmonic content increase, frequency fluctuation is big Topic, in addition in electrical network supply line end, power quality index is originally decreased, important and to electric energy so as to have influence on some The operation of the more sensitive load of mass ratio, can even cause the permanent damage of these loads under serious conditions, electricity of such as handling official business The equipment such as brain, workspace server, instrument and meter, precision electric motor.
Content of the invention
The present invention provides a kind of factory important sensitivity load Power supply system, and the system is used for solving present plant punching Hitting property load startup moment causes supply line's power quality index degradation, affects the normal work of important sensitivity load The technical problem of work.
In order to solve above-mentioned technical problem, the technical scheme is that:A kind of important sensitivity load of factory is powered guarantor Barrier system, including some impact loads for being connected in parallel in supply line and some important sensitivity loads, and by wirelessly holding Row device, auxiliary reclay, chopper, ups power, 6 class functional module of wireless transceiver and electricity consumption Automatic Centering Control of factory, its In wireless executor include the wireless executor of impact load and the wireless executor of important sensitivity load.
The impact load is connected in supply line by chopper, and the chopper is by auxiliary reclay and punching Executor's connection that hitting property load is wireless, the control signal that wireless for impact load executor is sent by auxiliary reclay are amplified, are made Impact load is wireless, and executor controls input and the excision of chopper, and then controls the power on/off of impact load;
Important sensitivity load first line in parallel, the second connection in supply line, described Chopper and ups power is in series with one circuit, is provided with chopper on the second circuit, disconnected on first line, the second circuit Road device is connected with the wireless executor of important sensitivity load by auxiliary reclay respectively, and important sensitivity is born by auxiliary reclay Lotus is wireless, and control signal that executor sends is amplified, and makes the wireless executor's control first line of important sensitivity load, the second line The input of chopper and excision on road, and then control the power on/off of important sensitivity load;
The wireless executor of impact load and the wireless executor of important sensitivity load are by wirelessly or non-wirelessly mode Communicated with wireless transceiver, for transmitting control signal;The wireless executor of impact load described here and important sensitivity Property the wireless executor of load preferably wirelessly communicated with wireless transceiver.
The Main Function of wireless transceiver is the enabling signal to impact load and automatically controls from factory's electricity consumption The control signal of the heart is received and is forwarded.
The wireless transceiver is connected with electricity consumption Automatic Centering Control of factory, and electricity consumption Automatic Centering Control of factory can be automatic Judge, automatically confirm that and execute automatically the Booting sequence of impact load, before impact load is started, send control signal and cut Change important sensitivity load to be powered by UPS, after impact load stable operation, control signal is sent by important sensitivity load Switch by electrical network normal power supply, so as to ensure the power supply reliability of important sensitivity load.
Ups power having acted in addition to the uninterrupted power supply except ensureing important load after grid cut-off, also herein Electrical network is replaced to power for important sensitivity load temporarily, it is to avoid its function of being affected by impact load start-up course.
Electricity consumption Automatic Centering Control of factory, is the core of the system, can either automatic decision, automatically confirm that and execute automatically The Booting sequence of impact load, ensures the normal operation of important sensitivity load.There is human-computer interaction function again, manually can set Fixed and optimized work flow.
The operation principle of whole system is:Under being executed by the control of electricity consumption Automatic Centering Control of factory, starting impact Before load, switch important sensitivity load and powered by UPS, after waiting impact load stable operation, switch important sensitivity load By former electrical network normal power supply, the power supply reliability of important sensitivity load is ensured with this.
The invention has the advantages that:
1. avoid supply line's power quality index degradation being caused as factory's impact load starts moment, affect The normal work of important sensitivity load.
2. ensure that the whole process of important sensitivity load normal work is automatically complete by electricity consumption Automatic Centering Control of factory Into, it is to avoid artificial maloperation, safe and reliable.
3. radio communication, it is to avoid loaded down with trivial details wiring.
Description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is the system principle schematic diagram of the present invention.
Specific embodiment
As shown in figure 1, a kind of important sensitivity load Power supply system of factory, if including being connected in parallel in supply line Dry impact load (i.e. load 11,21...N1) and some important sensitivity loads 101 (only indicate in Fig. 1 one group important quick Inductive load), and by wireless executor, auxiliary reclay, chopper, ups power 3, wireless transceiver 4 and factory's electricity consumption certainly 5 six class functional module of dynamic control centre, wherein wireless executor include the wireless executor of impact load 14,24 ... N4 and weight Want the wireless executor 104 of sensitivity load.
By taking the 1st impact load 11 as an example, which passes through chopper 12 and is connected in supply line, during chopper 12 passes through Between relay 13 be connected with the wireless executor 14 of impact load, auxiliary reclay 13 is by wireless for impact load executor 14 The control signal for going out is amplified, and makes input and the excision of the wireless control of executor 14 chopper 12 of impact load, and then controls punching The power on/off of hitting property load 11.
2nd impact load is connected in supply line by chopper 22, and chopper 22 passes through auxiliary reclay 23 Wireless executor 24 is connected with impact load, the control letter that wireless for impact load executor 24 is sent by auxiliary reclay 23 Number amplify, make input and the excision of impact load wireless executor 24 control chopper 22, and then control impact load 21 Power on/off.
The like, n-th impact load N1 is connected in supply line by chopper N2, during chopper N2 passes through Between relay N3 executor N4 wireless with impact load be connected, auxiliary reclay N3 by wireless for impact load executor N4 send out The control signal for going out is amplified, and makes input and the excision of the wireless executor N4 controls chopper N2 of impact load, and then controls punching The power on/off of hitting property load N1.
Important sensitivity load 101 first line 1 in parallel, the second circuit 2 are connected in supply line, First Line Chopper 1021 and ups power 3 is in series with road 1, is provided with chopper 1022, the open circuit in first line 1 on the second circuit 2 Device 1021 is connected with the wireless executor 104 of important sensitivity load by auxiliary reclay 1031, and auxiliary reclay 1031 will weight The control signal for wanting the wireless executor 104 of sensitivity load to send is amplified, and controls the wireless executor 104 of important sensitivity load The input of chopper 1021 and excision in first line 1;Chopper 1022 on second circuit 2 passes through auxiliary reclay respectively 1032 are connected with the wireless executor 104 of important sensitivity load, and important sensitivity load is wirelessly executed by auxiliary reclay 1032 The control signal that device 104 sends is amplified, and makes the wireless executor 104 of important sensitivity load control chopper on the second circuit 2 1022 input and excision, and then control the power on/off of important sensitivity load 101.
Impact load is wireless executor 14,24...N4 and the wireless executor 104 of important sensitivity load pass through wireless parties Formula is communicated with wireless transceiver 4, for transmitting control signal.
The Main Function of wireless transceiver 4 is the enabling signal to impact load 11,21...N1 and from factory's electricity consumption The control signal of Automatic Centering Control 5 is received and is forwarded.
Wireless transceiver 4 is connected with electricity consumption Automatic Centering Control of factory 5, and electricity consumption Automatic Centering Control of factory 5 can be automatic Judge, automatically confirm that and automatically execute impact load 11,21...N1 Booting sequence, start impact load 11, 21...N1, before, send control signal and switch important sensitivity load 101 and powered by ups power 3, impact load 11, 21...N1, after stable operation, send control signal and switch important sensitivity load 101 by electrical network normal power supply, so as to ensure The power supply reliability of important sensitivity load 101.
Above-mentioned some refer to one or more, now as a example by starting n-th impact load N1, the course of work is such as Under:
1. n-th impact load N1 start by set date, or operator people are set by electricity consumption Automatic Centering Control of factory 5 N-th impact load executor N4 is manipulated for ground, enabling signal is sent to electricity consumption Automatic Centering Control of factory 5.
2. factory's electricity consumption Automatic Centering Control 5 confirm errorless after, send control signal wirelessly hold to important sensitivity load Row device 104, closes the chopper 1021 in first line 1 by auxiliary reclay 1031 then, the moment after closure, then leads to Crossing auxiliary reclay 1032 disconnects the chopper 1022 on the second circuit 2.
3. the implementing result that factory's electricity consumption Automatic Centering Control 5 is fed back according to the wireless executor 104 of important sensitivity load, After confirming that execution is errorless, send control signal and give impact load executor N4, chopper is made by auxiliary reclay N3 then N2 is closed, and waits impact load N1 to enter steady-working state.
4. the transmission of factory's electricity consumption Automatic Centering Control 5 control signal gives important sensitivity load wireless executor 104, then Close the chopper 1022 on the second circuit 2 by auxiliary reclay 1032, the moment after closure, then pass through auxiliary reclay 1031 disconnect the chopper 1021 in first line 1.
Said process is completed and starts any one impact load, and has just automatically ensured important sensitivity load Often running for task.
To start multiple stage impact load, as long as after above-mentioned 3rd step, starting other impact loads successively, then holding The step of important sensitivity load switching is returned of the 4th step of row.If there are multiple important sensitivity loads, start punching successively After hitting property load, progressively important sensitivity load switching is returned.
Above-described embodiment limits the present invention never in any form, every is obtained by the way of equivalent or equivalent transformation Technical scheme all fall within protection scope of the present invention.

Claims (1)

1. the important sensitivity load Power supply system of a kind of factory, some impacts including being connected in parallel in supply line are born Lotus and some important sensitivity loads, it is characterised in that:The impact load is connected in supply line by chopper, institute State chopper to be connected with the wireless executor of impact load by auxiliary reclay, impact load is wirelessly held by auxiliary reclay The control signal that row device sends is amplified, and makes input and the excision of the wireless executor's control chopper of impact load, and then controls The power on/off of impact load;Important sensitivity load first line in parallel, the second connection are in supply lines Lu Shang, is in series with the first chopper and ups power in the first line, be provided with the second chopper on the second circuit, and first The first chopper, the second chopper on circuit, the second circuit respectively by the first auxiliary reclay, the second auxiliary reclay with Executor's connection that important sensitivity load is wireless, the first auxiliary reclay, the second auxiliary reclay by important sensitivity load without The control signal that line executor sends is amplified, and makes on the wireless executor's control first line of important sensitivity load, the second circuit First chopper, the input of the second chopper and excision, and then control the power on/off of important sensitivity load;The impact is born Lotus is wireless executor and the wireless executor of important sensitivity load are wirelessly communicated with wireless transceiver, for passing Pass control signal;The wireless transceiver is connected with electricity consumption Automatic Centering Control of factory, and electricity consumption Automatic Centering Control of factory can Automatic decision, the Booting sequence for automatically confirming that and executing automatically impact load, before impact load is started, send control letter Number important sensitivity load of switching is powered by UPS, after impact load stable operation, sends control signal by important sensitivity Property load switching by electrical network normal power supply, so as to ensure the power supply reliability of important sensitivity load.
CN201410592919.4A 2014-10-29 2014-10-29 A kind of important sensitivity load Power supply system of factory Active CN104362745B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410592919.4A CN104362745B (en) 2014-10-29 2014-10-29 A kind of important sensitivity load Power supply system of factory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410592919.4A CN104362745B (en) 2014-10-29 2014-10-29 A kind of important sensitivity load Power supply system of factory

Publications (2)

Publication Number Publication Date
CN104362745A CN104362745A (en) 2015-02-18
CN104362745B true CN104362745B (en) 2017-03-15

Family

ID=52529983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410592919.4A Active CN104362745B (en) 2014-10-29 2014-10-29 A kind of important sensitivity load Power supply system of factory

Country Status (1)

Country Link
CN (1) CN104362745B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007202362A (en) * 2006-01-30 2007-08-09 Chugoku Electric Power Co Inc:The Power supply method coping with power failure and instantaneous voltage drop and device thereof
CN102163874B (en) * 2011-04-26 2013-04-17 广东康菱动力科技有限公司 Power supplying method of electrical power system with high-powered and high-voltage diesel generating set for large data memory center
CN202050285U (en) * 2011-04-26 2011-11-23 广东康菱动力科技有限公司 Power system of high-power high-voltage diesel generator set of larger data storage center
CN102394497B (en) * 2011-10-18 2013-10-09 重庆大学 Microgrid coordination control system and method based on state transition
CN102882268B (en) * 2012-08-27 2015-02-04 青岛经济技术开发区创统科技发展有限公司 Undisturbed uninterruptible power supply device

Also Published As

Publication number Publication date
CN104362745A (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN101871981B (en) Automatic detection and regulation method and circuit for air conditioner
CN101673964B (en) Modular UPS integrated power distribution system
CN104932387B (en) A kind of primary, spare device intelligence converter
CN104246521A (en) Method and device for automatic test of relay protection function of intelligent susbstation
US20180293062A1 (en) Arrangement and method for updating a control software in a high-voltage control unit
CN104062580B (en) A kind of portable beaker three-phase non-three phase tester movement time
CN104362745B (en) A kind of important sensitivity load Power supply system of factory
CN104090511A (en) Circuit and method for achieving non-polar 485 communication
CN104600833B (en) Method and system for determining spare power automatic switching on-off combination
CN206584019U (en) A kind of double power supply automatic transfer switch hookup and a kind of electrical system
CN104521089A (en) Battery system and motor vehicle with battery system
CN204008905U (en) USB interface measurement jig
CN116707508A (en) Standby optocoupler switching circuit, method and device, storage medium and electronic equipment
EP4235722A3 (en) Relay array for grid connection
CN103701201B (en) Realize the system of locking prepared auto restart during stability control device action cutting load
CN203119929U (en) A network connecting device capable of switching paths
CN107078517A (en) The control method of battery system and the system
CN105548738B (en) Of ac acquisition methods and system needed for relay protection device constant value verification
Jusoh et al. Development of a new modeling circuit for the Remote Terminal Unit (RTU) with GSM communication
CN204216661U (en) The uninterrupted ac power supply system of a kind of power communication machine room
CN102590657B (en) Communication capacity test device of intelligent carrier electrical energy meters and test method thereof
CN203385808U (en) Fault detection apparatus
CN201993450U (en) Bus type multi-battery centralized detection system
CN204559625U (en) A kind of remote control of high-speed railway wireless network
CN110324067A (en) A kind of power line communication fault detection circuit and detection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200522

Address after: 213000 No.21, Chuangzhi Road, Kunlun Street, Liyang City, Changzhou City, Jiangsu Province

Patentee after: Jiangsu Nandian Smart Energy Service Co., Ltd

Address before: 213300 Jiangsu city of Changzhou province Liyang Liyang Town of Wuhu Shanghai Road No. 168

Patentee before: CHANGZHOU SPREAD POWER TECH Co.,Ltd.

TR01 Transfer of patent right