CN104344726B - Vanadium goods raw material preheating system - Google Patents

Vanadium goods raw material preheating system Download PDF

Info

Publication number
CN104344726B
CN104344726B CN201410599242.7A CN201410599242A CN104344726B CN 104344726 B CN104344726 B CN 104344726B CN 201410599242 A CN201410599242 A CN 201410599242A CN 104344726 B CN104344726 B CN 104344726B
Authority
CN
China
Prior art keywords
heat
electric arc
furnace
arrest
arc furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410599242.7A
Other languages
Chinese (zh)
Other versions
CN104344726A (en
Inventor
陈昱键
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panzhihua City Ren Tongfan Industry Co Ltd
Original Assignee
Panzhihua City Ren Tongfan Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panzhihua City Ren Tongfan Industry Co Ltd filed Critical Panzhihua City Ren Tongfan Industry Co Ltd
Priority to CN201410599242.7A priority Critical patent/CN104344726B/en
Publication of CN104344726A publication Critical patent/CN104344726A/en
Application granted granted Critical
Publication of CN104344726B publication Critical patent/CN104344726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a kind of heating system, especially a kind of vanadium goods raw material preheating system.The invention provides a kind of vanadium goods raw material preheating system improving utilization rate of waste heat, including electric arc furnace collector mat, preheating furnace, electric arc furnace and ladle;Electric arc furnace collector mat includes funnel shaped heat collector cavity, the big end of heat collector cavity is positioned on electric arc furnace and ladle and towards electric arc furnace and ladle, the small end of heat collector cavity is connected with the heat supply mouth of preheating furnace by conveyance conduit, also include recuperated cycle pipeline, recuperated cycle pipeline includes thermal-arrest spiral tube, heat release pipe and circulating pump, thermal-arrest spiral tube is arranged in heat collector cavity, and heat release pipe is arranged in preheating furnace, and thermal-arrest spiral tube is connected by circulating pump circulation with heat release pipe.This makes a waste heat part for electric arc furnace be absorbed by the heat transferring medium in thermal-arrest spiral tube, and then slow heat release is with the raw material in heating electric arc furnace in heat release pipe, and another part is entered directly into by flue gas and adds hot charge in preheating furnace, and the utilization rate of waste heat is improved.

Description

Vanadium goods raw material preheating system
Technical field
The present invention relates to a kind of heating system, especially a kind of vanadium goods raw material preheating system.
Background technology
Electric furnace smelting vanadium goods are in current vanadium goods alloy smelting Technology, commonly used a kind of smelting mode, extensively should For fields such as metallurgy industry vanadium goods alloy smeltings, it is a kind of Technology being smelted vanadium goods by electrical heating, as iron and steel Metallurgy industry, electric furnace smelting vanadium goods are also widely used for the processing of vanadium goods alloy.
Existing tradition smelts vanadium goods electric furnace, is that the commonly used a kind of vanadium goods in Flos Bombacis Malabarici vanadium titanium industry garden smelt mode, During use, it is heated to temperature required (1300 DEG C owing to electric furnace smelting need to consume substantial amounts of electric energy to realize vanadium alloy raw material --1600 DEG C) critical point, therefore power consumption is huge, and the waste heat flue gas of the at present garden Nei Ge enterprise heated generation of electric furnace and going out The waste heat of the slag that slag produces is higher, and its temperature is up to 300 DEG C--and 600 DEG C, the most existing following technology carries out pre-recuperation of heat: specially The Chinese patent of profit ZL201320578097.5 discloses a kind of raw material preheating device, and it utilizes electric arc furnace collector mat and pit collection The flue gas of electric arc furnace and the high-temperature gas of pit are incorporated into preheating furnace by heat cover, thus heat the vanadium goods raw material in preheating furnace. Although this device make use of part to preheat, but owing to air heat exchange efficiency is low, gas is by the speed of preheating furnace too simultaneously Hurry up, cause the waste heat in flue gas not to be fully utilized.
Summary of the invention
The technical problem to be solved is to provide a kind of vanadium goods raw material preheating system improving utilization rate of waste heat.
The present invention solves the vanadium goods raw material preheating system that its technical problem is used, including electric arc furnace collector mat, preheating furnace, electricity Arc stove and ladle;Electric arc furnace collector mat includes funnel shaped heat collector cavity, and the big end of described heat collector cavity is positioned at electric arc furnace and ladle On and towards electric arc furnace and ladle, the small end of described heat collector cavity is connected with the heat supply mouth of preheating furnace by conveyance conduit, also wraps Including recuperated cycle pipeline, described recuperated cycle pipeline includes that thermal-arrest spiral tube, heat release pipe and circulating pump, described thermal-arrest spiral tube set Putting in heat collector cavity, described heat release pipe is arranged in preheating furnace, and described thermal-arrest spiral tube is connected by circulating pump circulation with heat release pipe.
Further, described thermal-arrest spiral tube spirals setting along the inwall of heat collector cavity.
Further, described heat release pipe spirals setting along the inwall of preheating furnace.
Further, also include that cleaner unit, described cleaner unit are arranged on the top of preheating furnace.
Further, also include pit, pit be provided above pit collector mat, pit collector mat pass through arm and conveying Pipeline communication.
Further, it is provided with blower fan at the heat supply mouth of preheating furnace.
Further, described thermal-arrest spiral tube is laid with heat conduction fin.
The invention has the beneficial effects as follows: by arranging thermal-arrest spiral tube on electric arc furnace collector mat, and arranging in preheating furnace Heat release pipe, this makes a waste heat part for electric arc furnace be absorbed by the heat transferring medium in thermal-arrest spiral tube, and then in heat release pipe slowly Heat release is with the raw material in heating electric arc furnace, and another part is entered directly into by flue gas and adds hot charge in preheating furnace, and this allows for remaining The utilization rate of heat is improved.Thermal-arrest spiral tube can also arrange heat conduction fin, thus obtain higher heat exchange efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the upward view of electric arc furnace collector mat;
Fig. 3 is the side view of electric arc furnace collector mat;
Parts, position and numbering in figure: electric arc furnace collector mat 1, preheating furnace 2, electric arc furnace 3, ladle 4, thermal-arrest spiral Pipe 5, heat release pipe 6, conveyance conduit 7, cleaner unit 8, pit 9, blower fan 10, tremie pipe 11.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
As it is shown in figure 1, the present invention includes electric arc furnace collector mat 1, preheating furnace 2, electric arc furnace 3 and ladle 4;Electric arc furnace thermal-arrest Cover 1 includes funnel shaped heat collector cavity, and the big end of described heat collector cavity is positioned on electric arc furnace 3 and ladle 4 and towards electric arc furnace 3 With ladle 4, the small end of described heat collector cavity is connected with the heat supply mouth of preheating furnace 2 by conveyance conduit 7, also includes recuperated cycle Pipeline, described recuperated cycle pipeline includes that thermal-arrest spiral tube 5, heat release pipe 6 and circulating pump, described thermal-arrest spiral tube 5 are arranged on In heat collector cavity, described heat release pipe 6 is arranged in preheating furnace 2, and described thermal-arrest spiral tube 5 and heat release pipe 6 are circulated by circulating pump Connection.Heat-conducting medium in thermal-arrest spiral tube 5 typically uses water, when needing the temperature of change, can use boiling point more High liquid.Thermal-arrest spiral tube 5 uses common steel pipe, and it spirals setting according to the inwall of heat collector cavity;At electric arc furnace 3 With in the flue gas uphill process of ladle 4, flue gas and thermal-arrest spiral tube 5 carry out heat exchange so that water in thermal-arrest spiral tube 5 Temperature rises, and then the water in thermal-arrest spiral tube 5 is delivered in heat release pipe 6 by recycling circulating pump so that water and preheating furnace 2 In raw material carry out heat exchange, after heat exchange cooling water return in thermal-arrest spiral tube 5;Meanwhile, flue gas is also through electric arc furnace thermal-arrest Cover 1 enters in preheating furnace 2 and adds hot charge.So make raw material by dual-heated, electric arc furnace 3 and the flue gas of ladle 4 Waste heat is fully utilized.Circulating pump can control water flow velocity, thus controls heat conveying capacity so that raw material in preheating furnace 2 Heating controlled, this, compared with traditional direct flue gas, can improve the heat exchanger time of medium and raw material, it is thus achieved that more preferably Exchange efficiency.
It is concrete, as in figure 2 it is shown, described thermal-arrest spiral tube 5 spirals setting along the inwall of heat collector cavity.Namely thermal-arrest spiral tube 5 tapered spring-like.In flue gas uphill process, can contact with thermal-arrest spiral tube 5, thus carry out heat exchange, thermal-arrest spiral tube 5 On inwall easy for installation, and there is bigger heat exchange area.Equally, as it is shown in figure 1, described heat release pipe 6 is along preheating furnace The inwall of 2 spirals setting, so can increase heat exchange area.The water inlet of thermal-arrest spiral tube 5 is arranged on electric arc furnace collector mat 1 Lower end and be connected with the water side of heat release pipe 6, outlet be positioned at electric arc furnace collector mat 1 upper end and with the water inlet of heat release pipe 6 End is connected.The water inlet end of heat release pipe 6 is positioned at the lower end of preheating furnace 2, and water side is positioned at the upper end of preheating furnace 2.
In order to avoid the dust in raw material is blown, as it is shown in figure 1, also include cleaner unit 8, described cleaner unit 8 is arranged on pre- The top of hot stove 2.Cleaner unit 8 is used as discharge flue gas use, and dust so can be avoided to be blown, and reduces whole system to environment Impact.
The slag itself poured out from electric arc furnace 8 also can produce high-temperature flue gas, if this part of waste heat is used, can carry further High waste heat recovery rate, is conducive to saving the energy further.To this end, on the basis of the above, also include pit 9, pit 9 upper Side is provided with pit collector mat, and pit collector mat is connected with conveyance conduit 7 by arm.The high-temperature flue gas produced in pit 9 can Entering conveyance conduit 7 by pit collector mat and arm, after entering conveyance conduit 7, this partial fume can be along conveyance conduit 7 Enter preheating furnace 2, and then for the raw material in preheating furnace 2 is heated.
In order to improve the throughput of flue gas, as it is shown in figure 1, be provided with blower fan 10 at the heat supply mouth of preheating furnace 2.Utilize blower fan 10 More high-temperature flue gas can be introduced in preheating furnace 2.
In order to obtain bigger heat exchange area, described thermal-arrest spiral tube 5 is laid with heat conduction fin.Heat conduction fin can increase collection Hot plate coil 5 and the contact area of flue gas, thus improve the efficiency of heat exchange.

Claims (6)

1. vanadium goods raw material preheating system, including electric arc furnace collector mat (1), preheating furnace (2), electric arc furnace (3) and ladle (4);Electric arc furnace collector mat (1) includes funnel shaped heat collector cavity, and the big end of described heat collector cavity is positioned at electric arc furnace (3) and molten iron On bag (4) and towards electric arc furnace (3) and ladle (4), the small end of described heat collector cavity is by conveyance conduit (7) and preheating The heat supply mouth of stove (2) is connected, it is characterised in that: also include that recuperated cycle pipeline, described recuperated cycle pipeline include that thermal-arrest spirals Pipe (5), heat release pipe (6) and circulating pump, described thermal-arrest spiral tube (5) is arranged in heat collector cavity, and described heat release pipe (6) sets Putting in preheating furnace (2), described heat release pipe (6) is spiraled setting along the inwall of preheating furnace (2), described thermal-arrest spiral tube (5) Connected by circulating pump circulation with heat release pipe (6).
2. vanadium goods raw material preheating system as claimed in claim 1, it is characterised in that: described thermal-arrest spiral tube (5) is along collection The inwall in hot chamber spirals setting.
3. vanadium goods raw material preheating system as claimed in claim 1, it is characterised in that: also include cleaner unit (8), described remove Dirt device (8) is arranged on the top of preheating furnace (2).
4. vanadium goods raw material preheating system as claimed in claim 1, it is characterised in that: also include pit (9), pit (9) Be provided above pit collector mat, pit collector mat is connected with conveyance conduit (7) by arm.
5. vanadium goods raw material preheating system as claimed in claim 1, it is characterised in that: set at the heat supply mouth of preheating furnace (2) It is equipped with blower fan (10).
6. the vanadium goods raw material preheating system as described in claim 1 to 5 any claim, it is characterised in that: described thermal-arrest Spiral tube is laid with heat conduction fin on (5).
CN201410599242.7A 2014-10-30 2014-10-30 Vanadium goods raw material preheating system Active CN104344726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410599242.7A CN104344726B (en) 2014-10-30 2014-10-30 Vanadium goods raw material preheating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410599242.7A CN104344726B (en) 2014-10-30 2014-10-30 Vanadium goods raw material preheating system

Publications (2)

Publication Number Publication Date
CN104344726A CN104344726A (en) 2015-02-11
CN104344726B true CN104344726B (en) 2016-11-23

Family

ID=52500846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410599242.7A Active CN104344726B (en) 2014-10-30 2014-10-30 Vanadium goods raw material preheating system

Country Status (1)

Country Link
CN (1) CN104344726B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108253805A (en) * 2018-01-22 2018-07-06 浙江润东环保科技股份有限公司 Glass tail gas feed powder heating unit and system
CN108504870A (en) * 2018-06-15 2018-09-07 河钢股份有限公司承德分公司 Vanadium slag waste heat recovery aoxidizes the device and method of sodium vanadium extraction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE442440B (en) * 1983-10-03 1985-12-23 Flaekt Ab DEVICE FOR HEATING OF SCRAP TO BE CHARGED TO AN ELECTROSTO OVEN
CN2910956Y (en) * 2006-06-12 2007-06-13 江阴海陆冶金设备制造有限公司 Coiled-pipe air-seal type active chimney of evaporated cooling flue of steelmaking converter
CN202253695U (en) * 2011-09-21 2012-05-30 苏州海陆重工股份有限公司 Movable smoke hood for waste heat boiler
CN203053248U (en) * 2013-01-31 2013-07-10 浙江大大不锈钢有限公司 Annealing furnace waste-heat use water heater device
CN203464755U (en) * 2013-09-17 2014-03-05 攀枝花市仁通钒业有限公司 Raw material preheating device

Also Published As

Publication number Publication date
CN104344726A (en) 2015-02-11

Similar Documents

Publication Publication Date Title
CN202018025U (en) High temperature sintering mineral aggregate cooling and waste heat steam generator integration device
CN206469667U (en) A kind of energy-conserving and environment-protective mineral hot furnace for being easy to feed
CN204612502U (en) A kind of electric-arc furnace steelmaking fume afterheat efficient system for reclaiming
CN104344726B (en) Vanadium goods raw material preheating system
CN206572530U (en) The electricity-saving melting plant that a kind of continuous feed is slagged tap
CN201621973U (en) A device for recovering waste heat from electric furnace flue gas
CN103968666B (en) A kind of smelting furnace of aluminum or aluminum alloy production
CN105823218A (en) High-efficient condensing flue gas waste heat recovery device
CN206724719U (en) A kind of microwave fluosolids roasting device
CN108362135B (en) Iron Furnace Waste Heat Utilization Device
CN204063896U (en) A kind of isothermal smelting
CN208238578U (en) Cupola furnace residual heat using device
CN205640887U (en) Sediment waste heat utilization's air -cooled system at bottom of improvement circulating fluidized bed boiler
CN208187138U (en) A kind of thermal energy recycling heating installation pouring waste heat using molten iron
CN207991251U (en) Water-cooled crucible for middle frequency furnace
CN203464755U (en) Raw material preheating device
CN207779149U (en) A kind of heating recovery of liquid slag utilizes device
CN102382976B (en) Fluidized boiling roasting furnace
CN218511509U (en) Non-ferrous metal smelting device
CN205079635U (en) Finned tube cooling water steam heat recovery system
CN205843354U (en) A kind of water-cooled machine electromagnetic energy-saving smelting furnace
CN204513766U (en) A kind of phase-change and energy-storage medium thawing apparatus
CN109489249A (en) A kind of energy-saving efficient boiler
CN214095584U (en) Cooling water circulation equipment for flue gas of silicon-manganese alloy electric furnace
CN105202933A (en) Electric furnace energy saving system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant