CN104314316A - 一种异形腿柱支撑安装施工方法 - Google Patents
一种异形腿柱支撑安装施工方法 Download PDFInfo
- Publication number
- CN104314316A CN104314316A CN201410669797.4A CN201410669797A CN104314316A CN 104314316 A CN104314316 A CN 104314316A CN 201410669797 A CN201410669797 A CN 201410669797A CN 104314316 A CN104314316 A CN 104314316A
- Authority
- CN
- China
- Prior art keywords
- bearing
- support
- purlin
- chip
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 41
- 239000010959 steel Substances 0.000 claims description 41
- 238000009432 framing Methods 0.000 claims description 31
- 210000002356 Skeleton Anatomy 0.000 claims description 29
- 238000000034 method Methods 0.000 claims description 4
- 239000010410 layer Substances 0.000 abstract 4
- 239000002365 multiple layer Substances 0.000 abstract 2
- 238000005452 bending Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
Abstract
本发明公开了一种异形腿柱支撑安装施工方法,它包括以下步骤:(1)在承台的桩基顶端的承台垫层上安装多层底部受力钢筋,同时在承台垫层上安装多套支撑墩,多套支撑墩与多层底部受力钢筋相交处焊接相连;(2)在每套支撑墩上均沿竖直方向固定承台门式钢劲性主骨架,然后将相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁、中间受力钢筋固定连接;(3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土;(4)将相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁固定连接;(5)在顶层连系梁上固定连接多层顶部受力钢筋;(6)在主骨架上安装支座。采用本方法构成了一整套有足够的承载力的受力体系。
Description
技术领域
[0001] 本发明涉及支撑施工方法,尤其涉及一种异形腿柱支撑安装施工方法。
背景技术
[0002] 用于支撑无轴式大吨位摩天轮的异形腿柱必须有足够的承载力和稳固的着陆支撑点。申请号为:(^201310583286.6的中国专利公开了 “双排四斜腿钢结构门式墩”,具体涉及一种双排四斜腿钢结构门式墩。它包括0号块和钢盖梁,所述钢盖梁底部两端分别连接有左徘墩柱和右排墩柱,所述左徘墩柱和右排墩柱底部分别设有左承台和右承台,所述左徘墩柱包括第一左墩柱和第二左墩柱,所述第一左墩柱和第二左墩柱顶部相交于钢盖梁底部一端、底部分别与左承台两端连接;所述右排墩柱包括第一右墩柱和第二右墩柱,所述第一右墩柱和第二右墩柱顶部相交于钢盖梁底部另一端、底部分别与右承台两端连接。此专利的斜腿是用来支撑0号块的,而且此专利的左排墩柱和右排墩柱与承台的连接是靠预埋螺栓连接的,容易形成受力薄弱点。
发明内容
[0003] 本发明的目的在于克服已有技术的特点,提供一种支撑稳固、安全可靠,具备支撑大吨位摩天轮承载力的异形腿柱支撑安装施工方法。
[0004] 本发明的一种异形腿柱支撑安装施工方法,它包括以下步骤:
[0005] (1)在承台的桩基顶端的承台垫层上安装多层底部受力钢筋,同时在承台垫层上安装多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连;
[0006] (2)在每套支撑墩上均沿竖直方向固定承台门式钢劲性主骨架,然后将相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁、中间受力钢筋固定连接;
[0007] (3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土 ;
[0008] (4)将相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁固定连接;
[0009] (5)在所述的顶层连系梁上固定连接多层顶部受力钢筋;
[0010] (6)在主骨架上安装支座,所述的支座的具体安装过程为:(^1)安装支座的多个斜腿柱,多个斜腿柱的安装步骤为:步骤一、利用龙门吊吊装第一桁片式劲性骨架作为第一列斜腿柱,然后将第一桁片式劲性骨架的底部与主骨架固定连接,并在第一桁片式劲性骨架侧壁上安装多道第一排联系梁;步骤二、吊装第二桁片式劲性骨架作为第二列斜腿柱,然后将第二桁片式劲性骨架的底部与主骨架固定连接,将第二桁片式劲性骨架的侧壁与多道第一排联系梁固定相连,最后再在第二桁片式劲性骨架侧壁上安装多道第二排联系梁;步骤三、重复所述的步骤二直至完成整个斜腿柱的安装;(13)在所述的多列斜腿柱上安装支座的支承面,所述的支承面的安装步骤为:步骤一、在所述的多列斜腿柱围成的区域的顶面中间位置上固定中间块体;步骤二、在所述的中间块体两侧的斜腿柱上同时分别固定两侧块体;步骤三、将中间块体和两侧块体固定相连。
[0011] 本发明用于支撑无轴式大吨位摩天轮的异形腿柱,支撑安全稳定,承载力高。承台门式钢劲性主骨架可靠地与支撑墩、受力钢筋、底层连系梁连接为整体,桁片式劲性骨架又和钢劲性主骨架、多道联系梁连接成整体,构成了一整套有足够的承载力和具有安全稳固的着陆支撑点的受力体系。
附图说明
[0012] 图1是本发明的一种异形腿柱支撑安装施工方法的安装示意图;
[0013]图2是本发明的一种异形腿柱支撑安装施工方法的第一块体、第二块体、第三块体安装平面示意图。
具体实施方式
[0014] 下面结合附图和具体实施例对本发明作以详细描述。
[0015] 如附图所示的本发明的一种异形腿柱支撑安装施工方法,它包括以下步骤:(1)在承台的桩基顶端的承台垫层上安装多层底部受力钢筋,同时在承台垫层上安装多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连;(2)在每套支撑墩上均沿竖直方向固定的承台门式钢劲性主骨架1,然后将相邻的主骨架1下部以及中部之间分别采用沿水平方向设置的底层连系梁2、中间受力钢筋固定连接;(3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土 ;混凝土位于中间受力钢筋之上的位置通常高于中间受力钢筋,既可稳固已安装完的受力钢筋和局部钢劲性主骨架,又可以使后续施工有安全的操作面。(4)将相邻的主骨架1的顶部之间采用沿水平方向设置的顶层连系梁3固定连接;(5)在所述的顶层连系梁3上固定连接多层顶部受力钢筋;(6)在主骨架1上安装支座,所述的支座的具体安装过程为:(3)安装支座的多个斜腿柱,多个斜腿柱的安装步骤为:步骤一、利用龙门吊吊装第一桁片式劲性骨架4-1作为第一列斜腿柱,然后将第一桁片式劲性骨架4-1的底部与主骨架1固定连接,并在第一桁片式劲性骨架4-1侧壁上安装多道第一排联系梁5-1 ;步骤二、吊装第二桁片式劲性骨架作为第二列斜腿柱,然后将第二桁片式劲性骨架
4-1的底部与主骨架1固定连接,将第二桁片式劲性骨架4-1的侧壁与多道第一排联系梁
5-1固定相连,最后再在第二桁片式劲性骨架侧壁上安装多道第二排联系梁5-2 ;步骤三、重复所述的步骤二直至完成整个斜腿柱的安装;03)在所述的多个斜腿柱上安装支座的支承面,所述的支承面的安装步骤为:步骤一、在所述的多个斜腿柱围成的区域的顶面中间位置上固定中间块体;步骤二、在所述的中间块体两侧的多个斜腿柱上同时分别固定两侧块体;步骤三、将中间块体和两侧块体固定相连。
[0016] 作为本发明的一种实施方式,所述的步骤(1)中的每一套所述的支撑墩包括四根支撑立柱,所述的四根支撑立柱围成的区域的横截面为矩形,在四根支撑立柱顶部安装有四根立柱联系梁。所述的支撑墩的立柱联系梁安装在多层底部受力钢筋的顶部,所述的步骤(2)中的主骨架1安装在支撑墩的立柱联系梁上。这样可以防止主骨架压弯受力钢筋,降低受力钢筋的承载力,支撑墩和其上的联系梁为主骨架构成了稳固的支撑体系。
[0017] 实施例1
[0018] (1)在承台的桩基顶端的承台垫层上安装5层底部受力钢筋,同时在承台垫层上安装多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连;所述的支撑墩包括四根支撑立柱,所述的四根支撑立柱围成的区域的横截面为矩形,在四根支撑立柱顶部安装有四根立柱联系梁,所述的支撑墩的立柱联系梁安装在5层底部受力钢筋的顶部。
(2)将沿竖直方向设置的承台门式钢劲性主骨架1安装在支撑墩的联系梁上,然后将相邻的主骨架1下部以及中部之间分别采用沿水平方向设置的底层连系梁2、中间受力钢筋固定连接;(3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土;(4)将相邻的主骨架1的顶部之间采用沿水平方向设置的顶层连系梁3固定连接;(5)在所述的顶层连系梁3上固定连接5层顶部受力钢筋;(6)在主骨架1上安装支座,所述的支座的具体安装过程为:(^)安装支座的多个斜腿柱,多个斜腿柱的安装步骤为:步骤一、利用龙门吊吊装第一桁片式劲性骨架4-1作为第一列斜腿柱,然后将第一桁片式劲性骨架4-1的底部与主骨架1固定连接,并在第一桁片式劲性骨架4-1侧壁上安装多道第一排联系梁5-1 ;步骤二、吊装第二桁片式劲性骨架作为第二列斜腿柱,然后将第二桁片式劲性骨架4-1的底部与主骨架1固定连接,将第二桁片式劲性骨架4-2的侧壁与多道第一排联系梁5-1固定相连,最后再在第二桁片式劲性骨架侧壁上安装多道第二排联系梁5-2 ;步骤三、重复所述的步骤二完成斜腿柱4-33-4的安装;(^)在所述的多个斜腿柱上安装支座的支承面,所述的支承面的安装步骤为:步骤一、在所述的多列斜腿柱围成的区域的顶面中间位置上固定中间块体6-2 ;步骤二、在所述的中间块体两侧的斜腿柱上同时分别固定两侧块体6-14-3 ;步骤三、将中间块体和两侧块体固定相连。
[0019] 在支承面上安装无轴式大吨位摩天轮后,经测试整个支撑体系支撑安全稳定,承载力高。无轴式大吨位摩天轮运行安全平稳、没有出现任何承载力失稳的征兆。
Claims (2)
1.一种异形腿柱支撑安装施工方法,其特征在于它包括以下步骤: (1)在承台的桩基顶端的承台垫层上安装多层底部受力钢筋,同时在承台垫层上安装多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连; (2)在每套支撑墩上均沿竖直方向固定承台门式钢劲性主骨架,然后将相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁、中间受力钢筋固定连接; (3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土 ; (4)将相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁固定连接; (5)在所述的顶层连系梁上固定连接多层顶部受力钢筋; (6)在主骨架上安装支座,所述的支座的具体安装过程为:(a)安装支座的多个斜腿柱,多个斜腿柱的安装步骤为:步骤一、利用龙门吊吊装第一桁片式劲性骨架作为第一列斜腿柱,然后将第一桁片式劲性骨架的底部与主骨架固定连接,并在第一桁片式劲性骨架侧壁上安装多道第一排联系梁;步骤二、吊装第二桁片式劲性骨架作为第二列斜腿柱,然后将第二桁片式劲性骨架的底部与主骨架固定连接,将第二桁片式劲性骨架的侧壁与多道第一排联系梁固定相连,最后再在第二桁片式劲性骨架侧壁上安装多道第二排联系梁;步骤三、重复所述的步骤二直至完成整个斜腿柱的安装;(b)在所述的多列斜腿柱上安装支座的支承面,所述的支承面的安装步骤为:步骤一、在所述的多列斜腿柱围成的区域的顶面中间位置上固定中间块体;步骤二、在所述的中间块体两侧的斜腿柱上同时分别固定两侧块体;步骤三、将中间块体和两侧块体固定相连。
2.根据权利要求1所述的异形腿柱支撑安装施工方法,其特征在于:所述的步骤(I)中的每一套所述的支撑墩包括四根支撑立柱,所述的四根支撑立柱围成的区域的横截面为矩形,在四根支撑立柱顶部安装有四根立柱联系梁,所述的支撑墩的立柱联系梁安装在多层底部受力钢筋的顶部,所述的步骤(2)中的主骨架安装在支撑墩的立柱联系梁上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410669797.4A CN104314316B (zh) | 2014-11-20 | 2014-11-20 | 一种异形腿柱支撑安装施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410669797.4A CN104314316B (zh) | 2014-11-20 | 2014-11-20 | 一种异形腿柱支撑安装施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104314316A true CN104314316A (zh) | 2015-01-28 |
CN104314316B CN104314316B (zh) | 2016-05-11 |
Family
ID=52369616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410669797.4A Active CN104314316B (zh) | 2014-11-20 | 2014-11-20 | 一种异形腿柱支撑安装施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104314316B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442856A (zh) * | 2015-12-29 | 2016-03-30 | 中建六局土木工程有限公司 | 一种多角度重吨位箱体安装施工方法 |
CN111155550A (zh) * | 2020-01-21 | 2020-05-15 | 中国华冶科工集团有限公司 | 竖井斜架快速施工方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2401280A1 (fr) * | 1977-08-23 | 1979-03-23 | Longinotti Enrico | Structure portante en elements prefabriques verticaux et horizontaux constituant des piliers et des dalles de planchers |
EP0280621B1 (fr) * | 1987-02-23 | 1990-10-17 | Marc Edouard Irigoyen | Système d'appui et d'accrochage de poutres de longue portée |
JPH04176935A (en) * | 1990-11-08 | 1992-06-24 | Ohbayashi Corp | Construction method for multistory building |
JPH06221030A (ja) * | 1993-01-22 | 1994-08-09 | Ishima Riyuutai Kenkyusho:Kk | 物体免震装置 |
JPH11264247A (ja) * | 1998-03-19 | 1999-09-28 | Toda Constr Co Ltd | 既設杭を利用した建物の構築方法 |
JP3057466B2 (ja) * | 1993-11-11 | 2000-06-26 | 株式会社竹中工務店 | 地下躯体の構築法 |
FR2846681A1 (fr) * | 2002-11-06 | 2004-05-07 | Daniel Pitault | Structure porteuse modulaire |
CN101559285A (zh) * | 2009-05-11 | 2009-10-21 | 中建国际建设有限公司 | 大型轮辐式摩天轮轮盘牵引旋转立式逐段拼装施工系统 |
CN101624875A (zh) * | 2008-07-08 | 2010-01-13 | 施华理 | 金轮泊车装置 |
CN201552396U (zh) * | 2009-10-29 | 2010-08-18 | 天津重钢机械装备股份有限公司 | 用于大型筒体构件的组对焊接伞形胎架 |
CN101912686A (zh) * | 2010-07-31 | 2010-12-15 | 中山市金马科技娱乐设备有限公司 | 摩天轮 |
CN102409864A (zh) * | 2011-11-14 | 2012-04-11 | 中建钢构有限公司 | 一种钢桁架的施工方法及其吊装时使用的临时加固装置 |
CN103556567A (zh) * | 2013-11-19 | 2014-02-05 | 中铁第四勘察设计院集团有限公司 | 双排四斜腿钢结构门式墩 |
-
2014
- 2014-11-20 CN CN201410669797.4A patent/CN104314316B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2401280A1 (fr) * | 1977-08-23 | 1979-03-23 | Longinotti Enrico | Structure portante en elements prefabriques verticaux et horizontaux constituant des piliers et des dalles de planchers |
EP0280621B1 (fr) * | 1987-02-23 | 1990-10-17 | Marc Edouard Irigoyen | Système d'appui et d'accrochage de poutres de longue portée |
JPH04176935A (en) * | 1990-11-08 | 1992-06-24 | Ohbayashi Corp | Construction method for multistory building |
JPH06221030A (ja) * | 1993-01-22 | 1994-08-09 | Ishima Riyuutai Kenkyusho:Kk | 物体免震装置 |
JP3057466B2 (ja) * | 1993-11-11 | 2000-06-26 | 株式会社竹中工務店 | 地下躯体の構築法 |
JPH11264247A (ja) * | 1998-03-19 | 1999-09-28 | Toda Constr Co Ltd | 既設杭を利用した建物の構築方法 |
FR2846681A1 (fr) * | 2002-11-06 | 2004-05-07 | Daniel Pitault | Structure porteuse modulaire |
CN101624875A (zh) * | 2008-07-08 | 2010-01-13 | 施华理 | 金轮泊车装置 |
CN101559285A (zh) * | 2009-05-11 | 2009-10-21 | 中建国际建设有限公司 | 大型轮辐式摩天轮轮盘牵引旋转立式逐段拼装施工系统 |
CN201552396U (zh) * | 2009-10-29 | 2010-08-18 | 天津重钢机械装备股份有限公司 | 用于大型筒体构件的组对焊接伞形胎架 |
CN101912686A (zh) * | 2010-07-31 | 2010-12-15 | 中山市金马科技娱乐设备有限公司 | 摩天轮 |
CN102409864A (zh) * | 2011-11-14 | 2012-04-11 | 中建钢构有限公司 | 一种钢桁架的施工方法及其吊装时使用的临时加固装置 |
CN103556567A (zh) * | 2013-11-19 | 2014-02-05 | 中铁第四勘察设计院集团有限公司 | 双排四斜腿钢结构门式墩 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442856A (zh) * | 2015-12-29 | 2016-03-30 | 中建六局土木工程有限公司 | 一种多角度重吨位箱体安装施工方法 |
CN111155550A (zh) * | 2020-01-21 | 2020-05-15 | 中国华冶科工集团有限公司 | 竖井斜架快速施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104314316B (zh) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (zh) | 一种贝雷梁悬吊模板支撑体系及其施工工法 | |
CN102587661B (zh) | 钢筋混凝土框架高大截面结构柱施工方法 | |
JP6289046B2 (ja) | 仮設架台 | |
CN102691420A (zh) | 多层大跨度钢桁架安装施工方法 | |
CN201933419U (zh) | 一种拱桥拱肋现浇支架 | |
CN104775364A (zh) | 斜拉桥索塔塔柱钢筋的安装方法 | |
CN204343701U (zh) | 一种异形腿柱支撑安装施工结构 | |
CN104314316A (zh) | 一种异形腿柱支撑安装施工方法 | |
CN102605717A (zh) | 墩顶纵向支撑膺架法 | |
CN106703197A (zh) | 一种大跨度多层抗震框架结构体系及其施工方法 | |
CN104775363B (zh) | 上塔柱钢筋节段的组拼方法 | |
CN105113541A (zh) | 自承式无排无模地下室无梁楼板及其逆作施工方法 | |
CN110158770A (zh) | 一种装配式建筑梁柱锚板式连接装置及其施工方法 | |
CN109763492A (zh) | 一种装配式钢支撑大跨度支护结构及其安装方法 | |
CN211113725U (zh) | 一种基于地下室结构的施工电梯基础 | |
JP6028984B2 (ja) | 橋脚の交換方法 | |
CN201981483U (zh) | 拱肋现浇支架用钢筋砼异型帽梁 | |
CN203546900U (zh) | 建筑物 | |
JP7169765B2 (ja) | 構造物の構築方法 | |
KR102394812B1 (ko) | 프리캐스트 무량판 시공방법 | |
CN110219435A (zh) | 一种适用于装配式外加电梯井道的结构 | |
CN102660924A (zh) | 钢柱组合支架施工工法及钢柱组合支架 | |
CN103541426A (zh) | 建筑物及其节点结构的构造方法 | |
CN217678621U (zh) | 一种标准h型钢塔架的基础结构 | |
CN212295030U (zh) | 住宅配套商业地下室顶板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20180914 Granted publication date: 20160511 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20190618 Granted publication date: 20160511 |