CN104349326B - Network plan method - Google Patents
Network plan method Download PDFInfo
- Publication number
- CN104349326B CN104349326B CN201310335633.3A CN201310335633A CN104349326B CN 104349326 B CN104349326 B CN 104349326B CN 201310335633 A CN201310335633 A CN 201310335633A CN 104349326 B CN104349326 B CN 104349326B
- Authority
- CN
- China
- Prior art keywords
- interference
- planning
- candidate stations
- different system
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/18—Network planning tools
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/22—Traffic simulation tools or models
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
This application discloses a kind of network plan method, first determine to produce the different system website disturbed to the system in this method, then these different system websites are taken into account in emulation, the website that they are regarded as to the system carries out the network plan simulation of the system, to obtain corresponding satisfactory coverage prediction index.The present invention is applied to the network planning scene that different system be present, it can be ensured that the reliability of the network planning.
Description
Technical field
The present invention relates to mobile communication technology, more particularly to a kind of network plan method.
Background technology
The most common networking mode of radio communication is the beehive net for using similar honeycomb structure.The basic frequency of communication system
Rate multiplex mode includes identical networking and inter-frequency networking.Identical networking refers to that all cells of the whole network use identical frequency.Due to
The frequency of each cell is the same, and all adjacent areas of cell are to be configured with frequency, and more co-channel interference occurs between cell.It is different
Frequency networking refers to that neighbor cell uses different frequency configurations.Band resource is limited to, so interference control be present makes with frequency band
Equilibrium problem.Therefore the network planning is needed to come guaranteed capacity and the balance of covering.
Traditional network planning flow is as follows:
First, demand analysis
Demand of the network planning based on user, the demand of user include design capacity, coverage coverage rate, and network
Performance indications.
2nd, network size pre-planning
Network size estimation mainly determines the basic rule of networking by the analysis and volume calculation of covering radius
Mould, to be propagated when carrying out covering estimation according to the landform of overlay area, landforms, signal using the selection of the information such as frequency range is suitable
Model, the coverage radius of cell of different zones is then determined by link budget, so as to estimate the base for meeting covering demand
Stand quantity.Overlay area capacity analysis is then the power system capacity that system can carry according to network's coverage area user's development potentiality,
Whether calculate can meet the capacity requirement of user.
3rd, site planning and exploration
Mainly according to the recommended value of the cellular topology of standard and link budget, with reference to current network site resource feelings
Condition, site layout work is carried out, and it is determined that after the preliminary placement of website, carry out on-site land survey to carry out the availability of website point
Analysis.Because various factors limits, actually available site is not necessarily completely the same with design site, geographical position, antenna height, machine
Room condition and the engineering fact all can certain gaps.But pass through site survey, it specify which place possesses work substantially
For the necessary condition of base station site.If by the way of inter-frequency networking, frequency planning be also influence site distribution it is important because
Element.
4th, network plan simulation
Complete site planning and exploration after, will site programme import network plan simulation software in covered with
And capacity analysis, the flow of simulation analysis include layout data importing, propagation forecast, face section planning, frequency planning, user and industry
The configuration of business model and Monte-Carlo Simulation, by analyzing simulation data result, assess whether current programme can meet
, subregion such as be present and be unsatisfactory for going, programme is adjusted so that programme is final in covering and capacity goals
Meet the object of planning.
After detailed planning appraisal is carried out using Network planning software, it is possible to export antenna hang height, deflection, under
The detailed wireless parameters such as inclination angle, base-station transmitting-power, PCI planning, frequency planning.
The propagation model that network plan simulation uses can be the statistical model of standard, can also use the mould after correction
Type.The work of model correction can be carried out in the arbitrary steps before the 4th step.
At present, frequency resource is very in short supply in wireless environment, and different frequency range from low to high is allocated
To a variety of systems.Traditional network plan method is single system network plan method, is not suitable for different system being present
Scene.Reason is that co-frequency cell only considered the interference between currently used system, not when carrying out network plan simulation
Consider the interference between different system.In some systems(Such as data radio station)In, to ensure to cover, transmitting terminal can use larger
Transmit power, can so larger interference be produced to the other systems for using similar frequency bands, the frequency range can be caused to block when serious,
For using Lin Dao(Nearby frequency bands)Or every road(Every a frequency band)System can also produce larger interference, therefore, if not
Consider different system interference, the confidence level of network plan simulation can reduce, and the guidance of network engineering construction and the network optimization is made
With can have a greatly reduced quality.
The content of the invention
In view of this, it is a primary object of the present invention to provide a kind of network plan method, this method is applied to exist different
The network planning scene of system.
In order to achieve the above object, technical scheme proposed by the present invention is:
A kind of network plan method, including:
A, reconnoitred beforehand through site on the spot, determine the rule of candidate stations and each candidate stations of the system in planning region
Parameter initial configuration is drawn, determines to whether there is the different system interference station for producing the system interference in the planning region;
B, when in the planning region exist to the system produce interference different system interference station when, in the system by
Each candidate stations of interference, determine interference signal intensity, the different system interference to candidate stations generation interference that the candidate stations are subject to
Quantity and the projecting parameter configuration stood;
C, propagation model revision, the propagation model after being corrected are carried out using the frequency not arrived by different system interference;
D, the website using the different system interference station as the system, propagation model after the correction, described by dry is utilized
The interference signal intensity for the candidate stations disturbed, the projecting parameter at different system interference station configuration and each candidate stations of the system are current
Projecting parameter configures, and carries out the network plan simulation of the planning region of the system, and the coverage prediction for obtaining this emulation refers to
Mark;
E, judge whether the coverage prediction index of this emulation meets default requirement, if it is, during this is emulated
The current projecting parameter of each candidate stations of the system is configured as current network planning result, otherwise, according to backlog demand
Coverage prediction index, the projecting parameter configuration current to each candidate stations of the system in this emulation are adjusted correspondingly, are transferred to
Walk poly- d and re-start network plan simulation.
In summary, network plan method proposed by the present invention, different system interference station is considered in network plan simulation
The influence of point, so as to improve the matching degree of network plan simulation and actual working environment, makes the result of network plan simulation
It is more credible.Therefore, the present invention is applied to the network planning scene that different system be present, it can be ensured that the reliability of the network planning.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the embodiment of the present invention one.
Embodiment
It is right below in conjunction with the accompanying drawings and the specific embodiments to make the object, technical solutions and advantages of the present invention clearer
The present invention is described in further detail.
The present invention core concept be:Determine to produce the system the different system website disturbed, and in emulation by this
A little different system websites are taken into account, and candidate's website of these different system websites and the system are emulated together, to obtain phase
The satisfactory coverage prediction index answered.
Fig. 1 is the schematic flow sheet of the embodiment of the present invention one, as shown in figure 1, the embodiment mainly includes:
Step 101, beforehand through site on the spot reconnoitre, determine candidate stations and each candidate of the system in planning region
The projecting parameter initial configuration stood, determine to whether there is the different system interference for producing the system interference in the planning region
Stand.
This step whether there is the different system interference being had an impact to the system for determining in planning region, so as to
Consider that different system interference carries out the network planning when there is different system interference.
Here, determining the projecting parameter initial configuration of candidate stations and each candidate stations of the system in planning region can adopt
Realized, will not be repeated here with prior art.
Can be by way of sweep generator carries out frequency sweep, to determine to whether there is to this in planning region in this step
System produces the different system interference station of interference, and frequency sweep is carried out to search the specific method of jamming station be this area skill using sweep generator
Art personnel are grasped, and will not be repeated here.
Step 102, when in the planning region exist to the system produce interference different system interference station when, be for this
Each candidate stations being disturbed in system, determine the interference signal intensity that the candidate stations are subject to, the different system disturbed candidate stations generation
The quantity of jamming station of uniting and projecting parameter configure.
This step is used to, in the case where existing to the different system interference station of the system generation interference, determine to the system
Each candidate stations produce the relevant information at the different system interference station of interference, i.e. interference signal intensity, jamming station quantity and projecting parameter
Configuration etc., to utilize these information in the planning simulation of follow-up the system, carries out the network planning of the system, so that emulation
Scene is closer to real wireless communications environment, it is ensured that the reasonability of the network planning.
It is preferred that the projecting parameter can include:Geographical position, transmit power, antenna hang high, antenna model and antenna
The parameters such as angle.It is not limited to above-mentioned parameter in actual applications, those skilled in the art can be according to being actually needed to planning
The content of parameter is configured.
Step 103, using the frequency that is not arrived by different system interference carry out propagation model revision, the propagating mode after being corrected
Type.
This step is used to carry out propagation model revision, to carry out the emulation of the network planning based on the model.Specific school
Correction method can use prior art to realize, will not be repeated here.
Step 104, the website using the different system interference station as the system, utilize propagation model, institute after the correction
State interference signal intensity, the configuration of the projecting parameter at the different system interference station and each candidate stations of the system for the candidate stations being disturbed
Current projecting parameter configuration, carries out the network plan simulation of the planning region of the system, obtains the covering of this emulation
Prediction index.
This step is used for the network plan simulation for realizing the system, except that, is somebody's turn to do with existing network plan simulation
In emulation as, the different system interference determined in abovementioned steps regarded to the website of the system, can be by institute in step 102 during emulation
Reference of the interference signal intensity measured as the up different system interference source of fixation, can so take into full account different system interference
Influence to the system candidate stations, so as to ensure the validity of the projecting parameter configuration to each candidate stations of the system, improve
The degree of accuracy of network plan simulation.Based on above-mentioned difference, specific network plan simulation method is compared with system, herein not
Repeat again.
Step 105-107, judge whether the coverage prediction index of this emulation meets default requirement, if it is, will
The current projecting parameter of each candidate stations of the system is configured as current network planning result in this emulation, otherwise, according to not
Meet desired coverage prediction index, the projecting parameter configuration current to each candidate stations of the system in this emulation carries out corresponding
Adjustment, it is transferred to step poly- 104 and re-starts network plan simulation.
Whether the network planning result that step 105-107 is used in judgment step 104 obtain meets set target, if
Do not meet, corresponding parameter is adjusted, then perform step 104 and re-start emulation, until meeting the requirements.In this way, can be with
It is final to obtain the network planning result for meeting preset requirement.
It should be noted that above-mentioned steps 102-107 is applied to when planning region has different system influential on the system
Unite the situation of interference, and when be not present in the planning region the different system interference station of interference is produced to the system when, can be by
The network planning is carried out according to existing single system network plan method.Specific method is grasped by those skilled in the art, no longer superfluous herein
State.
In summary, presently preferred embodiments of the present invention is these are only, is not intended to limit the scope of the present invention.
Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's
Within protection domain.
Claims (4)
- A kind of 1. network plan method, it is characterised in that including:A, reconnoitred beforehand through site on the spot, determine the planning ginseng of candidate stations and each candidate stations of the system in planning region Number initial configuration, determine to whether there is the different system interference station for producing the system interference in the planning region;B, when the different system interference station to the system generation interference in the planning region be present, for being disturbed in the system Each candidate stations, determine interference signal intensity that the candidate stations are subject to, the candidate stations produced with the different system interference station of interference Quantity and projecting parameter configuration;C, propagation model revision, the propagation model after being corrected are carried out using the frequency not arrived by different system interference;D, the website using the different system interference station as the system, using propagation model after the correction, described it is disturbed The interference signal intensity of candidate stations, the planning that the projecting parameter at the different system interference station configures and each candidate stations of the system are current Parameter configuration, the network plan simulation of the planning region of the system is carried out, obtain the coverage prediction index of this emulation;E, judge this emulation coverage prediction index whether meet default requirement, if it is, by this emulate in this be The current projecting parameter of each candidate stations of uniting is configured as current network planning result, otherwise, according to the covering of backlog demand Prediction index, the projecting parameter configuration current to each candidate stations of the system in this emulation are adjusted correspondingly, and are transferred to the poly- d of step Re-start network plan simulation.
- 2. according to the method for claim 1, it is characterised in that methods described further comprises:When in the planning region During in the absence of the different system interference station that interference is produced to the system, the network planning is carried out according to single system network plan method.
- 3. according to the method for claim 1, it is characterised in that the projecting parameter includes:Geographical position, transmit power, Antenna hangs high, antenna model and aerial angle.
- 4. according to the method for claim 1, it is characterised in that carry out frequency sweep using sweep generator in step a, determine described It whether there is the different system interference station that interference is produced to the system in planning region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310335633.3A CN104349326B (en) | 2013-08-05 | 2013-08-05 | Network plan method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310335633.3A CN104349326B (en) | 2013-08-05 | 2013-08-05 | Network plan method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104349326A CN104349326A (en) | 2015-02-11 |
CN104349326B true CN104349326B (en) | 2017-11-14 |
Family
ID=52503946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310335633.3A Expired - Fee Related CN104349326B (en) | 2013-08-05 | 2013-08-05 | Network plan method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104349326B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105744536A (en) * | 2014-12-09 | 2016-07-06 | 富士通株式会社 | Wireless network deployment method and device |
CN106332130B (en) * | 2015-07-02 | 2020-03-24 | 中国移动通信集团设计院有限公司 | Base station investigation method, device and system |
CN108572379B (en) * | 2018-04-27 | 2022-02-08 | 陈亮 | Communication base station site selection exploration method based on unmanned aerial vehicle |
CN109511125B (en) * | 2018-11-15 | 2021-12-03 | 中国科学院上海微系统与信息技术研究所 | Method for identifying adjacent cell interference and different system interference in wireless network |
CN116390106A (en) * | 2023-04-18 | 2023-07-04 | 国脉通信规划设计有限公司 | Intelligent community 5G network planning method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556661A (en) * | 2004-01-12 | 2004-12-22 | 中兴通讯股份有限公司 | Method of radio network contemplation |
EP1866662A1 (en) * | 2005-03-18 | 2007-12-19 | Seeker Wireless PTY Limited | Enhanced mobile location |
CN101137171A (en) * | 2007-03-02 | 2008-03-05 | 中兴通讯股份有限公司 | Method and system for obtaining and correcting wireless propagation model parameter |
CN102065432A (en) * | 2009-11-13 | 2011-05-18 | 中国移动通信集团黑龙江有限公司 | Transmission model-based network coverage correcting method and system |
-
2013
- 2013-08-05 CN CN201310335633.3A patent/CN104349326B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556661A (en) * | 2004-01-12 | 2004-12-22 | 中兴通讯股份有限公司 | Method of radio network contemplation |
EP1866662A1 (en) * | 2005-03-18 | 2007-12-19 | Seeker Wireless PTY Limited | Enhanced mobile location |
CN101137171A (en) * | 2007-03-02 | 2008-03-05 | 中兴通讯股份有限公司 | Method and system for obtaining and correcting wireless propagation model parameter |
CN102065432A (en) * | 2009-11-13 | 2011-05-18 | 中国移动通信集团黑龙江有限公司 | Transmission model-based network coverage correcting method and system |
Also Published As
Publication number | Publication date |
---|---|
CN104349326A (en) | 2015-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103354644B (en) | Base station selection method and system | |
US10149172B2 (en) | Method and system for network planning in fixed wireless backhaul networks | |
CN104349326B (en) | Network plan method | |
US10425860B2 (en) | System and method for value optimized mobile networks | |
CN102316469B (en) | Method and system for configuring antenna parameters | |
CN103347261B (en) | Based on network-building method and the device of CDMA network data determination deployment of LTE network | |
CN106804046A (en) | Mobile location method and device based on measurement report | |
CN104956709A (en) | Allocation of physical cell identification | |
CN104854901A (en) | Method to guide pacement of new small cell | |
US11729631B2 (en) | System and method of automatic outdoor small cell planning | |
CN104038953B (en) | A kind of collocation method of mobile communications network wireless parameter | |
CN105813096A (en) | Method for optimizing neighbor cell plan based on topological structure | |
Bahri et al. | On the wireless local area network design problem with performance guarantees | |
CN105898761A (en) | Heterogeneous cellular wireless network programming scheme | |
Lin et al. | Optimization of wireless access point placement in realistic urban heterogeneous networks | |
CN107431937A (en) | The adaptive sector configuration of AAS | |
RU2695796C1 (en) | Methods and apparatus for determining an equivalent cell in a communication network | |
Hsu et al. | Optimizing spectrum-energy efficiency in downlink cellular networks | |
Mirahsan et al. | User-in-the-loop for hethetnets with backhaul capacity constraints | |
CN104602249B (en) | A kind of method and device for determining cell relations | |
WO2020245976A1 (en) | Layout design device, layout design method, and program | |
Maccari et al. | Towards scalable community networks topologies | |
CN110493793B (en) | Method and system for planning new station building based on capacity LTE | |
CN103179573B (en) | Frequency resource allocation method | |
CN102638807B (en) | A kind of descending interference defining method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |