CN104343114A - Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method - Google Patents

Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method Download PDF

Info

Publication number
CN104343114A
CN104343114A CN201410542786.XA CN201410542786A CN104343114A CN 104343114 A CN104343114 A CN 104343114A CN 201410542786 A CN201410542786 A CN 201410542786A CN 104343114 A CN104343114 A CN 104343114A
Authority
CN
China
Prior art keywords
sediment
pipe
scum pipe
mud
stake holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410542786.XA
Other languages
Chinese (zh)
Inventor
李胜
赵建立
陈燕辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CMTCC Shanghai Shisanye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201410542786.XA priority Critical patent/CN104343114A/en
Publication of CN104343114A publication Critical patent/CN104343114A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/14Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using liquids and gases, e.g. foams

Abstract

The invention relates to a cast-in-situ bored pile constructing method for cleaning sediment by a gas lift reverse circulation method. The cast-in-situ bored pile constructing method comprises the following steps: measuring and arranging a pile position, arranging a steel casing at an upper opening of a pile hole, and placing a drilling machine; drilling the pile hole by using the drilling machine, cleaning the pile hole, and installing a reinforcing cage; installing a concrete pipe at the inner lower part of the reinforcing cage; installing a sediment discharging pipe at the top end of the concrete pipe, installing a rubber pipe at a preserved port in the sediment discharging pipe, and enabling the rubber pipe to stretch into the pile hole from the interior of the sediment discharging pipe; connecting the other end of the rubber pipe to an air compressor; connecting the sediment discharging pipe to a slurry purifying device by using a soft pipe; starting up the air compressor, and starting to clean the hole through gas lift reverse circulation; after hole cleaning, pulling the rubber pipe out of the sediment discharging pipe, detaching the sediment discharging pipe, and casting concrete into the pile hole. Before sediment cleaning, construction can be performed only by installing the sediment discharging pipe at the top end and putting down the rubber pipe and by taking out the sediment discharging pipe and the rubber pipe before concrete casting, so that the sediment treatment time is reduced and the sediment treatment effect is very good.

Description

A kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment
Technical field
The invention belongs to construction technology of cast-in-place bored field, particularly relate to a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment.
Background technology
In recent years, bored pile was because its easy construction, and the advantage such as with low cost, is widely used in pattern foundation pit supporting structure and pile foundation construction field.Bored pile is in work progress, and for preventing hole wall collapse from generally adopting clay mortar or bentonite slurry to carry out retaining wall, the rubble produced during boring, grit etc. can not completely with outside mud taps, and part can slowly be settled down at the bottom of hole, form sediment.Sediment is the key factor affecting bearing capacity of pile foundation, and cleaning does not reach code requirement, will have a strong impact on bearing capacity of pile foundation.Traditional cleaning sediment method is method of air lifting reverse circulation, and this method utilizes special sediment pipe to coordinate air compressor machine to carry out hole clearly, has following shortcoming: 1, during construction, sediment pipe often will save and be fixed installation, and transfers at the bottom of hole, constructs very loaded down with trivial details and cost of labor is higher.2, sediment treatment effect is general.Need to dismantle section by section after sediment cleaning, in this process, the suspended particulate in some mud slowly can be deposited on and sink to the bottom, and the sediment thickness having met code requirement may be made again defective.3, greatly, contaminated environment, also improves construction cost in addition for mud use and discharge value.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment, adopt gas lift reverse circulation in conjunction with mud purifying device construction method cleaning sediment, improve hole efficiency and clear hole quality clearly, and reduce mud contamination and waste.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment, step is as follows:
A () measuring stake position also buries steel pile casting underground, driller insertion at stake holes upper end open place;
B () uses rig to start to get out described stake holes, described stake holes completes boring and install reinforcing cage behind clear hole;
C tremie is installed in () bottom in reinforcing cage;
D () installs scum pipe on described tremie top, the reserved opening on described scum pipe installs sebific duct, and described sebific duct stretches into stake holes in scum pipe;
E the other end of sebific duct is connected to air compressor by ();
F scum pipe flexible pipe is connected to mud purifying device by ();
G () opens air compressor, form the mixture of mud, air, sediment in the bottom of conduit;
H the density of () mixture is less than the density of mud, under the effect of deadweight, rise gradually, enter mud conditioning device along conduit and scum pipe.Mud after process is comparatively large due to deadweight, constantly enters stake holes, and then forms closed circuit, constantly carries out the cleaning of sediment;
I () clear hole is extracted sebific duct from scum pipe, and is removed by scum pipe, concreting in stake holes after terminating.
Sebific duct described in step (d) stretches into 1/3 to 2/3 depths of stake holes, seals between described scum pipe and sebific duct.
Described scum pipe is identical with the internal diameter of tremie.
Beneficial effect
The invention has the advantages that, construct simple, quick for installation, only top scum pipe need be installed and transfer sebific duct before cleaning sediment, top scum pipe to be pulled out before concreting and sebific duct is taken away, can construct, greatly reduce sediment process and complete the intermittent time to concreting, sediment effect process is fine.Utilize in addition mud purifying device by carry sediment mud conditioning after, mud can recycle, and reduces mud use amount and discharge value, reduces environment pollution, and saves construction cost.
Accompanying drawing explanation
Fig. 1 is view when opening air compressor machine deslagging after each several part of the present invention is installed.
Detailed description of the invention
Below in conjunction with specific embodiment, set forth the present invention further.Should be understood that these embodiments are only not used in for illustration of the present invention to limit the scope of the invention.In addition should be understood that those skilled in the art can make various changes or modifications the present invention, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the present invention's instruction.
As shown in Figure 1, a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment, step is as follows:
A () measuring stake position also buries steel pile casting 6 underground, driller insertion at stake holes 7 upper end open place;
B () uses rig to start to get out described stake holes 7, described stake holes 7 completes boring and install reinforcing cage 10 behind clear hole;
C tremie 9 is installed in () bottom in reinforcing cage 10;
D () installs scum pipe 3 on described tremie 9 top, the reserved opening on described scum pipe 3 installs sebific duct 4, and described sebific duct 4 stretches into stake holes 7 in scum pipe 3;
E the other end of sebific duct 4 is connected to air compressor 5 by ();
F scum pipe 3 flexible pipe 2 is connected to mud purifying device 1 by ();
G () opens air compressor 5, form the mixture of mud, air, sediment in the bottom of conduit 9;
H the density of () mixture is less than the density of mud, under the effect of deadweight, rise gradually, enter mud conditioning device 1 along conduit 9 and scum pipe 3.Mud after process is comparatively large due to deadweight, constantly enters stake holes 7, and then forms closed circuit, constantly carries out the cleaning of sediment;
I () clear hole is extracted sebific duct 4 from scum pipe 3, and is removed by scum pipe 3, concreting in stake holes after terminating.
Sebific duct 4 described in step (d) stretches into 1/3 to 2/3 depths of stake holes 7, seals between described scum pipe 3 and sebific duct 4.
Described scum pipe 3 is identical with the internal diameter of tremie 9.
In actual use, the present invention needs to use air compressor, sebific duct, scum pipe, mud purifying device.In the pressure-air utilizing air compressor to discharge and hole, mud forms low-density mixture, under Gravitative Loads, the mud that density is larger constantly declines, enter stake holes, the mixture that density is less constantly rises along conduit, and sediment at the bottom of portable hole is along tremie and special scum pipe to surface mud purifier, treated silt is filtered after, return in hole, thus reach the object of cleaning sediment.

Claims (3)

1. utilize method of air lifting reverse circulation to clear up a bored pile construction method for sediment, step is as follows:
A () measuring stake position also buries steel pile casting (6) underground at stake holes (7) upper end open place, driller insertion;
B () uses rig to start to get out described stake holes (7), described stake holes (7) completes boring and behind clear hole, installs reinforcing cage (10);
C tremie (9) is installed in () bottom in reinforcing cage (10);
D () installs scum pipe (3) on described tremie (9) top, reserved opening on described scum pipe (3) installs sebific duct (4), and described sebific duct (4) stretches into stake holes (7) in scum pipe (3);
E the other end of sebific duct (4) is connected to air compressor (5) by ();
F scum pipe (3) flexible pipe (2) is connected to mud purifying device (1) by ();
G () opens air compressor (5), form the mixture of mud, air, sediment in the bottom of conduit (9);
H the density of () mixture is less than the density of mud, under the effect of deadweight, rise gradually along conduit (9) and scum pipe (3), enter mud conditioning device (1), mud after process is larger owing to conducting oneself with dignity, constantly enter stake holes (7), and then form closed circuit, constantly carry out the cleaning of sediment;
I () clear hole is extracted sebific duct (4) from scum pipe (3), and is removed by scum pipe (3), concreting in stake holes after terminating.
2. a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment according to claim 1, it is characterized in that, sebific duct described in step (d) (4) stretches into 1/3 to 2/3 depths of stake holes (7), seals between described scum pipe (3) and sebific duct (4).
3. a kind of bored pile construction method utilizing method of air lifting reverse circulation to clear up sediment according to claim 1, it is characterized in that, described scum pipe (3) is identical with the internal diameter of tremie (9).
CN201410542786.XA 2014-10-15 2014-10-15 Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method Pending CN104343114A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410542786.XA CN104343114A (en) 2014-10-15 2014-10-15 Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410542786.XA CN104343114A (en) 2014-10-15 2014-10-15 Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method

Publications (1)

Publication Number Publication Date
CN104343114A true CN104343114A (en) 2015-02-11

Family

ID=52499522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410542786.XA Pending CN104343114A (en) 2014-10-15 2014-10-15 Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method

Country Status (1)

Country Link
CN (1) CN104343114A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695426A (en) * 2015-03-29 2015-06-10 安徽建工集团有限公司 Gas lift method based secondary hole cleaning construction process for overlength pile foundations
CN105937376A (en) * 2016-06-08 2016-09-14 深圳市宏业基基础工程有限公司 Hole clearing system for drilling construction pile
CN105937377A (en) * 2016-06-08 2016-09-14 深圳市宏业基基础工程有限公司 Air lift reverse circulation borehole cleaning method
CN105952408A (en) * 2016-06-16 2016-09-21 中国建筑第六工程局有限公司 Device for salvaging percussion bit based on pile hole and using method thereof
CN108798566A (en) * 2018-07-10 2018-11-13 浙江新盛建设集团有限公司 A kind of cast-in-situ bored pile eject hydraulic pressure slag cleaning device and its construction method
CN110424444A (en) * 2019-08-13 2019-11-08 中国电建集团山东电力建设有限公司 Steel pipe pole overhead transmission line foundation pile construction method
CN113445946A (en) * 2021-08-03 2021-09-28 淮南矿业(集团)有限责任公司 Large-diameter life-saving hole buried drilling treatment method
CN113445917A (en) * 2021-08-03 2021-09-28 淮南矿业(集团)有限责任公司 Implementation method of large-diameter life-saving hole
CN113529718A (en) * 2021-05-18 2021-10-22 中交一公局集团有限公司 Hole bottom vacuum cleaning device after pile foundation construction
CN113981978A (en) * 2021-09-22 2022-01-28 江苏开放大学(江苏城市职业学院) Method and device for cleaning sediment at bottom of slurry retaining wall cast-in-place pile
CN115030675A (en) * 2022-06-23 2022-09-09 海通建设集团有限公司 Gas lift reverse circulation hole cleaning device and hole cleaning method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1123953A (en) * 1966-05-12 1968-08-14 Tilbury Contracting Group Ltd Method of piling
GB2200156A (en) * 1984-12-06 1988-07-27 Cementation Piling & Found Fluid ejection apparatus
CN101328709A (en) * 2007-06-20 2008-12-24 上海塔奇实业有限公司 Borehole cleaning method and apparatus for fast reverse circulation by using high pressure air
CN103696417A (en) * 2013-12-20 2014-04-02 中国一冶集团有限公司 Secondary hole cleaning device and method of bottom of cast-in-situ bored pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1123953A (en) * 1966-05-12 1968-08-14 Tilbury Contracting Group Ltd Method of piling
GB2200156A (en) * 1984-12-06 1988-07-27 Cementation Piling & Found Fluid ejection apparatus
CN101328709A (en) * 2007-06-20 2008-12-24 上海塔奇实业有限公司 Borehole cleaning method and apparatus for fast reverse circulation by using high pressure air
CN103696417A (en) * 2013-12-20 2014-04-02 中国一冶集团有限公司 Secondary hole cleaning device and method of bottom of cast-in-situ bored pile

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
余志文等: "冲(钻)孔灌注桩气举反循环清孔工艺", 《福建建设科技》 *
刘涛: "钻孔灌注桩气举反循环成孔工艺质量控制", 《施工技术》 *
吴卫敏等: "气举反循环结合泥浆净化装置清孔工艺在北江特大桥的应用", 《公路交通科技-应用技术版》 *
张军旗: "钻孔灌注桩气举反循环二次清孔工艺研究与应用", 《施工技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695426A (en) * 2015-03-29 2015-06-10 安徽建工集团有限公司 Gas lift method based secondary hole cleaning construction process for overlength pile foundations
CN105937376A (en) * 2016-06-08 2016-09-14 深圳市宏业基基础工程有限公司 Hole clearing system for drilling construction pile
CN105937377A (en) * 2016-06-08 2016-09-14 深圳市宏业基基础工程有限公司 Air lift reverse circulation borehole cleaning method
CN105952408A (en) * 2016-06-16 2016-09-21 中国建筑第六工程局有限公司 Device for salvaging percussion bit based on pile hole and using method thereof
CN108798566A (en) * 2018-07-10 2018-11-13 浙江新盛建设集团有限公司 A kind of cast-in-situ bored pile eject hydraulic pressure slag cleaning device and its construction method
CN108798566B (en) * 2018-07-10 2024-03-26 浙江新盛建设集团有限公司 Self-elastic hydraulic slag removing device for bored pile and construction method thereof
CN110424444A (en) * 2019-08-13 2019-11-08 中国电建集团山东电力建设有限公司 Steel pipe pole overhead transmission line foundation pile construction method
CN113529718A (en) * 2021-05-18 2021-10-22 中交一公局集团有限公司 Hole bottom vacuum cleaning device after pile foundation construction
CN113445946A (en) * 2021-08-03 2021-09-28 淮南矿业(集团)有限责任公司 Large-diameter life-saving hole buried drilling treatment method
CN113445917A (en) * 2021-08-03 2021-09-28 淮南矿业(集团)有限责任公司 Implementation method of large-diameter life-saving hole
CN113981978A (en) * 2021-09-22 2022-01-28 江苏开放大学(江苏城市职业学院) Method and device for cleaning sediment at bottom of slurry retaining wall cast-in-place pile
CN115030675A (en) * 2022-06-23 2022-09-09 海通建设集团有限公司 Gas lift reverse circulation hole cleaning device and hole cleaning method
CN115030675B (en) * 2022-06-23 2023-10-13 海通建设集团有限公司 Gas lift reverse circulation hole cleaning device and hole cleaning method

Similar Documents

Publication Publication Date Title
CN104343114A (en) Cast-in-situ bored pile constructing method for cleaning sediment by gas lift reverse circulation method
CN203655190U (en) Hole cleaning equipment for cast-in-place bored pile
CN102704871B (en) The method of further well-flushing and well washing apparatus in water source heat pump system
CN106120783B (en) Bored concrete pile removing slag from pile bottom reinforcement process method
CN110409422B (en) Diaphragm wall construction method and diaphragm wall construction system
CN110409421B (en) Ultra-deep pile ground is wall construction system even
CN107542093B (en) Bottom cleaning method for punched cast-in-place pile
CN103603339A (en) Method for long spiral drilling machine grouting retaining wall hole forming and system thereof
CN203374227U (en) Direct circulation hole-cleaning device
CN204266957U (en) A kind of filter net type Slarry cycling appts
CN206785338U (en) A kind of underwater pile secondary pile hole cleaning device
CN103147707A (en) Complete treatment method for pile bottom sediment
CN202249851U (en) Reverse circulation hole forming equipment for cast-in-place pile
CN212316900U (en) Precast pile construction auxiliary system and pile cap
CN103711119B (en) A kind of pneumatic anti-settling circulating system of drilled pile mud and using method
JP2005299217A (en) Slime disposal method applicable to diameter-expanded portion at axial midpoint of cast-in-place concrete pile
CN205954646U (en) Deep basal pit excavation precipitation device
CN204419083U (en) The quick hole cleaning machine of a kind of pile foundation
CN111733803B (en) Dry operation one-column one-pile steel pipe composite pile concrete subsection construction method
CN107778029B (en) Concrete curing method for buried pipe in structure
CN204543668U (en) One under water gas rushes soil discharging facility
CN104514505A (en) Drilling device
CN212316899U (en) Precast pile construction auxiliary system and pile plug
CN203701079U (en) Pneumatic anti-settling circulating system for drilled pile slurry
CN102011398B (en) Device and method for forming high-frequency vibratory pressing displacement bored concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150211