CN104317910A - Data processing method and device - Google Patents

Data processing method and device Download PDF

Info

Publication number
CN104317910A
CN104317910A CN201410584628.0A CN201410584628A CN104317910A CN 104317910 A CN104317910 A CN 104317910A CN 201410584628 A CN201410584628 A CN 201410584628A CN 104317910 A CN104317910 A CN 104317910A
Authority
CN
China
Prior art keywords
data
data processing
model
result
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410584628.0A
Other languages
Chinese (zh)
Inventor
王伟
林弘宇
尹玉
田传波
王雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Beijing Guodiantong Network Technology Co Ltd
Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Beijing Guodiantong Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd, Beijing Guodiantong Network Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410584628.0A priority Critical patent/CN104317910A/en
Publication of CN104317910A publication Critical patent/CN104317910A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a data processing method. The data processing method includes acquiring power data in a database of a power system and environment data monitored by monitoring sensing devices positioned on a power line and equipment; inputting the power data and the environment data into a preset model to acquire model data after conversion through the preset model; taking the model data as an input end of a neutral network in a data processing model to acquire a result of data processing. The power data in the database of the power system have the advantages of instantaneity, authenticity and completeness, so that by the method of data processing by utilizing the power data and the environment data monitored by the monitoring sensing devices on the power line and the equipment, the problem that accuracy of the result of data processing is influenced due to the fact that a data source is incomplete can be avoided.

Description

A kind of data processing method and device
Technical field
The present invention relates to data processing field, particularly relate to a kind of data processing method and device.
Background technology
Data processing is collection to data, storage, retrieval, processing, conversion and transmission.Data are a kind of expression-forms to true, concept or instruction, can be processed by artificial or automation equipment.The basic object of data processing from a large amount of, may be that to extract rambling, elusive data and derive for some specific people be valuable, significant data.
Along with the progress and development of society, data processing is through the every field of producing and live.The development of data processing technique and the breadth and depth of application thereof, greatly affect the process of human social development.
In data processing, the approach that the kind of data source, classification and data obtain directly affects the integrality of data.Available data disposal system, such as, carries out the data handling system of analyses and prediction to macroeconomy in economic field, often adopt the disclosed data of society to process.Some are had to the data of confidentiality and authority, the quantitative data that disclosed in the society that available data disposal system obtains, data deficiency is complete, thus have impact on the accuracy of final data result.
Summary of the invention
The object of this invention is to provide a kind of data processing method and device, its object is to solve the problem affecting result accuracy in available data process because data source is imperfect.
For solving the problems of the technologies described above, the invention provides a kind of data processing method, comprising:
Obtain the electric power data in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors;
By inputing in preset model by described electric power data and described environmental data, obtain the model data after described preset model conversion;
Using the input end of described model data as the neural network in data processing model, obtain the result of data processing.
Alternatively, the electric power data in described acquisition Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing equipment on power circuit and equipment monitors and comprise:
Obtain the power consumer personal information in described Database Management System in Electrical Power System, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and be distributed on described power circuit and equipment sensor or the direct or indirect transfer chamber of power optical fiber inside and outside environmental data.
Alternatively, also comprise:
Set up described preset model, described preset model comprises the factor of influence affecting described data processed result.
Alternatively, described using the input end of described model data as the neural network in data processing model, the result obtaining data processing comprises:
Using the input end of described model data as the neural network in data processing model, the algorithm in described neural network is optimized, adjusts the weight of each factor of influence in described preset model, reach optimum solution to make the result of described data processing.
Alternatively, also comprise:
According to the demand of data security and object user, set different safe classes and multi-form data display figure, the result of the described data processing obtained is carried out displaying multi-form, in various degree.
Present invention also offers a kind of data processing equipment, comprising:
Obtain data module, for the electric power data that obtains in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors;
Model data generation module, inputs in preset model for the described electric power data by described acquisition data module being obtained and described environmental data, obtains the model data after described preset model conversion;
Result generation module, for using the input end of described model data as the neural network in data processing model, obtains the result of data processing.
Alternatively, described acquisition data module is for the electric power data that obtains in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors and comprise:
Described acquisition data module specifically for, obtain the environmental data inside and outside the power consumer personal information in described Database Management System in Electrical Power System, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and the sensor be distributed on described electric power networks or the direct or indirect transfer chamber of power optical fiber.
Alternatively, also comprise:
Preset model sets up module, and for setting up described preset model, described preset model comprises the factor of influence affecting described data processed result.
Alternatively, described result generation module is used for the input end of described model data as the neural network in data processing model, and the result obtaining data processing comprises:
Described result generation module specifically for, using the input end of described model data as the neural network in data processing model, algorithm in described neural network is optimized, adjusts the weight of each factor of influence in described preset model, obtain the result of data processing.
Alternatively, also comprise:
Display module, for the demand according to data security and object user, sets different safe classes and multi-form data display figure, the result of the described data processing obtained is carried out displaying multi-form, in various degree.
Data processing method provided by the present invention and device, by by the electric power data in the Database Management System in Electrical Power System got and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors, input in preset model, obtain the model data after preset model conversion, and using the input end of this model data as neural network, finally obtain the result of data processing.Due to the ubiquity of electric service project, can other information such as the consumer power consumption with electricity condition, row enterprise and resident of reflection entire society from the electric power data in Database Management System in Electrical Power System.Electric power data become know best, device in the large data sets of one of most real-time, most authenticity, most integrality.Simultaneously, the environmental information of the surrounding monitored returns by the monitoring device be positioned on power circuit and equipment, the relevant information of each position in whole power system network can be provided, effectively prevent because data source is imperfect and affect the problem of data processed result accuracy.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of a kind of embodiment of data processing method provided by the present invention;
Fig. 2 is the process flow diagram of the another kind of embodiment of data processing method provided by the present invention;
Fig. 3 is the schematic diagram of neural network in the another kind of embodiment of data processing method provided by the present invention;
Fig. 4 is the structured flowchart of a kind of embodiment of data processing equipment provided by the present invention.
Embodiment
Core of the present invention is to provide a kind of data processing method, can be used for, by analyzing the electric power data in Database Management System in Electrical Power System, obtaining the analysis processing result of related data.Such as can be used for the Data processing in economic field, city macroeconomy being carried out to analyses and prediction.
In order to make those skilled in the art person understand the present invention program better, below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in Figure 1, the method comprises the following steps the process flow diagram of a kind of embodiment of data processing method provided by the present invention:
Step 101: the environmental data that the electric power data in acquisition Database Management System in Electrical Power System and the monitoring device being positioned at power circuit and equipment monitor;
Step 102: by inputing in preset model by described electric power data and described environmental data, obtains the model data after described preset model conversion;
Step 103: using the input end of described model data as the neural network in data processing model, obtain the result of data processing.
The data processing method that this embodiment provides, by the environmental data that the electric power data in the Database Management System in Electrical Power System got and the monitoring device that is positioned at power circuit and equipment are monitored, input in preset model, obtain the model data after preset model conversion, and using the input end of this model data as the neural network in data processing model, finally obtain the result of data processing.Due to the ubiquity of electric service project, can other information such as the consumer power consumption with electricity condition, row enterprise and resident of reflection entire society from the electric power data in Database Management System in Electrical Power System.Electric power data become know best, device in the large data sets of one of most real-time, most authenticity, most integrality.Simultaneously, the environmental information of the surrounding monitored returns by the monitoring device be positioned on power circuit and equipment, the relevant information of each position in whole power system network can be provided, effectively prevent because data source is imperfect and affect the problem of data processed result accuracy.
Data processing method provided by the invention specifically may be used for the Data processing in economic field, city macroeconomy being carried out to analyses and prediction.Existing more authoritative business forecasting service, each economic projection result can be collected, according to statistics, in conjunction with the economic relevant historical data that official announces, carry out in-house forecast model foundation, carried out the proportion of adjusting mechanism internal algorithm by the real data of predicted data and official, draw predicted value by average weighted mode.
But existing business forecasting service is dependent on that data analysis disclosed in government and associated mechanisms obtains predicting the outcome often.Some are had to the data of confidentiality and authority, the quantitative data that disclosed in the society that business forecasting service obtains, data deficiency is complete, thus have impact on the accuracy that final analysis predicts the outcome.Due to the internal data that data source of the present invention is in Database Management System in Electrical Power System, the generation of the problems referred to above when therefore data processing method provided by the invention is predicted macroeconomy, can be avoided.
Below in conjunction with concrete scene, the another kind of embodiment of data processing method provided by the present invention is set forth.The process flow diagram of the another kind of embodiment of data processing method provided by the invention as shown in Figure 2.
Step 201: obtain the environmental data inside and outside the power consumer personal information in described Database Management System in Electrical Power System, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and the sensor be distributed on power circuit and equipment or the direct or indirect transfer chamber of power optical fiber;
Step 202: set up preset model, wherein, preset model comprises the influencing factors analysis module affecting city Macroeconomic Development, specifically can comprise following seven modules: dynamics level evaluation module is built in local resident's population analysis module, the income of residents and level of consumption rate of consumption evaluation module, government policy analysis module, large SMEs power consumption statistical analysis module, industry development state analyzing module, other factor impact evaluation modules of urban development and urban development;
It is to be noted, these seven influencing factors analysis modules are according to law of economic development and available data, filter out from a factor urban economy development being existed to the impact of positive and negative two sides, its number and type are not limited to the form in embodiment of the present invention.
Step 203: by electric power data and described environmental data being inputed in seven modules of above-mentioned preset model, obtains the influencing factors analysis module data after described seven module converts;
Local resident's population analysis module specifically may be used for, the electricity consumption data provided by the user's registration information in Database Management System in Electrical Power System, ammeter, a use point rule, be divided into local resident: old man's feature colony, working feature colony and student characteristics colony etc.Like this, in conjunction with local row enterprise development situation, the methods such as maintenance data mining algorithm, cluster analysis and user behavior pattern analysis, the resident's population characteristic in zones of different and local resident's rule of life pattern can be analyzed, thus science provide reference for government puts into effect corresponding development policies, auxiliary government carries out the planning such as urban road, public service, urban development and region function divides, and also has directive function to row enterprise development.Such as: in this region, old man colony accounts for major part, just auxiliary government strengthens the public service construction for the elderly.
The income of residents and level of consumption rate of consumption evaluation module specifically may be used for, and by local row business electrical amount and benefited situation, assess the income of resident and the level of consumption in conjunction with the historical data of row enterprise operation, local resident's demographic categories.For income and the level of consumption assessment situation of resident, new row enterprise can be instructed to move in this region.
Government policy analysis module specifically for, to put into effect like policy in conjunction with associated class in the world and economic implication put into effect on the impact of urban economy development and domestic history relevant policies, use prediction analysis method, carry out new policy and put into effect impact emulation.
Large, medium and small business electrical amount statistical analysis module specifically for, use the data in Database Management System in Electrical Power System, the power consumption of large, medium and small enterprise added up, makes history curve.
Industry development state analyzing module specifically for, use the data in Database Management System in Electrical Power System, industry development state added up, makes history curve.
Other factor impact evaluation modules of urban development specifically for, collect related data by sensor that power circuit and equipment spread all over, the environmental datas such as temperature humidity noise be provided, the data message in the unmanned corner areas in city is provided.This module is also by the high-power electricity consumption situation of row enterprise, and whether the emphasis electrical travelling enterprise analyzed in this region starts environmental protection pollutant-removing system equipment, and for departments of government provides data message, auxiliary relevant environmental administration reduces its working strength.
Urban development build dynamics level evaluation module specifically for, by analyzing the support degree of government policy, comprising: the situations such as government subsidy, input in science and technology fund and government revenue and expenditure, setting up a set of level evaluation system and assess.
Step 204: using the influencing factors analysis module data that obtains as the input end of the neural network of Forecast Model of Macro-Economy, the algorithm in neural network is optimized, adjusts the weight of each factor of influence, reach optimum solution to make the result of analyses and prediction;
In this embodiment, three-layer neural network modeling is adopted to carry out analyses and prediction to the macroeconomy in city.In this Forecast Model of Macro-Economy, its input end is seven modules in step 203, and output is one, comprises these urban economy development state index of correlation data, form, figure and report etc.Neural network schematic diagram in this Forecast Model of Macro-Economy as shown in Figure 3.
The neural network algorithm control method of building Forecast Model of Macro-Economy is studied and optimized, carries out data processing by conventional analyzing and predicting method.In this specific embodiment, choice accuracy is higher, arithmetic speed faster wavelet algorithm carry out data processing, compare according to training result and actual result, continue to optimize algorithm, the weight of each factor of influence in adjustment preset model, obtains the result of these Regional Macro economic System analyses and prediction.
Step 205: according to the demand of data security and object user, set different safe classes and multi-form data display figure, the described analyses and prediction result obtained is carried out displaying multi-form, in various degree.
Such as Government can provide the functions such as macro economic analysis, industrial pattern analysis, electricity consumption trade classification, the displaying of city electricity consumption layout, user power utilization behavioural analysis, local resident's income and consumption assessment is comprised in the face of industry and resident can provide, realize auxiliary industry firm location, auxiliary resident selects the functions such as living area as required.
The data processing method that embodiment of the present invention provides, by by the electric power data in the Database Management System in Electrical Power System got and be positioned at the environmental data that the monitoring device on power circuit and equipment monitors, input in seven influencing factors analysis modules in preset model, obtain the influencing factors analysis module data after preset model conversion, and it can be used as the input end of neural network, algorithm in described neural network is optimized, adjust the weight of each factor of influence, finally obtain the data processed result of this Forecast Model of Macro-Economy.Because the electric power data in Database Management System in Electrical Power System of the present invention has the feature of real-time, authenticity, integrality, break the barrier that government and electric power data produce because of security permission, therefore the environmental data monitored based on the monitoring device on electric power data and power circuit and equipment carries out the method for analyses and prediction to Regional Macro economic System, can avoid the problem due to the imperfect accuracy and impact analysis predicts the outcome of data source.
In addition, the data analysis of existing authoritative institution, mainly for national economy, due to the inadequate refinement of data, only rests on country, province aspect, fits not with the development construction in city or region, not pointed.And the electric power data that embodiment of the present invention adopts can reflect the actual conditions in local city or region more really, therefore the demand of local requirement of main body can be met targetedly based on the urban economy forecast analysis of electric power data, real realization assist government formulate have more directiveness work out plan, put into effect the policy of scientific and reasonable laminating local area.In addition, can also realize instructing enterprise to improve management and administration, help resident to realize the functions such as the selection of life pattern, for every profession and trade, resident provide valuable customized information.
On the prediction of city economic development tendency can simulate government, enterprise, resident three human subject behavior act on the impact of urban economy tendency, the behavior act that can affect economy downturn can be prevented in advance, form optimum urban development pattern, science, the predictable development to city propose subsidiary function more.
As shown in Figure 4, this device comprises the structured flowchart of a kind of embodiment of data processing equipment provided by the present invention:
Obtain data module 100, for the electric power data that obtains in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring device on power circuit and equipment monitors;
This acquisition data module 100 specifically can by obtaining power consumer personal information, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and the sensor be distributed on described electric power networks in described Database Management System in Electrical Power System or the environmental data inside and outside the direct or indirect transfer chamber of power optical fiber.
Model data generation module 200, inputs in preset model for the electric power data by acquisition data module being obtained and environmental data, obtains the model data after preset model conversion;
Result generation module 300, for the model data that will obtain as the input end of the neural network in data processing model, obtains the result of data processing.
This result generation module 300 specifically can using the input end of described model data as the neural network in data processing model, algorithm in described neural network is optimized, adjust the weight of each factor of influence in described preset model, reach optimum solution to make the result of described data processing.
Alternatively, embodiment of the present invention also comprises:
Preset model sets up module 400, and for setting up described preset model, described preset model comprises the factor of influence affecting described data processed result;
Display module 500, for the demand according to data security and object user, sets different safe classes and multi-form data display figure, the result of the described data processing obtained is carried out displaying multi-form, in various degree.
Data processing equipment provided by the present invention, by by the electric power data in the Database Management System in Electrical Power System got and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors, input in preset model, obtain the model data after preset model conversion, and using the input end of this model data as neural network, finally obtain the result of data processing.Due to the ubiquity of electric service project, can other information such as the consumer power consumption with electricity condition, row enterprise and resident of reflection entire society from the electric power data in Database Management System in Electrical Power System.Electric power data become know best, device in the large data sets of one of most real-time, most authenticity, most integrality.Simultaneously, the environmental information of the surrounding monitored returns by the monitoring sensing device be positioned on power circuit and equipment, the relevant information of each position in whole power system network can be provided, effectively prevent because data source is imperfect and affect the problem of data processed result accuracy.In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiment, between each embodiment same or similar part mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a data processing method, is characterized in that, comprising:
Obtain the electric power data in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors;
By inputing in preset model by described electric power data and described environmental data, obtain the model data after described preset model conversion;
Using the input end of described model data as the neural network in data processing model, obtain the result of data processing.
2. data processing method as claimed in claim 1, is characterized in that, the electric power data in described acquisition Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors and comprise:
Obtain the environmental data inside and outside the power consumer personal information in described Database Management System in Electrical Power System, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and the sensor be distributed on described electric power networks or the direct or indirect transfer chamber of power optical fiber.
3. data processing method as claimed in claim 1, is characterized in that, also comprise:
Set up described preset model, described preset model comprises the factor of influence affecting described data processed result.
4. data processing method as claimed in claim 1, it is characterized in that, using the input end of described model data as the neural network in data processing model, the result obtaining data processing comprises:
Using the input end of described model data as the neural network in data processing model, the algorithm in described neural network is optimized, adjusts the weight of each factor of influence in described preset model, reach optimum solution to make the result of described data processing.
5. data processing method as claimed in claim 1, is characterized in that, also comprise:
According to the demand of data security and object user, set different safe classes and multi-form data display figure, the result of the described data processing obtained is carried out displaying multi-form, in various degree.
6. a data processing equipment, is characterized in that, comprising:
Obtain data module, for the electric power data that obtains in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors;
Model data generation module, inputs in preset model for the described electric power data by described acquisition data module being obtained and described environmental data, obtains the model data after described preset model conversion;
Result generation module, for using the input end of described model data as the neural network in data processing model, obtains the result of data processing.
7. data processing equipment as claimed in claim 6, is characterized in that, described acquisition data module is for the electric power data that obtains in Database Management System in Electrical Power System and be positioned at the environmental data that the monitoring sensing device on power circuit and equipment monitors and comprise:
Described acquisition data module specifically for, obtain the environmental data inside and outside the power consumer personal information in described Database Management System in Electrical Power System, all kinds of Smart Home electric power data record, residential electricity consumption record, local row business electrical record and the sensor be distributed on described electric power networks or the direct or indirect transfer chamber of power optical fiber.
8. data processing equipment as claimed in claim 6, is characterized in that, also comprise:
Preset model sets up module, and for setting up described preset model, described preset model comprises the factor of influence affecting described data processed result.
9. data processing equipment as claimed in claim 6, is characterized in that, described result generation module is used for the input end of described model data as the neural network in data processing model, and the result obtaining data processing comprises:
Described result generation module specifically for, using the input end of described model data as the neural network in data processing model, algorithm in described neural network is optimized, adjusts the weight of each factor of influence in described preset model, obtain the result of data processing.
10. data processing equipment as claimed in claim 6, is characterized in that, also comprise:
Display module, for the demand according to data security and object user, sets different safe classes and multi-form data display figure, the result of the described data processing obtained is carried out displaying multi-form, in various degree.
CN201410584628.0A 2014-10-27 2014-10-27 Data processing method and device Pending CN104317910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410584628.0A CN104317910A (en) 2014-10-27 2014-10-27 Data processing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410584628.0A CN104317910A (en) 2014-10-27 2014-10-27 Data processing method and device

Publications (1)

Publication Number Publication Date
CN104317910A true CN104317910A (en) 2015-01-28

Family

ID=52373142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410584628.0A Pending CN104317910A (en) 2014-10-27 2014-10-27 Data processing method and device

Country Status (1)

Country Link
CN (1) CN104317910A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105811579A (en) * 2016-03-15 2016-07-27 中车唐山机车车辆有限公司 Large-scale-enterprise electric power system based electric power data processing method and apparatus
CN106570783A (en) * 2016-10-27 2017-04-19 国网江苏省电力公司 Customer electricity utilization behavior analysis model based on big data thinking
WO2017097040A1 (en) * 2015-12-10 2017-06-15 深圳先进技术研究院 Method and system for evaluating medical transfusion speed
CN110688371A (en) * 2019-08-08 2020-01-14 平安科技(深圳)有限公司 Data adjusting method and device, electronic equipment and storage medium
CN115577093A (en) * 2022-05-26 2023-01-06 深圳格隆汇信息科技有限公司 AI analysis method and system of financial information

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1697284A (en) * 2005-03-22 2005-11-16 东北大学 System and equipment for collecting and monitoring data of electric power
CN102682349A (en) * 2012-05-14 2012-09-19 云南电力试验研究院(集团)有限公司电力研究院 Electricity consumption intelligent prediction system and method
CN102930354A (en) * 2012-11-06 2013-02-13 北京国电通网络技术有限公司 Method and device for predicating electricity consumption of residential area
CN103164779A (en) * 2013-04-08 2013-06-19 国家电网公司 Processing method and device of electric power system data
CN103326468A (en) * 2013-06-07 2013-09-25 九星通信设备(福州)有限公司 Electrical equipment long-distance intelligent environmental monitoring warning device
CN103544539A (en) * 2013-10-12 2014-01-29 国家电网公司 Method for predicting variables of users on basis of artificial neural networks and D-S (Dempster-Shafer) evidence theory
JP2014078137A (en) * 2012-10-10 2014-05-01 Sharp Corp Information processing device, information processing method, and program
CN103868605A (en) * 2012-12-12 2014-06-18 河南省电力公司焦作供电公司 Electric power transmission temperature detection system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1697284A (en) * 2005-03-22 2005-11-16 东北大学 System and equipment for collecting and monitoring data of electric power
CN102682349A (en) * 2012-05-14 2012-09-19 云南电力试验研究院(集团)有限公司电力研究院 Electricity consumption intelligent prediction system and method
JP2014078137A (en) * 2012-10-10 2014-05-01 Sharp Corp Information processing device, information processing method, and program
CN102930354A (en) * 2012-11-06 2013-02-13 北京国电通网络技术有限公司 Method and device for predicating electricity consumption of residential area
CN103868605A (en) * 2012-12-12 2014-06-18 河南省电力公司焦作供电公司 Electric power transmission temperature detection system
CN103164779A (en) * 2013-04-08 2013-06-19 国家电网公司 Processing method and device of electric power system data
CN103326468A (en) * 2013-06-07 2013-09-25 九星通信设备(福州)有限公司 Electrical equipment long-distance intelligent environmental monitoring warning device
CN103544539A (en) * 2013-10-12 2014-01-29 国家电网公司 Method for predicting variables of users on basis of artificial neural networks and D-S (Dempster-Shafer) evidence theory

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
耿亮 等: "电力数据挖掘在电网内部及各领域间的应用", 《电信科学》 *
齐明: "多维数据分析及其在电力营销决策中的应用", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017097040A1 (en) * 2015-12-10 2017-06-15 深圳先进技术研究院 Method and system for evaluating medical transfusion speed
CN105811579A (en) * 2016-03-15 2016-07-27 中车唐山机车车辆有限公司 Large-scale-enterprise electric power system based electric power data processing method and apparatus
CN105811579B (en) * 2016-03-15 2018-05-04 中车唐山机车车辆有限公司 Electric power data treating method and apparatus based on large enterprise's electric system
CN106570783A (en) * 2016-10-27 2017-04-19 国网江苏省电力公司 Customer electricity utilization behavior analysis model based on big data thinking
CN110688371A (en) * 2019-08-08 2020-01-14 平安科技(深圳)有限公司 Data adjusting method and device, electronic equipment and storage medium
CN110688371B (en) * 2019-08-08 2023-06-06 平安科技(深圳)有限公司 Data adjustment method, device, electronic equipment and storage medium
CN115577093A (en) * 2022-05-26 2023-01-06 深圳格隆汇信息科技有限公司 AI analysis method and system of financial information
CN115577093B (en) * 2022-05-26 2023-05-16 深圳格隆汇信息科技有限公司 AI analysis method and system for financial information

Similar Documents

Publication Publication Date Title
CN104317910A (en) Data processing method and device
Akhbari et al. Managing water resources conflicts: modelling behavior in a decision tool
Fu et al. Planning of distributed renewable energy systems under uncertainty based on statistical machine learning
Safdarian et al. Coalitional game theory based value sharing in energy communities
Endy Marlina Geotourism as a strategy of geosite empowerment towards the tourism sustainability in Gunungkidul Regency, Indonesia
Liu et al. The re-optimization strategy of multi-layer hybrid building’s cooling and heating load soft sensing technology research based on temperature interval and hierarchical modeling techniques
Berntzen et al. Sensors and the smart city: Creating a research design for sensor-based smart city projects
de Wildt et al. A comprehensive approach to reviewing latent topics addressed by literature across multiple disciplines
Selvarajan et al. SCBC: Smart city monitoring with blockchain using Internet of Things for and neuro fuzzy procedures.
Androulaki et al. Enabling local authorities to produce short-term energy plans: A multidisciplinary decision support approach
Li Research on the development trend of smart community
CN107436945A (en) A kind of information collecting method and system based on electronic map
Xing et al. Exploring the use of systems dynamics in sustainable urban retrofit planning
Yan et al. Identifying and assessing robust water allocation plans for deltas under climate change
Paohua Evaluation of building safety environment operation and maintenance management based on the AIoT system
Wang et al. Geographic information system and system dynamics combination technique for municipal solid waste treatment station site selection
Jichuan et al. Research on architecture design of urban comprehensive management service platform
TWI536282B (en) Campus energy conservation neural network decision spport system and method thereof
Xie Electric load forecast of long-period rail transit based on fuzzy mathematics
Liu et al. Study on the Index System for “Internet Plus” Smart Environmental Protection
Lu Building a Smart City Planning System Integrating Multidimensional Spatiotemporal Features
Yilmaz et al. An adaptive-neuro-fuzzy-inference-system based grading model to estimate the value of the residential real estate considering the quality of property location within the neighborhood
Liu et al. Analysis on the development of smart city of big cities in China and its effect to economic structure based on entropy method
Yi Current State, Shortcomings, and Strategies to Improve China’s Waste Recycling Network: Optimization of Regional Site Selection for Waste Disposal Systems Based on Supply Chain Management
Zhao et al. The research of the innovation performance evaluation system for enterprises in internet and communication industrial clusters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: BEIJING GUODIANTONG NETWORK TECHNOLOGY CO., LTD. E

Free format text: FORMER OWNER: BEIJING GUODIANTONG NETWORK TECHNOLOGY CO., LTD. ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID HENAN ELECTRIC POWER COMPANY

Effective date: 20150113

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Wei

Inventor after: Lin Hongyu

Inventor after: Yin Yu

Inventor after: Tian Chuanbo

Inventor after: Wang Ya

Inventor after: Guo Kunya

Inventor after: Wang Chenggang

Inventor after: Jin Peng

Inventor before: Wang Wei

Inventor before: Lin Hongyu

Inventor before: Yin Yu

Inventor before: Tian Chuanbo

Inventor before: Wang Ya

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG WEI LIN HONGYU YIN YU TIAN CHUANBO WANG YA TO: WANG WEI LIN HONGYU YIN YU TIAN CHUANBO WANG YA GUO KUNYA WANG CHENGGANG JIN PENG

TA01 Transfer of patent application right

Effective date of registration: 20150113

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Beijing Guodiantong Network Technology Co., Ltd.

Applicant after: Electric Power Research Institute, State Grid Henan Electric Power Company

Applicant after: Shenyang Power Supply Company of State Grid Liaoning Electric Power Co., Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Beijing Guodiantong Network Technology Co., Ltd.

Applicant before: Electric Power Research Institute, State Grid Henan Electric Power Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150128