CN104278676A - 一种钻孔灌注桩桩头即时处理方法及其装置 - Google Patents
一种钻孔灌注桩桩头即时处理方法及其装置 Download PDFInfo
- Publication number
- CN104278676A CN104278676A CN201410527968.XA CN201410527968A CN104278676A CN 104278676 A CN104278676 A CN 104278676A CN 201410527968 A CN201410527968 A CN 201410527968A CN 104278676 A CN104278676 A CN 104278676A
- Authority
- CN
- China
- Prior art keywords
- drill bit
- pile head
- pile
- drill
- immediate processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/223—Details of top sections of foundation piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
一种钻孔灌注桩桩头即时处理方法及其装置,包括步骤:钻孔灌注桩水下混凝土灌注完毕后,拔出导管,通过走行、回转系统行至桩位旁,启动变幅装置直立起可伸缩钻杆,进行钻机就位,使钻头的中心对准孔位中心,放下可伸缩钻杆使钻头到达浮碴面,启动主动旋转电动机带动钻头旋转,将浮碴和桩头预设标高以上混凝土钻入钻头内,当套钻头的底部到达预设标高后,上拔可伸缩钻杆,将钻头提出钻孔灌注桩,将钻头内的浮碴、混凝土清理干净,完成桩头即时处理施工作业。所述钻孔灌注桩桩头即时处理的装置,包括走行、回转系统和变幅装置。具有提高桩头混凝土质量、增加工效、节省费用的特点,且可更换不同直径的钻头,适应性能力强,可进行长深度桩头处理的深孔作业能力。
Description
技术领域
本发明涉及一种钻孔灌注桩桩头即时处理方法及其装置。
背景技术
目前我国钻孔灌注桩桩头处理多在承台开挖以后,凿除的方法通常有两种做法,一是使用人工配合风镐、钢钎等工具进行桩头凿除;二是先凿除钻孔灌注桩的主筋,进行剥离,然后环切桩头的方法。这两种方法都存在对桩头混凝土、主筋损害大、费用高、工效满等缺点。
而在钻孔灌注桩水下混凝土灌注完毕后即进行桩头挖除作业方面,国内仅有加长钢护筒至桩头以下,抽干泥浆后人工挖除桩头混凝土的尝试,其安全性差、工效不高。
发明内容
本发明其目的就在于提供一种钻孔灌注桩桩头即时处理方法及其装置,具有提高桩头混凝土质量、增加工效、节省费用的特点,且可更换不同直径的钻头,适应性能力强,可进行长深度桩头处理的深孔作业能力。
实现上述目的而采取的技术方案,
包括步骤:钻孔灌注桩水下混凝土灌注完毕后,拔出导管,用于钻孔灌注桩桩头即时处理钻机通过走行、回转系统行至桩位旁,启动变幅装置直立起可伸缩钻杆,进行桩头即时处理钻机就位,使桩头即时处理钻头的中心对准孔位中心,放下可伸缩钻杆使钻头到达浮碴面,启动主动旋转电动机带动钻头旋转,将浮碴和桩头预设标高以上混凝土钻入钻头内,提升可伸缩钻杆钻头出孔后,撞击弹簧开门机构打开钻头底门,将钻头内的桩头混凝土倒出孔外,如此反复,当可伸缩钻杆上的刻度显示桩头即时处理钻头的底部到达预设标高后,上拔可伸缩钻杆,将钻头提出钻孔灌注桩,将钻头内的浮碴、混凝土清理干净,完成桩头即时处理施工作业。
一种钻孔灌注桩桩头即时处理方法的装置,包括走行、回转系统和变幅装置,变幅装置经大臂连接可伸缩钻杆,可伸缩钻杆下端连接桩头即时处理钻头,所述大臂上设有主动旋转电动机,主动旋转电动机连接可伸缩钻杆。
与现有技术相比本发明具有以下优点。
1)工效高,承台开挖后只需射水清理掉钢筋笼范围内桩头的浮浆,用铁锤或风镐敲掉钢筋笼外的剩余桩头混凝土即完成了桩头处理施工;
2)经济性好,经测算如果大规模采用该技术施工,它可大幅度降低钻孔灌注桩桩头处理费用;
3)后续施工便捷,在基坑开挖完毕后,在向基坑吊放钢筋的同时便可完成桩头的剩余处理工作,实现了基坑开挖和承台钢筋施工工序间的无缝连接;
4)对于水中墩、深基坑等危险性较大的施工,可缩短重大危险源持续时间,大大降低施工风险。
附图说明
下面结合附图对本发明作进一步详述。
图1为本发明中钻孔灌注桩桩头即时处理方法的装置结构示意图;
图2为本发明中钻孔灌注桩桩头即时处理方法的装置中桩头即时处理钻头结构示意主视图;
图3为本发明中钻孔灌注桩桩头即时处理方法的装置中桩头即时处理钻头结构示意侧视图。
具体实施方式
包括步骤:钻孔灌注桩水下混凝土灌注完毕后,拔出导管,用于钻孔灌注桩桩头即时处理钻机通过走行、回转系统1行至桩位旁,启动变幅装置2直立起可伸缩钻杆3,进行钻机就位,使桩头即时处理钻头5的中心对准孔位中心,放下可伸缩钻杆3使桩头即时处理钻头5到达浮碴面,启动主动旋转电动机4带动桩头即时处理钻头5旋转,将浮碴和桩头预设标高以上混凝土钻入钻头内,提升可伸缩钻杆3钻头出孔后,撞击弹簧开门机构9打开钻头底门10,将钻头内的桩头混凝土倒出孔外。如此反复,当可伸缩钻杆3上的刻度显示桩头即时处理钻头5的底部到达预设标高后,上拔可伸缩钻杆3,将桩头即时处理钻头5提出钻孔灌注桩,将桩头即时处理钻头5内的浮碴、混凝土清理干净,完成桩头即时处理施工作业。
如图1、图2、图3所示,一种钻孔灌注桩桩头即时处理方法的装置,包括走行、回转系统1和变幅装置2,变幅装置2经大臂6连接可伸缩钻杆3,可伸缩钻杆3下端连接桩头即时处理钻头5,所述大臂6上设有主动旋转电动机4,主动旋转电动机4连接可伸缩钻杆3。
所述桩头即时处理钻头5设有套筒8,套筒8上设有钻杆连接件7、弹簧开门机构9、双层底门刀头组合件10。
所述可伸缩钻杆3上设有刻度显示。
实施例
在钻孔灌注桩施工过程中桩头处混凝土在灌注时会不停被抬升,为不影响桩头混凝土的质量,水下混凝土多掺有缓凝剂,根据规范要求,钻孔灌注桩水下混凝土灌注完毕时,桩头处混凝土都没有初凝,这样就为我们桩头混凝土的提前处理创造了可能。本发明的原理就是通过钻头切割破碎尚未初凝的水下混凝土,并通过钻头旋转将破碎后的混凝土装入筒体,并带出孔外,达到桩头提前处理的目的。
根据用于桩头处理的桩头即时处理钻机进行钻孔灌注桩桩头即时处理的工作特点和工作环境,设计该工装需具备走行能力,不用辅助机械的自我工作能力,可更换不同直径钻头的强适应性能力,可进行长深度桩头处理的深孔作业能力。
整套工装设备运输走行时预计长度10m,宽3m,高度3m总重不超过20t,包括行走、转向系统1、变幅装置2、可伸缩钻杆3、主动旋转电机4、桩头即时处理钻头5,如图1、图2、图3所示。
本发明进行钻孔灌注桩桩头即时处理的方法是,钻孔灌注桩水下混凝土灌注完毕后,拔出导管,用于钻孔灌注桩桩头即时处理钻机通过走行、回转系统1行至桩位旁,启动变幅装置2直立起可伸缩钻杆3,进行钻机就位,使桩头即时处理钻头5的中心对准孔位中心,放下可伸缩钻杆3使桩头即时处理钻头5到达浮碴面,启动主动旋转电动机4带动桩头即时处理钻头5旋转,将浮碴和桩头预设标高以上混凝土钻入钻头内,提升可伸缩钻杆3钻头出孔后,撞击弹簧开门机构9打开钻头底门10,将钻头内的桩头混凝土倒出孔外。如此反复,当可伸缩钻杆3上的刻度显示桩头即时处理钻头5的底部到达预设标高后,上拔可伸缩钻杆3,将桩头即时处理钻头5提出钻孔灌注桩,将桩头即时处理钻头5内的浮碴、混凝土清理干净,完成桩头即时处理施工作业。
Claims (4)
1.一种钻孔灌注桩桩头即时处理方法,其特征在于,包括步骤:钻孔灌注桩水下混凝土灌注完毕后,拔出导管,用于钻孔灌注桩桩头即时处理钻机通过走行、回转系统(1)行至桩位旁,启动变幅装置(2)直立起可伸缩钻杆(3),进行钻机就位,使桩头即时处理钻头(5)的中心对准孔位中心,放下可伸缩钻杆(3)使桩头即时处理钻头(5)到达浮碴面,启动主动旋转电动机(4)带动桩头即时处理钻头(5)旋转,将浮碴和桩头预设标高以上混凝土钻入钻头内,提升可伸缩钻杆(3)钻头出孔后,撞击弹簧开门机构(9)打开钻头底门(10),将钻头内的桩头混凝土倒出孔外,如此反复,当可伸缩钻杆(3)上的刻度显示桩头即时处理钻头(5)的底部到达预设标高后,上拔可伸缩钻杆(3),将桩头即时处理钻头(5)提出钻孔灌注桩,将桩头即时处理钻头(5)内的浮碴、混凝土清理干净,完成桩头即时处理施工作业。
2.根据权利要求1所述的一种钻孔灌注桩桩头即时处理方法的装置,其特征在于,用于钻孔灌注桩桩头即时处理的钻机包括走行、回转系统(1)和变幅装置(2),变幅装置(2)经大臂(6)连接可伸缩钻杆(3),可伸缩钻杆(3)下端连接桩头即时处理钻头(5),所述大臂(6)上设有主动旋转电动机(4),主动旋转电动机(4)连接可伸缩钻杆(3)。
3.根据权利要求2所述的一种钻孔灌注桩桩头即时处理方法的装置,其特征在于,所述桩头即时处理钻头(5)设有套筒(8),套筒(8)上设有钻杆连接件(7)、弹簧开门机构(9)、双层底门刀头组合件(10)。
4.根据权利要求2所述的一种钻孔灌注桩桩头即时处理方法的装置,其特征在于,所述可伸缩钻杆(3)上设有刻度显示。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410527968.XA CN104278676A (zh) | 2014-10-10 | 2014-10-10 | 一种钻孔灌注桩桩头即时处理方法及其装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410527968.XA CN104278676A (zh) | 2014-10-10 | 2014-10-10 | 一种钻孔灌注桩桩头即时处理方法及其装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104278676A true CN104278676A (zh) | 2015-01-14 |
Family
ID=52253984
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410527968.XA Pending CN104278676A (zh) | 2014-10-10 | 2014-10-10 | 一种钻孔灌注桩桩头即时处理方法及其装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104278676A (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106285469A (zh) * | 2016-10-08 | 2017-01-04 | 郑州神利达钻采设备有限公司 | 一种地钻设备 |
| CN108755729A (zh) * | 2018-08-20 | 2018-11-06 | 中铁二十局集团第工程有限公司 | 一种cfg桩基桩帽与桩身一体化施工装置及方法 |
| CN111218937A (zh) * | 2020-03-31 | 2020-06-02 | 中冶建工集团有限公司 | 泥浆护壁成孔灌注桩桩顶浮浆层破除装置 |
| CN112170329A (zh) * | 2020-08-29 | 2021-01-05 | 深圳鹏城岩土科技有限公司 | 一种基坑支护钻孔灌注桩施工设备及其方法 |
| CN113882801A (zh) * | 2021-10-27 | 2022-01-04 | 重庆城建控股(集团)有限责任公司 | 土壤、硬质岩结合地层的旋挖钻桩基施工方法 |
| CN114351711A (zh) * | 2021-07-23 | 2022-04-15 | 唐山际宇岩土工程有限公司 | 一种cfg桩复合地基中基桩桩头的回转切除方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6062328A (ja) * | 1983-09-17 | 1985-04-10 | Hasegawa Komuten Co Ltd | 場所打ち杭の杭頭処理方法 |
| JPS6192213A (ja) * | 1984-10-09 | 1986-05-10 | Matsui Kensetsu Kk | 杭頭処理装置 |
| CN102155160A (zh) * | 2011-01-29 | 2011-08-17 | 湖南山河智能机械股份有限公司 | 一种混合动力旋挖钻机 |
| CN202866660U (zh) * | 2012-10-31 | 2013-04-10 | 郑州正弘桩工机械制造有限公司 | 钻机钻头及使用该钻头的长螺旋钻机 |
| CN202946012U (zh) * | 2012-11-14 | 2013-05-22 | 中铁四局集团第五工程有限公司 | 一种用于桩头处理的套管螺旋钻机 |
-
2014
- 2014-10-10 CN CN201410527968.XA patent/CN104278676A/zh active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6062328A (ja) * | 1983-09-17 | 1985-04-10 | Hasegawa Komuten Co Ltd | 場所打ち杭の杭頭処理方法 |
| JPS6192213A (ja) * | 1984-10-09 | 1986-05-10 | Matsui Kensetsu Kk | 杭頭処理装置 |
| CN102155160A (zh) * | 2011-01-29 | 2011-08-17 | 湖南山河智能机械股份有限公司 | 一种混合动力旋挖钻机 |
| CN202866660U (zh) * | 2012-10-31 | 2013-04-10 | 郑州正弘桩工机械制造有限公司 | 钻机钻头及使用该钻头的长螺旋钻机 |
| CN202946012U (zh) * | 2012-11-14 | 2013-05-22 | 中铁四局集团第五工程有限公司 | 一种用于桩头处理的套管螺旋钻机 |
Non-Patent Citations (1)
| Title |
|---|
| 赵惠蓉: ""水利工程钻孔灌注桩质量控制及旋挖钻的应用"", 《黑龙江水利科技》, vol. 40, no. 7, 31 July 2012 (2012-07-31), pages 69 - 70 * |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106285469A (zh) * | 2016-10-08 | 2017-01-04 | 郑州神利达钻采设备有限公司 | 一种地钻设备 |
| CN108755729A (zh) * | 2018-08-20 | 2018-11-06 | 中铁二十局集团第工程有限公司 | 一种cfg桩基桩帽与桩身一体化施工装置及方法 |
| CN108755729B (zh) * | 2018-08-20 | 2023-07-04 | 中铁二十局集团第一工程有限公司 | 一种cfg桩基桩帽与桩身一体化施工装置及方法 |
| CN111218937A (zh) * | 2020-03-31 | 2020-06-02 | 中冶建工集团有限公司 | 泥浆护壁成孔灌注桩桩顶浮浆层破除装置 |
| CN112170329A (zh) * | 2020-08-29 | 2021-01-05 | 深圳鹏城岩土科技有限公司 | 一种基坑支护钻孔灌注桩施工设备及其方法 |
| CN114351711A (zh) * | 2021-07-23 | 2022-04-15 | 唐山际宇岩土工程有限公司 | 一种cfg桩复合地基中基桩桩头的回转切除方法 |
| CN113882801A (zh) * | 2021-10-27 | 2022-01-04 | 重庆城建控股(集团)有限责任公司 | 土壤、硬质岩结合地层的旋挖钻桩基施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101122130B (zh) | 一种建筑物或桥梁基础用的随钻跟管桩的施工方法 | |
| CN105649012B (zh) | 上软下硬地层地铁车站围护结构钻孔桩施工方法 | |
| CN105780763B (zh) | 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法 | |
| CN104278676A (zh) | 一种钻孔灌注桩桩头即时处理方法及其装置 | |
| CN109025816B (zh) | 超深超厚密实砂层预应力管桩长螺旋引孔施工方法 | |
| CN105649083A (zh) | 全套管一次性旋切式清桩装置及其清桩方法 | |
| CN207093008U (zh) | 钻孔钻头 | |
| CN201952802U (zh) | 混凝土管桩桩孔清理工具 | |
| CN105804656A (zh) | 钻孔大块孤石提取筒钻 | |
| CN104805831A (zh) | 一种大直径硬岩基桩成孔方法 | |
| CN101982614A (zh) | 全套管钻机凿取岩石成桩的方法 | |
| CN202946012U (zh) | 一种用于桩头处理的套管螺旋钻机 | |
| CN104141455B (zh) | 钻机设备和钻机钻进方法 | |
| CN214033711U (zh) | 一种清除废桩的旋挖钻头 | |
| CN2906026Y (zh) | 大口径桩孔用双筒硬岩取芯钻具 | |
| CN205387708U (zh) | 全套管一次性旋切式清桩装置 | |
| CN105113976A (zh) | 钢丝刷钻头回旋钻机及解决埋钻、掉钻、卡钻的方法 | |
| CN107401388B (zh) | 一种钻机卡钻处理装置和方法 | |
| CN109610494B (zh) | 一种大口径桩基嵌岩施工工艺 | |
| CN115772899A (zh) | 一种灌注桩钢筋笼塌孔钻进清扫装置及方法 | |
| CN207727581U (zh) | 一种全套管清障机 | |
| CN211922619U (zh) | 破桩头装置 | |
| CN1963044A (zh) | 拔出废桩的施工方法 | |
| CN109403326A (zh) | 基于钻孔桩发生严重塌孔取出钢筋笼方法 | |
| CN105421457B (zh) | 螺旋式管桩取土机 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150114 |